Loading...
S.J. Amoroso Construction - Change Order No. 30City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 030 To contract for: New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 30A: Provide for added ceiling access panels at security areas in accordance with RFQ -80, Field Memo No. 267, andresponse to RFI- 380. 3 .................................................................. ............................... .....................$4,828.00. (CPE #228) Item 30B: Provide concrete anchors for duct angles at floor penetrations in accordance with response to RFI -609 and RFQ- 76 ............................................................................................... ............................... .....................$4,060.00. (CPE #226) Item 30C: Add fire treated plywood for backing of base flashing at the east and south roof mechanical rooms in accordance with response to RFI -550 and RFQ- 70 ............................. ............................... .....................$8,577.00. (CPE #199) Item 301): Modify structural steel beams over emergency generator to allow for muffler and revise woven rod security mesh in accordance with response to RFI -529.2 and RFQ- 75 ........... ............................... .....................$6,579.00. (CPE #185.1) All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. RECEIVED DEC 1 3 2005 ENGINEERING Page 1 of 2 S.J. Amoroso Construction Co., Inc. Contractor *Requires emergency authorization if greater than 25 %. By: Date: f ! / 8 S RECOMMENDED BY: ACCEPTED BY: ion Manager Project Engineer k Page 2 of 2 re— k rz ! Dat' Date Date % �//wo ) Date Cost Percent I (We) agree to make the above change Original Contract Price $22,377,000.00 subject to the terms of this Change Order Previous Change Orders to Date $502,256.00 2.2% " for the NET INCREASE of $24,044.00 Total to Date $22,879,256.00 This Change Order $24,044.00 Total Change Orders to Date $526,300.00 2.4% Revised Contract Price $22,903,300.00 S.J. Amoroso Construction Co., Inc. Contractor *Requires emergency authorization if greater than 25 %. By: Date: f ! / 8 S RECOMMENDED BY: ACCEPTED BY: ion Manager Project Engineer k Page 2 of 2 re— k rz ! Dat' Date Date % �//wo ) Date