S.J. Amoroso Construction - Change Order No. 31City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 031 To contract for: New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 31A: Added electrical provisions for relocated air compressor in accordance with response to RFI -474.1 and RFQ- 64 ............................................................................................................... ............................... .....................$4,134.00. (CPE #176B) Item 31B: Plumbing provisions to relocate air compressor from P107 to below stairs in Room S106 in accordance with response to RFI- 474.1, RFQ -64, and Field Memo No. 220 ....................... ............................... .....................$5,526.00. (CPE #I 76A) Item 31 C: Provide for plaster soffit framing over south entry in accordance with response to RFI -528.1 and RFQ- 73 ...................................................................................................................................... ............................... $2,825.00. (CPE # 177) Item 31D: Provide for keying upgrade to Best's Patented Keyway (Premium) System at the request of the Owner from the2/15/05 keying meeting ....................................................................... ............................... .....................$3,261.00. (CPE #233R) Item 31E: Provide for added electrical in operation of IWH units in accordance with response to RFI- 497.1R and RFQ- 81 ................................................................................................................. ............................... .......................$812.00. (CPE #158) Item 31F: Provide for wall framing changes to accommodate door openings in accordance with sketches and response to RFI- 574 ........................................................................................................................... ............................... $793.00. (CPE #216) Item 31 G: Additional cost for shop re- detailing due to T.O.S. beam elevation changes in accordance with response to RFI -14 5 ......................................................................................................... ............................... ....................... $858.00. (CPE #191) Item 31H: Revise shop and erection drawings due to mansard roof slope change (J line between 6 and 7) in accordance withresponse to RFI- 358/ 358. 1 ................................................................ ............................... .....................$6,160.00. (CPE # 192) Page 1 of 2 DECEIVED DEC 1 3 2005 ENGINEERING All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. Cost Percent I (We) agree to make the above change Original Contract Price $22,377,000.00 subject to the terms of this Change Order Previous Change Orders to Date $526,300.00 2.4% for the NET INCREASE of $24,369.00 Total to Date $22,903,300.00 This Change Order $24,369.00 Total Change Orders to Date $550,669.00 2.5% Revised Contract Price $22,927,669.00 S.J. Amoroso Construction Co., Inc. Contractor *Requires emergency authorization if greater than 25 %. By: Date: RECOMMEND ACCEPTED BI Page 2 of 2