CHANGE ORDER NO. 032
To contract for: New Gilroy Police Facility Project No. 03 -CDD -114
Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
Additional cost to effect changes for PD operations requested by Owner in accordance with WLC Instruction Bulletin
No. 10, RFQ -65, and Field Memo 206 ........................................................ ............................... ....................$24,129.00.
(CPE #17882)
All requirements of the original Contract Documents shall apply to the above work except as specifically
modified by this Change Order. The contract time shall not extend unless expressly provided for in this
Change Order.
Cost Percent
I (We) agree to make the above change Original Contract Price $22,377,000.00
subject to the terms of this Change Order Previous Change Orders to Date $550,669.00 2.5%
for the NET INCREASE of $24,129.00 Total to Date $22,927,669.00
This Change Order $24,129.00
Total Change Orders to Date $574,798.00 2.6%
Revised Contract Price $22,951,798.00
S.J. Amoroso Construction Co., Inc.
Contractor *Requires emergency authorization if greater than 25 %.
By: �G %� Date:
RECOMMENDE Y: t ;r—) O
ction a Date
ACCEPTED BY: —
Ciky
y
M-3�� Date
lC- l� �
i Eng' Date
Y
Project Engineer Date RECEIVED
DEC 1 3 2005
Page 1 of 1 ENGINEERING