S.J. Amoroso Construction - Change Order No. 34City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846 -0450; Fax (408) 846 - 04291,E
CHANGE ORDER NO. 034
To contract for: New Gilroy Police Facility Project No. 03 -CDD -114
Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
Item 34A: Additional costs to grind down concrete cap over existing SD line down Hanna Street to conform with new
paving elevations in accordance with Field Directive No. 33 ............. ............................... ....................$16,560.00.
(CPE #214R)
Item 3413: Additional cost to effect casework changes per WLC submittal #130 review comments in accordance with
RFQ -59 and Field Memo No. 178 ....................................................... ............................... .....................$7,898.00.
(CPE #150R2)
All requirements of the original Contract Documents shall apply to the above work except as specifically
modified by this Change Order. The contract time shall not extend unless expressly provided for in this
Change Order.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $24,458.00
Original Contract Price
Previous Change Orders to Date
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost Percent
$22,377,000.00
$599,287.00 2.7%
$22,976,287.00
$24,458.00
$623,745.00 2.8%
$23,000,745.00
S.J. Amoroso Construction Co., Inc.
Contractor *Requires emergency authorization if greater than 25 %.
By: Date:
RECEIVED
DEC 1 3 2005
§ iNEERING
Page 1 of 2
n
RECOMMENDED B'y
ACCEPTED BY:
Page 2 of 2