S.J. Amoroso Construction - Change Order No. 35City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020��
Phone (408) 846 -0450; Fax (408) 846 -0429
CHANGE ORDER NO. 035
To contract for : New Gilroy Police Facility Project No. 03 -CDD -114
Contractor: S.J. Amoroso Construction
Contract Date: 8/16/2004
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
Item 35A: Additional cost for security ceiling diffuser grilles due to change in ceiling type in accordance with response
toRFI- 413. 1 ............................................................................................ ............................... .....................$1,378.00.
(CPE # 156)
Item 35B: Additional cost to remove /regrade existing asphalt encountered during grading for new curb and gutter along
Dowdy and Seventh Street in accordance with Field Directive No. 31 ... ............................... .....................$8,317.00.
(CPE #211)
Item 35C: Additional cost to provide for meter by -pass line for domestic service in accordance with City Standard
Drawing WA -14 and field requirements of Water Department ................ ............................... .....................$8,270.00.
(CPE #239)
Item 35D: Additional cost for new pair door/hardware at the south mechanical room in accordance with response to RFI-
253.5 and RFQ- 79 ................................................................................ ............................... .....................$4,663.00.
(CPE #200.1)
Item 35E: Additional cost to modify ductwork penetration resulting from relocated wall at E.5/1.7 in accordance with
responseto RFI- 253. 6 .......................................................................... ............................... .....................$1,396.00.
(CPE #200.2)
All requirements of the original Contract Documents shall apply to the above work except as specifically
modified by this Change Order. The contract time shall not extend unless expressly provided for in this
Change Order.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $24,024.00
RECEIVED
DEC 1 3 2005
ENGINEERING
Original Contract Price
Previous Change Orders to Date
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Page 1 of 2
Cost Percent
$22,377,000.00
$623,745.00 2.8%
$23,000,745.00
$24,024.00 n (�
$647,769.00 2.9% Y.(h/{V�`� -�
$23,024,769.00
S.J. Amoroso Construction Co., Inc.
Contractor *Requires emergency authorization if greater than 25 %.
i
By; Date: ///., S
RECOMMENDED BY:
ACCEPTED BY:
i to Date
J121011ar
En Date
roiect Engineer Date
Page 2 of 2
Date