S.J. Amoroso Construction - Change Order No. 36City of Gilroy Engineering Division ; 7351 Rosanna St., Gilroy, CA 95020 ' Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 036 To contract for: New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 36A: Additional cost for soffit framing attachment associated with detail 15D/S1.4, in accordance with RFQ -63 and FieldDirective No. 38 ........................................................................... ............................... ....................$21,668.00. (CPE # 148A) Item 3613: Additional cost to demo top portion of existing SDMH at Hanna Steet to coincide with new finish paving grade as directed under T &M on 10/ 31/ 05 ........................................... ............................... .....................$3,280.00. (CPE #242) All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $24,948.00 S.J. Amoroso Construction Co., Inc. Contractor By: v G ?z Cost Original Contract Price $22,377,000.00 Previous Change Orders to Date $647,769.00 Total to Date $23,024,769.00 This Change Order $24,948.00 Total Change Orders to Date $672,717.00 Revised Contract Price $23,049,717.00 *Requires emergency authorization if greater than 25 %. Date: /l / L� Page 1 of 2 Percent 2.9% 3.0% RECEIVED DEC 1 3 2005 ENGINEERING RECOMMENDED BY ACCEPTED BY: Page 2 of 2