S.J. Amoroso Construction - Change Order No. 39City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020 JAM 19 2006
Phone (408) 846 -0450; Fax (408) 846 -0429
CHANGE ORDER NO. 039'
To contract for : New Gilroy Police Facility Project No. 03 -CDD -114
Contractor: S.J. Amoroso Construction
Contract Date: 8/16/2004
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
Excavate, expose and extend existing conduits in accordance with Field Directive No. 8, and for all CDF backfill of
conduit trench northside of building. All work performed under force account ....................... ....................$25,253.00.
(CPE #53B)
All requirements of the original Contract Documents shall apply to the above work except as specifically
modified by this Change Order. The contract time shall not extend unless expressly provided for in this
Change Order.
RECOMMENDED BY:
C0 ctio a
ACCEPTED BY:
ity d //��
� "City l,�c�r
Engineer
Project Engineer
Page 1 of 1
Date
Date
Date
Date
Cost Percent
I (We) agree to make the above change Original Contract Price
$22,377,000.00
subject to the terms of this Change Order Previous Change Orders to Date
$720,516.00 3.2%
for the NET INCREASE of $25,253.00 Total to Date
$23,097,516.00
This Change Order
$25,253.00 ,� r
Total Change Orders to Date
$745,769.00 3.3% (�
Revised Contract Price
$23,122,769.00
S.J. Amoroso Construction Co., Inc.
Contractor *Requires emergency authorization if greater than 25 %.
% �� Date: 11l7 b;�
By: L, �%
RECOMMENDED BY:
C0 ctio a
ACCEPTED BY:
ity d //��
� "City l,�c�r
Engineer
Project Engineer
Page 1 of 1