Loading...
S.J. Amoroso Construction - Change Order No. 47i City of Gilroy Engineering Division C F_A/1� 0 7 7351 Rosanna St., Gilroy, CA 95020 MAR 4 2LJp5 Phone (408) 846 -0450; Fax (408) 846 -0429 ` \ CHANGE ORDER NO. 047'`' To contract for : New Gilroy Police Facile Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 47A: Provide and install three (3) elevator pit ladders..................................................................................................... ............................... .....................$2,020.00. (CPE #292) Item 4713: Provide and install fire- treated plywood in lieu of exterior grade at sheetmetal curb (detail 14/S1.3) in accordancewith RFQ- 83 ................................................................................ ............................... .......................$382.00. (CPE #230) Item 47C: Provide for modifications to grab bar and sink chase wall in accordance with response to RFI -630 and RFQ- 89 ................................................................................................................... ............................... .......................$327.00. (CPE #253A) Item 47D: Provide /install dowels at four jail column locations in accordance with sketches provided in response to RFI- 617 R .................................................................................................................................. ............................... (CPE #251) Item 47E: Contractor to enlarge column furring and relocate plumbing piping (including deck coring) in accordance with response to RFI- 186.1/536.1 and Field Directive No. 43 ............................... ............................... .......................$625.00. (CPE #235.2) Item 47F: Contractor to extend 5" OD line at A /10 Line (south exterior stair) in accordance with response to RFI -590 andRFQ- 71 ..................................................................................................... ............................... .......................$592.00. (CPE #218R) Item 47G: Contractor to extend 6" OD line at north exterior stair in accordance with response to RFI- 590/483 and Field Directive No. 39 (including coring cost) ......................................................... ............................... .....................$1,883.00. (CPE 9208R) Item 47H: Contractor to change FSD size and relocate ductwork above soffit at Room 1116/1116A in accordance with responseto RFI- 650 .......................................................................................... ............................... .....................$4,984.00. (CPE #268) Page 1 of 2 All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. RECOMMENE ACCEPTED B' Page 2 of 2 Cost Percent I (We) agree to make the above change Original Contract Price $22,377,000.00 subject to the terms of this Change Order Previous Change Orders to Date $960,157.00 4.3% for the NET INCREASE of $13,630.00 Total to Date $23,337,157.00 This Change Order $13,630.00 Total Change Orders to Date $973,787.00 4.4% Revised Contract Price $23,350,787.00 S.J. Amoroso Construction Co., Inc. Contractor *Requires emergency authorization if greater than 25 %. By: /?%/2� S- �i���� =z� Date: �-,6 RECOMMENE ACCEPTED B' Page 2 of 2