S.J. Amoroso Construction - Change Order No. 50City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846 -0450; Fax (408) 846 -0429
CHANGE ORDER NO. 050
To contract for : New Gilroy Police Facility Project No. 03 -CDD -114
Contractor:
S.J. Amoroso Construction Contract Date:
8/16/2004
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
Item 50A: Contractor agrees to provide for and/or perform the additions /changes in accordance with RFQ -105 at no cost
tothe contract ................................................................................................ ............................... .........................$0.00.
(CPE #290)
Item 5013: Provide for revisions to drinking fountain alcoves in accordance with response to RFI- 661/737 and Field
DirectiveNo. 65 and 78 .............................................................................. ............................... .....................$4,159.00.
(CPE #266/300)
Item 50C: Provide for a duct shaftwall enclosure down to P100 in accordance with response to RFI -713R and RFQ-
104 .............................................................................................................. ............................... .....................$1,461.00.
(CPE #288)
Item 501): Provide for all changes identified in WLC Bulletin #14 in accordance with RFQ -99 and Field Directive No.
69 ................................................................................................................ ............................... .....................$7,074.00.
(CPE #297)
Item 50E: Provide credit to the contract for all casework changes identified in WLC Memo #44 in accordance with RFQ-
103 ................................................................................................................ ............................... ...................($2,278.00).
(CPE #286)
Item 50F: Provide for changes to boiler room floor in accordance with response to RFI #577 -1 thru 577 -4 and RFQ-
72 .................................................................................................................. ............................... ....................$18,445.00.
(CPE #215A)
Item 50G: Change Order No. 42 has been voided. This change order corrects the cost totals as indicated below.
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by
this Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
Page 1 of 2
� � r
Cost
I (We) agree to make the above change Original Contract Price $22,377,000.00
subject to the terms of this Change Order Previous Change Orders to Date $963,578.00
for the NET INCREASE of $28,861.00 Total to Date $23,340,578.00
This Change Order $28,861.00
Total Change Orders to Date $992,439.00
Revised Contract Price $23,369,439.00
S.J. Amoroso Construction Co., Inc.
Contractor *Requires emergency authorization if greater than 25 %.
By; L`7 ��G�' -. Date:
RECOMMENDED BY:
ACCEPTED BY:
51 b L
,5-- /D - O
Ar�. C, 6Q,-
meer Date
Page 2 of 2
Percent
4.3%
4.4%
Ir