S.J. Amoroso Construction - Change Order No. 52N,SSO City of Gilroy RaRECEIVE®s Engineering Division JUN 2 6 2006 � 7351 Rosanna St., Gilroy, CA 95020 v Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 052 To contract for : New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 52: Provide for formwork, reinforcing, and all other changes /additions for boiler room floor, curb and pads in accordance with Clarification drawings 577 -1 through 4 issued under RFQ -72. All work performed under force account. This completes cost of work partially paid for in CCO -50 .......................... ............................... ....................$19,715.00. (CPE #215B) All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $19,715.00 S.J. Amoroso Construction Co., Inc. Contractor RECOMMENDE ACCEPTED BY: 1 *Requires emergency authorization if greater than 25 %. Date: 1p GS Page 1 of 1 P.M. Cost Percent Initial Original Contract Price $22,377,000.00 Previous Change Orders to Date $1,031,107.00 4.6% Total to Date $23,408,107.00 This Change Order $19,715.00 WSW' Total Change Orders to Date $1,050,822.00 4.7% Revised Contract Price $23,427,822.00 *Requires emergency authorization if greater than 25 %. Date: 1p GS Page 1 of 1