S.J. Amoroso Construction - Change Order No. 53-` AS City of Gilroy , R Soy, Engineering Division aECEIVEp 7351 Rosanna St., Gilroy, CA 95020 JUN 2 6 2(706 co Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 053 To contract for : New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 53A: Contractor to provide for switching of Corridor 1106 lighting in accordance with response to RFI -756 and RFQ- 112 ............................................................................................................................. ............................... $424.00. (CPE #320) Item 53B: Contractor to provide for stainless steel tops added in Room 1112 in accordance with RFQ -59 (not paid for in CPE# 150R2) ............................................................................................. ............................... .....................$1,098.00. (CPE # 150.1) Item 53C: Provide /install additional roof walk -tread in accordance with Lower Roof Plan -Walk Tread Layout issued underRFQ- 107 ............................................................................................ ............................... .....................$5,112.00. (CPE #304) Item 531): Provide for all electrical changes /additions (WLC Bulletin No. 15, Items 15.1 through 15.3 only) in accordancewith RFQ- 98 .............................................................................. ............................... .....................$8,384.00. (CPE #296R) All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. Page 1 of 2 P.M. Cost Percent Initial I (We) agree to make the above change Original Contract Price $22,377,000.00 subject to the terms of this Change Order Previous Change Orders to Date $1,050,822.00 4.7% for the NET INCREASE of $15,018.00 Total to Date $23,427,822.00 This Change Order $15,018.00 �} Total Change Orders to Date $1,065,840.00 4.8% W1p'W Revised Contract Price $23,442,840.00 S.J. Amoroso Construction Co., Inc. Contractor *Requires emergency authorization if greater than 25 %. IL Date: Page 1 of 2 RECOMMENDED BY ACCEPTED BY: C (Aa rig p OrJ C r y Page 2 of 2 03