S.J. Amoroso Construction - Change Order No. 55City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 055 To contract for: New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 55A: Contractor to provide /install/finish revised HM door and frame (1140) in accordance with WLC ESK -2 and RFQ- 97 ......................................................................................................... ............................... .....................$1,344.00. (CPE #278.1) Item 55B: Contractor to provide for equipment relocation of cable television distribution system from Room 1047 to 1148 in accordance with Clarification Letter No. 25, and RFQ- 110 ............. ............................... .....................$5,794.00. (CPE #308) Item 55C: Relocate door frame at east tower in accordance with response to RFI -253.3 and 7, Field Directive No. 37 and 61 ................................................................................................................... ............................... .....................$1,014.00. (CPE #200.3) Item 551): CMU blockout at jail cells not needed, cost for associated PSH -2 fixture /valve assembly not returnable (part ofRFQ -86 /WLC IB- 13) ......................................................`......................... ............................... .....................$1,550.00. (CPE #244.1 R & 244112) Item 55E: Credit for CMU blockout at jail cells not needed but paid for in Change Order No. 38 in accordance with Harris written response of 3/14/06 to SJA facsimile dated 3/ 10/ 06 ............... ............................... ...................($3,497.00). (CPE #244) Item 55F: Replace Type R light fixtures at Room 1075 and effect cove lighting changes in accordance with WLC Memo No. 49 and RFQ -119. Original fixtures to be turned over to Owner ............. ............................... .....................$8,348.00. (CPE #329) Item 55G: Replace Type I light fixtures (25 total) at first floor in accordance with response to RFI- 626/626.1 and RFQ- 88. Original fixtures to be turned over to Owner .............................. ..... .......................... .....................$9,733.00. (CPE #250) Page 1 of 2 All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $24,286.00 Original Contract Price Previous Change Orders to Date Total to Date This Change Order Total Change Orders to Date Revised Contract Price S.J. Amoroso Construction Co., Inc. Contractor *Requires emergency authorization if greater than 25 %. By: �9" �a_-k c�ate: Z, RECOMMENDED B. ACCEPTED BY: Page 2 of 2 PM Cost Percent Initial $22,377,000.00 $1,088,779.00 4.9% $23,465,779.00 $24,286.00 $1,113,065.00 5.0% 44;4 $23,490,065.00 S.J. Amoroso Construction Co., Inc. Contractor *Requires emergency authorization if greater than 25 %. By: �9" �a_-k c�ate: Z, RECOMMENDED B. ACCEPTED BY: Page 2 of 2