S.J. Amoroso Construction - Change Order No. 58City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO 058 To contract for : New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 58A: Contractor to provide for soffit end cap closure in accordance with response to RFI -579 and RFQ- 82 .............................................................................................................................................. ............................... $0.00. (CPE #229) Item 5813: Contractor to provide for alignment angles at B.5 btwn 4 and 6 in accordance with response to RFI- 294. 2 ........................................................................................................................................ ............................... $523.00. (CPE #198) Item 58C: Contractor to provide for added shut -off valves in accordance with response to RFI -770, RFQ -98, and Field DirectiveNo. 83 ............................................................................................ ............................... .....................$3,780.00. (CPE #296.1) Item 581): Contractor to revise storm drain piping in accordance with response to RFI- 761/773, and Field Directive No. 44 and 90R ...................................................................................... ............................... $8,062.00. (CPE #327R) Item 58E: Contractor to provide for changes to mobile shelving system per Architect's review comments in approved submittal# 187 .............................................................. ............................... .....................$2,020.00. (CPE #358) Item 58F: Contractor to provide for mixing valve (TMV -2) change in accordance with response to RFI -669 and RFQ- 96 ................................................................................ .............I................. .........................$0.00. (CPE #277) Item 58G: Contractor to provide for wood stair inside south penthouse in accordance with response to RFI -822 and RFQ- 127 ................................................................................................. ............................... $2,078.00. (CPE #352) Item 58H: Contractor to revise gate leaf at PI 12 in accordance with response to RFI -489, RFQ -124, and Roscoe letter of 3/ 14/ 06 ...................................................... ............................... I ................. .....................$1,918.00. (CPE #152.1) Pace 1 of 2 Item 58I: Contractor to provide for flashing at south penthouse roof eave in accordance with response to RFI -809.1 and RFQ- 130 ......................................................................................... ............................... $609.00. (CPE #347) Item 58J: Contractor to provide /install 45KVA transformer to step down power from UPS System and provide letter from manufacturer per Harris notation on SJA CPE # 355 ........ ............................... .....................$1,340.00. (CPE #355) All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $20,330.00 Original Contract Price Previous Change Orders to Date Total to Date This Change Order Total Change Orders to Date Revised Contract Price $1,188,943.00 5.3% $23,565,943.00 S.J. Amoroso Construction Co., Inc. Contractor d / *Requires emergency authorization if greater than 25 %. By: 7Ai ate: RECOMMENDED BY: ACCEPTED BY: Construc 'ge Date Page 2 of 2 C1- -L Z -C) t, PM Cost Percent Initial $22,377,000.00 $1,168,613.00 5.2% $23,545,613.00 $20,330.00 $1,188,943.00 5.3% $23,565,943.00 S.J. Amoroso Construction Co., Inc. Contractor d / *Requires emergency authorization if greater than 25 %. By: 7Ai ate: RECOMMENDED BY: ACCEPTED BY: Construc 'ge Date Page 2 of 2 C1- -L Z -C) t,