Loading...
S.J. Amoroso Construction - Change Order No. 63r City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 063 To contract for : New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 63A: Provide for added elevator cab channel support at S103 sump pit in accordance with WLC sketch dated 2/14/06 and Field Directive No. 74 ................................................................. ............................... .......................$456.00. (CPE #287) Item 6313: Contractor to provide /install six (6) saddle flashings in accordance with response to RFI- 754.1, RFQ -113, and FieldDirective No. 89 ..................................................................................... ............................... .....................$2,600.00. (CPE #315) Item 63C: Contractor to provide /install galvanized flashing in accordance with drawing RFI- 00349, RFQ -39, and Field DirectiveNos. 10, IOR, and 48 ........................................................................ ............................... ....................$10,997.00. (CPE #90R3) Item 63D: Demolish concrete overpour from existing planter wall footing to accommodate new curb installation at north end of parking lot per Harris field direction .................................................... ............................... .......................$695.00. (CPE #396) Item 63E: Contractor to provide for relocation of existing verizon vault as shown on Sketch ESK -1 dated 5/17/05 in accordance with response to RFI- 398.1, RFQ -56, and Field Directive No. 11 ............................... .....................$8,060.00. (CPE #117R4) Item 63F: Contractor to provide for painting at inside of elevator tower and generator muffler in accordance with response to RFI- 913/914 and Field Directive No. 153 ...................................... ............................... .......................$998.00. (CPE #417/418) Item 63G: Credit for deletion of epoxy coating at jail area, remobilization after door reversal work, in accordance with WLCMemo #52 and RFQ- 120 ........................................................................ ............................... ...................($3,017.00). (CPE #340/343.1) Page 1 of 2 All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. RECOMMENDEI ACCEPTED BY: Page 2 of 2 PM Cost Percent Initial I (We) agree to make the above change Original Contract Price $22,377,000.00 subject to the terms of this Change Order Previous Change Orders to Date $1,432,067.00 6.4% for the NET INCREASE of $20,789.00 Total to Date $23,809,067.00 This Change Order $20,789.00 Total Change Orders to Date $1,452,856.00 6.5% Revised Contract Price $23,829,856.00 S.J. Amoroso Construction Co., Inc. Contractor *Requires emergency authorization if greater than 25 %. ��� By: � � �-x Date: RECOMMENDEI ACCEPTED BY: Page 2 of 2