S.J. Amoroso Construction - Change Order No. 67City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846 -0450; Fax (408) 846 -0429
CHANGE ORDER NO. 067
To contract for : New Gilroy Police Facility Project No. 03 -CDD -114
Contractor: S.J. Amoroso Construction
Contract Date: 8/16/2004
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
Item 67A: Provide /install alternate supports for roof top disconnects at mechanical units in accordance with response to
RFI -755, RFQ -116, and Field Directive No. 149 .................................... ............................... .....................$7,301.00.
(CPE #318)
Item 6713: Contractor to provide for concrete walk not shown outside of S 105 at north side of building in accordance
withRFQ- 134 ........................................................................................... ............................... .....................$1,677.00.
(CPE #385R)
Item 67C: Contractor to resolve conflict with clearance requirements of rolling shelves and ceiling height in accordance
with response to RFI- 877/877.1 and Field Directive No. 132 ................................. ............................... ....$3,353.00.
(CPE #389)
Item 67D: Contractor to provide for electrical power to control panels in accordance with response to RFI -900 and Field
DirectiveNo. 146R .................................................................................. ............................... .....................$1,024.00.
(CPE #413)
Item 67E: Contractor to provide for door swing change at J128 in accordance with response to RFI -800, WLC Memo
955 and Field Directive No. 105R ................................................................ ............................... .....................$6,564.00.
(CPE #343)
Item 67F: Contractor to provide /install carpet seat at concrete island locker bench in accordance with response to RFI-
896 and Field Directive No. 137 ................................................................. ............................... .....................$3,062.00.
(CPE #402)
A
Item 67G: Contractor to replace foot pedals with gooseneck faucets in accordance with response to RFI-
866/866.1R/866.3, RFQ -133, and Field Directive No. 160 ......................... ............................... ................:....$1,795.00.
(CPE #404)
Page 1 of 2
1+
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by
this Chan ge Order. The contract time shall not extend unless expressly provided for in this Change Order.
RECOMMENDED BY:
ACCEPTED BY:
PAR F-Aw-owmeArm
Project Engineer L7ate
Page 2 of 2
PM
Cost
Percent Initial
I (We) agree to make the above change
Original Contract Price
$22,377,000.001
subject to the terms of this Change Order
Previous Change Orders to Date
$1,548,339.00
6.9% Y`
for the NET INCREASE of $24,776.00
Total to Date
$23,925,339.00
This Change Order
$24,776.00
Total Change Orders to Date
$1,573,115.00
7.0%
Revised Contract Price
$23,950,115.00
S.J. Amoroso Construction Co., Inc.
*Requires emergency authorization if
greater than 25 %.
By:
Date: /
RECOMMENDED BY:
ACCEPTED BY:
PAR F-Aw-owmeArm
Project Engineer L7ate
Page 2 of 2