S.J. Amoroso Construction - Change Order No. 67City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 067 To contract for : New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 67A: Provide /install alternate supports for roof top disconnects at mechanical units in accordance with response to RFI -755, RFQ -116, and Field Directive No. 149 .................................... ............................... .....................$7,301.00. (CPE #318) Item 6713: Contractor to provide for concrete walk not shown outside of S 105 at north side of building in accordance withRFQ- 134 ........................................................................................... ............................... .....................$1,677.00. (CPE #385R) Item 67C: Contractor to resolve conflict with clearance requirements of rolling shelves and ceiling height in accordance with response to RFI- 877/877.1 and Field Directive No. 132 ................................. ............................... ....$3,353.00. (CPE #389) Item 67D: Contractor to provide for electrical power to control panels in accordance with response to RFI -900 and Field DirectiveNo. 146R .................................................................................. ............................... .....................$1,024.00. (CPE #413) Item 67E: Contractor to provide for door swing change at J128 in accordance with response to RFI -800, WLC Memo 955 and Field Directive No. 105R ................................................................ ............................... .....................$6,564.00. (CPE #343) Item 67F: Contractor to provide /install carpet seat at concrete island locker bench in accordance with response to RFI- 896 and Field Directive No. 137 ................................................................. ............................... .....................$3,062.00. (CPE #402) A Item 67G: Contractor to replace foot pedals with gooseneck faucets in accordance with response to RFI- 866/866.1R/866.3, RFQ -133, and Field Directive No. 160 ......................... ............................... ................:....$1,795.00. (CPE #404) Page 1 of 2 1+ All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Chan ge Order. The contract time shall not extend unless expressly provided for in this Change Order. RECOMMENDED BY: ACCEPTED BY: PAR F-Aw-owmeArm Project Engineer L7ate Page 2 of 2 PM Cost Percent Initial I (We) agree to make the above change Original Contract Price $22,377,000.001 subject to the terms of this Change Order Previous Change Orders to Date $1,548,339.00 6.9% Y` for the NET INCREASE of $24,776.00 Total to Date $23,925,339.00 This Change Order $24,776.00 Total Change Orders to Date $1,573,115.00 7.0% Revised Contract Price $23,950,115.00 S.J. Amoroso Construction Co., Inc. *Requires emergency authorization if greater than 25 %. By: Date: / RECOMMENDED BY: ACCEPTED BY: PAR F-Aw-owmeArm Project Engineer L7ate Page 2 of 2