S.J. Amoroso Construction - Change Order No. 70W, City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 070 To contract for : New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 70A: Provide finished materials to cover exposed pneumatic piping at second floor in accordance with response to RFI -881 and Field Directive No. 131R ........................................................ ............................... .......................$655.00. (CPE #394) Item 7013: Contractor to provide for dishwasher electrical receptacle at Room 1041 in accordance with response to RFI - 954 and Field Directive No. 183 ................................................................. ............................... .....................$1,815.00. (CPE #454) Item 70C: Contractor to provide for relocation of electrical outlets at Room 1020 in accordance with response to RFI - 937 and Field Directive No. 172 .................................................................. ............................... .....................$3,489.00. (CPE #450) Item 70D: Contractor to provide for mechanical duct changes at JI 11 in accordance with response to RFI -111.1 and FieldDirective No. 93 ................................................................................... ............................... .......................$512.00. (CPE #330) Item 70E: Contractor to provide /install additional signage at Doors 1051A/106413 in accordance with response to RFI - 952 and Field Directive No. 182 .................................................................. ............................... .......................$333.00. (CPE #453) Item 70F: Contractor to provide for changes outlined in WLC IB #16, RFQ -108R, Field Memo No. 371, and Field DirectiveNos. 92 and 96 ............................................................................... ............................... .....................$7,528.00. (CPE #305A) Item 70G: Contractor to provide for added flashing work in accordance with response to RFI- 637/637R, and Field DirectiveNos. 56 and 63 ................................................................................. ............................... .....................$6,171.00. (CPE 9259R) Page 1 of 2 Item 70H: Contractor to provide for pre - finished metal flashing at balcony edge in accordance with response to RFI -802, andField Directive No. 119 .............................................................................. ............................... .....................$1,448.00. (CPE #346) All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $21,951.00 S.J. Amoroso Construction Co., Inc. Contractor RECOMMEND ACCEPTED B� Original Contract Price Previous Change Orders to Date Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost $22,377,000.00 $1,632,988.00 $24,009,988.00 $21,951.00 $1,654,939.00 $24,031,939.00 *Requires emergency authorization if greater than 25 %. Date: Page 2 of 2 PM Percent Initial 7.3% Ulf-1K 7.4% �/'rir"