Loading...
S.J. Amoroso Construction - Change Order No. 72City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 072 To contract for : New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 72: Provide for garbage disposal electrical in accordance with response to RFI -880, ESK -1 through 4, clarification drawing 00880, and Field Directive No. 142 ........................................ ............................... ....................$25,535.00. (CPE #397) All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $25,535.00 S.J. Amoroso Construction Co., Inc. Contractor IN RECOMMENI ACCEPTED B Original Contract Price Previous Change Orders to Date Total to Date This Change Order Total Change Orders to Date Revised Contract Price *Requires emergency authorization if greater than 25 %. Date: Page 1 of 1 P.M. Cost Percent Initial $22,377,000.00 $1,688,825.00 7.5% $24,065,825.00 $25,535.00 $1,714,360.00 7.7% kd*� $24,091,360.00 *Requires emergency authorization if greater than 25 %. Date: Page 1 of 1