S.J. Amoroso Construction - Change Order No. 72City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846 -0450; Fax (408) 846 -0429
CHANGE ORDER NO. 072
To contract for : New Gilroy Police Facility Project No. 03 -CDD -114
Contractor: S.J. Amoroso Construction
Contract Date: 8/16/2004
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
Item 72: Provide for garbage disposal electrical in accordance with response to RFI -880, ESK -1 through 4, clarification
drawing 00880, and Field Directive No. 142 ........................................ ............................... ....................$25,535.00.
(CPE #397)
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by
this Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $25,535.00
S.J. Amoroso Construction Co., Inc.
Contractor
IN
RECOMMENI
ACCEPTED B
Original Contract Price
Previous Change Orders to Date
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
*Requires emergency authorization if greater than 25 %.
Date:
Page 1 of 1
P.M.
Cost
Percent Initial
$22,377,000.00
$1,688,825.00
7.5%
$24,065,825.00
$25,535.00
$1,714,360.00
7.7% kd*�
$24,091,360.00
*Requires emergency authorization if greater than 25 %.
Date:
Page 1 of 1