S.J. Amoroso Construction - Change Order No. 73City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 073 To contract for : New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 73A: Complete electrical power to control panels in accordance with response to RFI -900 and Field Directive No. 146R..................................................................................................................................... ............................... $769.00. (CPE #413.1) Item 73B: Contractor to provide electrical for added pneumatic tube station in accordance with response to RFI -927R andField Directive No. 180 ............................................................................ ............................... .....................$3,273.00. (CPE #438) Item 73C: Contractor to provide for ceramic tile borders at toilet accessories in accordance with response to RFI -886 andField Directive No. 136 ............................................................................. ............................... .....................$2,539.00. (CPE #400) Item 73D: Contractor to provide for relocation of supply air diffuser at J123 in accordance with response to RFI -786 and FieldDirective No. 104 ................................................................................. ............................... .......................$370.00. (CPE #342) Item 73E: Contractor to provide /install batt insulation cap at return air openings above ceilings in accordance with response to RFI -604 and Field Directive No. 100 ......................................... ............................... .....................$3,764.00. (CPE #338) Item 73F: Contractor to provide for added uplights and relocation of lobby receptacle in accordance with response to RFI- 831.1/831.2, and Field Directive No. 115R ......................................... ............................... ....................$13,179.00. (CPE #357A) All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. Page 1 of 2 I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $23,894.00 S.J. Amoroso Construction Co., Inc. Contractor 0 RECOMMEN ACCEPTED E Cost Original Contract Price $22,377,000.00 Previous Change Orders to Date $1,714,360.00 Total to Date $24,091,360.00 This Change Order $23,894.00 Total Change Orders to Date $1,738,254.00 Revised Contract Price $24,115,254.00 *Requires emergency authorization if greater than 25 %. Date: Page 2 of 2 PM Percent Initial 7.7% Uhfk 7.8%