Loading...
S.J. Amoroso Construction - Change Order No. 74„ a City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 074 To contract for : New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 74A: Provide for added CMU at gate locations and reinforcing in accordance with response to RFI-837/837. I R and FieldDirective No. 111 ............................................................................ ............................... .....................$6,393.00. (CPE #360) Item 7413: Contractor to provide for mechanical ductwork modifications resulting from security ceiling system change issuedunder WLC IB #3 and RFQ- 31 .......................................................... ............................... .....................$2,655.00. (CPE #68.3) Item 74C: Contractor to provide revised electrical at bi -fold doors in accordance with response to RFI -889 and Field DirectiveNo. 144 ......................................................................................... ............................... .....................$4,507.00. (CPE #405) Item 741): Contractor to provide for alternate wire mesh screens at Atrium stairwell supply openings in accordance with response to RFI -860 and WLC email of 8/ 24/ 06 ............................................ ............................... .......................$631.00. (CPE #456) Item 74E: Complete work associated with deletion of foot pedal operators and addition of gooseneck faucets in accordance with response to RFI- 866/866.IR/866.3, RFQ -133, and Field Directive No. 160 .... .......................$465.00. (CPE #404.1) All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. Page 1 of 2 t I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $14,651.00 S.J. Amoroso Construction Co., Inc. Contractor 0 RECOMMEND. ACCEPTED 131 PM Cost Percent Initial Original Contract Price $22,377,000.00 Previous Change Orders to Date $1,738,254.00 7.8% Total to Date $24,115,254.00 This Change Order $14,651.00 Total Change Orders to Date $1,752,905.00 7.8% Revised Contract Price $24,129,905.00 *Requires emergency authorization if greater than 25 %. Date: Page 2 of 2