S.J. Amoroso Construction - Change Order No. 75LJ
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846 -0450; Fax (408) 846 -0429
CHANGE ORDER NO. 075
To contract for: New Gilroy Police Facility Project No. 03 -CDD -114
Contractor: S.J. Amoroso Construction Contract Date:
8/16/2004
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
Item 75A: Provide for six (6) journeyman electrician hours omitted in CCO -72 for electrical to disposals in accordance
withresponse to RFI -880 and FD- 142 ............................................................. ............................... .......................$527.00.
(CPE #397.1)
Item 7513: Contractor provided tables in lieu of Owner furniture at Room 1057 for security VCR's and microphone amps
atrequest of Gilroy PD ..................................................................................... ............................... .......................$283.00.
(CPE #447)
Item 75C: Contractor to provide for wiring change to condenser unit and added wiring for freezer controller in
accordance with response to RFI -928 and FD- 169 ........................................... ............................... .....................$7,130.00.
(CPE #443)
Item 751): Contractor to provide for elevator recall operation in accordance with response to RFI -882.1 and Field
DirectiveNo. 166 ........................................................................................... ............................... ....................$12,170.00.
(CPE #401)
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by
this Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
Page 1 of 2
Cost
I (We) agree to make the above change Original Contract Price $22,377,000.00
subject to the terms of this Change Order Previous Change Orders to Date $1,752,905.00
for the NET INCREASE of $20,110.00 Total to Date $24,129,905.00
This Change Order $20,110.00
Total Change Orders to Date $1,773,015.00
Revised Contract Price $24,150,015.00
S.J. Amoroso Construction Co., Inc.
Contractor *Requires emergency authorization if greater than 25 %.
By: � Date:
RECOMMENDED F
ACCEPTED BY:
Project Engineer
Page 2 of 2
PM
Percent Initial
7.8% U
7.9% W k