S.J. Amoroso Construction - Change Order No. 75LJ City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 075 To contract for: New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 75A: Provide for six (6) journeyman electrician hours omitted in CCO -72 for electrical to disposals in accordance withresponse to RFI -880 and FD- 142 ............................................................. ............................... .......................$527.00. (CPE #397.1) Item 7513: Contractor provided tables in lieu of Owner furniture at Room 1057 for security VCR's and microphone amps atrequest of Gilroy PD ..................................................................................... ............................... .......................$283.00. (CPE #447) Item 75C: Contractor to provide for wiring change to condenser unit and added wiring for freezer controller in accordance with response to RFI -928 and FD- 169 ........................................... ............................... .....................$7,130.00. (CPE #443) Item 751): Contractor to provide for elevator recall operation in accordance with response to RFI -882.1 and Field DirectiveNo. 166 ........................................................................................... ............................... ....................$12,170.00. (CPE #401) All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. Page 1 of 2 Cost I (We) agree to make the above change Original Contract Price $22,377,000.00 subject to the terms of this Change Order Previous Change Orders to Date $1,752,905.00 for the NET INCREASE of $20,110.00 Total to Date $24,129,905.00 This Change Order $20,110.00 Total Change Orders to Date $1,773,015.00 Revised Contract Price $24,150,015.00 S.J. Amoroso Construction Co., Inc. Contractor *Requires emergency authorization if greater than 25 %. By: � Date: RECOMMENDED F ACCEPTED BY: Project Engineer Page 2 of 2 PM Percent Initial 7.8% U 7.9% W k