S.J. Amoroso Construction - Change Order No. 760 City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 076 To contract for : New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 76A: Contractor to provide for added roof insulation and flashing in accordance with response to RFI- 552.1, RFQ- 69, and Field Directive No. 40 ................................................................... ............................... ....................$10,205.00. (CPE #209) Item 7613: Contractor to provide for waterproofing measures (sheetmetal) at slab area Line 4 to 6 in accordance with response to RFI -781 and Field Directive No. 101 ..................................... ............................... .....................$3,814.00. (CPE #337B) Item 76C: Contractor to provide for modifications to stainless steel counter in accordance with response to RFI -911 and FieldDirective No. 156 ............................................................................. ............................... .....................$1,571.00. (CPE #426) Item 76D: Contractor to provide for added knox box in accordance with response to RFI -863.1 and Field Directive No. 181 ................................................................................................................. ............................... .......................$705.00. (CPE #452) Item 76E: Contractor to provide for revised flow calculations for fire sprinklers due to change in piping from C900 PVC toDI at request of Fire Marshal ...................................................................... ............................... .......................$505.00. (CPE #210) Item 76F: Contractor to provide for roof framing bracing in accordance with response to RFI -319 (split cost of $1447 submitted due to bracing shown but not identified) ..................................... ............................... .......................$725.00. (CPE #94) Item 76G: Contractor to provide for added landscape headerboard in accordance with WLC detail transmittal of 11/30/06 and Field Directive No. 196 .......................................................... ............................... .....................$1,210.00. (CPE #471) Page 1 of 2 Item 76H: Contractor to provide for added vertical curb and removal of existing paving in accordance with response to RFI- 899.2, and Field Directive No. 179 ....................................................... ............................... .....................$2,479.00. (CPE #433) All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. RECOMMENDED BY: ACCEPTED BY: Project Engineer V+1V6tn �. OR 11 PM Cost Percent Initial I (We) agree to make the above change Original Contract Price $22,377,000.00 subject to the terms of this Change Order Previous Change Orders to Date $1,773,015.00 7.9% for the NET INCREASE of $21,214.00 Total to Date $24,150,015.00 This Change Order $21,214.00 Total Change Orders to Date $1,794,229.00 8.0% Revised Contract Price $24,171,229.00 S.J. Amoroso Construction Co., Inc. Contractor *Requires emergency authori/�zatiion if greater than 25 %. ` /iG"�� Date: /jj By: =L RECOMMENDED BY: ACCEPTED BY: Project Engineer V+1V6tn �. OR 11 Page 2 of 2