S.J. Amoroso Construction - Change Order No. 77I City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 077 To contract for : New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 77A: Contractor to fur out wall at J106 eye wash station in accordance with response to RFI -851 and Field DirectiveNo. 113 ................................................................................. ............................... .....................$2,191.00. (CPE #368) Item 7713: Contractor to provide for adjustment of light fixtures to coincide with revisions to fire sprinkler installations at garage in accordance with response to RFI -748 and FD- 103R ......... ............................... .....................$1,500.00. (CPE #325) Item 77C: Contractor to provide for alternate support of SD /OD piping at P109 in accordance with response to RFI- 668.2 and 668. 3 ..................................................................................... ............................... .......................$711.00. (CPE #378) Item 771): Contractor to provide for alternate light fixtures at Room 1058 in accordance with response to RFI -946 and FieldDirective No. 177 ............................................................................. ............................... .......................$617.00. (CPE #448) Item 77E: Contractor to provide for revised routing of condensate drain line in accordance with response to RFI -720, RFQ -106, and FD- 84 ...................................................................................... ............................... .....................$7,520.00. (CPE #302R) Item 77F: Contractor to provide for fire putty pads (A to E line and 6 to 11 line) at rated walls not called out on drawings orspecified ................................................................................................ ............................... .....................$3,300.00. (CPE #375) Item 77G: Contractor to provide for modified stainless steel counter at Room J139 in accordance with response to RFI- 876,876R,876.1 thru 876.3, and FD- 140 ................................................. ............................... .....................$2,255.00. (CPE #393) Page 1 of 2 Item 77H: Contractor to provide for added vertical curb within planter area east of traffic circle in accordance with response to RFI -899.3 and Field Directive No. 187 ..................................... ............................... .....................$2,103.00. (CPE #463) Item 77I: Contractor to provide for changes to door hardware (1116 and 1116A) in accordance with response to RFI- 762, and RFQ- 115 ........................................................................................ ............................... .....................$1,988.00. (CPE #319) All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. RECOMMENDED B ACCEPTED BY: Page 2 of 2 PM Cost Percent Initial I (We) agree to make the above change Original Contract Price $22,377,000.00 414 subject to the terms of this Change Order Previous Change Orders to Date $1,794,229.00 8.0% for the NET INCREASE of $22,185.00 Total to Date $24,171,229.00 This Change Order $22,185.00 _ ,, Total Change Orders to Date $1,816,414.00 8.1% Revised Contract Price $24,193,414.00 S.J. Amoroso Construction Co., Inc. Contractor *Requires emergency authorization if greater than 25 %. By. `� Date: Q RECOMMENDED B ACCEPTED BY: Page 2 of 2