S.J. Amoroso Construction - Change Order No. 81City of Gilroy Engineering Division 7351 Rosanna St., Gi Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 081 To contract for: New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 81A: Contractor to provide for revised door latchset at Rm 1055 in accordance with response to RFI -824.1 and FieldDirective No. 168 ............................................................................... ............................... .......................$760.00. (CPE #442) Item 81B: Contractor to provide for casework and electrical changes in accordance with response to RFI -888, RFQ -136 andField Directive No. 148 ....................................................................... ............................... .....................$6,847.00. (CPE #410) Item 81 C: Contractor to provide for caulking sealant at fascia/soffit intersect in accordance with response to RFI -749, RFQ -114 and Field Directive No. 87- R ........................................................ ............................... .....................$3,650.00. (CPE #31713) Item 81D: Contractor to provide for gate changes at stair S104 in accordance with response to RFI -777.1 and Field DirectiveNo. 190 ........................................................................................... ............................... .....................$1,674.00. (CPE #466) Item 81E: Contractor to provide CAT6 telephone cable for Paging System in accordance with response to RFI -931 and FieldDirective No. 167 ............................................................................. ............................... .....................$4,542.00. (CPE #441) Item 81F: Contractor to provide for all finish paving grade elevation changes at north parking lot and settlement of drawing notation ambiguities (AD 1 -C -9) regarding existing baserock ......... ............................... ....................$15,000.00. (CPE #372) All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. Page 1 of 2 I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $32,473.00 Original Contract Price Previous Change Orders to Date Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost Percent Initial $22,377,000.00 l W $1,919,087.00 8.6% $24,296,087.00 $32,473.00 11 AIL $1,951,560.00 8.7% $24,328,560.00 S.J. Amoroso Construction Co., Inc. Contractor *Requires emergency authorization if greater than 25 %. By: \ Date: ?A2 7 RECOMMEND] ACCEPTED BN Page 2 of 2