S.J. Amoroso Construction - Change Order No. 87.1�
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846 -0450; Fax (408) 846 -0429
CHANGE ORDER NO. 087
To contract for : New Gilroy Police Facility Project No. 03 -CDD -114
Contractor: S.J. Amoroso Construction Contract Date:
8/16/2004
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
Item 87A: Contractor to provide for relocated irrigation controller outside of building in accordance with RFQ -121, and
FieldDirective No. 109 ............................................................................. ............................... .....................$3,522.00.
(CPE #339.1)
Item 8713: Contractor to provide for low voltage relay and connection to FACP for roll -up door at 1103 in accordance
with response to RFI -767.2 and Field Directive No. 207 ............................ ............................... .....................$3,734.00.
(CPE #493)
Item 87C: Contractor to provide for casework modifications to mailbox surrounds in accordance with response to RFI-
917 and Field Directive No. 155 ................................................................. ............................... .....................$2,029.00.
(CPE #429)
Item 87D: Contractor to provide for alternate fridge to specified undercounter unit in accordance with response to RFI-
966 and Field Directive No. 200 ................................................................. ............................... .....................$1,168.00.
(CPE #476)
Item 87E: Contractor to provide for revised positioning of overflow scuppers and CMU coring in accordance with
response to RFI -544 through 544.2 and field review ................................... ............................... .....................$3,597.00.
(CPE #254)
Item 87F: Contractor to provide for floor covering changes in accordance with response to RFI -894.2 and WLC Memo
No. 61 to Harris ........................................................................................... ............................... .....................$4,650.00.
(CPE #395)
Item 87G: Contractor to provide for all changes associated with conduit tie -in to City Hall in accordance with RFQ -122,
andField Directive No. 145R ..................................................................... ............................... ....................$14,579.00.
(CPE #341)
Page 1 of 2
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by
this Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
RECOMMENDED
ACCEPTED BY:
Page 2 of 2
PM
Cost
Percent Initial
I (We) agree to make the above change
Original Contract Price
$22,377,000.00
` JA,'
subject to the terms of this Change Order
Previous Change Orders to Date
$3,920,844.00
17.5% zmN
for the NET INCREASE of $33,279.00
Total to Date
$26,297,844.00
This Change Order
$33,279.00
Total Change Orders to Date
$3,954,123.00
17.7%
Revised Contract Price
$26,331,123.00
S.J. Amoroso Construction Co., Inc.
Contractor
*Requires emergency authorization if greater
than 25 %.
`
By;
Date: b 7
RECOMMENDED
ACCEPTED BY:
Page 2 of 2