S.J. Amoroso Construction - Change Order No. 87.1� City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 087 To contract for : New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 87A: Contractor to provide for relocated irrigation controller outside of building in accordance with RFQ -121, and FieldDirective No. 109 ............................................................................. ............................... .....................$3,522.00. (CPE #339.1) Item 8713: Contractor to provide for low voltage relay and connection to FACP for roll -up door at 1103 in accordance with response to RFI -767.2 and Field Directive No. 207 ............................ ............................... .....................$3,734.00. (CPE #493) Item 87C: Contractor to provide for casework modifications to mailbox surrounds in accordance with response to RFI- 917 and Field Directive No. 155 ................................................................. ............................... .....................$2,029.00. (CPE #429) Item 87D: Contractor to provide for alternate fridge to specified undercounter unit in accordance with response to RFI- 966 and Field Directive No. 200 ................................................................. ............................... .....................$1,168.00. (CPE #476) Item 87E: Contractor to provide for revised positioning of overflow scuppers and CMU coring in accordance with response to RFI -544 through 544.2 and field review ................................... ............................... .....................$3,597.00. (CPE #254) Item 87F: Contractor to provide for floor covering changes in accordance with response to RFI -894.2 and WLC Memo No. 61 to Harris ........................................................................................... ............................... .....................$4,650.00. (CPE #395) Item 87G: Contractor to provide for all changes associated with conduit tie -in to City Hall in accordance with RFQ -122, andField Directive No. 145R ..................................................................... ............................... ....................$14,579.00. (CPE #341) Page 1 of 2 All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. RECOMMENDED ACCEPTED BY: Page 2 of 2 PM Cost Percent Initial I (We) agree to make the above change Original Contract Price $22,377,000.00 ` JA,' subject to the terms of this Change Order Previous Change Orders to Date $3,920,844.00 17.5% zmN for the NET INCREASE of $33,279.00 Total to Date $26,297,844.00 This Change Order $33,279.00 Total Change Orders to Date $3,954,123.00 17.7% Revised Contract Price $26,331,123.00 S.J. Amoroso Construction Co., Inc. Contractor *Requires emergency authorization if greater than 25 %. ` By; Date: b 7 RECOMMENDED ACCEPTED BY: Page 2 of 2