S.J. Amoroso Construction - Change Order No. 88City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 088 To contract for: New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 88A: Contractor to provide for door strike at J121 and connect to electrical in accordance with response to RFI -975 andField Directive No. 208 ...................................................................... ............................... .......................$935.00. (CPE #490) Item 8813: Contractor to provide double wall construction for smoke door wall at elevator S101 in accordance with response to RFI -593.3 and Field Directive No. 91 ..................................... ............................... .....................$5,000.00. (CPE #312) Item 880 Contractor to provide for tie -in of FSD at Room 1147 to the FM200 System in accordance with response to RFI -994 and Field Directive No. 214 ........................................................... ............................... .....................$5,214.00. (CPE #497) Item 88D: Contractor to provide /install shaft wall infill at elevator doors, modify door jamb P1 IOF and provide mag door holds at 1115B and 1114A in accordance with response to RFI -835.1 and Field Directive No. 138 ................................................................................................................ ............................... ....................$13,349.00. (CPE #312.1) All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. Page 1 of 2 y S . I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $24,498.00 Original Contract Price Previous Change Orders to Date Total to Date This Change Order Total Change Orders to Date Revised Contract Price $3,978,621.00 17.8% $26,355,621.00 S.J. Amoroso Construction Co., Inc. Contractor *Requires emergency authorization if greater than 25 %. By: Date: e ri RECOMMENDEI ACCEPTED BY: Project Engineer Page 2 of 2 PM Cost Percent Initial $22,377,000.00 A , ,A $3,954,123.00 17.7% 1,�/!r+ $26,331,123.00 $24,498.00 $3,978,621.00 17.8% $26,355,621.00 S.J. Amoroso Construction Co., Inc. Contractor *Requires emergency authorization if greater than 25 %. By: Date: e ri RECOMMENDEI ACCEPTED BY: Project Engineer Page 2 of 2