S.J. Amoroso Construction - Change Order No. 88City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846 -0450; Fax (408) 846 -0429
CHANGE ORDER NO. 088
To contract for: New Gilroy Police Facility Project No. 03 -CDD -114
Contractor: S.J. Amoroso Construction Contract Date:
8/16/2004
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
Item 88A: Contractor to provide for door strike at J121 and connect to electrical in accordance with response to RFI -975
andField Directive No. 208 ...................................................................... ............................... .......................$935.00.
(CPE #490)
Item 8813: Contractor to provide double wall construction for smoke door wall at elevator S101 in accordance with
response to RFI -593.3 and Field Directive No. 91 ..................................... ............................... .....................$5,000.00.
(CPE #312)
Item 880 Contractor to provide for tie -in of FSD at Room 1147 to the FM200 System in accordance with response to
RFI -994 and Field Directive No. 214 ........................................................... ............................... .....................$5,214.00.
(CPE #497)
Item 88D: Contractor to provide /install shaft wall infill at elevator doors, modify door jamb P1 IOF and provide mag
door holds at 1115B and 1114A in accordance with response to RFI -835.1 and Field Directive No.
138 ................................................................................................................ ............................... ....................$13,349.00.
(CPE #312.1)
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by
this Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
Page 1 of 2
y S .
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $24,498.00
Original Contract Price
Previous Change Orders to Date
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
$3,978,621.00 17.8%
$26,355,621.00
S.J. Amoroso Construction Co., Inc.
Contractor *Requires emergency authorization if greater than 25 %.
By: Date: e ri
RECOMMENDEI
ACCEPTED BY:
Project Engineer
Page 2 of 2
PM
Cost
Percent Initial
$22,377,000.00
A , ,A
$3,954,123.00
17.7% 1,�/!r+
$26,331,123.00
$24,498.00
$3,978,621.00 17.8%
$26,355,621.00
S.J. Amoroso Construction Co., Inc.
Contractor *Requires emergency authorization if greater than 25 %.
By: Date: e ri
RECOMMENDEI
ACCEPTED BY:
Project Engineer
Page 2 of 2