S.J. Amoroso Construction - Change Order No. 89City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846 -0450; Fax (408) 846 -0429
CHANGE ORDER NO. 089
To contract for : New Gilroy Police Facility Project No. 03 -CDD -114
Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
Item 89A: Contractor to provide for electrical to insta -hot water heaters in accordance with response to RFI -985 and
FieldDirective No. 209 .................................................................................... ............................... .....................$7,954.00.
(CPE #491)
Item 8913: Contractor to provide /install motor starters for EF -5 through EF -9 in accordance with response to RFI -981
andField Directive No. 206 ........................................................................... ............................... ....................$12,688.00.
(CPE #488)
Item 89C: Credit for locking device at mens and womens lockers called out in Section 10505 -2.4, A -6 and Request For
QuotationNo. 142 ............................................................................................ ............................... .....................($394.00).
Item 891): Contractor to provide /install CAT6 cable for each entry telephone (4) in accordance with response to RFI -901
andField Directive No. 171 .......................................................................... ............................... .....................$8,350.00.
(CPE #449)
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by
this Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
Page 1 of 2
RECOMMENDED BY:
ACCEPTED BY
Date
Date / V
i
Date i
Project Engineer
Page 2 of 2
PM
Cost
Percent Initial
I (We) agree to make the above change
Original Contract Price
$22,377,000.00
subject to the terms of this Change Order
Previous Change Orders to Date
$3,978,621.00
17.8%
for the NET INCREASE of $28,598.00
Total to Date
$26,355,621.00
This Change Order
$28,598.00
Total Change Orders to Date
$4,007,219.00
17.9%
Revised Contract Price
$26,384,219.00
S.J. Amoroso Construction Co., Inc.
Contractor
*Requires emergency authorization if
greater than 25 %.
By: W'w
Date: 7
RECOMMENDED BY:
ACCEPTED BY
Date
Date / V
i
Date i
Project Engineer
Page 2 of 2