Loading...
S.J. Amoroso Construction - Change Order No. 91City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 091 To contract for : New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 91A: Contractor to provide /install added exit signs in accordance with response to RFI -962, and Field Directive No. 197 ............................................................................................................... ............................... .......................$855.00. (CPE #473) Item 91B: Contractor to provide for vent/water piping relocation at loading dock in accordance with WLC IB #16, FD -96, andFM- 521 ................................................................................................... ............................... .....................$3,674.00. (CPE #305B) Item 91C: Contractor to provide /install two additional camera poles in accordance with response to RFI -136.2 and Field DirectiveNo. 189 ............................................................................................. ............................... ....................$13,364.00. (CPE #465) Item 91 D: Contractor to provide /install end wall closure angles in accordance with response to RFI -872, RFQ -135, and FieldDirective No. 151 .................................................................................... ............................... .....................$3,683.00. (CPE #386) Item 91E: Credit to contract for payment of generator operational permit paid to BAAQMD by City Purchase Order No. 70685, as noted under FM- 495 ......................................................................... ............................... ...................($1,390.00). All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. Page 1 of 2 RECOMMENDEL ACCEPTED BY: Page 2 of 2 PM Cost Percent Initial I (We) agree to make the above change Original Contract Price $22,377,000.00 !.� subject to the terms of this Change Order Previous Change Orders to Date $4,063,920.00 18.2% 4`4 for the NET INCREASE of $20,186.00 Total to Date $26,440,920.00 This Change Order $20,186.00 �� / j� Total Change Orders to Date $4,084,106.00 18.3% '�/4 Revised Contract Price $26,461,106.00 S.J. Amoroso Construction Co., Inc. Contractor *Requires emergency authorization if greater than 25 %. By: Date: RECOMMENDEL ACCEPTED BY: Page 2 of 2