S.J. Amoroso Construction - Change Order No. 96 FinalCity of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 096 (FINAL) To contract for : New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 96A: Contractor to provide for fire sprinkler drop adjustments due to ceiling height changes to accommodate MEP installations through field direction by WLC .............................................. ............................... .....................$1,500.00. (CPE #427) Item 96B: Contractor to provide for removal of wet soil due to weather impacts resulting from design changes affecting pavingoperations and schedule ..................................................................... ............................... .....................$3,500.00. (CPE #220.1) Item 96C: Contractor to provide for all additional costs incurred associated with duct pressure testing resulting from ambiguous and/or conflicting design and test criteria in contract documents .............................. ....................$27,000.00. (CPE #246R) Item 96D: Contractor to provide for all additional costs incurred associated with installation /operation of the FSCP system in accordance with response to RFI -854.2 and Field Directive No. 73R ........................ ....................$35,000.00. (CPE #264) All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. Page 1 of 2 I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $67,000.00 Cost Original Contract Price $22,377,000.00 Previous Change Orders to Date $4,194,865.00 Total to Date $26,571,865.00 This Change Order $67,000.00 Total Change Orders to Date $4,261,865.00 Revised Contract Price $26,638,865.00 S.J. Amoroso Construction Co., Inc. Contractor *Requires emergency authorization if greater than 25 %. By: Date: V( ,1 V-0 7 RECOMMENDED BY: Project Engineer Page 2 of 2 PM Percent Initial 18.7% &A' 19.0% UAW City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0450; Fax (408) 846 -0429 CHANGE ORDER NO. 096 (FINAL) To contract for : New Gilroy Police Facility Project No. 03 -CDD -114 Contractor: S.J. Amoroso Construction Contract Date: 8/16/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item 96A: Contractor to provide for fire sprinkler drop adjustments due to ceiling height changes to accommodate MEP installations through field direction by WLC .............................................. ............................... .....................$1,500.00. (CPE #427) Item 9613: Contractor to provide for removal of wet soil due to weather impacts resulting from design changes affecting pavingoperations and schedule ..................................................................... ............................... .....................$3,500.00. (CPE #220.1) Item 96C: Contractor to provide for all additional costs incurred associated with duct pressure testing resulting from ambiguous and/or conflicting design and test criteria in contract documents .............................. ....................$27,000.00. (CPE #246R) Item 96D: Contractor to provide for all additional costs incurred associated with installation /operation of the FSCP system in accordance with response to RFI -854.2 and Field Directive No. 73R ........................ ....................$35,000.00. (CPE #264) All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. Page 1 of 2 I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $67,000.00 Original Contract Price Previous Change Orders to Date Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost $22,377,000.00 $4,194,865.00 $26,571,865.00 $67,000.00 $4,261,865.00 $26,638,865.00 S.J. Amoroso Construction Co., Inc. Contractor *Requires emergency authorization if greater than 25 %. By: ` % %G %� Date: ll 7 PM Percent Initial 18.7%W-424 19.0% Page 2 of 2