Loading...
PIA No. 2017-01 - Meritage Homes Corp.RECORDING REQUESTED BY: � 2371695 City of Gilroy ) Regina Alcomendras Santa Clara County - Clerk- Recorder 08/01/2017 02:11 PM Titles: 1 Pages: 38 WHEN RECORDED, MAIL TO: ) Fees . 0.00 Shawna Freels, City lerk Taxes . 0 y ) Total 10.00 1��I City of Groy 1351 Rosanna Street 1 11110 Gilroy, CA 95020 (SPACE ABOVE THIS LINE FOR RECORDER'S USE) PROPERTY IMPROVEMENT AGREEMENT No. 2017 -01 Heartland Gardens Phase 1, Phase 2 and Phase 3 Tract 10379, 10398, 10399 APNs: 810 -20 -022 and 810 =20 -007 Meritage Homes Corp. SEPARATE PAGE PURSUANT TO GOVERNMENT CODE SECTION 27361.6 PROPERTY IMPROVEMENT AGREEMENT RESIDENTIAL AGREEMENT FOR EXTENSIONS OF WATER DISTRIBUTION SYSTEMS: IMPROVEMENT OF STREETS: INSTALLATION OF SEWERS, STORM DRAINS AND OTHER PUBLIC WORKS FACILITIES Property Improvement Agreement No. 2017 -01 This Property Improvement Agreement ( "Agreement') is made and entered into this Wh day of ­16 t\Y, , 2017, by and between the City of Gilroy, a municipal corporation, herein called the "City," and Meritage Homes, a California corporation, herein called the "Developer ". WHEREAS, a final map of subdivision, record of survey or building permit (Site Clearance) application has now been submitted to the City for approval and acceptance, covering certain real estate and property improvements known as and called: Heartland Gardens, Tract No 10379, 10398, and 10399 APNs: 810 -20 -022 & 810 -20 -007, a legal description of which is attached hereto and incorporated herein as Exhibit "A" (the "Property "), and as described in the project improvement plans entitled Tract No 10379, 10398, 10399 Heartland Gardens. WHEREAS, the Developer is the fee owner of the Property and requires certain utilities and public works facilities in order to service the Property under the minimum standards established by the City and, WHEREAS, the City, by and through its City Council, has enacted certain Codes, Ordinances and Resolutions and certain Rules and Regulations have been promulgated concerning the subject matter of this Agreement and, WHEREAS, the City has certain responsibilities for maintenance and operation of such utilities and public service facilities after acceptance by City, and for providing the necessary connecting system, general plant and appurtenances, and the City is agreeing to discharge those responsibilities, provided that Developer has faithfully and fully complied with all of the terms, covenants, conditions to be performed by Developer pursuant to this Agreement. NOW THEREFORE, in consideration of the foregoing premises and in order to carry on the intent and purpose of said Codes, Ordinances, Resolutions and Regulations and established policies of the City and the laws of the State of California and the United States of America it is agreed by and between the parties as follows: SECTION 1 That all Codes, Ordinances, Resolutions, Rules and Regulations and established policies of the City and the laws of the State of California and the United States of America concerning the subject matter of this Agreement are hereby referred to and incorporated herein to the same effect as if they were set out at length herein. Said Codes, Ordinances, Resolutions, Rule and Regulations include, but are not limited to, the following: the Code of the City of Gilroy, the current Zoning Ordinance, and the currently adopted Uniform Building Code. -2- 1KKS11065242.1 9/18/12 rev. 3/23/15 091812-04706091 BN 285296840 SECTION 2 The Developer agrees: a. To perform each and every provision required by the City to be performed by the Developer in each and every one of said Codes, Ordinances, Resolutions, Rules and other Regulations and established policies of the City and the laws of the State of California and the United States of America, including without limitation, the California Labor Code and California Public Contract Code. Developer further agrees and acknowledges that it is its obligation to determine whether, and to what extent, the work performed under this Agreement is subject to any Codes, Ordinances, Resolutions, Rules and other Regulations and established policies of the City and the laws of the State of California, the United States of America, the California Labor Code and Public Contract Code relating to public contracting and prevailing wage laws. b. To grant to the City without charge, free and clear of encumbrances, any and all easements and rights of way in and to the Property necessary for the City in order that its water, electricity, and/or sewer lines in or to said Property may be extended. c. To indemnify, defend with counsel of City's choice and hold the City free and harmless from all suits, fees, claims, demands, causes of action, costs, losses, damages, liabilities and expenses (including without limitation attorneys' fees) incurred by City in connection with (i) any damage done to any utility, public facility or other material or installation of the City on said Property which the Developer or any contractor or subcontractor of the Developer, or any employee of the foregoing, shall do in grading or working upon said Property; or (ii) arising or resulting directly or indirectly from any act or omission of Developer or Developer's contractors, or subcontractors, or any employee of the foregoing in connection with the work performed by them in connection with this Agreement, including without limitation all claims relating to injury or death of any person or damage to any property. d. To construct and improve all public works facilities and other improvements described in this Agreement and the improvement plans submitted to the City of Gilroy in furtherance of this Agreement on file with the City of Gilroy. All construction and improvements shall be completed in accordance with all standards established in the Codes, Ordinances, Resolutions, Rules and Regulations and established policies of the City and the laws of the State of California and the United States of America and this agreement, and in accordance with the grades, plans, and specifications approved by the City Engineer. Developer shall furnish two good and sufficient bonds, a Payment Bond on a form provided by the City and a Faithful Performance Bond, both of which shall be secured from a surety company admitted to do business in California. Each bond shall set forth a time period for performance by the contractor of its obligations and the terms and conditions on which the City may obtain the proceeds of the bond. The Faithful Performance Bond shall be in an amount not less than one hundred percent (100 %) of the total estimated amount payable for the improvements described in this Agreement, and shall secure payment to City and the Developer of any loss due to the default of the contractor or its inability or refusal to perform its contract. The performance bond shall by its terms remain in full force and effect for a period of not less than one year after completion of the improvements by Developer and acceptance of the improvements by City, to guarantee the repair and replacement of -3- 1KKS110652421 9/18/12 rev. 3/23/15 091812 -04706091 BN 28529684v3 defective material and faulty workmanship. Upon completion of the improvements by Developer and acceptance of the improvements by City, Developer may substitute for the performance bond securing maintenance described above, a separate maintenance bond issued by an admitted surety in the amount of ten percent (10 %) of the total contract price of the improvements (provided that the amount of said bond shall not be less than One Thousand Dollars ($1,000) to cover the one -year maintenance period. The Payment Bond shall be in an amount not less than one hundred percent (100 %) of the total estimated amount payable for the improvements described in this Agreement. The Payment Bond shall secure the payment of those persons or entities to whom the Developer may become legally indebted for labor, materials, tools, equipment or services of any kind used or employed by the contractor or subcontractor in performing the work, or taxes or amounts to be withheld thereon. The Payment Bond shall provide that the surety will pay the following amounts should the Contractor or a Subcontractor fail to pay the same, plus reasonable attorneys' fees to be fixed by the court if suit is brought upon the bond: (1) amounts due to any of the persons named in California Civil Code Section 9100; (2) amounts due under the Unemployment Insurance Code with respect to work or labor performed for the improvements described in this Agreement; and (3) any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of the Contractor and Subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with respect to the work and labor. The Payment Bond shall, by its terms, inure to the benefit of any of the persons named in Civil Code Section 3181 so as to give a right of action to those persons or their assigns in any suit brought upon the bond. Simultaneously with the submission of its building permit application (Site Clearance), the Developer shall submit the following for both the surety that furnishes the Payment Bond and the surety that furnishes the Faithful Performance Bond: (1) a current printout from California Department of Insurance's website (www.insurance.ca.gov) showing that the surety is admitted to do business in the State; or (2) a certificate from the Clerk of the County of Santa Clara that the surety's certificate of authority has not been surrendered, revoked, canceled, annulled, or suspended or in the event that it has, that renewed authority has been granted. e. Except as otherwise expressly provided in this Agreement, all plan check and inspection fees which are payable by Developer pursuant to the attached comprehensive fee schedule are due and payable to the City prior to Council approval of the final map of the subdivision. Upon approval of the record of survey or the building permit covering the real estate to be improved and before any work is done therein, the Developer shall pay to the City all other sums payable by Developer pursuant to the attached comprehensive fee schedule. f. At all times during the term of this Agreement and until the improvements constructed by Developer are accepted by City, Developer shall, at no cost to City obtain and maintain (a) a policy of general liability and property damage insurance in the minimum amount of One Million Dollars ($1,000,000), combined single limit for both bodily injury and property damage; (b) workers' compensation insurance as required by law; and (c) broad form "Builder's Risk" property damage insurance with limits of not less than 100% of the estimated value of the improvements to be constructed by Developer pursuant to this Agreement. All such policies shall provide that thirty (30) days written notice must be given in advance to City -4- IKKS110652421 9/18/12 rev. 3/23/15 091812 -04706091 BN 285296840 prior to termination, cancellation or modification. The insurance specified in (a) above shall name City as an additional insured and the insurance specified in (c) shall name City as a loss payee, and shall provide that City, although an additional insured or loss payee, may recover for any loss suffered by reason of the acts or omissions of Developer or Developer's contractors or subcontractors or their respective employees. Developer hereby waives, and Developer shall cause each of its contractors and subcontractors to waive, all rights to recover against City for any loss or damage arising from a cause covered by the insurance required to be carried pursuant to this Agreement or actually carried by Developer in connection with the work described in this Agreement, and will cause each insurer to waive all rights of subrogation against City in connection therewith. All policies shall be written on an occurrence basis and not on a claims made basis and shall be issued by insurance companies acceptable to City. Prior to commencing any work pursuant this Agreement, Developer shall deliver to City the insurance company's certificate evidencing the required coverage, or if required by City a copy of the policies obtained. SECTION 3 That all the provisions of this Agreement and all work to be done pursuant to the terms of this Agreement are to be completed to City's satisfaction within one year from and after the date and year of this Agreement first above written. Developer shall maintain such public works facilities and other improvements described in this Agreement at Developer's sole cost and expense at all times prior to acceptance by City in a manner which will preclude any hazard to life or health or damage to property. SECTION 4 That the faithful and prompt performance by the Developer of each and every term and condition contained herein is made an express condition precedent to the duty of the City to perform any act in connection with this transaction, and the failure, neglect or refusal of the Developer to so perform, or to pay any monies due hereunder when due shall release the City from any and all obligations hereunder and the City, at its election, may enforce the performance of any provision herein, or any right accruing to the City or may pursue any remedy whatsoever it may have under applicable laws or the Codes, Ordinances, Resolutions, Rules and Regulations of the City, in the event of any such default by Developer. SECTION 5 That this Agreement, including without limitation the general stipulations outlined in Section 6 below, is an instrument affecting the title or possession of the real property and runs with the land. Except as expressly provided in the second sentence of Item 9 of the general stipulations set forth in Section 6 below (relating to the payment of reimbursement to the original Developer named in this Agreement), all the terms, covenants and conditions herein imposed shall be binding upon and inure to the benefit of City, Developer, the successors in interest of Developer, their respective successors and permitted assigns and all subsequent fees owners of the Property. The obligations of the Developer under this Agreement shall be the joint and several obligations of each and all of the parties comprising Developer, if Developer consists of more than one individual and/or entity. Upon the sale or division of the Property, the terms of this Agreement shall apply separately to each parcel and the fee owners of each parcel shall succeed to the obligations imposed on Developer by this Agreement. -5- 1KKS110652421 9/18/12 rev. 3/23/15 091812 -04706091 BN 28529684v3 SECTION 6 That the following general stipulations shall be completed subject to the approval of the Public Works Director /City Engineer. 1. The project shall comply with all applicable requirements of the Hecker Pass Specific Plan, Backbone Infrastructure Plan, and Development Agreement (DA). 2. The Project shall comply with all Tentative Map conditions and applicable mitigation measures as contained in City Council Resolution 2014 -35 (TM 13 -09 approval). Prior to issuance of the 350`h residential building permit or later as determined by the Public Works Director, the intersection of Hecker Pass Highway and Autumn Drive, together with the necessary travel lanes, turn lanes and roundabouts (together, the "West Intersection ") will be built and operational, per the Development Agreement, Exhibit F B 1 (a) (ii). Should Caltrans approval of this intersection be delayed, the Developer may use Lone Oak Lane and Two Oak Lane after issuance of the 350th residential building permit within the Hecker Pass Special Plan Area as approved by the Public Works Director /City Engineer. 3. The project shall comply with the conditions of approval of application AS 16 -32 as adopted by City Council Resolution No. 2017 -09. 4. Before issuance of first building permit, a construction phasing plan shall be provided to the Engineering Division. The developer shall follow the construction phasing plan approved by the Planning and Engineering Division. 5. To the extent possible, staging of equipment and supplies shall be located away from the existing residences along Lone Oak Lane. 6. The Developer acknowledges that changes to the project plans may result from review and approval of TM 13 -09 which may require removal and/or relocation of improvements. The Developer accepts the responsibility and cost for implementing the changes. 7. The Developer shall perform all work in compliance with the City of Gilroy Specifications Standards Design Criteria and Hecker Pass Specific Plan Development Agreement and is subject to all laws of the City of Gilroy by reference. 8. The Developer shall obtain the required Habitat Conservation Plan (HCP) Permit and pay the applicable fees prior to grading or improvement plan approval. 9. The project shall fully comply with the measures required by the City's Water Supply Shortage Regulations Ordinance (Gilroy City Code, Chapter 27, Article VI), and subsequent amendments, which was adopted on August 4, 2014 to meet the requirements imposed by the State of California's Water Board. This Ordinance established permanent voluntary water saving measures and temporary water conservation standards. a. All construction water from fire hydrants shall be metered and billed at the current hydrant meter rate. b. Recycled water shall be used for construction water, where available, as determined by the -6- \KKS\1065242 1 9/18/12 rev. 3/23/15 091812 -04706091 BN 28529684v3 Public Works Director. Recycled water shall be billed at the municipal industrial rate based on the current Santa Clara Valley Water District's municipal industrial rate. c. Where recycled water is not available, as determined by the Public Works Director, potable water shall be used. All City potable water will be billed based on the City's comprehensive fee schedule under the Portable Fire hydrant meter rate. 10. Prior to issuance of the 350th residential building permit within the Hecker Pass Special Plan Area or later as determined by the Public Works Director /City Engineer, all overhead utilities and poles will be removed along Hecker Pass Highway (SR 152). 11. A minimum of one exterior monument shall be set. Additional monuments can be required by the City Engineer or City Surveyor as deemed necessary. 12. Location of monuments shall be tied out prior to work. Any City monument damaged, displaced or destroyed shall be replaced at the Developer's sole expense. 13. In accordance with the California Professional Land Surveyors' Act (Business and Professions Code) Chapter 15 Sections 8771 and 8725, California Penal Code 605, and California Government Code 27581, the Developer, their employees, subcontractors, and/or any person performing, construction activities that will or may disturb an existing roadway/ street monument, corner stake, or any other permanent surveyed monument shall show all current monuments on the plans and shall ensure that a Corner Record and/or Record of Survey are filed with the County Surveyor Office prior to disturbing said monuments. All disturbed or destroyed monuments shall be reset and filed in compliance with Section 8771. 14. Prior to the recordation of the Final Map, the Conditions, Covenants and Restrictions shall be submitted to the Planning Division. 15. The Developer shall enter into a Landscape Maintenance Agreement as determined by the Director of Public Works. 16. Locate and properly dispose of any wells, septic tanks and underground fuel storage facilities. NOTE: The capping of any well will require inspection by the Santa Clara Valley Water District. 17. Schedule the construction of improvements along existing public roads so that the work affecting vehicular traffic is completed with a minimum interruption to traffic. 18. All work within the public right -of -way shall be subject to the approval of the Public Works Director /City Engineer. 19. Off -site public improvements shall be installed per the approved Improvement Plans. 20. The City shall be notified at least two (2) working days prior to the start of any construction work and at that time the contractor shall provide a project schedule and a 24 -hour emergency telephone number list. 21. All work shown on the approved improvement plans shall be inspected. Uninspected work shall be -7- \KKS110652421 9/18/12 rev. 3/23/15 091812 -04706091 BN 285296840 removed as deemed appropriate by the City Engineer. 22. All work shall be coordinated so that the existing residents on all adjacent streets have access to their properties. 23. Before construction utilizing combustible materials may proceed, an all- weather access must be provided to within 150 feet of the building site; and at least one in service fire hydrant must be available within 150 feet of each portion of the site wherein this construction is to take place. Location of the fire hydrants will be determined by the Fire Chief. 24. The Developer shall provide to the City of Gilroy electronic files, in a format acceptable to the City (PDF, DWG format, AutoCAD 2004 maximum) of the final map, tract map and/or parcel map, improvement plans, and record drawings. 25. Before issuance of any building permit, approval by both the City Engineer and City Fire Marshall must be obtained to verify site conditions and site access meet city requirements. 26. If there are any reimbursements payable to the Developer, they must be specifically identified in this Agreement. Any such reimbursements shall be payable to the original Developer named in this Agreement above, and shall not inure to the benefit of any subsequent owners of all or any portion of the Property. All reimbursements payable to Developer shall be subject to the City's reimbursement policies and ordinances in effect from time to time, including without limitation any expiration dates identified in such policies and ordinances. Such reimbursement shall be solely contingent upon the availability of the City's Traffic Impact Fee Funds and in no case shall the reimbursement be paid beyond ten (10) years after the execution of the Agreement. In addition to any other conditions, requirements and limitations set forth in the City's reimbursement policies and ordinances from time to time, (i) in no event shall any reimbursements be payable to Developer if City determines in its sole and absolute discretion from time to time that there are not sufficient reserves then on hand in the specific reimbursement fund from which Developer's reimbursement is payable, over and above any amounts anticipated to be required to be expended from such reimbursement fund, which reserves, at a minimum, are equal to at least half of the remaining average yearly anticipated expenditures of such reimbursement fund as determined by City from time to time; (ii) City may, in its sole and absolute discretion, make partial reimbursement payments to Developer in yearly increments, as determined by City; and (iii) City may defer payments in any given year if projects deemed by City to be of high importance are determined by City, in its sole and absolute discretion, to be warranted or necessary, and the funds in such reimbursement fund are designated by the City for use on such projects of high importance. SECTION 7 That the attached Development Cost Schedule enumerates all fees and their extensions. TOTAL AMOUNT DUE CITY $2,798,016 -8- 1KKS11065242 1 9/18/12 rev. 3/23/15 091812 -04706091 BN 28529684v3 CITY OF GILROY By: 2�� �� Gabriel A. Gonzalez City Administrator Date: APP R MAS RM: Andrew L. Faber, City ttorney DEVELOPER: Name: v Title: uW Date: (,/1,3 L 7 NOTE: If Developer is a corporation, the complete legal name and corporate seal of the corporation and the corporate titles of the persons signing for the corporation shall appear above. [ATTACH EXHIBIT A — LEGAL DESCRIPTION] [ATTACH CURRENT NOTARY FORM(S)] -9- 1KKS11065242.1 9/18/12 rev. 3/23/15 091812 -04706091 BN 285296840 "EXHIBIT A" CERTIFICATE OF COMPLIANCE NO. _ LOT LINE ADJUSTMENT PARCEL 2A: (Adjusted Parcel 2; 883 -M -21) All that real property situated in the City of Gilroy, County of Santa Clara, State of California, being a portion of "Parcel 2" as shown on the Parcel Map filed May 21, 2015 in Book 883 of Maps, at Pages 21 and 22, Records of Santa Clara County, California, and a portion of "Parcel 2" as shown on the Parcel Map filed September 28, 1976 in Book 380 of Maps, at Page 42, Records of Santa Clara County, California, being more particularly described as follows: Beginning at the southwest corner of "Parcel 1" as shown on the aforementioned Parcel Map filed in Book 380 of Maps, Page 42; thence along the south line of said "Parcel 1 ", N89 °1 9'53 "E, a distance of 4.08 feet; thence leaving said south line, S00 °00'00 "W, a distance of 472.57 feet to the westerly projection of the south line of "Parcel 2" as shown on the aforementioned Parcel Map filed in Book 380 of Maps, at Page 42; thence along said projection and south line, S81 °09'40 "E, a distance of 55.13 feet; thence continuing along said south line, S88 °25'40 "E, a distance of 107.09 feet; thence continuing along said south line, and the south line of "Parcel 3" as shown on the aforementioned Parcel Map filed in Book 380 of Maps, at Page 42, S81 °40'40 "E, a distance of 58.77 feet; thence continuing along said south line of said "Parcel 3 ", S88 °03'40 "E, a distance of 138.22 feet; thence continuing along said south line, N85 °21'20 "E, a distance of 77.50 feet; thence continuing along said south line and along the south line of "Parcel 4" as shown on the aforementioned Parcel Map filed in Book 380 of Maps, at Page 42, N68 °20'20 "E, a distance of 186.73 feet; thence continuing along said south line of said "Parcel 4 ", N78 °47'20 "E, a distance of 80.95 feet to the east line of "Parcel 2" as shown on the aforementioned Parcel Map filed in Book 883 of Maps, at Pages 21 and 22; thence along said east line, S00 °39'40 "E, a distance of 304.19 feet to the south line of "Parcel 2" as shown on the aforementioned Parcel Map filed in Book 883 of Maps, at Pages 21 and 22; thence along said south line, S78 °36'36 "W, a distance of 1.51 feet to a tangent curve to the right having a radius of 304.50 feet; thence continuing along said south line, westerly along said curve, through a central angle of 0803421", a distance of 45.56 feet; thence continuing along said south line, S8701 0'57"W, a distance of 18.95 feet; thence continuing along said south line, S87 °45'23 "W, a distance of 49.92 feet; thence continuing along said south line, S87 010'57 "W, a distance of 127.66 feet to a tangent curve to the left having a radius of 786.00 feet; thence continuing along said south line, westerly along said curve, through a central angle of 11 °55'51 ", a distance of 163.67 feet; thence continuing along said south line, S75 015'07 "W, a distance of 421.21 feet to a tangent curve to the right having a radius of 414.00 feet; thence continuing along said south line, northwesterly along said curve, through a central angle of 104 044'16 ", a distance of 756.80 feet; thence along the west line of said "Parcel 2" as shown on the aforementioned Parcel Map filed in Book 883 of Maps, at Pages 21 and 22, N00 °00'37 "W, a distance of 63.88 feet to a tangent curve to the right having a radius of 414.00 feet; thence continuing along said west line, northeasterly along said curve, through a central angle of 90 °00'00 ", a distance of 650.31 feet; thence along the north line of said "Parcel 2" as shown on the aforementioned Parcel Map filed in Book 883 of Maps, at Pages 21 and 22, N89 °59'23 "E, a distance of 139.65 feet; thence continuing along said north line, N88 015'15 "E, a distance of 16.51 feet; thence continuing along said north line, N89 059'23 "E, a distance of 65.17 feet; thence along the east line of said "Parcel 2" as shown on the aforementioned Parcel Map filed in Book 883 of Maps, at Pages 21 and 22, S00 °50'40 "E, a distance of 21.17 feet to the Point of Beginning. Containing 15.749 acres, more or less. As shown on "Exhibit B ", attached hereto and made a part hereof. Page 1 of 2 PARCEL 2B: (Adjusted Parcel 2; 380 -M -42) All that real property situated in the City of Gilroy, County of Santa Clara, State of California, being a portion of "Parcel 2" as shown on the Parcel Map filed May 21, 2015 in Book 883 of Maps, at Pages 21 and 22, Records of Santa Clara County, California, and a portion of "Parcel 2" as shown on the Parcel Map filed September 28, 1976 in Book 380 of Maps, at Page 42, Records of Santa Clara County, California, being more particularly described as follows: Beginning at the southwest corner of said "Parcel 2" as shown on the aforementioned Parcel Map filed in Book 380 of Maps, at Page 42; thence along the westerly projection of the south line of said "Parcel 2" as shown on the aforementioned Parcel Map filed in Book 380 of Maps, at Page 42, N81 °09'40 "W, a distance of 2.93 feet; thence N00 °00'00 "E, a distance of 472.57 feet to the north line of said "Parcel 2" as shown on the aforementioned Parcel Map filed in Book 380 of Maps, at Page 42; thence along said north line, N89 °19'53 "E, a distance of 393.18 feet to the east line of said "Parcel 2" as shown on the aforementioned Parcel Map filed in Book 380 of Maps, at Page 42; thence along said east line, S43 °44'48 "W, a distance of 42.00 feet; thence continuing along said east line, S89 °19'53 "W, a distance of 152.35 feet; thence continuing along said east line, S00 °39'40 "E, a distance of 464.61 feet; thence along the south line of said "Parcel 2" as shown on the aforementioned Parcel Map filed in Book 380 of Maps, at Page 42, N81 °40'40 "W, a distance of 56.20 feet; thence continuing along said south line, N88 °25'40 "W, a distance of 107.09 feet; thence continuing along said south line, N81 °09'40 "W, a distance of 52.20 feet to the Point of Beginning. Containing 2.494 acres, more or less. As shown on "Exhibit B ", attached hereto and made a part hereof. END OF DESCRIPTION. This description was prepared by me or under my direction pursuant to the requirements of the Professional Land Surveyor's Act. Bryan Pierce, PLS 8859 Date Expires: 12/31/2017 Page 2of2 w a O H O J a e4 h+ 6 VICINITY MAP NO SCALE "'*RW RUGGERI- JENSEN -AZAR 8055 CAMINO ARROYO GILROY, CA 95020 PHONE: (408) 848 -0300 FAX (408) 848 -0302 VICINITY MAP HEARTLAND GARDENS GILROY, CALIFORNIA JANUARY 16, 2017 JOB NUMBER: 994001 -37001 SHEET 1 OF 1 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of C; County of On personally Name) of Signer( who proved to me on the basis of satisfactory evidence to be th person(, whose name,1 i6 T€ s bscribed to the within instrument and acknoMed, ged to me tha h she*tey executed the same in his her#�cir authorized capacity(ie and that by erLt#4eir signature on the instrument the person(, the entity upon behalf of which the person( executed the in trument. IN A AL01 0 COmnN 001210S70S NOWY PWft - CWonk Sant Clara comy MV Comm ins r 15 2019 Place Notary Seal Above I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature ignature of Notary P b c OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Number of Pages: Document Date: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: \Z-VIZ- @2014 National .. :00 • -800-876-6827) •• CALIFORNIA • •. A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California ) Countyt of SO �0_r\ O ) On �V:l before me, M tns, Q _ �ic, , Date Here Insert Name and Title of thd Officer personally appeared Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is /are subscribed to the within instrument and acknowledged to me that he /she /they executed the same in his /her /their authorized capacity(ies), and that by his /her /their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. VICTORIA ADAMS WITNESS my hand and official seal. Notary Public - California < S o County > Commission #r 2105949 Signat Z ure I M Comm. Expires Apr 5, 2019 Signature of Notary Public Place Notary Seal Above OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Number of Pages: Document Date: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee Guardian or Conservator ❑ Other: Signer Is Representing: Signer's Name: -i Corporate Officer — Title(s): Partner — : Limited General El Individual Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: G:<'Sti✓:C✓. .. .: .. .: '! :�✓:�?i'.�..�,.�y.�✓:�✓,:�,.�,: .'.�.'�.�✓:�✓' ✓:�'!'.<'SS�!'.�•S:�:�✓ice, ice :. L .• ✓i�'i 6/5/2017 2:28 PM COST SCHEDULE Fees Last Revised January 20, BOd IbMDEVtENGINEERINGVDEVELtPMENT PROJECTSTEESWroject Cost Schedules\Tract 10379 Heartland Gardens 3-27 -2017 revised CITY OF GILROY PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION COST ESTIMATE EFFECTIVE 71112016 ENCOMPASS NO: Ell 17060004 Revised: Revision Number. DATE: 05- Jun -17 Revision By: NUMBER: Heartland Gardens (Tract 10399) PROJECT LOCATION: South of Hwy 152, Easterly of Uyias Creek PARCEL NUMBER: 810.20.095 & 81!030-007 OWNER/DEVELOPER: Merit WHoaxes MAILING ADDRESS: Phase IN TELEPHONE NO: PREPARED BY: Cle die Moran - Garcia Account No. Key Code Fee: Credits: Amount Due: Account Description Paid on Invoice # 100 - 2601 -0000 -3625 4904 $1,896.30 $1,896.30 $0.00 Special Public Works Sery 100 - 2601 - 0000 -3605 4702 $27,102.68 $27,102.68 $0.00 Eng Plan Check & Insp 420 -2600- 0000 -3660 4501 $1,466.40 $1,466.40 $0.00 Storm Development Fee 432 -2600- 0000 -3660 3301 $125.87 $125.87 $0.00 Str Tree Development Fee DEFERED TO 433 - 2600 - 0000 -3660 4905 $54,485.00 BUILDING PERMIT Traffic Impact Fee DEFERED TO 435 -2600- 0000 -3660 4509 $60,100.00 BUILDING PERMIT Sewer Development Fee DEFERED TO 436 - 2600 - 0000 -3660 4510 $21,470.00 BUILDING PERMIT Water Development Fee DEFERED TO 440- 2600 - 0000 -3660 4515 $94,760.00 BUILDING PERMIT Public Facility Fee 720 -0433- 0000 -3620 2202 $0.00 $0.00 Const Water Use Fee 801 - 2601 -PWDO -3899 4703 $0.00 $0.00 Reimbursements 801- 2601 -PWDO -3899 4703 $0.00 $0.00 Other Reimbursements Total $0.00 Payment Bond Amount for all improvements $247,651 Performance Bond Amount for all improvements $247,651 COST SCHEDULE Fees Last Revised January 20, BOd IbMDEVtENGINEERINGVDEVELtPMENT PROJECTSTEESWroject Cost Schedules\Tract 10379 Heartland Gardens 3-27 -2017 revised r 6/5/2017 2:28 PM ENCOMPASS NO: DATE: NUMBER: PROJECT LOCATION: PARCEL NUMBER: OWNER/DEVELOPER: MAILING ADDRESS: TELEPHONE NO: PREPARED BY: CITY OF GILROY COMMUNITY DEVELOPMENT DEPARTMENT ENGINEERING DIVISION COST ESTIMATE ALL PUBLIC FACILITY, SEWER, WATER 8 TRAFFIC FEES ARE DEFERED E1 17060004 5-Jun-2017 Heartland Gardens (Tract 10399) South of Hwy 152, Easterly of Uvas Creek 810 -20 -015 8 810 -20 -007 Meritage Homes Phase III Claudia Moran - Garcia ENGINEERING PLAN CHECK 8: INSPECTION 100 - 2601 -0000 -3605 COST ESTIMATE $27,102.68 ACTUAL COST OF PUBLIC IMPROVEMENTS FINAL ENGINEERING PLAN CHECK $0.00 At time of Improvement Plan /Final Map submittal 40% of fee is due for Plan Check. Remainder 60% due prior to submittal of Final Map for Council approval COST SCHEDULE Fees Last Revised January 20, 20(tBMDEV\ENGINEERING\DEVEL2)PMENT PROJECTS \FEES\Project Cost Schedules\Tract 10379 Heartland Gardens 3-27 -2017 revised Additional Plan Review After First Three Submittals or Review of Changes, Additions or Revisions to Approved Plans 0 hr Additional Plan Review $143.44 / hr. N, $0.00 Fee ID NO- GRADINS (2 Hour Minimum) Re- Inspection Fee 0 hr Re- Inspection $125.00 / hr. H $0.00 Fee ID NO- GRADINS FINAL ENGINEERING COST SCHEDULE TYPE: COST ESTIMATE ? Y PLAN CHECK ? N INCENTIVE AGREEMENT ONLY ? N PUBLIC FACILITY FEE ? TO PERMIT?, TO FINAL? 14 (DEFER DEFER SEWER, WATER, TRAFFIC FEES ? TO PERMIT? Y TO FINAL? N NOTE: This Preliminary Cost Schedule is an estimate and will be adjusted to the rates in effect at the time permits are issued. Site Information: Gross Acres: Lots: Units: Sq Ft: Residential -Low? 5 Residential -High ? 0.000 Commercial -Low 7 0.000 Commercial -High ? 0.000 Industrial - General ? 0.000 Industrial- Warehouse ? 0.000 Assembly Hall? 0.000 0 Common Area? 0.000 Commercial /Industrial Allocations: Sewer GPD: Water GPD: Reimbursements and credits: Front Footage/Square Footage Charges Street Tree FF: Water FF: Sewer FF: Storm FF: Const Water Acres to be Developed: 307.0 0.0 Pavement SF: Median SF: Sidewalk SF: Curb /Gutter FR Construction or FF: 0.0 0.0 M SPECIAL PUBLIC WORKS SERVICES 100 - 2601-00003625 $1,896.30 Maps: Final Map $1,755.00 + $15.70 / lot Y $1,896.30 Fee ID NO- FINALM Parcel Map $2,035.00 + $630.00 / lot N $0.00 Fee ID NO- PARCELM Re- assessment Map (Assessment District Parcels) $1,710.00 + $630.00 / lot N $0.00 Fee ID WASSESM Administration Fees: (Cost Schedules, Agreements, R/W Reviews and Other Misc. Services) 0 hr Misc Services $185.00 / hr. Y $0.00 Fee ID N -MISC Special Staff Analysis 0 hr Special Analysis $143.44 / hr. N $0.00 ENGINEERING PLAN CHECK 8: INSPECTION 100 - 2601 -0000 -3605 COST ESTIMATE $27,102.68 ACTUAL COST OF PUBLIC IMPROVEMENTS FINAL ENGINEERING PLAN CHECK $0.00 At time of Improvement Plan /Final Map submittal 40% of fee is due for Plan Check. Remainder 60% due prior to submittal of Final Map for Council approval COST SCHEDULE Fees Last Revised January 20, 20(tBMDEV\ENGINEERING\DEVEL2)PMENT PROJECTS \FEES\Project Cost Schedules\Tract 10379 Heartland Gardens 3-27 -2017 revised Additional Plan Review After First Three Submittals or Review of Changes, Additions or Revisions to Approved Plans 0 hr Additional Plan Review $143.44 / hr. N, $0.00 Fee ID NO- GRADINS (2 Hour Minimum) Re- Inspection Fee 0 hr Re- Inspection $125.00 / hr. H $0.00 Fee ID NO- GRADINS Inspections outside of normal business hours F-7hr Inspection $47500 + (Based on total cost of Improvements) Estimated Cost of Improvements 126% $0 105% $100,000 84% over Payment Bond Amount for all Improvements Performance Bond Amount for all Improvements IMPACT FEES Storm Drain Impact Fee a Residential -Low b Residential -High c Commercial d Industrial e Assembly Hall Street Tree Fee a City Planting and Replacement $306 / ff x b Inspection and Replacement $041 / If x Traffic Impact Fee a Residential -Low b Residential -High c Commercial -Low Traffic (< 10 75 trips /1000 sf) d Commercial -High Traffic ( >= 10 75 tnps /1000 sf) e Industnal - General f Industrial- Warehouse $16000 / hr after 3hrs =N $000 COST ACTUAL ESTIMATE COST _ _$247,651 1 1 $0 $100,0001 Y 1 $12,600 001 Y 1 $000 $200,000= $10,500 0o n $000 $200,000[1 $4,002 68 I v I $000 $247,651 $247,651 420- 2600 -0000 -3660 $56400 / acre =Y _ _ $1.46640 $88600 / acre =Y $000 $1,52800 ! acre =Y'1 $000 $1,12800 ! acre = $000 $56400 / acre = $000 432 - 2600 - 0000 -3660 =N 00 = $000 307 0 = $12587 433 - 2600 -0000 -3660 $10,89700 / unit =' $54,48500 $8,83400 / unit Y I $000 $12,05700 1 k s f I-1 $000 $24.35600 / It s f = $000 $4,77800 / k s f n $000 $3,46300 1 It s f = $000 6/512017 2 28 PM Fee ID NO- GRADINS DIFFERENCE ($27,10268) Fee ID NO- PCKINSP Fee ID NOSD-LD Fee ID NO-SD-HD Fee ID NOSD -C Fee ID NOSD -1 Fee ID NOSD-AH $1.46640 $12587 Fee ID NO- TREEPLT Fee ID NO- TREEINS DEFERED TO BUILDING PERMIT Fee ID Nt- TRAF -LD Fee ID N2- TRAF -HD Fee ID N3- TRAF -CL Fee ID N3- TRAF -CH Fee ID N4- TRAF -IG Fee ID N4- TRAF -IW COST SCHEDULE Fees Last Revised January 20, 2QQI5MDEV \ENGINEERING0EVELbPMENT PROJECTS \FEES\Protect Cost Schedules\Tract 10379 Heartland Gardens 327 -2017 revised 6/512017 228 PM Sewer Impact Fee 435 - 2600 -0000 -3r6�60 DEFERED TO BUILDING PERMIT a Residential -Low $12.02000 / unit t? ' $60,10000 Fee ID N1 -SS -LD to and including 12" b Residential -High $6,50400 / unit l�' $000 Fee ID N2 -SS -HD c Commercial /Industrial $3.80400 / cgpd = $000 Fee ID N5- SS -C /I 6 inch Water Impact Fee $39-00 436- 2600 -0000 -3660 0 d = DEFERED TO BUILDING PERMIT a Residential -Low $4,29400 ! unit = $21,47000 Fee ID N1- WATR -LD $000 b Residential -High $1,73700 / unit L �I $000 Fee ID N2- WATR -HD N 00, = c Commercial /Industrial $6,73100 / kgpd t=' $000 Fee ID N5- WTR -C /I / LF x N —00 = Public Facilities Impact Fee Fee ID N- WR12 -1/2 440- 2600 -0000 -316�60 Main DEFERED TO BUILDING PERMIT a Residential -Low $18,95200 / unit t=' $94,76000 Fee ID N1 -PF -LD $6200 b Residential -High S15,94500 / unit = $000 Fee ID N2 -PF -HD Main c Commercial $2,85600 / k s f �T i $000 Fee ID N3 -PF -C 20 inch of Industrial $1,26400 / k s f = $000 Fee ID N4 -PF -I Fee ID N- WR18 -1/2 Water User Fee (Construction) Main 720- 0433 - 0000 -3620 / LF x t—T 'I $000 Fee ID N- WR24 -1/2 $300 / If $000 Fee ID N0- CONWTFF N_ 001 = $000 Fee ID N- WR30 -1/2 plus Main $10600 / LF x r N 00' _ $18273 / ac $000 Fee ID NO- CONWTAC FRONT FOOT CHARGES (Used to charge and reimburse fees for existing infrastructure) The Half Pipe schedule is used to determine the front footage reimbursement to former developers for infrastructure previously Installed along the front footage of the development The Full Pipe schedule is used to determine the oversizing reimbursement to the developer for Installing water, sewer, and storm main extensions to sizes required by each master plan that are greater than the sizes required by the development The oversized portion is the difference between the master planned size for the main and the greater of the main size required by the development or the developer's minimum responsibility for each main Water 801- 2601 -PWDO -3899 Water Mains - including fire hydrants, valves, valve boxes and other pertinences Developer responsibility is up to and including 12" mains Half Pipe Lineal Footage 6 inch Main $39-00 / LF x 0 d = $000 Fee ID N- WR06 -1 /2 8 Inch Main $41 00 / LF x N _ _ 0 0 = $000 Fee ID N- WR08 -1/2 10 inch Main $4700 / LF x N 00, = $000 Fee ID N- WR10 -112 12 inch Main $5200 / LF x N —00 = $000 Fee ID N- WR12 -1/2 14 inch Main $5700 / LF x N 0 0. _ $000 Fee ID N- WR14 -1/2 16 inch Main $6200 / LF x N 00, = $000 Fee ID N- WR16 -1/2 18 inch Main $6800 / LF x N 0 0 = $000 Fee ID N- WR18 -1/2 20 inch Main $7600 / LF x N 007 , _ $000 Fee ID N- WR18 -1/2 24 inch Main $8200 / LF x N 00, _ $000 Fee ID N- WR24 -1/2 30 Inch Main $91 00 / LF x N_ 001 = $000 Fee ID N- WR30 -1/2 36 inch Main $10600 / LF x r N 00' _ $000 Fee ID N- WR36 -1/2 $000 COST SCHEDULE Fees Last Revised January 20, gtd :2MDEV\ENGINEERING\DEVEL4IPMENT PROJECTS\FEES\Prolect Cost Schedules \Tract 10379 Heartland Gardens 3 -27 -2017 revised 6/512017 2:28 PM Front Foot Charges Continued (Used to charge and reimburse fees for existing infrastructure) Sewer 801 - 2601 -PWDO -3899 $0.00 Sewer Mains - including manhole and other pertinences. Developer responsibility is up to and including 12" mains. Half Pipe Lineal Footage 6 inch Main $73.00 / LF x N' - - - y AQ = $0.00 Fee ID N- SS06 -1/2 8 inch Main $75.00 / LF x 0 = $0.00 Fee ID N- SS08 -1/2 10 inch Main $81.00 / LF x _ $0.00 Fee ID N- SS10 -1/2 12 inch Main $83.00 / LF x _ $0.00 Fee ID N- SS12 -1/2 15 inch Main $87.00 / LF x _ $0.00 Fee ID N- SS15 -1/2 18 inch Main $93.00 / LF x _ $0.00 Fee ID NSS18 -1/2 21 inch Main $102.00 / LF x ® _ $0.00 Fee ID NSS21 -1/2 24 inch Main $106.00 / LF x _ $0.00 Fee ID N- SS24 -1/2 27 inch Main $122.00 / LF x = $0.00 Fee ID NSS27 -1/2 30 inch Main $144.00 / LF x _ $0.00 Fee ID N- SS30 -1/2 33 inch Main $158.00 / LF x _ $0.00 Fee ID NSS33 -1/2 36 inch Main $178.00 / LF x _ $0.00 Fee ID N- SS36 -1/2 39 inch Main $212.00 / LF x N _ $0.00 Fee ID N- SS39 -1/2 42 inch Main $265.00 / LF x N = $0.00 Fee ID N- SS42 -1/2 Street Improvements 801- 2601 -PWDO -3899 $0.00 Pavement. Sidewalks & Medians Sauare Footaoe AC /Bike path: base $2.55 / SF x N 0.0 = $0.00 Fee ID N- STR -ACB AC /Bike path: pvmt $2.50 / SF x N 0.0 = $0.00 Fee ID N- STR -ACP Sidewalk: new $9.75 / SF x N 0.0 = $0.00 Fee ID N- STR -S/W Sidewalk: replace $13.25 / SF x N 0.0 = $0.00 Fee ID NSTR -SNVR Resurfacing $2.55 / SF x N 0.0 = $0.00 Fee ID N- STR -RESU Landscaped Median $20.35 / SF x N 0.0 = $0.00 Fee ID N- STR -LANM Hardscaped Median $11.63 / SF x N 0.0 = $0.00 Fee ID N -STR -HARD Traffic Signals (eguipment only) % of Lump Sum Traffic Signal -3 leg $130,200.00 / LS x N 0% = $0.00 Fee ID N- STR -TS3L Traffic Signal-4 leg $158,500.00 / LS x Ni 0% = $0.00 Fee ID N- STR -TS4L Curb and Gutter Lineal Footage Curb /Gutter: new $25.85 / LF x N 0.0 = $0.00 Fee ID NSTR -C /G Curb /Gutter. replace $33.40 / LF x N 0.0 = $0.00 Fee ID N- STR -C /GR Curb Ramps $1,057.63 / LF x N 0.0 = $0.00 Fee ID N- STR-CR COST SCHEDULE Fees Last Revised January 20, BOdI bMDEVIENGINEERINGIDEVEIrd)PMENT PROJECTSTEESTroject Cost ScheduleslTract 10379 Heartland Gardens 3-27 -2017 revised Front Foot Charges Continued (Used to charge and reimburse fees for existing infrastructure) Storm Drain 801- 2601 -PWDO -3899 Storm Mains - including manholes, catch basins and other pertinences. Developer responsibility is up to and including 24" mains. E N 0.0 = Half Pipe Fee ID N- SD18 -1/2 18 inch Main $63.00 / LF x 21 inch Main $69.00 / LF x 24 inch Main $70.00 / LF x 27 inch Main $82.00 ! LF x 30 inch Main $89.00 / LF x 33 inch Main $91.00 ! LF x 36 inch Main $95.00 / LF x 42 inch Main $99.00 / LF x 48 inch Main $117.00 / LF x 54 inch Main $137.00 / LF x 60 inch Main $158.00 / LF x 66 inch Main $179.00 / LF x 72 inch Main $200.00 / LF x 78 inch Main $216.00 / LF x 84 inch Main $231.00 / LF x 90 inch Main $246.00 / LF x 96 inch Main $261.00 / LF x NOTE: All deferred and /or estimated fees will be adjusted to the rates in effect at the time fees are paid. The undersigned agrees to provide actual construction costs for recalculation of fees and pay any underestimated fees prior to final acceptance. If the recalculated fees are less than the estimate, the City of Gilroy will refund the difference. Additional plan review required by changes, additions or revisions to approved plans, reinspections and inspections outside of normal business hours will be billed as shown in the City of Gilroy's most current compreheRsive fee schedule a( the ho y rates in effect at the time of inspection. V e Print 6/5/2017 2:20 PM $0.00 Mj� COST SCHEDULE Fees Last Revised January 20, B1QOMDEV \ENGINEERINGIDEVELI)PMENT PROJECTSTEESTroject Cost Schedules \Tract 10379 Heamand Gardens 327 -2017 revised Lineal Footage E N 0.0 = $0.00 Fee ID N- SD18 -1/2 N 0.0 = $0.00 Fee ID N- SD21 -1/2 N 0.0 = $0.00 Fee ID N- SD24 -1/2 N 0.0 = $0.00 Fee ID N- SD27 -1/2 N _ $0.00 Fee ID N- S030 -1/2 F!N 0.0 = $0.00 Fee ID N- SD33 -1/2 N 0.0 = $0.00 Fee ID NSD36 -1/2 N 0.0 = $0.00 Fee ID NSD42 -1/2 N _ $0.00 Fee ID N- SD48 -1/2 N _ $0.00 Fee ID N- SD54 -1/2 N _ $0.00 Fee ID NSD60 -1/2 ! N 0.0 = $0.00 Fee ID N- SD66 -1/2 N 0.0 = $0.00 Fee ID N- SD72 -1/2 N 0.0 = $0.00 Fee ID N- SD78 -1/2 N 0.0 = $0.00 Fee ID N- SD84 -1/2 N 0.0 = $0.00 Fee ID N- SD90 -1/2 N 0.0 = $0.00 Fee ID N- SD96 -1/2 NOTE: All deferred and /or estimated fees will be adjusted to the rates in effect at the time fees are paid. The undersigned agrees to provide actual construction costs for recalculation of fees and pay any underestimated fees prior to final acceptance. If the recalculated fees are less than the estimate, the City of Gilroy will refund the difference. Additional plan review required by changes, additions or revisions to approved plans, reinspections and inspections outside of normal business hours will be billed as shown in the City of Gilroy's most current compreheRsive fee schedule a( the ho y rates in effect at the time of inspection. V e Print 6/5/2017 2:20 PM $0.00 Mj� COST SCHEDULE Fees Last Revised January 20, B1QOMDEV \ENGINEERINGIDEVELI)PMENT PROJECTSTEESTroject Cost Schedules \Tract 10379 Heamand Gardens 327 -2017 revised 6/5/2017 2 28 PM OVERSIZING SCHEDULE (Used to reimburse oversized Infrastructure) Total Oversized Water, Sewer and Storm Drain Main Reimbursement $000 Total Oversized Water Main Reimbursement (Developer Is responsible for up to and Including 12" mains) $000 Oversized Minimum 12" main Oversized Full Pipe $Hoot Full Pipe $ /foot Oversized Footage Reimbursement 14 inch Main $11400 - $10400 x 1 001 = $0 00 1 N 16 Inch Main $12400 - $10400 x F 0 0� = $000 18 Inch Main $13500 - $10400 x 01 = $000 20 Inch Main $151 00 - $10400 x 0 0 = $000 (� 24 Inch Main $16400 - $10400 x = $000 30 Inch Main $18200 - $10400 x 0 0� = $000 36 Inch Main $211 00 - $10400 x �0 0� = $000 Total Oversized Sewer Main Reimbursement (Developer Is responsible for up to and Including 12" mains) $000 Oversized Minimum 12" main Oversized Full Pipe $/foot Full Pipe $/foot Oversized Footage Reimbursement 15 Inch Main $17400 - $16600 x I 001 = $0 00 1N 18 inch Main $18600 - $16600 x _0 = $000 21 Inch Main $20400 - $16600 x �1 = $000 24 Inch Main $211 00 - $16600 x �0 0� = $000 27 inch Main $24400 - $16600 x = $000 30 Inch Main $28700 - $16600 x X0 0 = $000 33 Inch Main $31500 - $16600 x D 0 = $000 36 Inch Main $35600 - $16600 x F — - — — — — To� = $000 (� 39 Inch Main $42300 - $16600 x I^ 0 0� = $000 42 Inch Main $52900 - $16600 x = $000 Total Oversized Storm Drain Main Reimbmnt (Developer Is responsible for up to and including 24" mains) $000. Oversized Minimum 24" main Oversized Full Pipe $/foot Full Pipe $/foot Oversized Footage Reimbursement 27 Inch Main $16400 - $14000 x L 001 = $0 00 1 N 30 Inch Main $17700 - $14000 x 0 = $0 02_=N 33 Inch Main $18200 - $14000 x _ -0 _ $000 36 Inch Main $18900 - $14000 x 0 = $000 42 Inch Main $19700 - $14000 x F 0 Oi = $000 48 Inch Main $23300 - $14000 x 0 0 = $000 54 Inch Main $27300 - $14000 x F — 0 = $000 60 Inch Main $31500 - $14000 x _D 1 = $000 COST SCHEDULE Fees Last Revised January 20, 20Q®MDEV \ENGINEERINGtDEVELbPMENT PROJECTSTEEMProlect Cost Schedules\Tract 10379 Heartland Gardens 3 -27 -2017 revised Oversizing Schedule Continued Oversized Storm Drain Main Reimbmnt Continued Full Pipe $/foot Oversized Footage Oversized $14000 x I 0-0, = Full Pipe $ /foot 66 inch Main $35700 72 inch Main $39900 78 inch Main $43100 64 inch Main $46100 90 inch Main $49200 96 inch Main $52200 (Used to reimburse oversized Infrastructure) Minimum 24" main Oversized Full Pipe $/foot Oversized Footage Reimbursement $14000 x I 0-0, = $0 00 I NJ $14000 x 0 01 = $000 $14000 x � 0 = _ $000 $14000 x 001 = $0 0LEN] $14000 x F 0 01 = $000 $14000 x 0 = $000 6/512017 2 28 PM COST SCHEDULE Fees Last Revised January 20, $ fi(t®MDEVIENGINEERINGTEVEt&)PMENT PROJECTSTEESIProject Cast Schedules \Tract 10379 Heartland Gardens 3-27 -2017 revised 6/512017 2 27 PM COST SCHEDULE Fees Last Revised January 20, W42MDEVtENGINEERINGIDEVELt)PMENT PROJECTSTEEMProlect Cost SchedulesMact 10379 Heartland Gardens 3-27 -2017 remised CITY OF GILROY PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION COST ESTIMATE EFFECTIVE 71112016 ENCOMPASS NO E1 16120021 Revised Revision Number DATE 05- 119n_17 Revision By NUMBER I Heartland Gardens (Tract 1037,9) PROJECT LOCATION South of Hwy 152, Easterlyof Uvas Creek PARCEL NUMBER 810,20,015.8 810-20 =007 OW NER/DEVELOPER I Meritage.Homes MAILING ADDRESS Phase TELEPHONE NO PREPARED BY CIFu—d i-al Moran- Garcia Account No Key Code Fee Credits Amount Due Account Description Paid on Invoice # 100 -2601- 0000 -3625 4904 $2,58710 $2,587 10 $000 Special Public Works Sery 100 -2601- 0000 -3605 4702 $300,86473 $300,86_4 7,3 $000 Eng Plan Check & Insp 420 - 2600- 0000 -3660 4501 $6,893 08 $6,89308 $000 Storm Development Fee®® 432 -2600- 0000 -3660 3301 $1,04960 $11,0.49 60. $000 Str Tree Development Fee DEFERED TO 433 - 2600 - 0000 -3660 4905 $353,36000 BUILDING PERMIT Traffic Impact Fee DEFERED TO 435 -2600- 0000 -3660 4509 $260,16000 BUILDING PERMIT Sewer Development Fee DEFERED TO 436 - 2600 - 0000 -3660 4510 $69,48000 BUILDING PERMIT Water Development Fee® DEFERED TO 440- 2600 - 0000 -3660 4515 $637,80000 BUILDING PERMIT Public Facility Fee 720 - 0433 - 0000 -3620 2202 $000 $000 Const Water Use Fee ®® 801 - 2601 -PW DO -3899 4703 $000 $000 Reimbursements 801 - 2601 -PW DO -3899 4703 $0 00 $000 Other Reimbursements Total $000 Payment Bond Amount for all improvements $3,506,723 Performance Bond Amount for all improvements $3,506,723 COST SCHEDULE Fees Last Revised January 20, W42MDEVtENGINEERINGIDEVELt)PMENT PROJECTSTEEMProlect Cost SchedulesMact 10379 Heartland Gardens 3-27 -2017 remised ENCOMPASS NO: DATE: NUMBER: PROJECT LOCATION: PARCEL NUMBER: OWNER/DEVELOPER: MAILING ADDRESS: TELEPHONE NO: PREPARED BY: CITY OF GILROY COMMUNITY DEVELOPMENT DEPARTMENT ENGINEERING DIVISION COST ESTIMATE ALL PUBLIC FACILITY, SEWER, WATER & TRAFFIC FEES ARE DEFERED E1 16120021 5-Jun -2017 Heartland Gardens (Tract 10379) South of Hwy 152, Easterly of Uvas Creek 810 -20 -015 & 810- 20-007 Meritage Homes Claudia Moran -Garcia 6/512017 2:27 PM Reimbursements and credits: FrontFootage/Square Footage Charges Street Tree FF: Water FF: FINAL ENGINEERING Sewer FF: Storm FF: COST SCHEDULE TYPE: COST ESTIMATE ? Y PLAN CHECK ? N INCENTIVE AGREEMENT ONLY? N': 0.0 PUBLIC FACILITY FEE? �__gaw0 Pavement SF: TO PERMIT ? Y TO FINAL? N! (DEFER DEFER SEWER, WATER, TRAFFIC FEES? Curb /Gutter FF: Construction Water FF: TO PERMIT? Y TO FINAL ?N 0.0 NOTE: This Preliminary Cost Schedule is an estimate and will be adjusted to the rates in effect at the time permits are issued. 0.0 Site Information: Gross Acres: Lots: Units: Sq Ft: Residential -Low ? 0.000 0 0 Residential -High? 7.780 53 40 $15.70 Commercial -Low ? 0.000 0 Fee ID NO- FINALM 0 Commercial -High? 0.000 0 N $0.00 0 Industrial - General ? 0.000 0 0 Industrial- Warehouse? 0.000 0 / lot 0 Assembly Hail? 0.000 0 0 Common Area? 0.000 (Cost Schedules, Agreements, R/W Reviews and Other Misc. Services) 0 Commercial /Industrial Allocations: Sewer GPD: Water GPD: $185.00 / hr. 0 0 Special Staff Analysis Reimbursements and credits: FrontFootage/Square Footage Charges Street Tree FF: Water FF: Sewer FF: Storm FF: Const Water Acres to be Developed: 2,560.0 0.0 0.0 0.0 �__gaw0 Pavement SF: Median SF: Sidewalk SF: Curb /Gutter FF: Construction Water FF: 0.0 0.0 0.0 0.0 SPECIAL PUBLIC WORKS SERVICES 100 - 2601 -0000 -3625 $2,587.10 Maps: Final Map $1,755.00 + $15.70 / lot Y $2,587.10 Fee ID NO- FINALM Parcel Map $2,035.00 + $630.00 / lot N $0.00 Fee ID NO- PARCELM Re- assessment Map (Assessment District Parcels) $1,710.00 + $630.00 / lot N $0.00 Fee ID N- ASSESM Administration Fees: (Cost Schedules, Agreements, R/W Reviews and Other Misc. Services) 0 hr Misc Services $185.00 / hr. Y $0.00 Fee ID N -MISC Special Staff Analysis 0 hr Special Analysis $143.44 / hr. N $0.00 ENGINEERING PLAN CHECK & INSPECTION 100 - 2601 -0000 -3605 COST ESTIMATE $300,864.73 ACTUAL COST OF PUBLIC IMPROVEMENTS FINAL ENGINEERING PLAN CHECK $0.00 At time of Improvement Plan /Final Map submittal 40% of fee is due for Plan Check. Remainder 60% due prior to submittal of Final Map for Council approval COST SCHEDULE Fees Last Revised January 20, ZQd2MDEVIENGINEERING0EVELaPMENT PROJECTSIFEEMProject Cost ScheduleslTract 10379 Heartland Gardens 3-27 -2017 revised Additional Plan Review After First Three Submittals or Review of Changes, Additions or Revisions to Approved Plans 0 hr Additional Plan Review $143.44 / hr. N $0.00 Fee ID NO- GRADINS (2 Hour Minimum) Re- Inspection Fee 0 hr Re- Inspection $125.00 f hr. N $0.00 Fee ID NO- GRADINS Inspections outside of normal business hours 0 hr Inspection $475.00 + (Based on total cost of improvements) Estimated Cost of Improvements 12.6% $0 10.5% $100,000 8.4% over Payment Bond Amount for all improvements Performance Bond Amount for all improvements IMPACT FEES Storm Drain Impact Fee a.Residential -Low b.Residential -High c.Commercial d.lndustrial e.Assembly Hall Street Tree Fee a.City, Planting and Replacement $3.06 ! f.f. x b.Inspection and Replacement $0.41 / fJ. x Traffic Impact Fee a.Residential -Low b.Residential -High c.Commercial -Low Traffic (< 10.75 trips /1000 sf) d.Commercial -High Traffic (> =10.75 trips /1000 sf) e.lndustrial- General I. Industrial-Warehouse $160.00 / hr. after 3hrs N $0.00 COST ACTUAL ESTIMATE COST $3,506,723 $0 $100,000 Y $12,600.00 Y $0.00 $200,000 Y $10,500.00 Y $0.00 $200,000 Y $277,764.73 Y $0.00 $3,506,723 $3,506,723 420 - 2600 -0000 -3660 $564.00 / acre Y $0.00 $886.00 / acre Y $6,893.08 $1,528.00 / acre Y $0.00 $1,128.00 / acre Y $0.00 $564.00 / acre Y $0.00 432 - 2600 -0000 -3660 N 0.0 = $0.00 Y 2,560.0 = $1,049.60 433 - 2600 -0000 -3660 $10,897.00 / unit Y $0.00 $8,834.00 / unit Y $353,360.00 $12,057.00 / k.s.f. Y $0.00 $24,356.00 / k.s.f. Y $0.00 $4,778.00 / k.s.f. Y $0.00 $3,463.00 / k.s.f. Y $0.00 6/5/2017 2:27 PM Fee ID NO- GRADINS DIFFERENCE ($300,864.73) Fee ID NO- PCKINSP Fee ID NOSD-LD Fee ID NO -SD-HD Fee ID NO -SD -C Fee ID NO -SD -I Fee ID NO -SD -AH $6,893.08 $1,049.60 Fee ID NO- TREEPLT Fee ID NO- TREEINS DEFERED TO BUILDING PERMIT Fee ID N1- TRAF -LD Fee ID N2- TRAF -HD Fee ID N3- TRAF -CL Fee ID N3- TRAF -CH Fee ID N4- TRAF -IG Fee ID N4- TRAF -IW COST SCHEDULE Fees Last Revised January 20, 2 QUlV1DEVtENGINEERING0EVELbPMENT PROJECTSIFEES1Project Cost Schedules7ract 10379 Heartland Gardens 3-27 -2017 revised 6/512017 2:27 PM Sewer Impact Fee 435 - 2600 -0000 -3660 DEFERED TO BUILDING PERMIT a.Residential -Low $12,020.00 unit Y $0.00 Fee ID N1 -SS -LD b.Residential -High $6,504.00 / unit Y $260,160.00 Fee ID N2 -SS -HD c.Commercial /Industrial $3,804.00 / cgpd Y $0.00 Fee ID N5- SS -C /I Half Pipe Water Impact Fee 436 - 2600-0000 -3660 DEFERED TO BUILDING PERMIT a.Residential -Low $4,294.00 unit Y $0.00 Fee ID N1- WATR -LD $0.00 b.Residentjal -High $1,737.00 / unit Y $69,480.00 Fee ID N2- WATR -HD N c.Commercial /industrial $6,731.00 ! kgpd Y $0.00 Fee ID N5- WTR -C /I $47.00 Public Facilities Impact Fee N 440- 2600-0000 -3660 $0.00 DEFERED TO BUILDING PERMIT a.Residental -Low $18,952.00 / unit Y $0.00 Fee ID N1 -PF -LD $0.00 b.Residenbal -High $15,945.00 / unit Y $637,800.00 Fee ID N2 -PF -HD N c.Commercial $2,856.00 / k.s.f. Y $0.00 Fee ID N3 -PF-C $62.00 d.Industrial $1,264.00 / k.s.f. Y $0.00 Fee ID N4 -PF -I 18 inch Water User Fee (Construction) $68.00 720- 0433 - 0000 -3620 N Y $0.00 Fee ID N- WR18 -1/2 $3.00 / f.f. $0.00 Fee ID NO- CONWTFF N 0.0 = $0.00 plus 24 inch Main $82.00 / LF x $18273 / a.c. $0.00 Fee ID NO- CONWTAC 30 inch FRONT FOOT CHARGES (Used to charge and reimburse fees for existing infrastructure) The Half Pipe schedule is used to determine the front footage reimbursement to former developers for infrastructure previously installed along the front footage of the development. The Full Pipe schedule is used to determine the oversizing reimbursement to the developer for installing water, sewer, and storm main extensions to sizes required by each master plan that are greater than the sizes required by the development. The oversized portion is the difference between the master planned size for the main and the greater of the main size required by the development or the developers minimum responsibility for each main. Water 801- 2601 -PWDO -3899 Water Mains - including fire hydrants, valves, valve boxes and other pertinences. Developer responsibility is up to and including 12" mains Half Pipe Lineal Footaoe 6 inch Main $39.00 / LF x N 04 = $0.00 Fee ID N- WR06 -1/2 8 inch Main $41.00 LF x N 0.0 = $0.00 Fee ID N- WR08 -1/2 10 inch Main $47.00 / LF x N 0.0 = $0.00 Fee ID N- WR10 -1/2 12 inch Main $52.00 / LF x N 0.0 = $0.00 Fee ID N- WR12 -1/2 14 inch Main $57.00 / LF x N 0.0 = $0.00 Fee ID N- WR14 -1/2 16 inch Main $62.00 / LF x N 0.0 = $0.00 Fee ID N- WR16 -1/2 18 inch Main $68.00 LF x N 0,0 = $0.00 Fee ID N- WR18 -1/2 20 inch Main $76.00 LF x N 0.0 = $0.00 Fee ID N- WR18 -1/2 24 inch Main $82.00 / LF x N 0.0 = $0.00 Fee ID N- WR24 -1/2 30 inch Main $91.00 / LF x N 0.0 = $0.00 Fee ID N- WR30 -1/2 36 inch Main $106.00 / LF x N 0:0 = $0.00 Fee ID N- WR36 -1/2 $0.00 COST SCHEDULE Fees Last Revised January 20, MUMDEVIENGINEERINGOEVEAPMENT PROJECTS\FEES\Projecl Cost Schedules \Tract 10379 Heartland Gardens 3.27 -2017 revised 6/5/2017 2:27 PM Front Foot Charges Continued (Used to charge and reimburse fees for existing infrastructure) Sewer 801- 2601 -PW DO -3899 $0.00 Sewer Mains - including manhole and other pertinences. Developer responsibility is up to and including 12" mains. Half Pipe Lineal Footage 6 inch Main $73.00 LF x N 0.0 = $0.00 Fee ID N- SS06 -1/2 8 inch Main $75.00 LF x N 0.0 = $0.00 Fee ID N- SS08 -1/2 10 inch Main $81.00 LF x N 0.0 = $0.00 Fee ID N- SS10 -1/2 12 inch Main $83.00 LF x N 0.0 = $0.00 Fee ID N- SS12 -1/2 15 inch Main $87.00 LF x N 0.0 = $0.00 Fee ID N- SS15 -1/2 18 inch Main $93.00 ! LF x N 0.0 = $0.00 Fee ID N- SS18 -1/2 21 inch Main $102.00 ! LF x N 0.0 = $0.00 Fee ID N- SS21 -1/2 24 inch Main $106.00 / LF x N 0.0 = $0.00 Fee ID N- SS24 -1/2 27 inch Main $122.00 / LF x N 0.0 = $0.00 Fee ID N- SS27 -1/2 30 inch Main $144.00 LF x N 0.0 = $0.00 Fee ID N- SS30 -1/2 33 inch Main $158.00 LF x N 0.0 = $0.00 Fee ID N- SS33 -1/2 36 inch Main $178.00 / LF x N 0.0 = $0.00 Fee ID N- SS36 -1/2 39 inch Main $212.00 LF x N 0.0 = $0.00 Fee ID N- SS39 -1/2 42 inch Main $265.00 LF x N 0.0 = $0.00 Fee ID N- SS42 -1/2 Street Improvements 801- 2601 -PW DO- 3899 $0.00 Pavement. Sidewalks 8 Medians Souare Footage AC /Bike path: base $2.55 / SF x N 0.0 = $0.00 Fee ID N- STR -ACB AC/Bike path: pvmt $2.50 SF x N 0.0 = $0.00 Fee ID N- STR -ACP Sidewalk: new $9.75 / SF x N 0.0 = $0.00 Fee ID N- STR -S/W Sidewalk: replace $13.25 SF x N 0.0 = $0.00 Fee ID N- STR -S/WR Resurfacing $2.55 / SF x N 0.0 = $0.00 Fee ID N- STR -RESU Landscaped Median $20.35 / SF x N 0.0 = $0.00 Fee ID N- STR -LANM Hardscaped Median $11.63 / SF x N 0.0 = $0.00 Fee ID N-STR -HARD Traffic Signals (eguipment only) % of Lump Sum Traffic Signal -3 leg $130,200.00 LS x N 0% = $0.00 Fee ID N- STR -TS3L Traffic Signal-4 leg $158,500.00 / LS x N 0% = $0.00 Fee ID N- STR -TS4L Curb and Gutter Lineal Footage Curb /Gutter: new $25.85 / LF x N 0.0 = $0.00 Fee ID N- STR -C /G Curb /Gutter: replace $33.40 / LF x N 0.0 = $0.00 Fee ID N- STR -C /GR Curb Ramps $1,057.63 / LF x N 0.0 = $0.00 Fee ID N- STR -CR COST SCHEDULE Fees Last Revised January 20, ZQUMDEV\ENGINEERING\DEVELbPMENT PROJECTS \FEES \Project Cost Schedules \Tract 10379 Heartland Gardens 3-27 -2017 revised Front Foot Charges Continued (Used to charge and reimburse fees for existing infrastructure) Storm Drain 801- 2601 -PWDO -3899 Storm Mains - including manholes, catch basins and other pertinences. Developer responsibility is up to and including 24" mains. N 010 = Half Pipe Fee ID N- SD 18 -1/2 18 inch Main $63.00 / LF x 21 inch Main $69.00 LF x 24 inch Main $70.00 J LF x 27 inch Main $82.00 / LF x 30 inch Main $89.00 / LF x 33 inch Main $91.00 / LF x 36 inch Main $95.00 / LF x 42 inch Main $99.00 / LF x 48 inch Main $117.00 / LF x 54 inch Main $137.00 / LF x 60 inch Main $158.00 / LF x 66 inch Main $179.00 / LF x 72 inch Main $200.00 / LF x 78 inch Main $216.00 / LF x 84 inch Main $231.00 / LF x 90 inch Main $246.00 / LF x 96 inch Main $261.00 / LF x NOTE: All deferred and /or estimated fees will be adjusted to the rates in effect at the time fees are paid. The undersigned agrees to provide actual construction costs for recalculation of fees and pay any underestimated fees prior to final acceptance. If the recalculated fees are less than the estimate, the City of Gilroy will refund the difference. Additional plan review required by changes, additions or revisions to of normal business hours will be billed as shown in the City of Gilroy in effect at the time of inspection. Accepted by: Print Name: Date: 6/52017 2:27 PM $0.00 COST SCHEDULE Fees Last Revised January 20, p tBIVIDEVIENGINEERINGVEVEAPMENT PROJECTS\FEES1Project Cost ScheduleslTract 10379 Heartland Gardens 3.27 -2017 redsed Lineal Footage N 010 = $0.00 Fee ID N- SD 18 -1/2 N W), = $0.00 Fee ID N- SD21 -1/2 N 0.0 = $0.00 Fee ID N- SD24 -1/2 N 0.0 = $0.00 Fee ID N- SD27 -1/2 $0.00 Fee ID N- SD30 -1/2 _ $0.00 Fee ID N- SD33 -1/2 _ $0.00 Fee ID N- SD36 -1/2 _ $0.00 Fee ID N- SD42 -1/2 _ $0.00 Fee ID N- SD48 -1/2 - _ $0.00 Fee ID N- SD54 -1/2 - _ $0.00 Fee ID N- SD60 -1/2 - _ $0.00 Fee ID N- SD66 -1/2 _ $0.00 Fee ID N- SD72 -1/2 - _ $0.00 Fee ID N- S078 -1/2 _ $0.00 Fee ID N- SD84 -1/2 N - $0.00 Fee ID N- SD90 -1/2 N 0.0 = $0.00 Fee ID N- SD96 -1/2 NOTE: All deferred and /or estimated fees will be adjusted to the rates in effect at the time fees are paid. The undersigned agrees to provide actual construction costs for recalculation of fees and pay any underestimated fees prior to final acceptance. If the recalculated fees are less than the estimate, the City of Gilroy will refund the difference. Additional plan review required by changes, additions or revisions to of normal business hours will be billed as shown in the City of Gilroy in effect at the time of inspection. Accepted by: Print Name: Date: 6/52017 2:27 PM $0.00 COST SCHEDULE Fees Last Revised January 20, p tBIVIDEVIENGINEERINGVEVEAPMENT PROJECTS\FEES1Project Cost ScheduleslTract 10379 Heartland Gardens 3.27 -2017 redsed OVERSILNG SCHEDULE (Used to reimburse oversized infrastructure) Total Oversized Water, Sewer and Storm Drain Main Reimbursement Total Oversized Water Main Reimbursement (Developer is responsible for up to and including 12" mains) Oversized Minimum 12" main Oversized Full Pipe $/foot Full Pipe $/foot Oversized Footage Reimbursement 14 inch Main $11400 - $10400 x 1 001 = $0 00 1 N 16 inch Main $12400 - $10400 x 0 0 = $000 18 inch Main $13500 $10400 x 0 01 = $000 20 inch Main $15100 $10400 x 0 00 = $000 24 inch Main $16400 $10400 x F------o 01 = $000 (� 30 inch Main $18200 $10400 x 0 = $000 36 inch Main $21100 $1 D4 00 x —001 = $000 Total Oversized Sewer Main Reimbursement (Developer is responsible for up to and including 12" mains) Oversized Minimum 12" main Oversized Full Pipe $/foot Full Pipe $Ifoot Oversized Footage Reimbursement 15 inch Main $17400 - $16600 x I 001 = $0 00 1 N 18 inch Main $18600 $16600 x 0 0 = $000 21 inch Main $20400 $16600 x 0 0 = $000 (� 24 inch Main $21100 $16600 x 6j = $000 27 inch Main $24400 $16600 x 001 = S000 30 inch Main $28700 $16600 x r------o -01 = $000 33 inch Main $31500 $16600 x 0 0 = $000 36 inch Main $35600 $16600 x 0 0 = $000 39 inch Main $42300 $16600 x = $000 42 inch Main $52900 $16600 x 0 0 = $000 n Total Oversized Storm Drain Main Reimbmnt (Developer is responsible for up to and including 24' mains) Oversized Minimum 24" main Oversized Full Pipe $ /foot Full Pipe Wool Oversized Footage Reimbursement 27 inch Main $16400 $14000 x F 0 Ol = $0 00 1 N 30 inch Main $177 00 $14000 x D O) = $000 33 inch Main $18200 $14000 x -�o 0 = $000 36 inch Main $18900 $14000 x F — — — — — 0� = $000 42 inch Main $19700 - $14000 x 0 = $000 48 inch Main $23300 $14000 x r = $000 54 inch Main $27300 $14000 x F-----o 01 = $000 60 inch Main $31500 $14000 x = $000 6/512017 2 27 PM $000 $000 $000 $000 COST SCHEDULE Fees Last Revised January 20, ZaUMDEVIENGINEERINGIDEVELbPMENT PROJECTSIFEESIProlect Cost Schedules%Tract 10379 Heartland Gardens 3 -27 -2017 revised 6/5/2017 2 27 PM Oversizin9 Schedule Continued (Used to reimburse oversized infrastructure) Oversized Storm Drain Main Reimbmnt Continued Oversized Minimum 24' main Oversized Full Pipe $Hoot Full Pipe $Hoot Oversized Footage Reimbursement 66 inch Main $35700 $14000 x l 001 = $0 00 I N 72 inch Main $39900 $14000 x = $000 78 inch Main $43100 $14000 x --070 = $000 84 inch Main $46100 $14000 x 0 0 = $000 90 inch Main $49200 $14000 x 0 0 = $000 96 inch Main $52200 $14000 x 0 = $000 COST SCHEDULE Fees Last Revised January 20, WdtMDEVIENGINEERINGIDEVELbPMENT PROJECTSIFEESIPro)ect Cost schedules\Tract 10379 Heartland Garderks 3.27.2017 reused 6/5/2017 2 28 PM COST SCHEDULE Fees Last Revised January 20, 2QIBMDEV \ENGINEERING \DEVELbPMENT PROJECTSTEES \Project Cost Schedules \Tract 10379 Heartland Gardens 3-27 -2017 revised CITY OF GILROY PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION COST ESTIMATE EFFECTIVE 71112016 ENCOMPASS NO E1 17060003 Revised Revision Number DATE 05- Jun -17 Revision By NUMBER Heartland Gardens (Tract 103984 PROJECT LOCATION ISouth of Hwy 152, Easterly of Uvas Creek PARCEL NUMBER 810 -20 -015 & 810 -20-007 OWNER/DEVELOPER IMeritage Homes MAILING ADDRESS Phase II TELEPHONE NO PREPARED BY Claudia Moran - Garcia Account No Key Code Fee Credits Amount Due Account Descnpbon Paid on Invoice # 100- 2601- 0000 -3625 4904 $2,241 70 $2,241 70 $000 Special Public Works Sery 100- 2601 -0000 -3605 4702 $242,50607 $242,506 07 $000 Eng Plan Check & Insp 420 -2600- 0000 -3660 4501 $4,49508 $4,495 08 $000 Storm Development Fee 432 - 2600 - 0000 -3660 3301 $74005 $740 05 $000 Str Tree Development Fee DEFERED TO 433 -2600- 0000 -3660 4905 $294,21900 0 BUILDING PERMIT Traffic Impact Fee DEFERED TO 435 - 2600 -0000 -3660 4509 $324,54000 BUILDING PERMIT Sewer Development Fee DEFERED TO 436 -2600- 0000 -3660 4510 $115,93800 0 BUILDING PERMIT Water Development Fee, DEFERED TO 440 - 2600 - 0000 -3660 4515 $511,70400 BUILDING PERMIT Public Facility Fee 720- 0433 - 0000 -3620 2202 $000 0 $000 Const Water Use Fee 801 - 2601 -PWDO -3899 4703 $000 0 $000 Reimbursements 801 - 2601 -PWDO -3899 4703 $0 00 $000 Other Reimbursements Total $000 Payment Bond Amount for all improvements $2,811,977 Performance Bond Amount for all improvements $2,811,977 COST SCHEDULE Fees Last Revised January 20, 2QIBMDEV \ENGINEERING \DEVELbPMENT PROJECTSTEES \Project Cost Schedules \Tract 10379 Heartland Gardens 3-27 -2017 revised 6/5/2017 2 28 PM FINAL ENGINEERING COST SCHEDULE TYPE COST ESTIMATE ? y ] PLAN CHECK ?n INCENTIVE AGREEMENT ONLY 7^N (DEFER PUBLIC FACILITY FEE 2 TO PERMIT ?FY I TO FINAL vl N I DEFER SEWER, WATER, TRAFFIC FEES 9 TO PERMIT ?FY J J TO FINAL ?L N._) NOTE This Preliminary Cost Schedule is an estimate and will be adjusted to the rates in effect at the time permits are Issued Site Information Residential -Low Residential -High o Commercial -Low Commercial -High Industrial- General ? Industrial- Warehouse ? Assembly Hall? Common Area? Commercial /Industrial Allocations Reimbursements and credits Front Footage/Square Footage Charges Street Tree FF 1,805 0 Pavement SF 00 SPECIAL PUBLIC WORKS SERVICES Maps Final Map $1,75500 + Parcel Map $2.03500 + Gross Acres Lots Units Sq Ft 79701 31 - — - — - �27 0 000 0 0000: 0 0� 0 0001 09 0! 0 000 0� 0 , 0 0001 0 0� 0 000 01 Sewer GPD Water GPD 0 0, Water FF Sewer FF Storm FF Const Water Acres to be Developed 0, 1 00 1 0 000, Median SF Sidewalk SF Curb /Gutter FF Construction Water FF 00! 00, 001 100 - 2601 - 0000 -3625 $2,241 70 $1570 / lot L=i $2,241 70 Fee ID NO- FINALM $630 00 / lot i N i $000 Fee ID NO- PARCELM Re- assessment Map (Assessment District Parcels) $1,71000 + $63000 / lot Administration Fees (Cost Schedules, Agreements, RAN Reviews and Other Mlsc Services) F____70 hr Mlsc Services $18500 / hr Special Staff Analysis F___70 hr Special Analysis $14344 / hr n $000 Fee ID N- ASSESM t�' $000 Fee ID N -MISC i N i $000 ENGINEERING PLAN CHECK & INSPECTION 100 - 2601 -0000 -3605 COST ESTIMATE $242.50607 ACTUAL COST OF PUBLIC IMPROVEMENTS FINAL ENGINEERING PLAN CHECK $0 00 At time of Improvement Plan /Final Map submittal 40% of fee is due for Plan Check Remainder 60% due pnor to submittal of Final Map for Council approval COST SCHEDULE Fees Last Revised January 20, 2IQlbMDEV IENGINEERINGIDEVEt2)PMENT PROJECTSTEES\Prolect Cost ScheduleslTrac110379 Heartland Gardens 3 -27 -2017 revised Additional Plan Review After First Three Submittals or Review of Changes, Additions or Revisions to Approved Plans F___07, hr Additional Plan Review $143 44 / hr EN j $000 Fee ID NO- GRADINS (2 Hour Minimum) Re- Inspection Fee F-01 hr Re- Inspection $12500 / hr = $000 Fee ID NO- GRADINS CITY OF GILROY COMMUNITY DEVELOPMENT DEPARTMENT ENGINEERING DIVISION COST ESTIMATE ALL PUBLIC FACILITY, SEWER, WATER & TRAFFIC FEES ARE DEFERED ENCOMPASS NO E7 17060003 DATE 5-Jun-2017 NUMBER Heartland Gardens (Tract 10398) PROJECT LOCATION South of Hwy 152, Easterly of Uvas Creek PARCEL NUMBER 810.20 -015 & 810.20 -007 OWNER/DEVELOPER Mentage Homes MAILING ADDRESS Phase II TELEPHONE NO PREPARED BY Claudia Moran - Garcia FINAL ENGINEERING COST SCHEDULE TYPE COST ESTIMATE ? y ] PLAN CHECK ?n INCENTIVE AGREEMENT ONLY 7^N (DEFER PUBLIC FACILITY FEE 2 TO PERMIT ?FY I TO FINAL vl N I DEFER SEWER, WATER, TRAFFIC FEES 9 TO PERMIT ?FY J J TO FINAL ?L N._) NOTE This Preliminary Cost Schedule is an estimate and will be adjusted to the rates in effect at the time permits are Issued Site Information Residential -Low Residential -High o Commercial -Low Commercial -High Industrial- General ? Industrial- Warehouse ? Assembly Hall? Common Area? Commercial /Industrial Allocations Reimbursements and credits Front Footage/Square Footage Charges Street Tree FF 1,805 0 Pavement SF 00 SPECIAL PUBLIC WORKS SERVICES Maps Final Map $1,75500 + Parcel Map $2.03500 + Gross Acres Lots Units Sq Ft 79701 31 - — - — - �27 0 000 0 0000: 0 0� 0 0001 09 0! 0 000 0� 0 , 0 0001 0 0� 0 000 01 Sewer GPD Water GPD 0 0, Water FF Sewer FF Storm FF Const Water Acres to be Developed 0, 1 00 1 0 000, Median SF Sidewalk SF Curb /Gutter FF Construction Water FF 00! 00, 001 100 - 2601 - 0000 -3625 $2,241 70 $1570 / lot L=i $2,241 70 Fee ID NO- FINALM $630 00 / lot i N i $000 Fee ID NO- PARCELM Re- assessment Map (Assessment District Parcels) $1,71000 + $63000 / lot Administration Fees (Cost Schedules, Agreements, RAN Reviews and Other Mlsc Services) F____70 hr Mlsc Services $18500 / hr Special Staff Analysis F___70 hr Special Analysis $14344 / hr n $000 Fee ID N- ASSESM t�' $000 Fee ID N -MISC i N i $000 ENGINEERING PLAN CHECK & INSPECTION 100 - 2601 -0000 -3605 COST ESTIMATE $242.50607 ACTUAL COST OF PUBLIC IMPROVEMENTS FINAL ENGINEERING PLAN CHECK $0 00 At time of Improvement Plan /Final Map submittal 40% of fee is due for Plan Check Remainder 60% due pnor to submittal of Final Map for Council approval COST SCHEDULE Fees Last Revised January 20, 2IQlbMDEV IENGINEERINGIDEVEt2)PMENT PROJECTSTEES\Prolect Cost ScheduleslTrac110379 Heartland Gardens 3 -27 -2017 revised Additional Plan Review After First Three Submittals or Review of Changes, Additions or Revisions to Approved Plans F___07, hr Additional Plan Review $143 44 / hr EN j $000 Fee ID NO- GRADINS (2 Hour Minimum) Re- Inspection Fee F-01 hr Re- Inspection $12500 / hr = $000 Fee ID NO- GRADINS Inspections outside of normal business hours F 01hr Inspection $47500 + (Based on total cost of improvements) Estimated Cost of Improvements 126% $0 105% $100,000 84% over Payment Bond Amount for all improvements Performance Bond Amount for all improvements IMPACT FEES Storm Drain Impact Fee a Residential -Low b Residential-High c Commercial d Industrial e Assembly Hall Street Tree Fee a City Planting and Replacement $306 / If x b Inspection and Replacement $041 / ff x Traffic Impact Fee a Residential -Low b Residential -High c Commercial -Low Traffic (c 10 75 tnps /1000 so d Commercial -High Traffic (> 10 75 tnps /1000 sf) e Industnal- General f Industrial- Warehouse $16000 / hr after 3hrs CI $000 COST ACTUAL ESTIMATE COST $2,811,9771 $01 _1 $100,00011 $12,600 00 I Y 1 $000 $200,000 $10,500 00 1 $000 $200,0001 $219,406 07 n $000 $2,811,977 $2,811,977 420 - 2600 - 0000 -3660 $56400 / acre LYY $4,49508 $88600 ! acre LY$ _$000 $1,52800 / acre =YY $000 $1.12800 / acre L_ $000 $56400 / acre 1 $000 432 - 2600 -0000 -3660 00 = $000 1 1,805 0 = $74005 433 -2600- 0000 -3660 $10,89700 / unit L= $294,21900 $8,83400 / unit 11 $000 $12.05700 / k s f I_ $000 $24,35600 ! k s f = $000 $4 778 00 / k s f 11 $000 $3 463 00 / k s f =i $000 6/512017 2 28 PM Fee ID NO- GRADINS DIFFERENCE ($242,506 07) Fee ID NO- PCKINSP Fee ID NO -SD-LD Fee ID NO-SD-HD Fee ID NO -SD-C Fee ID NO-SD-1 Fee ID NOSD-AH $4,495 08 $74005 Fee ID NO- TREEPLT Fee ID NO- TREEINS DEFERED TO BUILDING PERMIT Fee ID N1- TRAF -LD Fee ID N2- TRAF -HD Fee ID N3- TRAF -CL Fee ID N3- TRAF -CH Fee ID N4- TRAF -IG Fee ID N4- TRAF -IW COST SCHEDULE Fees Last Revised January 20, 2QQ®MDEVIENGINEERINGIDEVELI)PMENT PROJECTSIFEESIProject Cost Schedules \Tract 10379 Heartland Gardens 3-27 -2017 revised 61512017 2:28 PM Sewer Impact Fee 435 - 2600 -0000 -3660 DEFERED TO BUILDING PERMIT a.Residential -Low $12,020.00 / unit Y $324,540.00 Fee ID N1SS-LD b.Residential -High $6,504.00 / unit Y $0.00 Fee ID N2-SS-HD c.Commercial /Industrial $3,804.00 / cgpd ya $0.00 Fee ID N5- SS-C /I Half Pipe Water Impact Fee Lineal Footage 436 - 2600 - 0000 -3660 DEFERED TO BUILDING PERMIT a.Residential -Low $4,294.00 / unit $115,938.00 Fee ID N1- WATR -LD Fee ID N- WR06 -1/2 8 inch b.Residential -High $1,737.00 / unit $0.00 Fee ID N2- WATR -HD $0.00 c.Commercial /Industrial $6.731.00 / kgpd °' $0.00 Fee ID N5- WTR -C /I N Public Facilities Impact Fee $0.00 440- 2600 - 00003660 12 inch DEFERED TO BUILDING PERMIT a.Residential -Law $18,952.00 / unit Y $511,704.00 Fee ID N1 -PF -LD 14 inch b.Residentiai -High $15,945.00 / unit Y $0.00 Fee ID N2 -PF -HD $0.00 c.Commercial $2,856.00 / k.s.f. Y $0.00 Fee ID N3 -PF-C N d.lndustrial $1,264.00 / k.s.f. Y $0.00 Fee ID N4 -PF -I $68.00 Water User Fee (Construction) N 720 -0433 -00003620 $0.00 Y $0.00 Main $3.00 / f.f. $0.00 Fee ID NO- CONWTFF $0.00 Fee ID N- WR18 -1/2 24 inch plus $82.00 / LF x N 0,0 = $182.73 / a.c. $0.00 Fee ID NO- CONWTAC $91.00 FRONT FOOT CHARGES (Used to charge and reimburse fees for existing infrastructure) The Half Pipe schedule is used to determine the front footage reimbursement to former developers for infrastructure previously installed along the front footage of the development. The Full Pipe schedule is used to determine the oversizing reimbursement to the developer for installing water, sewer, and storm main extensions to sizes required by each master plan that are greater than the sizes required by the development. The oversized portion is the difference between the master planned size for the main and the greater of the main size required by the development or the developer's minimum responsibility for each main. Water 801- 2601 -PWDO -3899 Water Mains - including fire hydrants, valves, valve boxes and other pertinences. Developer responsibility is up to and including 12" mains Half Pipe Lineal Footage 6 inch Main $39.00 / LF x N 0.0 = $0.00 Fee ID N- WR06 -1/2 8 inch Main $41.00 / LF x N 0.0 = $0.00 Fee ID N- WR08 -1/2 10 inch Main $47.00 / LF x N 0.0 = $0.00 Fee ID N- WR10 -1/2 12 inch Main $52.00 / LF x N 0.0 = $0.00 Fee ID N- WR12 -1/2 14 inch Main $57.00 / LF x N 0.0 = $0.00 Fee ID N- WR14 -1/2 16 inch Main $62.00 / LF x N 0.0 = $0.00 Fee ID N- WR16 -1/2 18 inch Main $68.00 / LF x N 0.0 = $0.00 Fee ID N- WR18 -1/2 20 inch Main $76.00 / LF x N 0.0 = $0.00 Fee ID N- WR18 -1/2 24 inch Main $82.00 / LF x N 0,0 = $0.00 Fee ID N- WR24 -1/2 30 inch Main $91.00 / LF x N, 0'10 = $0.00 Fee ID N- WR30 -1/2 36 inch Main $106.00 / LF x N G.G = $0.00 Fee ID N- WR36 -1/2 $0.00 COST SCHEDULE Fees Last Revised January 20, Wd®MDEV\ENGINEERING\DEVELbPMENT PROJECTS\FEES\Project Cost Schedules \Tract 10379 Heartland Gardens 327 -2017 revised 6/5/2017 2:28 PM Front Foot Charges Continued (Used to charge and reimburse fees for existing infrastructure) Sewer 801- 2601 -PWDO -3899 $0.00 Sewer Mains - including manhole and other pertinences. Developer responsibility is up to and including 12" mains. Half Pipe Lineal Footage 6 inch Main $73.00 / LF x N 0.0 = $0.00 Fee ID N- SS06 -1/2 8 inch Main $75.00 / LF x N 0.0 = $0.00 Fee ID N- SS08 -1/2 10 inch Main $81.00 / LF x N 0.0 = $0.00 Fee ID N- SS10 -1/2 12 inch Main $83.00 / LF x N 0.0 = $0.00 Fee ID NSS12 -1/2 15 inch Main $87.00 f LF x N 0.0 = $0.00 Fee ID N- SS15 -1/2 18 inch Main $93.00 / LF x N 0.0 = $0.00 Fee ID N- SS18 -1/2 21 inch Main $102.00 / LF x N 0.0 = $0.00 Fee ID N- SS21 -1/2 24 inch Main $106.00 / LF x N 0.0 = $0.00 Fee ID NSS24 -1/2 27 inch Main $122.00 / LF x N 0.0 = $0.00 Fee ID N- SS27 -1/2 30 inch Main $144.00 ! LF x N 0'.0 = $0.00 Fee ID N- SS30 -1/2 33 inch Main $158.00 / LF x N 0.0 = $0.00 Fee ID N- SS33 -1/2 36 inch Main $178.00 / LF x N 0.0 = $0.00 Fee ID N- SS36 -1/2 39 inch Main $212.00 / LF x N 0.0 = $0.00 Fee ID N- SS39 -1/2 42 inch Main $265.00 / LF x N 0.0 = $0.00 Fee ID N- SS42 -1/2 Street Improvements 801- 2601 -PWDO -3899 $0.00 Pavement. Sidewalks 8 Medians Square Footage AC /Bike path: base $2.55 / SF x N 0.0 = $0.00 Fee ID N- STR -ACB AC /Bike path: pvmt $2.50 / SF x N 0.0 = $0.00 Fee ID N- STR -ACP Sidewalk: new $9.75 / SF x N 0.0 = $0.00 Fee ID N- STRS/W Sidewalk: replace $13.25 / SF x N 0.0 = $0.00 Fee ID N- STRS/WR Resurfacing $2.55 ! SF x N 0.0 = $0.00 Fee ID N- STR -RESU Landscaped Median $20.35 / SF x N 0.0 = $0.00 Fee ID N- STR -LANM Hardscaped Median $11.63 / SF x N 0.0 = $0.00 Fee ID N -STR -HARD Traffic Signals (equipment only % of Lump Sum Traffic Signal -3 leg $130,200.00 ! LS x N' 0% = $0.00 Fee ID N- STR -TS3L Traffic Signal-4 leg $158,500.00 / LS x N 0% _ $0.00 Fee ID N- STR -TS4L Curb and Gutter Lineal Footace Curb /Gutter: new $25.85 / LF x N 0.0 = $0.00 Fee ID N- STR -C /G Curb /Gutter: replace $33.40 / LF x N 0.0 = $0.00 Fee ID N- STR -C /GR Curb Ramps $1,057.63 / LF x N 0.0 = $0.00 Fee ID N- STR-CR COST SCHEDULE Fees Last Revised January 20, 2 0dtMDEVIENGINEERINGtDEVELB)PMENT PROJECTSTEEMProject Cost Schedules \Tract 10379 Heartland Gardens 3-27 -2017 revised Front Foot Charges Continued (Used to charge and reimburse fees for existing infrastructure) Storm Drain 801- 2601 -PWDO -3899 Storm Mains - including manholes, catch basins and other pertinences. Developer responsibility is up to and including 24" mains. - _ $0.00 Fee ID N- SD21 -1/2 Half Pipe Fee ID N- SD24 -1/2 18 inch Main $63.00 / LF x 21 inch Main $69.00 / LF x 24 inch Main $70.00 / LF x 27 inch Main $82.00 / LF x 30 inch Main $89.00 / LF x 33 inch Main $91.00 / LF x 36 inch Main $95.00 / LF x 42 inch Main $99.00 / LF x 48 inch Main $117.00 / LF x 54 inch Main $137.00 / LF x 60 inch Main $158.00 / LF x 66 inch Main $179.00 / LF x 72 inch Main $200.00 / LF x 78 inch Main $216.00 I LF x 84 inch Main $231.00 / LF x 90 inch Main $246.00 / LF x 96 inch Main $261.00 / LF x Lineal Footage _ $0.00 Fee ID N- SD18 -1/2 - _ $0.00 Fee ID N- SD21 -1/2 _ $0.00 Fee ID N- SD24 -1/2 _ $0.00 Fee ID N- SD27 -1/2 $0.00 Fee ID N- SD30 -1/2 $0.00 Fee ID NSD33 -1/2 _ $0.00 Fee ID N- SD36 -1/2 _ $0.00 Fee ID NSD42 -1/2 ° $0.00 Fee ID NSD48 -1/2 $0.00 Fee ID N- SD54 -1/2 _ $0.00 Fee ID N- SD60 -112 $0.00 Fee ID NSD66 -1/2 _ $0.00 Fee ID N- SD72 -1/2 $0.00 Fee ID NSD78 -1/2 _ $0.00 Fee ID N- SD84 -1/2 - $0.00 Fee ID N- SD90 -1/2 N ttQ = $0.00 Fee ID N- SD96 -1/2 NOTE: All deferred and /or estimated fees will be adjusted to the rates in effect at the time fees are paid. The undersigned agrees to provide actual construction costs for recalculation of fees and pay any underestimated fees prior to final acceptance. If the recalculated fees are less than the estimate, the City of Gilroy will refund the difference. Additional plan review required by changes, additions or revisions to approved plans, reinspections and inspections outside of normal business hours will be billed as shown in the City of Gilroy's most current comprehensive fee schedule at the hpur in effect at the time of inspection. n t \` Accepted Print 6/5/2017 2:2B PM $0.00 COST SCHEDULE Fees Last Revised January 20, 2QdZMDEVZNGINEERINGIDEVEIibPMENT PROJECTSWEEMProject Cost Schedules%Tract 10379 Heartland Gardens 3.27 -2017 revised OVERSI27NG SCHEDULE (Used to reimburse oversized Infrastructure) Total Oversized Water, Sewer and Storm Drain Main Reimbursement 61512017 2 28 PM $000 Total Oversized Water Main Reimbursement (Developer is responsible for up to and Including 12" mains) $000 Oversized Minimum 12" main Oversized Full Pipe $ /foot Full Pipe $/foot Oversized Footage Reimbursement 14 inch Main $11400 - $104 00 x 1 00, = $000 1 N 16 inch Main $12400 - $10400 x F-0 = $000 (� 18 inch Main S13500 - $10400 x F 0 = $000 20 inch Main $151 00 - $10400 x F-0 0 = $000 24 inch Main $16400 - $10400 x 0 = $000 30 inch Main $18200 - $10400 x 0 = $000 36 inch Main $211 00 - $10400 x - = $000 Total Oversized Sewer Main Reimbursement (Developer is responsible for up to and including 12" mains) $000 Oversized Minimum 12" main Oversized Full Pipe $Hoot Full Pipe $Hoot Oversized Footage Reimbursement 15 inch Main $17400 - $16600 x 1 00" = $0 00 1 N 18 inch Main $18600 - $16600 x F-0 01 = $000 21 inch Main $20400 - $16600 x 0� _ $000 24 inch Main $211 00 - $16600 x 0 0; _ $000 27 inch Main $24400 - $16600 x F--------070 _ $0 00 n 30 inch Main $28700 - $16600 x 0 0 = $000 n 33 inch Main $31500 - $16600 x 0 = $000 36 inch Main $35600 - $16600 x 0 0 = $000 n 39 inch Main $42300 - $16600 x F--�o 01 = $000 42 inch Main $52900 - $16600 x 0 0) _ $000 Total Oversized Storm Drain Main Reimbmnt (Developer is responsible for up to and including 24" mains) $000 Oversized Minimum 24" main Oversized Full Pipe $Hoot Full Pipe $/foot Oversized Footage _ Reimbursement 27 inch Main $16400 - $14000 x 1 001 = $0 00 1 N 30 inch Main $17700 - $14000 x 0 = $0 00 = 33 inch Main $18200 - $14000 x $000 36 inch Main $18900 - $14000 x 0 = $000 (� 42 inch Main $19700 - $14000 x 0 3 _ $000 48 inch Main $23300 - $14000 x F-------070 _ $0 00 = 54 inch Main $27300 - $14000 x = 60 inch Main $31500 - $14000 x -001 = $000 COST SCHEDULE Fees Last Revised January 20, SGQlbMDEVIENGINEERING IDEVELbPMENT PROJECTSIFEESTmject Cost SchedulesUract 10379 Heartland Gardens 3-27 -2017 revised Oversizing Schedule Continued (Used to reimburse oversized Infrastructure) Oversized Storm Drain Mein Reimbmnt Continued Oversized Minimum 24" main Oversized Full Pipe $/foot Full Pipe $/foot Oversized Footage Reimbursement 66 inch Main $35700 - $14000 x 1 00 = $0 00 1 N 72 inch Main $39900 - $14000 x F 0 = _ $000 (� 78 inch Main $431 00 - $14000 x 0 0 = $000 84 inch Main $461 00 - $14000 x 0 01 = $000 90 inch Main $49200 - $14000 x 0 = $000 96 inch Main $52200 - $14000 x 0 0 = $000 6/512017 2 28 PM COST SCHEDULE Fees Last Revised January 20, 20 Q®MDEVtENGINEERING\DEVEtrR)PMENT PROJECTSWEESTrolect Cost ScheduleslTract 10379 Heartland Gardens 3 -27 -2017 revised