PIA No. 2018-01 - Gilroy Self Storage Partners LLC1,5-bv
RECORDING REQUESTED BY:
City of Gilroy
I-r,,l0 _G'Q 19 &
WHEN RECORDED, MAIL TO:
Shawna Freels
City of Gilroy
7351 Rosanna Street
Gilroy, CA 95020
" *This document was electronically submitted
to Santa Clara County for recording "
23912625
Regina Alcomendras
Santa Clara County - Clerk- Recorder
04/18/2018 02:02 PM
Titles:1 Pages: 21
Fees: $0.00
Tax: $0
Total: $0.00
(SPACE ABOVE THIS LINE FOR RECORDER'S USE)
Property Improvement Agreement No. 2018 -01
PROJECT TITLE — San Ysidro Storage
APN: 835 -04 -078
Gilroy Self Storage Partners, LLC, a California Limited Liability Company
4-
1XMI065242.1 9/18/12
091612-04706091
l-r b0�
RECORDING REQUESTED BY:
City of Gilroy
WHEN RECORDED, MAIL TO:
Shawna Freels
City of Gilroy
7351 Rosanna Street
Gilroy, CA 95020
THIS DOCUMENT HAS BEEN
ELECTRONICALLY RECORDED. SEE
THE ATTACHED COVER PAGE FOR
RECORDING INFORMATION
(SPACE ABOVE THIS LINE FOR RECORDER'S USE)
Property Improvement Agreement No. 2018 -01
PROJECT TITLE — San Ysidro Storage
APN: 835 -04 -078
Gilroy Self Storage Partners, LLC, a California Limited Liability Company
-1-
WKS11065242.1 9/18/12
091812 - 04706091
PROPERTY IMPROVEMENT AGREEMENT
COMMERCIAL
AGREEMENT FOR PROJECT FRONTAGE IMPROVEMENTS AND EXTENSIONS OF STORM
DRAINAGE FAILITIES TO SERVE THE SITE, INCLUDING BUT NOT LIMITED TO STREET
IMPROVEMENTS, INSTALLATION OF WATER, SEWERS AND OTHER PUBLIC WORKS
FACILITIES
Property Improvement Agreement No. 2018 -01
This Property Improvement Agreement ( "Agreement ") is made and entered into this & &y of
20—&-, by and between the City of Gilroy, a municipal corporation, herein called the "City,"
and Gilroy Self Storage Partners, LLC, a California Limited Liability Company, herein called the
"Developer ".
WHEREAS, a final map of subdivision, record of survey or building permit (Site Clearance)
application has now been submitted to the City for approval and acceptance, covering certain real estate
and property improvements known as and called: San Ysidro Storage, APN: 835 -04 -078, a legal
description of which is attached hereto and incorporated herein as Exhibit "A" (the "Property "), and as
described in the project improvement plans entitled San Ysidro Storage.
WHEREAS, the Developer is the fee owner of the Property and requires certain utilities and
public works facilities in order to service the Property under the minimum standards established by the
City and,
WHEREAS, the City, by and through its City Council, has enacted certain Codes, Ordinances and
Resolutions and certain Rules and Regulations have been promulgated concerning the subject matter of
this Agreement and,
WHEREAS, the City has certain responsibilities for maintenance and operation of such utilities
and public service facilities after acceptance by City, and for providing the necessary connecting system,
general plant and appurtenances, and the City is agreeing to discharge those responsibilities, provided
that Developer has faithfully and fully complied with all of the terms, covenants, conditions to be
performed by Developer pursuant to this Agreement.
NOW THEREFORE, in consideration of the foregoing premises and in order to carry on the
intent and purpose of said Codes, Ordinances, Resolutions and Regulations, it is agreed by and between
the parties as follows:
SECTION 1
That all Codes, Ordinances, Resolutions, Rules and Regulations and established policies of the
City and the laws of the State of California and the United States of America concerning the subject
matter of this Agreement are hereby referred to and incorporated herein to the same effect as if they
were set out at length herein. Said Codes, Ordinances, Resolutions, Rule and Regulations include, but
are not limited to, the following: the Code of the City of Gilroy, the current Zoning Ordinance, and the
currently adopted Uniform Building Code.
-2-
WKS11065242.1 9/18/12
091812 - 04706091
SECTION 2
The Developer agrees:
a. To perform each and every provision required by the City to be performed by the Developer in each
and every one of said Codes, Ordinances, Resolutions, Rules and other Regulations and to comply
with the foregoing and all applicable laws.
b. To grant to the City without charge, free and clear of encumbrances, any and all easements and
rights of way in and to the Property necessary for the City in order that its water, electricity, and/or
sewer lines in or to said Property may be extended.
c. To indemnify, defend with counsel of City's choice and hold the City free and harmless from all
suits, fees, claims, demands, causes of action, costs, losses, damages, liabilities and expenses
(including without limitation attorneys' fees) incurred by City in connection with (i) any damage
done to any utility, public facility or other material or installation of the City on said Property which
the Developer or any contractor or subcontractor of the Developer, or any employee of the
foregoing, shall do in grading or working upon said Property; or (ii) arising or resulting directly or
indirectly from any act or omission of Developer or Developer's contractors, or subcontractors, or
any employee of the foregoing in connection with the work performed by them in connection with
this Agreement, including without limitation all claims relating to injury or death of any person or
damage to any property.
d. To construct and improve all public works facilities and other improvements described in this
Agreement and the improvement plans submitted to the City of Gilroy in furtherance of this
Agreement on file with the City of Gilroy. All construction and improvements shall be completed in
accordance with all standards established in the Codes, Ordinances, Resolutions, Rules and
Regulations, all applicable laws and this agreement, and in accordance with the grades, plans, and
specifications approved by the City Engineer. Developer shall furnish two good and sufficient
bonds, a Payment Bond on a form provided by the City and a Faithful Performance Bond, both of
which shall be secured from a surety company admitted to do business in California. Each bond
shall set forth a time period for performance by the contractor of its obligations and the terms and
conditions on which the City may obtain the proceeds of the bond.
The Faithful Performance Bond shall be in an amount not less than one hundred percent (100 %) of
the total estimated amount payable for the improvements described in this Agreement, and shall
secure payment to City and the Developer of any loss due to the default of the contractor or its
inability or refusal to perform its contract. The performance bond shall by its terms remain in full
force and effect for a period of not less than one year after completion of the improvements by
Developer and acceptance of the improvements by City, to guarantee the repair and replacement of
defective material and faulty workmanship. Upon completion of the improvements by Developer
and acceptance of the improvements by City, Developer may substitute for the performance bond
securing maintenance described above, a separate maintenance bond issued by an admitted surety in
the amount of ten percent (10 1/6) of the total contract price of the improvements (provided that the
amount of said bond shall not be less than One Thousand Dollars ($1,000) to cover the one -year
maintenance period.
-3-
WKS11065242.1 9/18/12
091812 - 04706091
The Payment Bond shall be in an amount not less than one hundred percent (100 %) of the total
estimated amount payable for the improvements described in this Agreement. The Payment Bond
shall secure the payment of those persons or entities to whom the Developer may become legally
indebted for labor, materials, tools, equipment or services of any kind used or employed by the
contractor or subcontractor in performing the work, or taxes or amounts to be withheld thereon. The
Payment Bond shall provide that the surety will pay the following amounts should the Contractor or
a Subcontractor fail to pay the same, plus reasonable attorneys' fees to be fixed by the court if suit is
brought upon the bond: (1) amounts due to any of the persons named in California Civil Code
Section 9100; (2) amounts due under the Unemployment Insurance Code with respect to work or
labor performed for the improvements described in this Agreement; and (3) any amounts required to
be deducted, withheld, and paid over to the Employment Development Department from the wages
of employees of the Contractor and Subcontractors pursuant to Section 13020 of the Unemployment
Insurance Code with respect to the work and labor. The Payment Bond shall, by its terms, inure to
the benefit of any of the persons named in Civil Code Section 3181 so as to give a right of action to
those persons or their assigns in any suit brought upon the bond.
Simultaneously with the submission of its building permit application (Site Clearance), the
Developer shall submit the following for both the surety that furnishes the Payment Bond and the
surety that furnishes the Faithful Performance Bond: (1) a current printout from California
Department of Insurance's website (www.insurance.ca.gov) showing that the surety is admitted to
do business in the State; or (2) a certificate from the Clerk of the County of Santa Clara that the
surety's certificate of authority has not been surrendered, revoked, canceled, annulled, or suspended
or in the event that it has, that renewed authority has been granted.
e. Except as otherwise expressly provided in this Agreement, all plan check and inspection fees which
are payable by Developer pursuant to the attached comprehensive fee schedule are due and payable
to the City prior to Council approval of the final map of the subdivision. Upon approval of the
record of survey or the building permit covering the real estate to be improved and before any work
is done therein, the Developer shall pay to the City all other sums payable by Developer pursuant to
the attached comprehensive fee schedule.
f. At all times during the term of this Agreement and until the improvements constructed by Developer
are accepted by City, Developer shall, at no cost to City obtain and maintain (a) a policy of general
liability and property damage insurance in the minimum amount of One Million Dollars
($1,000,000), combined single limit for both bodily injury and property damage; (b) workers'
compensation insurance as required by law; and (c) broad form "Builder's Risk" property damage
insurance with limits of not less than 100% of the estimated value of the improvements to be
constructed by Developer pursuant to this Agreement.
All such policies shall provide that thirty (30) days written notice must be given in advance to City
prior to termination, cancellation or modification. The insurance specified in (a) above shall name
City as an additional insured and the insurance specified in (c) shall name City as a loss payee, and
shall provide that City, although an additional insured or loss payee, may recover for any loss
suffered by reason of the acts or omissions of Developer or Developer's contractors or
subcontractors or their respective employees. Developer hereby waives, and Developer shall cause
each of its contractors and subcontractors to waive, all rights to recover against City for any loss or
damage arising from a cause covered by the insurance required to be carried pursuant to this
Agreement or actually carried by Developer in connection with the work described in this
-4-
WWI 065242.1 9/18/12
091812 - 04706091
Agreement, and will cause each insurer to waive all rights of subrogation against City in connection
therewith. All policies shall be written on an occurrence basis and not on a claims made basis and
shall be issued by insurance companies acceptable to City. Prior to commencing any work pursuant
this Agreement, Developer shall deliver to City the insurance company's certificate evidencing the
required coverage, or if required by City a copy of the policies obtained.
SECTION 3
That all the provisions of this Agreement and all work to be done pursuant to the terms of this
Agreement are to be completed to City's satisfaction within one year from and after the date and year of
this Agreement first above written. Developer shall maintain such public works facilities and other
improvements described in this Agreement at Developer's sole cost and expense at all times prior to
acceptance by City in a manner which will preclude any hazard to life or health or damage to property.
SECTION 4
That the faithful and prompt performance by the Developer of each and every term and condition
contained herein is made an express condition precedent to the duty of the City to perform any act in
connection with this transaction, and the failure, neglect or refusal of the Developer to so perform, or to
pay any monies due hereunder when due shall release the City from any and all obligations hereunder
and the City, at its election, may enforce the performance of any provision herein, or any right accruing
to the City or may pursue any remedy whatsoever it may have under applicable laws or the Codes,
Ordinances, Resolutions, Rules and Regulations of the City, in the event of any such default by
Developer.
SECTION 5
That this Agreement, including without limitation the general stipulations outlined in Section 6
below, is an instrument affecting the title or possession of the real property and runs with the land.
Except as expressly provided in the second sentence of Item 9 of the general stipulations set forth in
Section 6 below (relating to the payment of reimbursement to the original Developer named in this
Agreement), all the terms, covenants and conditions herein imposed shall be binding upon and inure to
the benefit of City, Developer, the successors in interest of Developer, their respective successors and
permitted assigns and all subsequent fees owners of the Property. The obligations of the Developer
under this Agreement shall be the joint and several obligations of each and all of the parties comprising
Developer, if Developer consists of more than one individual and /or entity. Upon the sale or division of
the Property, the terms of this Agreement shall apply separately to each parcel and the fee owners of
each parcel shall succeed to the obligations imposed on Developer by this Agreement.
SECTION 6
That the following general stipulations shall be completed subject to the approval of the Public
Works Director /City Engineer.
1. Locate and properly dispose of any wells, septic tanks and underground fuel storage facilities.
NOTE: The capping of any well will require inspection by the Santa Clara Valley Water District.
2. Schedule the construction of improvements along existing public roads so that the work affecting
-5-
IKKS11066242.1 9/18/12
091812 - 04706091
vehicular traffic is completed with a minimum interruption to traffic.
3. All work within the public right -of -way shall be subject to the approval of the Public Works
Director /City Engineer.
4. Before construction utilizing combustible materials may proceed, an all - weather access must be
provided to within 150 feet of the building site; and at least one in service fire hydrant must be
available within 150 feet of each portion of the site wherein this construction is to take place.
Location of the fire hydrants will be determined by the Fire Chief.
5. All work shall be coordinated so that the existing residents on all adjacent streets have access to their
properties.
6. Off -site public improvements shall be installed per the approved Improvement Plans.
7. The Developer shall provide to the City of Gilroy electronic files, in a format acceptable to the City
(PDF, DWG format, AutoCAD 2004 maximum) of the final map, tract map and/or parcel map,
improvement plans, and record drawings.
8. Before issuance of any building permit, all roadway infrastructures shall be in place and covered
with an all weather road subject to the approval of the City Engineer.
9. If there are any reimbursements payable to the Developer, they must be specifically identified in this
Agreement. Any such reimbursements shall be payable to the original Developer named in this
Agreement above, and shall not inure to the benefit of any subsequent owners of all or any portion of
the Property. All reimbursements payable to Developer shall be subject to the City's reimbursement
policies and ordinances in effect from time to time, including without limitation any expiration dates
identified in such policies and ordinances. In addition to any other conditions, requirements and
limitations set forth in the City's reimbursement policies and ordinances from time to time, (i) in no
event shall any reimbursements be payable to Developer if City determines in its sole and absolute
discretion from time to time that there are not sufficient reserves then on hand in the specific
reimbursement fund from which Developer's reimbursement is payable, over and above any
amounts anticipated to be required to be expended from such reimbursement fund, which reserves, at
a minimum, are equal to at least half of the remaining average yearly anticipated expenditures of
such reimbursement fund as determined by City from time to time; (ii) City may, in its sole and
absolute discretion, make partial reimbursement payments to Developer in yearly increments, as
determined by City; and (iii) City may defer payments in any given year if projects deemed by City
to be of high importance are determined by City, in its sole and absolute discretion, to be warranted
or necessary, and the funds in such reimbursement fund are designated by the City for use on such
projects of high importance.
SECTION 7
That the attached Development Cost Schedule enumerates all fees and their extensions.
TOTAL AMOUNT DUE CITY $597,499.95
-6-
1KKS11065242.1 9/18/12
091812- 04706091
CITY OF GILROY
By:
Gabriel A. Gonzales
City Administrator
DEVELOPER:
See Attached Notary
B
Name: VxAQ
Date: Title: MCP(d'�t�'' C-,,, LPL
APPR VED AS TO FORM:
Andrew . Faber, City Attorney
Date:
NOTE: If Developer is a corporation, the complete legal name and corporate seal of the corporation and
the corporate titles of the persons signing for the corporation shall appear above.
[ATTACH EXHIBIT A — LEGAL DESCRIPTION]
[ATTACH EXHIBIT B — COMPREHENSIVE FEE SCHEDULE]
1KKS11065242.1
091812 - 04706091
-7-
9/18/12
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the Identity of the individual
who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity of that document.
State of California
County of _ Contra Costa
On L(o before me, E. Clifford t v--,oV,(-ry
(insert name and title of the officer)
personally appeared C) S Y a a
who proved to me on the'basis of satisfactory evidence to be the person(s) whose names) is /are
subscribed to the within instrument and acknowledged to me that he /she/they executed the same in
his /her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the
person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
1 certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct,
WITNESS my hand and official seal. E. CLIFFORD
Notary Public— Califomla
Contra Costa County
1 Commission It 274fi458
My Comm. Expires Mar f 7, 2020
Signature (Seal)
CALIFORNIA ALL - PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
State of California )
County of JOx1 �-g Clara
)
On Aerl 20 (8 before me, .SOndf,,j L • 1�I�VU , NOtrnru
Date Here Insert Name and Title of the Officer
personally appeared G d b f► e I A. Gon z cc le L.
Name(s) of Signer(s)
who proved to me on the basis of satisfactory evidence to be the persons) whose name(o is /are
subscribed to the within instrument and acknowledged to me that he /,%Ke /tpdy executed the same in
his /f dd /tWr authorized capacity(ijs), and that by his /* /tliir signature(g) on the instrument the person(9),
or the entity upon behalf of which the personf4 acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing paragraph
is true and correct.
SANDRA E. NAVA WITNESS my hand and official seal.
Commission # 2086119 z
Notary Public - California > �
Z i
Santa Clara County Signature `--
My Comm. Exile Nov 11, 2018 Signature of Notary Public
Place Notary Seal Above
OPTIONAL
Though this section is optional, completing this information can deter alteration of the document or
fraudulent reattachment of this form to an unintended document.
Description of Attached Document �0, 2,0 -0t
Title or Type of Document: ?roperwLproyt(Aevkf hareewnf Document
Number of Pages: Signer(s) Other Than Named Above:
Capacity(ies) Claimed by Signer(s)
Signer's Name:
❑ Corporate Officer — Title(s):
❑ Partner — ❑ Limited ❑ General
❑ Individual ❑ Attorney in Fact
❑ Trustee ❑ Guardian or Conservator
❑ Other:
Signer Is Representing:
Date: f .bcuaru Z6. I-Olt
Signer's Name:
❑ Corporate Officer — Title(s):
❑ Partner — ❑ Limited ❑ General
❑ Individual ❑ Attorney in Fact
❑ Trustee ❑ Guardian or Conservator
❑ Other:
Signer Is Representing:
02014 National Notary Association o www.NationalNotary.org ^ 1- 800 -US NOTARY (1- 800 - 876 -6827) Item #5907
EXHIBIT A
LEGAL DESCRIPTIONS TO ACCOMPANY DEDICATIONS FOR
PUBLIC STREET RIGHT OF WAY AND PUBLIC SERVICE EASEMENT
PUBLIC STREET RIGHT OF WAY
All that real property lying within the City of Gilroy, County of Santa Clara, State
of California, being a strip of land, 13 feet in width, for Public Street Right of Way
purposes lying under, over, on and across a portion of Lot 12 as shown on that
certain 'Map of the Gilroy Land Co.'s Suburban Tract' filed in Book 72" of Maps,
at Page 37, Records of said County, being more particularly described as
follows:
Beginning at a point on the southeasterly boundary of said Lot 12, said point
being North 64 °40'00" East 30.00 feet from the most southwesterly corner of said
Lot, said point also being the most southeasterly comer of that 30 foot wide Right
of Way deeded to the County of Santa Clara May 16, 1977 in Book C 829, at
Page 211 of Official Records of said County; thence leaving said boundary along
the northeasterly line of said Right of Way North 25 020'00" West 267.96 feet to a
point on the northwesterly boundary of said Lot 12; thence leaving said Right of
Way line along said northwesterly boundary North 64 °40'00" East 13.00 feet to a
point; thence leaving said boundary along a line parallel to said Right of Way line
South 25 °20'00" East 267.96 feet to a point on said southeasterly boundary;
thence along said southeasterly boundary South 64 °40'00" West 13.00 feet to
the Point of Beginning.
Containing 3,483 square feet of land, more or less.
End of Description
Page One of Two Pages
PUBLIC SERVICE EASEMENT
All that real property lying within the City of Gilroy, County of Santa Clara, State
of California, being an easement, 10 feet in width, for the installation and
maintenance of Public Service facilities and any appurtenances thereto lying
under, over, on and across a portion of Lot 12 as shown on that certain `Map of
the Gilroy Land Co.'s Suburban Tract' filed in Book 'F2" of Maps, at Page 37,
Records of said County, being more particularly described as follows:
Beginning at a point on the southeasterly boundary of said Lot 12, said point
being North 64 °40'00" East 43.00 feet from the most southwesterly comer of said
Lot, said point also being North 64 040'00" East 13.00 feet from the most
southeasterly corner of that 30 foot wide Right of Way deeded to the County of
Santa Clara May 16, 1977 in Book C 829, at Page 211 of Official Records of said
County; thence leaving said boundary along a line being parallel to the
northeasterly line of said Right of Way North 25 °20'00" West 267.96 feet to a
point on the northwesterly boundary of said Lot 12; thence along said
northwesterly boundary North 64 °40'00" East 10.00 feet to a point; thence
leaving said boundary along a line parallel to said Right of Way line South
25 °20'00" East 267.96 feet to a point on said southeasterly boundary; thence
along said southeasterly boundary South 64 040'00" West 10.00 feet to the Point
of Beginning.
End of Description
As shown on Exhibit B attached hereto and made a part hereof.
These descriptions were prepared by me or under my direction pursuant to the
requirements of the Professional Land Surveyor's Act and are based on record
John K. King
P.L. . 6809
Page Two of Two Pages
11 -G °'7
Date
* N0,6609
N�
�Q
\ \CF CAS -��/
11 -G °'7
Date
Lli
Z)
z
LLJ
z
0
Z
(V)
PLAT TO ACCOMPANY DEDICATIONS FOR PUBLIC STREET RIGHT OF WAY AND FOR
A PUBLIC SERVICE EASEMENT TO THE CITY OF GILROY, COUNTY OF SANTA CLARA,
STATE OF CALIFORNIA, BEING PORTIONS OF LOT 12 AS SHOWN ON THAT CERTAIN
'MAP OF THE GILROY LAND CO'S SUBURBAN TRACT' FILED IN BOOK '172' OF MAPS.
AT PAGE 37, RECORDS OF THE COUNTY OF SANTA CLARA.
w
Z
Lv
Q
Lil
z
Or
Ll}
Cif
0
0'� 43'
—� 30' j
i
PARCEL 4 PARCEL 3
825 M 51 -52 825 M 51 -52
DEED OF RIGHT OF WAY TO THE COUNTY
OF SANTA CLARA PER C 829 O.R. 211
i
3011 10.00' N64'40'00 "E
13.00'
co
eft t I�
t3? c(0t t t�
I tN
It-I — PUBLIC STREET RIGHT OF WAY (3,483 S.F.t)
-n t-*-- PUBLIC SERVICE EASEMENT
S25'20'00 "E 267.96'
t I Ld
t t Io
z at t to LOT 12
N 'F2' MAPS 37
CA
13.00
!. 30' 1 Ii r10.00'
N64'40'00 "E
P.O.B. (PUBLIC SERVICE EASEMENT)
20 (RIGHT OF WAY) QNAL LA/Vo P
K. L
LOT 11
'F2' MAPS 37
LEGEND
EXISTING LOT LINE
EXISTING CENTERLINE
- --- - -- NEW RIGHT OF WAY / EASEMENT LINE
P.O.B. POINT OF BEGINNING
HANNA- BRUNIETTI
EST, 1910
CIVIL ENGINEERS • LAND SURVEYORS
ys CONSTRUCTION MANAGERS
7851 EIGLEBERRY ST. I GILROY, CA 95020
408.842.2173
CAO-e
a
LIA-7
JOH K. KING, P.L.S.
0-6. t
DATE JN 16065
Project: 16065dwg
Parcel Map check
Parcel name: PSE - REVISED
North: 5136.23
Line course: N 25 -20 -00 w
North: 5378.42
Line Course: N 64 -40 -00 E
North: 5382.70
Line Course: S 25 -20 -00 E
North: 5140.51
Line Course: S 64 -40 -00 w
North: 5136.23
row -pse- revised
Mon November 06 10:00 :49 2017
East : 5614.83
Length: 267.960000
East : 5500.17
Length: 10.000000
East : 5509.21
Length: 267.960000
East : 5623.87
Length: 10.000000
East : 5614.83
Perimeter: 555.920000 Area: 2,680 sq.ft. 0.06 acres
Mapcheck Closure - (uses listed courses, radii, and deltas)
Error Closure: 0.00 Course: 5 90 -00 -00 E
Error North: 0.000 East : 0.000
Precision 1: 555,920,000.000000
Parcel name: STREET ROW - REVISED
North: 5130.66
Line Course: N 25 -20 -00 w
North: 5372.86
Line course: N 64 -40 -00 E
North: 5378.42
Line Course: S 25 -20 -00 E
North: 5136.23
Line course: 5 64 -40 -00 w
North: 5130.66
East : 5603.08
Length: 267.960000
East : 5488.42
Length: 13.000000
East : 5500.17
Length: 267.960000
East : 5614.83
Length: 13.000000
East : 5603.08
Perimeter: 561.920000 Area: 3,483 sq.ft. 0.08 acres
Mapcheck closure - (uses listed courses, radii, and deltas)
Error closure: 0.00 Course: S 90 -00 -00 E
Error north: 0.000 East : 0.000
Precision 1: 561,920,000.000000
Page 1
10125/2017 1:36 PM
10/25/2017 1:37:51 PM
Revised building square- footage to 116,035 SF
G: \COMDEV\ENGINEERING \DEVELOPMENT PROJECTS\Buildin Permit Plan Review\9080 San Ysidro Avenue - San Ysidro Storage \invoice and fees\Dev Fees 10 -25 -2017 - San Ysidro
COST SCHEDULE Fees Last Revised January 20, 2012 1 Storage
CITY OF GILROY
PUBLIC WORKS DEPARTMENT
ENGINEERING DIVISION
COST ESTIMATE
EFFECTIVE 7/1/2017
ENCOMPASS NO:
Ell
17090039
Revised:
Revision Number:
DATE:
25-Oct-17
Revision By:
NUMBER:
PROJECT LOCATION:
9080 San Ysidro Avenue
PARCEL NUMBER:
835 -04 -078
OWNER/DEVELOPER:
Gilroy Self Storage Partners, LLC
MAILING ADDRESS:
TELEPHONE NO:
(805) 668 -3252
PREPARED BY:
Claudia Moran - Garcia
Account No.
Key Code
Fee: Credits:
Amount Due: Account Description Paid on Invoice #
100 - 2601 - 0000 -3625
4904
$0.00
$0.00 Special Public Works Sery
100 - 2601- 0000 -3605
4702
$23,194.94..;
$23,194.94 Eng Plan Check & Insp
420 - 2600 - 0000 -3660
4501
$5,166.24
$5,166.24 Storm Development Fee
432 - 2600- 0000 -3660
3301
$109.88 Mom ";
$109.88 Str Tree Development Fee
433 - 2600- 0000 -3660
4905
$413,896.85
$413,896.85 Traffic Impact Fee
435 - 2600- 0000 -3660
4509
$2,175.80 y_'.
$2,175.80 Sewer Development Fee
436 - 2600- 0000 -3660
4510
$370.21 �i� _ °°
$370.21 Water Development
Fee
440 - 2600 - 0000 -3660
4515
$152,586.03
$152,586.03 Public Facility Fee
720 - 0433 - 0000 -3620
2202
$0.00`
$0.00 Const Water Use Fee
801 - 2601 -PWDO -3899
4703
$0.00_ " =
$0.00 Reimbursements
801 - 2601 -PWDO -3899
4703
$0.00 t
$0.00 Other Reimbursements
Total
$597,499.95
Payment Bond Amount for all improvements
$201,130
Performance Bond Amount
for all improvements $201,130
10/25/2017 1:37:51 PM
Revised building square- footage to 116,035 SF
G: \COMDEV\ENGINEERING \DEVELOPMENT PROJECTS\Buildin Permit Plan Review\9080 San Ysidro Avenue - San Ysidro Storage \invoice and fees\Dev Fees 10 -25 -2017 - San Ysidro
COST SCHEDULE Fees Last Revised January 20, 2012 1 Storage
ENCOMPASS NO:
DATE:
NUMBER:
PROJECT LOCATION:
PARCEL NUMBER:
OWNER /DEVELOPER:
MAILING ADDRESS:
TELEPHONE NO:
PREPARED BY:
CITY OF GILROY
COMMUNITY DEVELOPMENT DEPARTMENT
ENGINEERING DIVISION
COST ESTIMATE
E1 17090039
26-Oct -2017
9080 San Ysidro Avenue
835 -04 -078
Gilroy Self Storage Partners, LLC
(806) 668 -0252
Claudia Moran- Garcla
10/25/2017 1:36 PM
Special Staff Analysis
0 hr Special Analysis
$143.44 / hr
N $0.00
G: \COMDEV\ENGINEERING \DEVELOPMENT PROJECTS\Buildin Permit Plan Review\9080 San Ysidro Avenue - San Ysidro Slorage\invoice and fees \Dev Fees 10 -25 -2017 - San Ysidro
COST SCHEDULE Fees Last Revised January 20, 20X2 2 Storage
ENGINEERING PLAN CHECK & INSPECTION 100 - 2601 - 0000 -3605 COST ESTIMATE $23,194.94
ACTUAL COST OF PUBLIC IMPROVEMENTS FINAL ENGINEERING PLAN CHECK $0.00
At time of Improvement Plan /Final Map submittal 40% of fee is due for Plan Check. Remainder 60% due prior to submittal of Final Map for
Council approval
FINAL ENGINEERING
COST SCHEDULE TYPE:
COST ESTIMATE ?
Y PLAN CHECK ? N
INCENTIVE AGREEMENT
ONLY ? N
(DEFER PUBLIC FACILITY FEE ?
TO PERMIT ? N
TO FINAL ? N
DEFER SEWER, WATER, TRAFFIC FEES?
TO PERMIT? N
TO FINAL? N
NOTE: This Preliminary Cost Schedule is an estimate and will be adjusted to the rates in effect at the time permits are issued.
Site Information:
Gross Acres:
Lots:
Units:
Sq Ft:
Residential -Low ?
0.000
0
0
Residential -High ?
0.000
0
0
Commercial -Low ?
0.000
0
0
Commercial -High ?
0.000
0
0
Industrial - General 7
0.000
0
0
Industrial - Warehouse ?
4.580
1
116,035
Assembly Hall?
0.000
0
0
Common Area?
0.000
0
Commercial/Industrial Allocations:
Sewer GPD:
Water GPD:
55
55
Reimbursements and credits:
Front Footage /Square Footage Charges
Street Tree FF:
Water FF:
Sewer FF:
Storm FF:
Const Water Acres to be Developed:
268.0
0.0
0.0
0.0
0.000
Pavement SF:
Median SF:
Sidewalk SF:
Curb /Gutter FF:
Construction Water FF:
0.0
0.0
0.0
0.0
0.0
SPECIAL PUBLIC WORKS SERVICES
10D -2601- 0000 -3625
$0.00
Maps:
Final Map $1,755.00
+ $15.70
/ lot N
$0.00
Fee ID NO- FINALM
Parcel Map $2,035.00
+ $630.00
/ lot N
$0.00
Fee ID NO- PARCELM
Re- assessment Map (Assessment District Parcels)
$1,710.00
+ $630.00
/ lot N
$0.00
Fee ID N- ASSESM
Administration Fees:
(Cost Schedules, Agreements, R/W Reviews and
Other Misc. Services)
0 hr Misc Services
$185.00
/ hr. Y
$0.00
Fee ID N -MISC
Special Staff Analysis
0 hr Special Analysis
$143.44 / hr
N $0.00
G: \COMDEV\ENGINEERING \DEVELOPMENT PROJECTS\Buildin Permit Plan Review\9080 San Ysidro Avenue - San Ysidro Slorage\invoice and fees \Dev Fees 10 -25 -2017 - San Ysidro
COST SCHEDULE Fees Last Revised January 20, 20X2 2 Storage
ENGINEERING PLAN CHECK & INSPECTION 100 - 2601 - 0000 -3605 COST ESTIMATE $23,194.94
ACTUAL COST OF PUBLIC IMPROVEMENTS FINAL ENGINEERING PLAN CHECK $0.00
At time of Improvement Plan /Final Map submittal 40% of fee is due for Plan Check. Remainder 60% due prior to submittal of Final Map for
Council approval
Additional Plan Review After First Three Submittals or Review of Changes, Additions or Revisions to Approved Plans
0 hr Additional Plan Review
$143.44
/
hr.
N
$0.00
(2 Hour Minimum)
Re- Inspection Fee
0 hr Re- Inspection
$125.00
/
hr.
N
$0.00
Inspections outside of normal business hours
0 hr Inspection $475.00
+ $160.00
/
hr. after 3hrs
N
$0.00
COST
ACTUAL
(Based on total cost of improvements)
ESTIMATE
COST
Estimated Cost of Improvements
$201,130
$0
12.6% $0
$100,000
Y
$12,600.00
Y
$0.00
10.5% $100,000
$200,000
Y
$10,500.00
Y
$0.00
8.4% over
$200,000
Y
$94.94
Y
$0.00
Payment Bond Amount for all improvements
$201,130
Performance Bond Amount for all improvements
$201,130
IMPACT FEES
Storm Drain Impact Fee
420 - 2600 -0000 -3660
a.Residential -Low
$564.00
/
acre
Y
$0.00
b.Residential -High
$886.00
1
acre
Y
$0.00
c.Commercial
$1,528.00
/
acre
Y
$0.00
d.Industriai
$1,128.00
/
acre
Y
$5,166.24
e.Assembly Hall
$564.00
/
acre
Y
$0.00
Street Tree Fee
432 - 2600.0000.3660
a.City Planting and Replacement
$3.06
/ f.f. x
N
0.0
=
$0.00
b.lnspectlon and Replacement
$0.41
/ f.f. x
Y
268.0
=
$109.88
Traffic Impact Fee
433 - 2600 - 0000 -3660
a.Residential -Low
$11,224.00
/
unit
Y
$0.00
b.Residential -High
$9,099.00
/
unit
Y
$0.00
c.Commercial -Low Traffic
(< 10.75 trips /1000 sf)
$12,419.00
!
k.s.f.
Y
$0.00
d.Commercial -High Traffic
( >= 10.75 trips /1000 sf)
$25,087.00
/
k.s.f.
Y
$0.00
e.Industrial- General
$4,921.00
/
k.s.f.
Y
$0.00
Ondustrial- Warehouse
$3,567.00
/
k.s.f.
Y
$413,896.85
10/25/2017 1:36 PM
Fee ID NO- GRADINS
Fee ID NO- GRADINS
Fee ID NO- GRADINS
DIFFERENCE ($23,194.94)
Fee ID NO- PCKINSP
Fee ID NO -SD -LD
Fee ID NO -SD -HD
Fee ID NO -SD -C
Fee ID NO -SD -1
Fee ID NO -SD -AH
Fee ID NO- TREEPLT
Fee ID NO- TREEINS
Fee ID N1- TRAF -LD
Fee ID N2- TRAF -HD
Fee ID N3- TRAF -CL
Fee ID N3- TRAF -CH
Fee ID N4- TRAF -IG
Fee ID N4- TRAF -IW
$5,166.24
$109.88
$413,896.85
G: \COMDEV\ENGINEERING \DEVELOPMENT PROJECTSXBuilding Pennit Plan Review\9080 San Ysidro Avenue - San Ysidro Storage\invoioe and fees\Dev Fees 10-25 -2017 - San Ysidro
COST SCHEDULE Fees Last Revised January 20, 2012 3 Storage
10/25/2017 1:36 PM
Sewer Impact Fee
435 - 2600 -0000 -3660
$2,175.80
a.Residential -Low
$12,501.00 I
unit Y
$0.00
Fee ID N1 -SS -LD
b.Residential -High
$6,764.00 /
unit Y
$0.00
Fee ID N2 -SS -HD
c.CommerciaUlndustrial
$3,956.00 !
cgpd Y
$2,175.80
Fee ID NS- SS -G /l
Water Impact Fee
436- 2600 - 0000 -3660
$370.21
a.Residential -Low
$4,294.00 /
unit Y
$0.00
Fee ID N1- WATR -LD
b.Residential -High
$1,737.00 /
unit Y
$0.00
Fee ID N2- WATR -HD
c.Commeroial /Industrial
$6,731.00 /
kgpd Y
$370.21
Fee ID N5- WiR -C /I
Public Facilities Impact Fee
440- 2600 - 0000 -3660
$152,586.03
a.Residential -Low
$19,710.00 /
unit Y
$0.00
Fee ID N1 -PF -LD
b.Residential -High
$16,583.00 /
unit Y
$0.00
Fee ID N2 -PF -HD
c.Commerciai
$2,970.00 /
k.s.f. Y
$0.00
Fee ID N3 -PF -C
d.Industrial
$1,315.00 /
k.s.f. Y
$152,586.03
Fee ID N4 -PF -I
Water User Fee (Construction)
720 - 0433 - 0000 -3620
Y
$0.00
$3.00 /
f.f.
$0.00
Fee ID NO- CONWTFF
plus
$182.73 /
a.c.
$0.00
Fee ID NO- CONWTAC
FRONT FOOT CHARGES
(Used to charge and reimburse fees for existing infrastructure)
The Half Pipe schedule is used to determine the front footage reimbursement to former developers for infrastructure previously installed along
the front footage of the development.
The Full Pipe schedule is used to determine the oversizing reimbursement to the developer for installing
water, sewer, and storm main
extensions to sizes required by each master plan
that are greater than the sizes required by the development. The oversized portion is the
difference between the master planned size for the main and the greater of the main size required by the development or the developer's
minimum responsibility for each main.
Water
801- 2601 -PWDO -3899
$0.00
Water Mains - including fire hydrants, valves, valve boxes and other pertinences.
Developer responsibility is up to and including 12"
mains
Half Pipe
Lineal Footage
6 inch Main $39.00
/ LF x N
0.0 =
$0.00
Fee ID N- WR06 -1/2
8 inch Main $41.00
/ LF x N
0.0 =
$0.00
Fee ID N -WR08 -112
10 inch Main $47.00
/ LF x N
0.0 =
$0.00
Fee ID N -WR10 -112
12 Inch Main $52.00
/ LF x N
0.0 =
$0.00
Fee ID N- WR12 -1/2
14 inch Main $57.00
/ LF x N
0.0 =
$0.00
Fee ID N- WR14 -1/2
16 inch Main $62.00
/ LF x N
0.0 =
$0.00
Fee ID N- WR16 -1/2
18 inch Main $68.00
/ LF x N
0.0 =
$0.00
Fee ID N -WR18 -112
20 inch Main $76.00
/ LF x N
0.0 =
$0.00
Fee ID N -WR18 -112
24 inch Main $82.00
/ LF x N
0.0 =
$0.00
Fee ID N- WR24 -1/2
30 inch Main $91.00
/ LF x N
0.0 =
$0.00
Fee ID N -WR30 -112
36 inch Main $106.00
/ LF x N
0.0 =
$0.00
Fee ID N -WR36 -112
G:\COMDEV\ENGINEERING \DEVELOPMENT PROJECTS \Building Permit Plan Review\9080 San Ysidro Avenue - San Ysidro Storage\invoice and fees\Dev Fees 10 -25 -2017 - San Ysidro
COST SCHEDULE Fees Last Revised January 20, 2012 4 Storage
Front Foot Charges Continued
(Used to charge and reimburse fees for existing infrastructure)
Sewer
801- 2601 -PWDO -3899
Sewer Mains - including manhole
and other pertinences.
Developer responsibility is up to and including 12"
mains.
Half Pipe
Lineal Footage
6 inch Main
$73.00
/ LF x
N
0.0 =
$0.00
Fee ID N- SS06 -112
8 inch Main
$75.00
/ LF x
N
0.0 =
$0.00
Fee ID N- SSOB -1/2
10 inch Main
$81.00
! LF x
N
0.0 =
$0.00
Fee ID N- SS10 -1/2
12 inch Main
$83.00
/ LF x
N
0.0 =
$0.00
Fee ID N- SS12 -1/2
15 inch Main
$87.00
/ LF x
N
0.0 =
$0.00
Fee ID N- SS15 -112
18 inch Main
$93.00
/ LF x
N
0.0 =
$0.00
Fee ID N- SS18 -1/2
21 inch Main
$102.00
/ LF x
N
0.0 =
$0.00
Fee ID N- SS21 -1/2
24 inch Main
$106.00
/ LF x
N
0.0 =
$0.00
Fee ID N- SS24 -1/2
27 inch Main
$122.00
/ LF x
N
0.0 =
$0.00
Fee ID N- SS27 -1/2
30 inch Main
$144.00
/ LF x
N
0.0 =
$0.00
Fee ID N- SS30 -1/2
33 inch Main
$158.00
/ LF x
N
0.0 =
$0.00
Fee ID N- SS33 -1/2
36 Inch Main
$178.00
/ LF x
N
0.0 =
$0.00
Fee ID N- SS36 -1/2
39 inch Main
$212.00
/ LF x
N
0.0 =
$0.00
Fee ID N- SS39 -1/2
42 inch Main
$265.00
/ LF x
N
0.0 =
$0.00
Fee ID N- SS42 -112
Street Improvements
801- 2601 -PWDO -3899
Pavement. Sidewalks & Medians
Square Footage
AC /Bike path: base
$2.55
/ SF x
N
0.0 =
$0.00
Fee ID N- STR -ACB
AC /Bike path: pvmt
$2.50
/ SF x
N
0.0 =
$0.00
Fee ID N- STR -ACP
Sidewalk: new
$9.75
/ SF x
N
0.0 =
$0.00
Fee ID N- STR -S/W
Sidewalk: replace
$13.25
/ SF x
N
0.0 =
$0.00
Fee ID N- STR -SfWR
Resurfacing
$2.55
/ SF x
N
0.0 =
$0.00
Fee ID N- STR -RESU
Landscaped Median
$20.35
/ SF x
N
0.0 =
$0.00
Fee ID N- STR -LANM
Handscaped Median
$11.63
/ SF x
N
0.0 =
$0.00
Fee ID N -STR -HARD
Traffic Signals (equipment only
% of Lump Sum
Traffic Signal -3 leg
$130,200.00
/ LS x
N
00% _
$0.00
Fee ID N- STR -TS3L
Traffic Signal -4 leg
$158,500.00
/ LS x
N
0% _
$0.00
Fee ID N- STR -TS4L
Curb and Gutter
Lineal Footage
Curb /Gutter: new
$25.85
/ LF x
N
0.0 =
$0.00
Fee ID N- STR -C /G
Curb /Gutter: replace
$33.40
/ LF x
N
0.0 =
$0.00
Fee ID N- STR -C /GR
Curb Ramps
$1,057.63
/ LF x
N
0.0 =
$0.00
Fee ID N- STR -CR
10125/2017 1:36 PM
$0.00
$0.00
G: \COMDEV\ENGINEERING \DEVELOPMENT PROJECTS \Building Permit Plan Review\9080 San Ysidro Avenue - San Ysidro Storagekinvoioe and fees \Dev Fees 10 -25 -2017 - San Ysidro
COST SCHEDULE Fees Last Revised January 20, 2012 5 Storage
Front Foot Charges Continued
(Used to charge and reimburse fees for existing Infrastructure)
Storm Drain
801- 2601 -PWDO -3899
Storm Mains
- including manholes, catch basins and
other pertinences.
Developer responsibility is up to and including 24"
mains.
Half Pipe
Lineal Footage
18 inch
Main
$63.00
/ LF x
N
0.0 =
$0.00
Fee ID N- SD18 -1/2
21 inch
Main
$69.00
/ LF x
N
0.0 =
$0.00
Fee ID N- SD21 -1/2
24 inch
Main
$70.00
/ LF x
N
0.0 =
$0.00
Fee ID N- SD24 -1/2
27 inch
Main
$82.00
/ LF x
N
0.0 =
$0.00
Fee ID N- SD27 -1/2
30 inch
Main
$89.00
/ LF x
N
0.0 =
$0.00
Fee ID N- SD30 -1/2
33 inch
Main
$91.00
/ LF x
N
0.0 =
$0.00
Fee ID N- SD33 -1/2
36 inch
Main
$95.00
/ LF x
N
0.0 =
$0.00
Fee ID N -SD36 -112
42 inch
Main
$99.00
/ LF x
N
0.0 =
$0.00
Fee ID N- SD42 -1/2
48 inch
Main
$117.00
/ LF x
N
0.0 =
$0.00
Fee ID N -SD48 -112
54 inch
Main
$137.00
/ LF x
N
0.0 =
$0.00
Fee ID N- SD54 -1/2
60 inch
Main
$158.00
I LF x
N
0.0 =
$0.00
Fee ID N- SD60 -1/2
66 inch
Main
$179.00
I LF x
N
0.0 =
$0.00
Fee ID N- SD66 -1/2
72 inch
Main
$200.00
1 LF x
N
0.0 =
$0.00
Fee ID N- SD72 -1/2
78 inch
Main
$216.00
/ LF x
N
0.0 =
$0.00
Fee ID N- SD78 -1/2
84 inch
Main
$231.00
/ LF x
N
0.0 =
$0.00
Fee ID N- SD84 -1/2
90 inch
Main
$246.00
/ LF x
N
0.0 =
$0.00
Fee ID N- SD90 -1/2
96 inch
Main
$261.00
/ LF x
N
0.0 =
$0.00
Fee ID N- SD96 -1/2
NOTE: All deferred and /or estimated fees will be adjusted to the rates in effect at the time fees are paid.
The undersigned agrees to provide actual construction costs for recalculation of fees and pay any underestimated
fees prior to final acceptance. If the recalculated fees are less than the estimate, the City of Gilroy will refund the difference.
Additional plan review required by changes, additions or revisions to approved plans, reinspections and inspections outside
of normal business hours will be billed as shown in the City of Gilroy's most current comprehensive fee schedule at the hourly rates
in effect at the time of inspection.
Accepted by:
Print Name:
?p
Date:
10/25/2017 1:36 PM
$0.00
G: \COMDEV\ENGINEERING \DEVELOPMENT PROJECTSOuilding Permit Plan Review \9080 San Ysidro Avenue - San Ysidro Storagelinvoice and fees\Dev Fees 10 -25 -2017 - San Ysidro
COST SCHEDULE Fees Last Revised January 20, 2012 6 Storage
OVERSIZING SCHEDULE (Used to reimburse oversized infrastructure)
Total Oversized Water, Sewer and Storm Drain Main Reimbursement
Total Oversized Water Main Reimbursement (Developer is responsible for up to and including 12" mains)
10125/2017 1:36 PM
$0.00
$0. DO
$0.00
$0.00
G: \COMDEV\ENGINEERING \DEVELOPMENT PROJECTS\Building Permit Plan Review\9080 San Ysidro Avenue - San Ysidro Storagelinvoice and fees \Dev Fees 10 -25 -2017 - San Ysidro
COST SCHEDULE Fees Last Revised January 20, 2012 7 Storage
Oversized
Minimum 12" main
Oversized
Full Pipe $ /foot
Full Pipe $ /foot
Oversized Footage
Reimbursement
14 inch
Main
$114.00
$104.00
x 0.0 =
$0.00
N
16 inch
Main
$124.00
$104.00
x 0.0 =
$0.00
N
18 inch
Main
$135.00
$104.00
x 0.0 =
$0.00
N
20 inch
Main
$151.00
$104.00
x 0.0 =
$0.00
N
24 inch
Main
$164.00
$104.00
x 0.0 =
$0.00
N
30 inch
Main
$182.00
$104.00
x 0.0 =
$0.00
N
36 inch
Main
$211.00
$104.00
x 0.0 =
$0.00
N
Total Oversized Sewer Main
Reimbursement
(Developer is responsible for up to and including 12" mains)
Oversized
Minimum 12" main
Oversized
Full Pipe $/foot
Full Pipe $ /foot
Oversized Footage
Reimbursement
15 inch
Main
$174.00
$166.00
x 0.0 =
$0.00
N
18 inch
Main
$186.00
$166.00
x 0.0 =
$0.00
N
21 inch
Main
$204.00
$166.00
x 0.0 =
$0.00
N
24 inch
Main
$211.00
$166.00
x 0.0 =
$0.00
N
27 inch
Main
$244.00
$166.00
x 0.0 =
$0.00
N
30 inch
Main
$287.00
$166.00
x 0.0 =
$0.00
N
33 inch
Main
$315.00
$166.00
x 0.0 =
$0.00
N
36 inch
Main
$356.00
$166.00
x 0.0 =
$0.00
N
39 inch
Main
$423.00
$166.00
x 0.0 =
$0.00
N
42 inch
Main
$529.00
$166.00
x 0.0 =
$0.00
N
Total Oversized Storm Drain Main Relmbmnt
(Developer is responsible for up to and including 24" mains)
Oversized
Minimum 24" main
Oversized
Full Pipe $/foot
Full Pipe $/foot
Oversized Footage
Reimbursement
27 inch
Main
$164.00
$14050
x 0.0 =
$0.00
N
30 inch
Main
$177.00
$140.00
x 0.0 =
$0.00
N
33 inch
Main
$182.00
$140.00
x 0.0 =
$0.00
N
36 inch
Main
$189.00
$140.00
x 0.0
= $0.00
N
42 inch
Main
$197.00
$140.00
x 0.0 =
$0.00
N
48 inch
Main
$233.00
$140.00
x 0.0
= $0.00
N
54 inch
Main
$273.00
$140.00
x 0.0
= $0.00
N
60 inch
Main
$315.00
$140.00
x 0.0
= $0.00
N
10125/2017 1:36 PM
$0.00
$0. DO
$0.00
$0.00
G: \COMDEV\ENGINEERING \DEVELOPMENT PROJECTS\Building Permit Plan Review\9080 San Ysidro Avenue - San Ysidro Storagelinvoice and fees \Dev Fees 10 -25 -2017 - San Ysidro
COST SCHEDULE Fees Last Revised January 20, 2012 7 Storage
10/25/2017 1:36 PM
Oversizing Schedule Continued
(Used to reimburse oversized infrastructure)
Oversized Storm Drain Main Reimbmnt
Continued
Oversized
Minimum 24" main
Oversized
Full Pipe $/foot
Full Pipe $/foot
Oversized Footage
Reimbursement
66 inch Main
$357.00
$1407
x 0.0 =
$0.00 N
72 inch Main
$399.00
$140.00
x 0.0 =
$0.00 N
78 inch Main
$431.00
$140.00
x 0.0 =
$0.00 N
84 inch Main
$461.00
$140.00
x 0.0 =
$0.00 N
90 inch Main
$492.00
$140.00
x 0.0 =
$0.00 N
96 inch Main
$522.00
$140.00
x 0.0 =
$0.00 N
G:\COMDEV\ENGINEERING \DEVELOPMENT PROJECTS \Building Permit Plan Review\9080 San Ysidro Avenue - San Ysidro Storage \invoice and fees\Dev Fees 10 -25 -2017 - San Ysidro
COST SCHEDULE Fees Last Revised January 20, 2012 8 Storage