Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
PIA No. 2018-04 - Performance Food Group -
y Recording Requested By old Republic Title RECORDING REQUESTED BY: City of Gilroy WHEN RECORDED, MAIL TO: Shawna Freels City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 * *This document was electronically submitted to Santa Clara County for recording ** 23947908 Regina Alcomendras . Santa Clara County - Clerk- Recorder 06/05/2018 08:26 AM Titles:1 Pages: 24 Fees: $169.00 Tax: $0 Total: $169.00 (SPACE ABOVE THIS LINE FOR RECORDER'S USE) Property Improvement Agreement No. 2018- 04 Warehouse and Distribution Facility Located at 5480 Monterey Blvd., Gilroy, California 95020 APN: 841 -14 -026; 841 -14 -027 Performance Food Group, Inc. -1- 4845- 4192- 5464v.7 0104344- 000001 Recording Requested By old Republic Title RECORDING REQUESTED BY: City of Gilroy WHEN RECORDED, MAIL TO: Shawna Freels City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 This document has been electronically recorded. See the attached cover page for recording information. (SPACE ABOVE THIS LINE FOR RECORDER'S USE) Property Improvement Agreement No. 2018- 04 Warehouse and Distribution Facility Located at 5480 Monterey Blvd., Gilroy, California 95020 APN: 841 -14 -026; 841 -14 -027 Performance Food Group, Inc. -1- 4845- 4192- 5464v.7 0104344- 000001 PROPERTY IMPROVEMENT AGREEMENT AGREEMENT FOR EXTENSIONS OF WATER DISTRIBUTION SYSTEMS: IMPROVEMENT OF STREETS: INSTALLATION OF SEWERS, STORM DRAINS POWER AND COMMUNICATION CONDUIT AND OTHER PUBLIC WORKS FACILITIES Property Improvement Agreement No. 2018 -4 This Property Improvement Agreement ( "Agreement ") is made and entered into this -1-Aday of MaY ,2018, by and between the City of Gilroy, a municipal corporation, herein called the "City," and Performance Food Group, Inc., a Colorado corporation, herein called the "Developer ". WHEREAS, a building permit (Site Clearance) application has now been submitted to the City for approval and acceptance, covering certain real estate and property improvements known as and called: Performance Food Group warehouse and distribution facility located at 5480 Monterey Blvd., Gilroy, California 95020 (the "Project "), APN: 841 -14 -026 and 841 -14 -027, a legal description of which is attached hereto and incorporated herein as Exhibit "A" (the "Property "). WHEREAS, the Developer is the fee owner of the Property and requires certain utilities and public works facilities in order to service the Property under the minimum standards established by the City and, WHEREAS, the City, by and through its City Council, has enacted certain Codes, Ordinances and Resolutions and certain Rules and Regulations have been promulgated concerning the subject matter of this Agreement and, WHEREAS, the City has certain responsibilities for maintenance and operation of such utilities and public service facilities after acceptance by City, and for providing the necessary connecting system, general plant and appurtenances, and the City is agreeing to discharge those responsibilities, provided that Developer has faithfully and fully complied with all of the terms, covenants, conditions to be performed by Developer pursuant to this Agreement. NOW THEREFORE, in consideration of the foregoing premises and in order to carry on the intent and purpose of said Codes, Ordinances, Resolutions and Regulations and established policies of the City and the laws of the State of California and the United States of America it is agreed by and between the parties as follows: SECTION 1 That all Codes, Ordinances, Resolutions, Rules and Regulations and established policies of the City and the laws of the State of California and the United States of America concerning the subject matter of this Agreement are hereby referred to and incorporated herein to the same effect as if they were set out at length herein. Said Codes, Ordinances, Resolutions, Rule and Regulations include, but are not limited to, the following: the Code of the City of Gilroy, the current Zoning Ordinance, and the currently adopted Uniform Building Code. -2- 4845- 4192- 5464v.7 0104344 - 000001 SECTION 2 The Developer agrees: a. To perform each and every provision required by the City to be performed by the Developer in each and every one of said Codes, Ordinances, Resolution, Rules and other Regulations and established policies of the City and the laws of the State of California and the United States of America, including without limitation, the California Labor Code and California Public Contract Code, as applicable. Developer further agrees and acknowledges that it is its obligation to determine whether, and to what extent, the work performed under this Agreement is subject to any Codes, Ordinances, Resolutions, Rules and other Regulations and established policies of the City and the laws of the State of California, the United States of America, the California Labor Code and Public Contract Code relating to public contracting and prevailing wage laws. b. To grant to the City without charge, free and clear of encumbrances, any and all easements and rights of way in and to the Property necessary for the City in order that its water, electricity, and /or sewer lines in or to said Property may be extended. c. To indemnify, defend with counsel of City's choice and hold the City free and harmless from all suits, fees, claims, demands, causes of action, costs, losses, damages, liabilities and expenses (including without limitation attorneys' fees) incurred by City in connection with (i) any damage done to any utility, public facility or other material or installation of the City on said Property which the Developer or any contractor or subcontractor of the Developer, or any employee of the foregoing, shall do in grading or working upon said Property; or (ii) arising or resulting directly or indirectly from any act or omission of Developer or Developer's contractors, or subcontractors, or any employee of the foregoing in connection with the work performed by them in connection with this Agreement, including without limitation all claims relating to injury or death of any person or damage to any property. d. To construct and improve all public works facilities and other improvements described in this Agreement (for Extensions of Water Distribution Systems, Improvement of Streets, Installation of Sewers, Storm Drains, Power and Communication Conduit off -site of the Property) and the improvement plans submitted on behalf of Developer to the City of Gilroy in furtherance of this Agreement, compiled on December 17, 2017 and on file with the City of Gilroy ( "Improvements "). All construction of the Improvements shall be completed in accordance with all standards established in the applicable Codes and Policies and this Agreement, and in accordance with the grades, plans, and specifications approved by the City Engineer. Developer shall furnish two good and sufficient bonds, a Payment Bond on a form provided by the City and a Faithful Performance Bond, both of which shall be secured from a surety company admitted to do business in California. Each bond shall set forth a time period for performance by the contractor of its obligations and the terms and conditions on which the City may obtain the proceeds of the bond. The Faithful Performance Bond shall be in an amount not less than one hundred percent (100 %) of the total estimated amount payable for the Improvements described in this Agreement in an amount of Eight Hundred Fourteen Thousand, Nine Hundred Five dollars ($814,905.00), as shown on Development Cost Schedule referenced in Section 7 below and attached hereto as Exhibit `B" and shall secure payment to City and the Developer of any loss due to the default of the contractor or its inability or refusal to perform its contract. -3- 4845- 4192- 5464v.7 0104344 - 000001 The Payment Bond shall be in an amount not less than one hundred percent (100 %) of the total estimated amount payable for the Improvements described in this Agreement, in an amount of Eight Hundred Fourteen Thousand, Nine Hundred Five dollars ($814,905.00), as shown on Development Cost Schedule referenced in Section 7 below and attached hereto as Exhibit `B ". The Payment Bond shall secure the payment of those persons or entities to whom the Developer may become legally indebted for labor, materials, tools, equipment or services of any kind used or employed by the contractor or subcontractor in performing the work, or taxes or amounts to be withheld thereon. The Payment Bond shall provide that the surety will pay the following amounts should the Contractor or a Subcontractor fail to pay the same, plus reasonable attorneys' fees to be fixed by the court if suit is brought upon the bond: (1) amounts due to any of the persons named in California Civil Code Section 9100; (2) amounts due under the Unemployment Insurance Code with respect to work or labor performed for the improvements described in this Agreement; and (3) any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of the Contractor and Subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with respect to the work and labor. The Payment Bond shall, by its terms, inure to the benefit of any of the persons named in Civil Code Section 3181 so as to give a right of action to those persons or their assigns in any suit brought upon the bond. The Bond shall by its terms remain in full force and effect for a period of not less than one year after completion of the Improvements by Developer and acceptance of the improvements by City, to guarantee the repair and replacement of defective material and faulty workmanship. Upon completion of the Improvements by Developer and acceptance of the Improvements by City, Developer may substitute for the Bond securing maintenance described above, a separate maintenance bond issued by an admitted surety in the amount of ten percent (10 %) of the total contract price of the Improvements (provided that the amount of said bond shall not be less than One Thousand Dollars ($1,000) to cover the one -year maintenance period. Simultaneously with the submission of its building permit application (Site Clearance), the Developer shall submit the following for both the surety that furnishes the Payment Bond and the surety that furnishes the Faithful Performance Bond: (1) a current printout from California Department of Insurance's website (www.insurance.ca.gov) showing that the surety is admitted to do business in the State; or (2) a certificate from the Clerk of the County of Santa Clara that the surety's certificate of authority has not been surrendered, revoked, canceled, annulled, or suspended or in the event that it has, that renewed authority has been granted. e. Except as otherwise expressly provided in this Agreement, all plan check and inspection fees which are payable by Developer pursuant to the Exhibit B, the attached Development Cost Schedule, are due and payable to the City prior to Council issuance of the building permit. The Developer shall pay to the City all other sums payable by Developer pursuant to Exhibit B, in accordance with applicable City fee schedules and agreements. f. At all times during the term of this Agreement and until the Improvements constructed by Developer are accepted by City, Developer shall, at no cost to City obtain and maintain (a) a policy of general liability and property damage insurance in the minimum amount of One Million Dollars ($1,000,000), combined single limit for both bodily injury and property damage; (b) workers' compensation insurance as required by law; and (c) broad form `Builder's Risk" property damage insurance with limits of not less than 100% of the estimated value of the improvements to be constructed by Developer pursuant to this Agreement. -4- 4845- 4192- 5464v.7 0104344 - 000001 All such policies shall provide that thirty (30) days written notice must be given in advance to City prior to termination, cancellation or modification. The insurance specified in (a) above shall name City as an additional insured and the insurance specified in (c) shall name City as a loss payee, and shall provide that City, although an additional insured or loss payee, may recover for any loss suffered by reason of the acts or omissions of Developer or Developer's contractors or subcontractors or their respective employees. Developer hereby waives, and Developer shall cause each of its contractors and subcontractors to waive, all rights to recover against City for any loss or damage arising from a cause covered by the insurance required to be carried pursuant to this Agreement or actually carried by Developer in connection with the work described in this Agreement, and will cause each insurer to waive all rights of subrogation against City in connection therewith. All policies shall be written on an occurrence basis and not on a claims made basis and shall be issued by insurance companies acceptable to City. Prior to commencing any work pursuant this Agreement, Developer shall deliver to City the insurance company's certificate evidencing the required coverage, or if required by City a copy of the policies obtained. I TT(1N That all the provisions of this Agreement and all work to be done pursuant to the terms of this Agreement are to be completed to City's satisfaction within two years from and after the date and year of this Agreement first above written. Developer shall maintain such Improvements described in this Agreement at Developer's sole cost and expense at all times prior to acceptance by City in a manner which will preclude any hazard to life or health or damage to property. SECTION 4 That the faithful and prompt performance by the Developer of each and every term and condition contained herein is made an express condition precedent to the duty of the City to perform any act in connection with this transaction, and the failure, neglect or refusal of the Developer to so perform, or to pay any monies due hereunder when due shall release the City from any and all obligations hereunder and the City, at its election, may enforce the performance of any provision herein, or any right accruing to the City or may pursue any remedy whatsoever it may have under applicable laws or the Codes, Ordinances, Resolutions, Rules and Regulations of the City, in the event of any such default by Developer. SECTION 5 That this Agreement, including without limitation the general stipulations outlined in Section 6 below, is an instrument affecting the title or possession of the real property and runs with the land. Except as expressly provided in Item 25 of the general stipulations set forth in Section 6 below (relating to the payment of reimbursement to the original Developer named in this Agreement), all the terms, covenants and conditions herein imposed shall be binding upon and inure to the benefit of City, Developer, the successors in interest of Developer, their respective successors and permitted assigns and all subsequent fees owners of the Property. The obligations of the Developer under this Agreement shall be the joint and several obligations of each and all of the parties comprising Developer, if Developer consists of more than one individual and /or entity. Upon the sale or division of the Property, the terms of this Agreement shall apply separately to each parcel and the fee owners of each parcel shall succeed to the obligations imposed on Developer by this Agreement. -5- 4845- 4192- 5464v.7 0104344 - 000001 �F.C',TTON 6 That the following general stipulations shall be completed subject to the approval of the Public Works Director /City Engineer. 1. All work within the public right -of -way shall be subject to the approval of the City Engineer. 2. The Developer shall perform all work in compliance with all applicable City of Gilroy Specifications Standards Design Criteria. Street improvements and the design of all storm drainage, sewer lines, and all street sections shall be in accordance with applicable City Standards. 3. The Developer shall defend, indemnify, and hold harmless the City, its City Council, Planning Commission, agents, officers, and employees from any claim, action, or proceeding relating to the construction of the Improvements against the City or its City Council, Planning Commission, agents, officer, and employees to attack, set aside, void, or annul an approval of the City, City Council, Planning Commission, or other board, advisory agency, or legislative claim, action, or proceeding against it, and will cooperate fully in the defense. This condition is imposed pursuant to California Government Code Section 66474.9. 4. The City shall be notified at least two (2) working days prior to the start of any construction work and at that time the contractor shall provide a project schedule and a 24 -hour emergency telephone number list. 5. At least one week prior to commencement of work, the Developer shall post the site and mail to owners of property within (500') five hundred feet of the exterior boundary of the project site, to the homeowner associations of nearby residential projects and to the Engineering Division, a notice that construction work will commence on or around the stated date. The notice shall include a list of contact persons with name, title, phone number and area of responsibility. The person responsible for maintaining the list shall be included. The list shall be current at all times and shall consist of persons with authority to initiate corrective action in their area of responsibility. The names of individuals responsible for dust, noise and litter control shall be expressly identified in the notice. 6. If the Developer proposes to phase construction with building occupancy, the Developer shall create, for City Engineer approval prior to first occupancy, a construction staging plan that addresses the ingress and egress location for all construction vehicles, parking and material storage area separate from occupied residential units. 7. Locate and properly dispose of any wells, septic tanks and underground fuel storage facilities. NOTE: The capping of any well will require inspection by the Santa Clara Valley Water District. Schedule the construction of Improvements along existing public roads so that the work affecting vehicular traffic is completed with a minimum interruption to traffic. 9. All work shall be coordinated so that the existing residents on all adjacent streets have access to their properties. 10. Before construction utilizing combustible materials may proceed, an all- weather access must be provided to within 150 feet of the building site; and at least one in service fire hydrant must be available within 150 feet of each portion of the site wherein this construction is to take place. Location of the fire hydrants will be determined by the Fire Chief. -6- 4845- 4192- 5464v.7 0104344- 000001 11. A complete construction schedule, which shall include a detailed phasing plan (including traffic control for each proposed phase), shall be submitted and approved by the City Engineer prior to start of construction. Any material deviation from the approved construction schedule and phasing plan shall be coordinated with the City Engineer. Deviating from the approved construction schedule and phasing plan without prior coordination with the City Engineer may prolong issuance of further building permits. (a) Upon request by the City Engineer, the Developer shall provide information for public outreach purposes, which may include maps and schedules for each phase of construction. 12. The Developer shall obtain the required Habitat Conservation Plan (HCP) Permit and pay the applicable fees prior to the issuance of a grading permit or improvement plan approval. 13. One hard copy and electronic copy of the approved /stamped PG &E Joint Trench Composite Plans shall be submitted to the Engineering Division. Should there be a delay in obtaining the PG&E - approved joint trench plans, the Developer will be allowed to commence joint trench work "at- risk". The Developer assumes responsibility for any required redesign, and all costs associated with the redesign and additional city review resulting from the at -risk work completed without PG&E - approved joint trench plans. Design revisions and ultimate joint trench construction shall be completed to the satisfaction of the City Engineer. 14. Site preparation and fill construction shall be conducted under the observation of, and tested by, a licensed soils or geotechnical engineer. A report shall be filed with the City of Gilroy stating that all site preparation and fill construction meets the requirements of the geotechnical investigation. This shall be subject to review and approval by the Building Division. [CBC] 15. All grading operations and soil compaction activities shall be per the approved soils report and shall meet with the approval of the City Engineer. 16. New and existing utility lines, appurtenances, and associated equipment, including but not limited to electrical transmission, street lighting, and cable television shall be required to be placed underground. [Municipal Code Section 21, Article V] 17. Construction activity shall be restricted to the period between 7:00 a.m. to 7:00 p.m. Mondays through Fridays, Saturday 9:00 a.m. to 7:00 p.m. No work shall be done on Sundays and City Holidays. The City Engineer will apply additional construction period restrictions, as necessary, to accommodate standard commute traffic along arterial roadways and along school commute routes. 18. Any damage resulting from project construction operations to existing city infrastructure on or adjacent to the subject property shall be repaired to the satisfaction of the City Engineer, at the full expense of the developer /contractor. This shall include slurry seal, overlay, street reconstruction, and repair to curb, gutter and sidewalk, driveway approach if reasonably deemed warranted by the City Engineer. 19. This project is subject to post - construction stormwater quality requirements per Section 27D of the Gilroy Municipal Code. -7- 4845- 4192- 5464v.7 0104344 - 000001 20. Storm water BMP Operation and Maintenance Agreement (a) Prior to the issuance of any building permit requiring stormwater management BMPs or as otherwise determined by the City Engineer, the owner(s) of the site shall enter into a formal written Stormwater BMP Operation and Maintenance Agreement with the City. The City shall record this agreement, against the property or properties involved, with the County of Santa Clara and it shall be binding on all subsequent owners of land served by the storm water management treatment BMPs. The City- standard Stormwater BMP Operation and Maintenance Agreement will be provided by Public Works Engineering. (b) This Agreement shall require that the BMPs not be modified and BMP maintenance activities not alter the designed function of the facility from its original design unless approved by the City prior to the commencement of the proposed modification or maintenance activity. (c) This Agreement shall also provide that in the event that maintenance or repair is neglected, or the stormwater management facility becomes a danger to public health or safety, the city shall have the authority to perform maintenance and /or repair work and to recover the costs from the owner. (d) All on -site stormwater management facilities shall be operated and maintained in good condition and promptly repaired /replaced by the property owner(s), an owners' or homeowners' association or other legal entity approved by the City. (e) Any repairs or restoration/replacement and maintenance shall be in accordance with City - approved plans. (f) The property owner(s) shall develop a maintenance schedule for the life of any stormwater management facility and shall describe the maintenance to be completed, the time period for completion, and who shall perform the maintenance. This maintenance schedule shall be included with the approved Stormwater Management Plan. 21. Stonnwater BMP Inspections will be required for this project and shall adhere to the following: (a) The property owner(s) shall be responsible for having all stormwater management facilities inspected for condition and function by a knowledgeable third party. (b) Unless otherwise required by the City Engineer or designee, stormwater facility inspections shall be done at least twice per year, once in Fall, in preparation for the wet season, and once in Winter. Written records shall be kept of all inspections and shall include, at minimum, the following information: 1. Site address; 2. Date and time of inspection; 3. Name of the person conducting the inspection; 4. List of stormwater facilities inspected; 5. Condition of each stormwater facility inspected; 6. Description of any needed maintenance or repairs; and 7. As applicable, the need for site re- inspection. -8- 4845- 4192- 5464v.7 0104344 - 000001 22. Upon completion of each inspection, an inspection report shall be submitted to Public Works Engineering no later than October 1st for the Fall report, and no later than March 15th of the following year for the Winter report. 23. A minimum of one exterior monument shall be set. Additional monuments can be required by the City Engineer or City Surveyor as deemed necessary. Location of monuments shall be tied out prior to work. 24. In accordance with the California Professional Land Surveyors' Act (Business and Professions Code) Chapter 15 Sections 8771 and 8725, California Penal Code 605, and California Government Code 27581, the developer, their employees, subcontractors, and /or any person performing construction activities that will or may disturb an existing roadway/ street monument, corner stake, or any other permanent surveyed monument shall show all current monuments on the plans and shall ensure that a Corner Record and /or Record of Survey are filed with the County Surveyor Office prior to disturbing said monuments. All disturbed or destroyed monuments shall be reset and filed in compliance with Section 8771 at the developer's sole expense. 25. Under the terms of the City Conditions of Approval, item 62, the City shall reimburse Developer "oversizing reimbursement" for installing water main extensions 16" in size, which is greater than the water sizes required by the Project, and which Developer is responsible for the size up to and including 12" mains. The additional marginal costs for obtaining, installing and maintaining a 16" water line on Monterey Boulevard is Twenty One Thousand, Three Hundred dollars ($21,300.00). This reimbursement shall be payable to the original Developer named in this Agreement above, and shall not inure to the benefit of any subsequent owners of all or any portion of the Property. All reimbursements payable to Developer shall be subject to the City's reimbursement policies and ordinances in effect from time to time, including without limitation any expiration dates identified in such policies and ordinances. Such reimbursement shall be solely contingent upon the availability of the City's Water Impact Fund and in no case shall the reimbursement be paid beyond ten (10) years after the execution of the Agreement. In addition to any other conditions, requirements and limitations set forth in the City's reimbursement policies and ordinances from time to time, (i) in no event shall any reimbursements be payable to Developer if City determines in its sole and absolute discretion from time to time that there are not sufficient reserves then on hand in the specific reimbursement fund from which Developer's reimbursement is payable, over and above any amounts anticipated to be required to be expended from such reimbursement fund, which reserves, at a minimum, are equal to at least half of the remaining average yearly anticipated expenditures of such reimbursement fund as determined by City from time to time; (ii) City may, in its sole and absolute discretion, make partial reimbursement payments to Developer in yearly increments, as determined by City; and (iii) City may defer payments in any given year if projects deemed by City to be of high importance are determined by City, in its sole and absolute discretion, to be warranted or necessary, and the funds in such reimbursement fund are designated by the City for use on such projects of high importance. -9- 4845- 4192- 5464v.7 0104344 - 000001 SF.C',TTON 7 That the attached Development Cost Schedule enumerates all fees and their extensions. TOTAL AMOUNT DUE CITY $ 1,222,639.91 CITY OF GILROY By: City Administrator Date:q� ATTEST: 4a7a Free s, CIty Clerk CiccL APPROVED AS TO FORM: �h Andy Faber, City Attorney DEVELOPER — Performance Food Group, Inc. By: ZL Name: , .e�\'Ce Title: v kcc L d Date: 0// U NOTE: If Developer is a corporation, the complete legal name and corporate seal of the corporation and the corporate titles of the persons signing for the corporation shall appear above. [ATTACH EXHIBIT A — LEGAL DESCRIPTION] [ATTACH EXHIBIT B — Development Cost Schedule] [ATTACH CURRENT NOTARY FORM(S)] -10- 4845- 4192- 5464v.7 0104344- 000001 STATE OF COLORADO ) )ss COUNTY OF ARAPAHOE ) On this ` day of 20 (S, before me, the undersigned']j a Notary Public in and for the above state and county, personally appeared �;c� the <bV of Pr&' , personally known to me or proved to be the person named in and who executed the foregoing instrument, and being first duly sworn, such person acknowledged that he or she executed said instrument for the purposes therein contained as his or her free and voluntary act and deed. Witness my hand and official seal Commission Expires 11 2-02-0 NO ARY PUBLIC KAREN S. RUCKER NOTARY PUBLIC (SEAL) NOTARY STATE D COLORADO MY COMMISSION EXPIRES 0217/2020 CALIFORNIA • ACKNOWLEDGMENT D 9 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California ) County of Sewto C. Iara ) On � 41 . 20►� before me, SanCirct E. Newel , Alofort4 Date Here Insert Name and Title the Officer personally appeared e B A. (team -A le z Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the person(k) whose name(s) Wpm subscribed to the within instrument and acknowledged to me that he /sh;5 /tP6y executed the same in his /hdr /th .eir authorized capacity(isais), and that by his/her /the'ir signature, s) on the instrument the person(s), or the entity upon behalf of which the person(g) acted, executed the instrument. SANDRA E. NAVA Commission # 2086119 Notary Public - California i Z Santa Clara County D My Comm. Expires Nov 11, 2018 I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature & TUeL& ✓ w'l-rc-, Signature of Notary Public Place Notary Seal Above OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document e A. tio, Title or Type of Document: Proper +y mo ( -avetm e i* �, rc� e?o` Document Date: AA a y 71 20 iS,' Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: ©2014 National Notary Association ^ www.NationalNotary.org o 1- 800 -US NOTARY (1- 800 - 876 -6827) Item #5907 EXHIBIT A DESCRIPTION OF PROPERTY The Property is that certain real property located in the City of Gilroy, County of Santa Clara, State of Califomia, and is described as follows: APNs: 841 -14 -026 and 841 -14 -027 [Continued on Next Page] A -1 PARCEL ONE The Southerly portion of the partlyingbetween the Southern Pacific Tracks andthe Monterey Road of Lot No. 1 of-the Thos. Rea Subdivision of Las Animas Ranch Lot 53,amap of which is filedinbookF of Maps, page 24 in the Office of the County Recorder of Santa Clara County, California, and more particularly described as follows: Beginning ata 11/ 4 "pipe ontheeastlineofthe Monterey Road on the lineb etween Lots land ofsaid Subdivision ,thencealongsaidline North 72 °00' East 31.265 chains to a 4 "x 4 'post intheWestlineof the Southern Pacific Railroad right of way, thence along said West line North 43° 30' West 9.706 chains to a 2 "x2 "stake; thence South 72' 00' West27.073 chains to a 1 "pipe inthe East line of Monterey Road; thence alongsaid Eastline of the Monterey Road South 18° 00' East 8.773 chains to the point of beginning. Excepting therefrom so much thereof as conveyed to Gennero P. Filice et ux, by instrument recorded July 3, 1962 in Book 563 3 Page 3 51, Official Records, and being more particularly described as follows: Beginning ata point in the Northeasterly line of Monterey Road as said Northeasterly linewas established by Deed from Frank Filiceand Theresa Filice, his wife, to the State of California, dated June 22, 1949 and recorded July28,1949 in Book 1824 of Official Records, page 427, Santa Clara County Records,distant thereon North 18 °West 389.02feet from the dividing linebetweenLots land 2as shownontheMap hereinafter referred to; thence along said Northeasterlyline of Monterey Road North 18° West 20.00 feet; thence leaving said last mentioned line North 72° East parallel with the said dividing line between Lots land 2, 218.00 feet; thence parallel withsaid line of Monterey Road North 18 °West 50.00 feet; thence North 72° East parallel with said dividing line between Lots land 2, 276.00 feet; thence South 18° East parallel with said Northeasterlyline of Monterey Road, 150.00 feet, thence South 72' West parallel with thesaiddividing line between Lots land 2, 276.00feet; thence North 18° West parallel with the said Northeasterlyline of Monterey Road, 80.00 feet; thence South 72 °Westparallel with the said dividingline betweenLots land2, 218.00feetto the point of beginning and being apart of Lotlof theThos,Rea Subdivision of LasAnimas Ranch Lot53, whichMap was filedforrecord inthe Office o fthe Recorder of the County of Santa Clara, State of California; in Book Fof Maps, page 24. Also excepting therefrom so much thereof as conveyed tothe State of California byInstrument recorded July 28, 1949 inbook 1824page427, Official Records and beingmore particularly described- as follows: Commencing atthe point of intersection of the Easterly line of the existing state highway (66 feet wide), between Gilroy and Sargent Overhead Crossing, with the Southerly line of said Lot 1, said pointbeing distant North 72'01'45" East, 67.78 feet from Engineer's Station "C13" 574 +23.99 on the centerline of the department of public works'survey for the State freeway inS anta Clara County, between Gilroy and Sargent overhead Crossing, Road IV- SCI -2 -C; thence along said Easterly highway line North l7 °58'15" West., 578.93 feet to the propertyl ine common to the lands, now orformerly, of Frank Filice, etux,andof Joseph Richard Musso; thence along said Common property line North 72'01'45" East,15.22 feet to a line parallelwith and distant 83 feet Easterly, atrightangles, from said "C13" centerline; thence along said parallel line South 17'58'15" East, 578.93 feet to the property line common to the lands, now or formerly, of Frank Filice, et ux, and of Pasquale Lamacchia, et ux; thence along last said common property line South 72° 01'45" West., 15.22 feet to the point of commencement. A -2 PARCEL TWO Beginning at a pipe driven belowthe surface North 720 East4.030 chainsfromthe Northwestern corner and on theNortherlylineof that certain 25.59acretract deeded by W.J. Hanna and Fannie S. Hanna to AugustDauberg; etux, in December 1927andrecorded in Book365 of Official Records, Page275, Records ofthe Office ofthe County Recorder ofthe County of Santa Clara, State of California; thence along the said Northerly line North 72° 71° East 23.043 chains to a 2" x 2" stake at the Northeasterly cornerofsaid 2 5.5 9 acretract in theWesterlylineofthe Southern PacificRighto fWay; thence along said Westerly line North 43' 30' West1. 948 chains toapipe; thence South 72 °West20.809 chains toan iron bar; thence South 18 "15'West 2.18 chains to the pointof beginning. Being p ortionofthe part lying between the Southern Pacific Tracks and the Monterey Road of Lot lof th.eThos Rea Subdivision of Las Animas Ranch Lot 53, a map ofWhich is filed in Book "F" of Maps, page 24inthe office of the County Recorder of the County of Santa Clara, State of California. Parcel Three Beginningata pointin the Northeasterly line of Monterey Road as said Northeasterly line was established by Deed from FrankFilice and Theresa Filice, hiswife, to the State of California, dated June22,1949 and recorded July 28, 1949 in Book 1824 of Official Records, page 427, Santa Clara County Records, distant thereon North 18° West 389.02 feet from the dividing line between lots 1 and 2 as shown on the map hereinafter referred to; thence along said Northeasterly line of Monterey Road North 18 °West 20.00 feet; thence leaving said last mentioned lineNorth72° East parallel with the said dividing linebetween Lots1 and2, 218.00 feet; thence parallel with said line of Monterey Road North 18° West 50.00 feet; thence North 72° East parallel with said dividing line between Lots land 2, 276.00 feet; thence South 18° East parallel with said Northeasterly line of Monterey Road, 150.00 feet; thence South 72" West parallel with the said dividing line between Lots 1 and 2, 276.00 feet; thence North 18° West parallel with the said Northeasterly line of Monterey Road, 80.00 feet; thence South 72° West parallel with the said dividingline between Lots 1 and 2, 218.00 feet to the pointof beginning and beinga part of Lot 1 of the Thos. Rea SubdivisionofLasAnimas RanchLot53,which map was filedfor recordinthe Office of the Recorder of the County of Santa Clara, State of California, in Book Fof Maps, page 24. A -3 EXHIBIT B 5/17/2018 10:15 AM G: \COMDEV\ENGINEERING \DEVELOPMENT PROJECTS \03_BUILDING PERMITS \5480 Monterey Rd - PFG \Fees and Invoices \Dev Fees 4 -3 -18 - 5480 Monterey With Jorge Request CITY OF GILROY PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION COST ESTIMATE EFFECTIVE 7/1/2017 ENCOMPASS NO: E1 117090031 Revised: Revision Number: DATE: 03- Apr -18 Revision By: NUMBER: This Engineering Cost Estimate is for offske improvements only. PROJECT LOCATION: 5480 Monterey Road PARCEL NUMBER: 841 - 14-026 & 841 -14 -027 OWNER/DEVELOPER: Performance Food Group MAILING ADDRESS: 12500 West Creek Parkway, Richmond, VA 23235 TELEPHONE NO: PREPARED BY: Nirorn Than Account No. Key Code Fee: Credits: Amount Due: Account Description: Paid on Invoice # 100 - 2601 - 0000 -3625 4904 $3,295.00 $3,295.00 $0.00 Special Public Works Sery 100 - 2601- 0000 -3605 4702 $37,118.00 $37,118.00 $0.00 Eng Plan Check & Insp 420 - 2600- 0000 -3660 4501 $30,726.72 $30,726.72 $0.00 Storm Development Fee 432 -2600- 0000 -3660 3301 $237.39 $237.39 $0.00 Str Tree Development Fee 433 - 2600 - 0000 -3660 4905 $713,911.34 $713,911.34 Traffic Impact Fee 435 - 2600- 0000 -3660 4509 $201,716.44 $201,716.44 Sewer Development Fee 436 - 2600- 0000 -3660 4510 $79,378.68 $79,378.68 Water Development Fee 440 -2600- 0000 -3660 4515 $248,933.45 $248,933.45 Public Facility Fee 720 - 0433 - 0000 -3620 2202 $0.00 $0.00 Const Water Use Fee 801 - 2601 -PWDO -3899 4703 $0.00 $0.00 Reimbursements 801 - 2601 -PWDO -3899 4703 $0.00 $0.00 Other Reimbursements 436- 2600 - 0000 -3660 4510 $ (21,300.00) $ (21,300.00) Oversize Water Reimbursement Total $1,222,639.91 Payment Bond Amount for all improvements $814,905 Performance Bond Amount for all improvements $814,905 G: \COMDEV\ENGINEERING \DEVELOPMENT PROJECTS \03_BUILDING PERMITS \5480 Monterey Rd - PFG \Fees and Invoices \Dev Fees 4 -3 -18 - 5480 Monterey With Jorge Request 5/17/2018 10:15 AM CITY OF GILROY COMMUNITY DEVELOPMENT DEPARTMENT ENGINEERING DIVISION COST ESTIMATE ENCOMPASS NO: El 117090031 DATE: 2- Feb -2018 NUMBER: This Engineering Cost Estimate is for offsite improvements only. PROJECT LOCATION: 5480 Monterey Road PARCEL NUMBER: 841 -14 -026 & 841 -14 -027 OWNER/DEVELOPER: Performance Food Group MAILING ADDRESS: 12500 West Creek Parkway, Richmond, VA 23235 TELEPHONE NO: PREPARED BY: Nirorn Than Common Area? Commercial /Industrial Allocations: Reimbursements and credits: Front Footage /Square Footage Charges Street Tree FF: 579.0 Pavement SF: 0.0 SPECIAL PUBLIC WORKS SERVICES Maps: Final Map $1,755.00 + Parcel Map $2,035.00 + Re- assessment Map (Assessment District Parcels) $1,710.00 + 0.000 Sewer GPD: 5,099 Water GPD: 11,793 Water FF: Sewer FF: Storm FF: 0.0 0.0 0.0 Median SF: Sidewalk SF: Curb /Gutter FF: 0.0 0.0 0.0 100- 2601 - 0000 -3625 $15.70 / lot N $0.00 $630.00 / lot Y $3,295.00 $630.00 / lot Administration Fees: (Cost Schedules, Agreements, R/W Reviews and Other Misc. Services) 0 hr Misc Services $185.00 / hr. Special Staff Analysis 0 hr Special Analysis $143.44 / hr. Sq Ft: 0 0 28,558 160,745 0 0 Const Water Acres to be Developed: 0.000 Construction Water FF: 0.0 $3,295.00 Fee ID NO- FINALM Fee ID NO- PARCELM N $0.00 Fee ID N- ASSESM Y $0.00 Fee ID N -MISC N $0.00 G: \COMDEV\ENGINEERING \DEVELOPMENT PROJECTS \03_BUILDING PERMITS \5480 Monterey Rd - PFG \Fees and Invoices \Dev Fees 4 -3 -18 - 5480 Monterey With Jorge Request FINAL ENGINEERING COST SCHEDULE TYPE: COST ESTIMATE ? Y PLAN CHECK ? N INCENTIVE AGREEMENT ONLY? N DEFER PUBLIC FACILITY FEE? TO PERMIT? N TO FINAL? N DEFER SEWER, WATER, TRAFFIC FEES ? TO PERMIT? N TO FINAL ? N NOTE: This Preliminary Cost Schedule is an estimate and will be adjusted to the rates in effect at the time permits are issued. Site Information: Gross Acres: Lots: Units: Residential -Low ? 0.000 0 0 Residential -High ? 0.000 0 0 Commercial -Low ? 0.000 0 Commercial -High ? 0.000 0 Industrial - General ? 0.000 0 Industrial - Warehouse ? 27.240 2 Assembly Hall? 0.000 0 Common Area? Commercial /Industrial Allocations: Reimbursements and credits: Front Footage /Square Footage Charges Street Tree FF: 579.0 Pavement SF: 0.0 SPECIAL PUBLIC WORKS SERVICES Maps: Final Map $1,755.00 + Parcel Map $2,035.00 + Re- assessment Map (Assessment District Parcels) $1,710.00 + 0.000 Sewer GPD: 5,099 Water GPD: 11,793 Water FF: Sewer FF: Storm FF: 0.0 0.0 0.0 Median SF: Sidewalk SF: Curb /Gutter FF: 0.0 0.0 0.0 100- 2601 - 0000 -3625 $15.70 / lot N $0.00 $630.00 / lot Y $3,295.00 $630.00 / lot Administration Fees: (Cost Schedules, Agreements, R/W Reviews and Other Misc. Services) 0 hr Misc Services $185.00 / hr. Special Staff Analysis 0 hr Special Analysis $143.44 / hr. Sq Ft: 0 0 28,558 160,745 0 0 Const Water Acres to be Developed: 0.000 Construction Water FF: 0.0 $3,295.00 Fee ID NO- FINALM Fee ID NO- PARCELM N $0.00 Fee ID N- ASSESM Y $0.00 Fee ID N -MISC N $0.00 G: \COMDEV\ENGINEERING \DEVELOPMENT PROJECTS \03_BUILDING PERMITS \5480 Monterey Rd - PFG \Fees and Invoices \Dev Fees 4 -3 -18 - 5480 Monterey With Jorge Request 5/17/2018 10:15 AM ENGINEERING PLAN CHECK & INSPECTION 100 - 2601 - 0000 -3605 COST ESTIMATE $37,118.00 ACTUAL COST OF PUBLIC IMPROVEMENTS FINAL ENGINEERING PLAN CHECK $0.00 At time of Improvement Plan /Final Map submittal 40% of fee is due for Plan Check. Remainder 60% due prior to submittal of Final Map for Council approval Additional Plan Review After First Three Submittals or Review of Changes, Additions or Revisions to Approved Plans 0 hr Additional Plan Review $143.44 / hr. N $0.00 Fee ID NO- GRADINS (2 Hour Minimum) Re- Inspection Fee 0 hr Re- Inspection $125.00 / hr. N $0.00 Fee ID NO- GRADINS Inspections outside of normal business hours 0 hr Inspection $475.00 + (Based on total cost of improvements) Estimated Cost of Improvements 12.6% $0 10.5% $100,000 8.4% over Payment Bond Amount for all improvements Performance Bond Amount for all improvements IMPACT FEES Storm Drain Impact Fee a.Residential -Low b.Residential -High c.Commercial d.Industdal e.Assembly Hall Street Tree Fee a.City Planting and Replacement $3.06 / f.f. x b.lnspection and Replacement $0.41 / f.f. x Traffic Impact Fee a.Residential -Low b.Residential -High c.Commercial -Low Traffic (< 10.75 trips /1000 sf) d.Commercial -High Traffic (> 10.75 trips /1000 sf) e.l nd ustrial- General f.lndustdal- Warehouse $160.00 / hr. after 3hrs N $0.00 COST ACTUAL ESTIMATE COST $814,905 $0 $100,000 Y $12,600.00 Y $0.00 $200,000 Y $10,500.00 Y $0.00 $200,000 Y $14,018.00 Y $0.00 $814,905 $814,905 420 - 2600- 0000 -3660 $564.00 / acre Y $0.00 $886.00 / acre Y $0.00 $1,528.00 / acre Y $0.00 $1,128.00 / acre Y $30,726.72 $564.00 / acre Y $0.00 432 - 2600 -0000 -3660 N 0.0 = $0.00 Y ` 579.0 = $237.39 433 - 2600 - 0000 -3660 $11,224.00 / unit Y $0.00 $9,099.00 / unit Y $0.00 $12,419.00 / k.s.f. Y $0.00 $25,087.00 / k.s.f. Y $0.00 $4,921.00 / k.s.f. Y $140,533.92 $3,567.00 / k.s.f. Y ' $573,377.42 Fee ID NO- GRADINS DIFFERENCE ($37,118.00) Fee ID NO- PCKINSP Fee ID NO -SD -LD Fee ID NO -SD -HD Fee ID NO -SD -C Fee ID NO -SD -I Fee ID NO -SD -AH Fee ID NO- TREEPLT Fee ID NO- TREEINS Fee ID N1- TRAF -LD Fee ID N2- TRAF -HD Fee ID N3- TRAF -CL Fee ID N3- TRAF -CH Fee ID N4- TRAF -IG Fee ID N4- TRAF -IW $30,726.72 $237.39 $713,911.34 G: \COMDEV\ENGINEERING \DEVELOPMENT PROJECTS \03_BUILDING PERMITS \5480 Monterey Rd - PFG \Fees and Invoices \Dev Fees 4 -3 -18 - 5480 Monterey With Jorge Request 5/17/2018 10:15 AM Sewer Impact Fee 435 - 2600 - 0000 -3660 $201,716.44 a.Residential -Low $12,501.00 / unit Y $0.00 Fee ID N1 -SS -LD b.Residential -High $6,764.00 / unit Y $0.00 Fee ID N2 -SS -HD to and including 12" c.Commercial /Industrial $3,956.00 / cgpd Y $201,716.44 Fee ID N5- SS -C /I Water Impact Fee Half Pipe 436 - 2600 - 0000 -3660 Lineal Footage $0.00 a.Residential -Low $4,294.00 / unit Y $0.00 Fee ID N1- WATR -LD Reimbursement 0.0 = $0.00 Fee ID N- WR06 -1/2 8 inch Main amount of b.Residential -High $1,737.00 / unit Y $0.00 Fee ID N2- WATR -HD $125,670. for 16" Main $47.00 / LF x N 0.0 = Pipe oversize c.Commercial /Industrial $6,731.00 / kgpd Y $79,378.68 Fee ID N5- WTR -C /I N Public Facilities Impact Fee $0.00 440 - 2600 - 0000 -3660 14 inch Main $248,933.45 a.Residential -Low $19,710.00 / unit Y $0.00 Fee ID N1 -PF -LD 16 inch b.Residential -High $16,583.00 / unit Y $0.00 Fee ID N2 -PF -HD $0.00 c.Commercial $2,970.00 / k.s.f. Y $0.00 Fee ID N3 -PF -C N d.lndustrial $1,315.00 / k.s.f. Y $248,933.45 Fee ID N4 -PF -I $76.00 Water User Fee (Construction) N 720- 0433 - 0000 -3620 $0.00 Y $0.00 Main $3.00 / f.f. $0.00 Fee ID NO- CONWTFF $0.00 Fee ID N- WR24 -1/2 30 inch plus $91.00 / LF x N 0.0 = $182.73 / a.c. $0.00 Fee ID NO- CONWTAC $106.00 FRONT FOOT CHARGES (Used to charge and reimburse fees for existing infrastructure) The Half Pipe schedule is used to determine the front footage reimbursement to former developers for infrastructure previously installed along the front footage of the development. The Full Pipe schedule is used to determine the oversizing reimbursement to the developer for installing water, sewer, and storm main extensions to sizes required by each master plan that are greater than the sizes required by the development. The oversized portion is the difference between the master planned size for the main and the greater of the main size required by the development or the developer's minimum responsibility for each main. Water 801- 2601 -P W DO -3899 Water Mains - including fire hydrants, valves, valve boxes and other pertinences. Developer responsibility is up to and including 12" mains Half Pipe Lineal Footage 6 inch Main $39.00 / LF x N 0.0 = $0.00 Fee ID N- WR06 -1/2 8 inch Main $41.00 / LF x N 0.0 = $0.00 Fee ID N- WR08 -1/2 10 inch Main $47.00 / LF x N 0.0 = $0.00 Fee ID N- WR.10 -1/2 12 inch Main $52.00 / LF x N 0.0 = $0.00 Fee ID N- WR12 -1/2 14 inch Main $57.00 / LF x N 0.0 = $0.00 Fee ID N- WR14 -1/2 16 inch Main $62.00 / LF x N 0.0 = $0.00 Fee ID N- WR16 -1/2 18 inch Main $68.00 / LF x N 0.0 = $0.00 Fee ID N- WR18 -1/2 20 inch Main $76.00 / LF x N 0.0 = $0.00 Fee ID N- WR18 -1/2 24 inch Main $82.00 / LF x N 0.0 = $0.00 Fee ID N- WR24 -1/2 30 inch Main $91.00 / LF x N 0.0 = $0.00 Fee ID N- WR30 -1/2 36 inch Main $106.00 / LF x N 0.0 = $0.00 Fee ID N- WR36 -1/2 $0.00 G: \COMDEV\ENGINEERING \DEVELOPMENT PROJECTS \03_BUILDING PERMITS \5480 Monterey Rd - PFG \Fees and Invoices \Dev Fees 4 -3 -18 - 5480 Monterey With Jorge Request Front Foot Charges Continued (Used to charge and reimburse fees for existing infrastructure) Sewer 801- 2601 -P W DO -3899 Sewer Mains - including manhole and other pertinences. Developer responsibility is up to and including 12" mains. Lineal Footage Half Pipe N 0.0 = 6 inch Main $73.00 / LF x 8 inch Main $75.00 / LF x 10 inch Main $81.00 / LF x 12 inch Main $83.00 / LF x 15 inch Main $87.00 / LF x 18 inch Main $93.00 / LF x 21 inch Main $102.00 / LF x 24 inch Main $106.00 / LF x 27 inch Main $122.00 / LF x 30 inch Main $144.00 / LF x 33 inch Main $158.00 / LF x 36 inch Main $178.00 / LF x 39 inch Main $212.00 / LF x 42 inch Main $265.00 / LF x Street Improvements N 0.0 = $0.00 Pavement, Sidewalks & Medians AC /Bike path: base $2.55 / SF x AC /Bike path: pvmt $2.50 / SF x Sidewalk: new $9.75 / SF x Sidewalk: replace $13.25 / SF x Resurfacing $2.55 / SF x Landscaped Median $20.35 / SF x Hardscaped Median $11.63 / SF x Traffic Signals (equipment only) Traffic Signal -3 leg $130,200.00 / LS x Traffic Signal -4 leg $158,500.00 / LS x Curb and Gutter Curb /Gutter: new $25.85 / LF x Curb /Gutter: replace $33.40 / LF x Curb Ramps $1,057.63 / LF x Lineal Footage N 0.0 = $0.00 N 0.0 = $0.00 N 0.0 = $0.00 N 0.0 = $0.00 N 0.0 = $0.00 N 0.0 = $0.00 N 0.0 = $0.00 N 0.0 = $0.00 N 0.0 = $0.00 N 0.0 = $0.00 N 0.0 = $0.00 N 0.0 = $0.00 N 0.0 = $0.00 N 0.0 = $0.00 801 - 2601 -P W DO -3899 Square Footage N 0.0 = $0.00 N 0.0 = $0.00 N 0.0 = $0.00 N 0.0 = $0.00 N 0.0 = $0.00 N 0.0 = $0.00 N 0.0 = $0.00 5/17/2018 10:15 AM Fee ID N- SS06 -1/2 Fee ID N- SS08 -1/2 Fee ID N- SS10 -1/2 Fee ID N- SS12 -1/2 Fee ID N- SS15 -1/2 Fee ID N- SS18 -1/2 Fee ID N- SS21 -1/2 Fee ID N- SS24 -1/2 Fee ID N- SS27 -1/2 Fee ID N- SS30 -1/2 Fee ID N- SS33 -1/2 Fee ID N- SS36 -1/2 Fee ID N- SS39 -1/2 Fee ID N- SS42 -1/2 Fee ID N- STR -ACB Fee ID N- STR -ACP Fee ID N- STR -S/W Fee ID N- STR -S/WR Fee ID N- STR -RESU Fee ID N- STR -LANM Fee ID N -STR -HARD of Lump Sum N 0% = $0.00 Fee ID N- STR -TS3L N 0% = $0.00 Fee ID N- STR -TS41- Lineal Footage N 0.0 = $0.00 Fee ID N- STR -C /G N 0.0 = $0.00 Fee ID N- STR -C /GR N 0.0 = $0.00 Fee ID N- STR -CR $0.00 $0.00 G:\COMDEV\ENGINEERING \DEVELOPMENT PROJECTS \03_BUILDING PERMITS \5480 Monterey Rd - PFG \Fees and Invoices \Dev Fees 4 -3 -18 - 5480 Monterey With Jorge Request Front Foot Charges Continued (Used to charge and reimburse fees for existing infrastructure) Storm Drain 801- 2601 -PWDO -3899 Storm Mains - including manholes, catch basins and other pertinences. Developer responsibility is up to and including 24" mains. Half Pipe Lineal Footage 18 inch Main $63.00 / LF x N 0.0 = $0.00 Fee ID N- SD18 -1/2 21 inch Main $69.00 / LF x N 0.0 = $0.00 Fee ID N- SD21 -1/2 24 inch Main $70.00 / LF x N 0.0 = $0.00 Fee ID N- SD24 -1/2 27 inch Main $82.00 / LF x N 0.0 = $0.00 Fee ID N- SD27 -1/2 30 inch Main $89.00 / LF x N 0.0 = $0.00 Fee ID N- SD30 -1/2 33 inch Main $91.00 / LF x N 0.0 = $0.00 Fee ID N- SD33 -1/2 36 inch Main $95.00 / LF x N 0.0 = $0.00 Fee ID N- SD36 -1/2 42 inch Main $99.00 / LF x N 0.0 = $0.00 Fee ID N- SD42 -1/2 48 inch Main $117.00 / LF x N 0.0 = $0.00 Fee ID N- SD48 -1/2 54 inch Main $137.00 / LF x N 0.0 = $0.00 Fee ID N- SD54 -1/2 60 inch Main $158.00 / LF x N 0.0 = $0.00 Fee ID N- SD60 -1/2 66 inch Main $179.00 / LF x N 0.0 = $0.00 Fee ID N- SD66 -1/2 72 inch Main $200.00 / LF x N 0.0 = $0.00 Fee ID N- SD72 -1/2 78 inch Main $216.00 / LF x N 0.0 = $0.00 Fee ID N- SD78 -1/2 84 inch Main $231.00 / LF x N 0.0 = $0.00 Fee ID N- SD84 -1/2 90 inch Main $246.00 / LF x N 0.0 = $0.00 Fee ID N- SD90 -1/2 96 inch Main $261.00 / LF x N 0.0 = $0.00 Fee ID N- SD96 -1/2 NOTE: All deferred and /or estimated fees will be adjusted to the rates in effect at the time fees are paid. The undersigned agrees to provide actual construction costs for recalculation of fees and pay any underestimated fees prior to final acceptance. If the recalculated fees are less than the estimate, the City of Gilroy will refund the difference. Additional plan review required by changes, additions or revisions to approved plans, reinspections and inspections outside of normal business hours will be billed as shown in the City of Gilroys most current comprehensive fee schedule at the hourly rates in effect at the time of inspection. Accepted by: Print Name: Date: 5/17/2018 10:15 AM $0.00 G: \COMDEV\ENGINEERING \DEVELOPMENT PROJECTS \03_BUILDING PERMITS \5480 Monterey Rd - PFG \Fees and Invoices\Dev Fees 4 -3 -18 - 5480 Monterey With Jorge Request 5/17/2018 10:15 AM OVERSIZING SCHEDULE (Used to reimburse oversized infrastructure) Total Oversized Water, Sewer and Storm Drain Main Reimbursement $21,300.00 Total Oversized Water Main Reimbursement (Developer is responsible for up to and including 12" mains) $21,300.00 Oversized Minimum 12" main Oversized Full Pipe $ /foot Full Pipe $ /foot Oversized Footage Reimbursement 14 inch Main $114.00 $104.00 x 0.0 = $0.00 N 16 inch Main $124.00 $104.00 x 1,065.0 = $21,300.00 Y 18 inch Main $135.00 $104.00 x 0.0 = $0.00 N 20 inch Main $151.00 $104.00 x 0.0 = $0.00 N 24 inch Main $164.00 $104.00 x 0.0 = $0.00 N 30 inch Main $182.00 $104.00 x 0.0 = $0.00 N 36 inch Main $211.00 $104.00 x 0.0 = $0.00 N Total Oversized Sewer Main Reimbursement (Developer is responsible for up to and including 12" mains) $0.00 Oversized Minimum 12" main Oversized Full Pipe $ /foot Full Pipe $ /foot Oversized Footage Reimbursement 15 inch Main $174.00 $166.00 x 0.0 = $0.00 N 18 inch Main $186.00 $166.00 x 0.0 = $0.00 N 21 inch Main $204.00 $166.00 x 0.0 = $0.00 N 24 inch Main $211.00 $166.00 x 0.0 = $0.00 N 27 inch Main $244.00 $166.00 x 0.0 = $0.00 N 30 inch Main $287.00 $166.00 x 0.0 = $0.00 N 33 inch Main $315.00 $166.00 x 0.0 = $0.00 N 36 inch Main $356.00 $166.00 x 0.0 = $0.00 N 39 inch Main $423.00 $166.00 x 0.0 = $0.00 N 42 inch Main $529.00 $166.00 x 0.0 = $0.00 N Total Oversized Storm Drain Main Reimbmnt (Developer is responsible for up to and including 24" mains) $0.00 Oversized Minimum 24" main Oversized Full Pipe $ /foot Full Pipe $ /foot Oversized Footage Reimbursement 27 inch Main $164.00 $140.00 x 0.0 = $0.00 N 30 inch Main $177.00 $140.00 x 0.0 = $0.00 N 33 inch Main $182.00 $140.00 x 0.0 = $0.00 N 36 inch Main $189.00 $140.00 x 0.0 = $0.00 N 42 inch Main $197.00 $140.00 x 0.0 = $0.00 N 48 inch Main $233.00 $140.00 x 0.0 = $0.00 N 54 inch Main $273.00 $140.00 x 0.0 = $0.00 N 60 inch Main $315.00 $140.00 x 0.0 = $0.00 N G: \COMDEV\ENGINEERING \DEVELOPMENT PROJECTS \03_BUILDING PERMITS \5480 Monterey Rd - PFG \Fees and Invoices \Dev Fees 4 -3 -18 - 5480 Monterey With Jorge Request 5/17/2018 10:15 AM Oversizing Schedule Continued (Used to reimburse oversized infrastructure) Oversized Storm Drain Main Reimbmnt Continued Oversized Minimum 24" main Oversized Full Pipe $ /foot Full Pipe $ /foot Oversized Footage Reimbursement 66 inch Main $357.00 $140.00 x 0.0 = $0.00 N 72 inch Main $399.00 $140.00 x 0.0 = $0.00 N 78 inch Main $431.00 $140.00 x 0.0 = $0.00 N 84 inch Main $461.00 $140.00 x 0.0 = $0.00 N 90 inch Main $492.00 $140.00 x 0.0 = $0.00 N 96 inch Main $522.00 $140.00 x 0.0 = $0.00 N G: \COMDEV\ENGINEERING \DEVELOPMENT PROJECTS \03_BUILDING PERMITS \5480 Monterey Rd - PFG \Fees and Invoices \Dev Fees 4 -3 -18 - 5480 Monterey With Jorge Request