Loading...
4LEAF - First Street Waterline Construction Management (2019)AGREEMENT FOR SERVICES (For contracts over $5,000 - CONSULTANT) This AGREEMENT made this 6 day of December, 2018, between: CITY: City of Gilroy, having a principal place of business at 7351 Rosanna Street, Gilroy, California and CONSULTANT: 4 LEAF, INC., having a principal place of business at 2126 Rheem Drive, Pleasanton, CA 94588. ARTICLE 1. TERM OF AGREEMENT This Agreement will become effective on 12/21/18 and will continue in effect through 3/4/2019 unless terminated in accordance with the provisions of Article 7 of this Agreement. Any lapse in insurance coverage as required by Article 5, Section D of this Agreement shall tenninate this Agreement regardless of any other provision stated herein. C Xj- ,--Illitial ARTICLE 2. INDEPENDENT CONTRACTOR STATUS It is the express intention of the parties that CONSULTANT is an independent contractor and not an employee, agent, joint venturer or partner of CITY. Nothing in this Agreement shall be interpreted or construed as creating or establishing the relationship of employer and employee between CITY and CONSULTANT or any employee or agent of CONSULTANT. Both parties acknowledge that CONSULTANT is not an employee for state or federal tax purposes. CONSULTANT shall not be entitled to any of the rights or benefits afforded to CITY'S employees, including, without limitation, disability or unemployment insurance, workers' compensation, medical insurance, sick leave, retirement benefits or any other employment benefits. CONSULTANT shall retain the right to perform services for others during the teen of this Agreement. ARTICLE 3. SERVICES TO BE PERFORMED BY CONSULTANT A. Specific Services CONSULTANT agrees to: Perform the services as outlined in Exhibit "A" ("Specific Provisions") and Exhibit "B" ("Scope of Services"), within the time periods described in Exhibit "C" ("Milestone Schedule"). B. Method of Performing Services CONSULTANT shall detenmine the method, details and means of performing the above - described services. CITY shall have no right to, and shall not, control the manner or determine the method of accomplishing CONSULTANT'S services. A R'lF_')9a7_nza 1.,1 -1- C. Employment of Assistants CONSULTANT may, at the CONSULTANT'S own expense, employ such assistants as CONSULTANT deems necessary to perform the services required of CONSULTANT by this Agreement, subject to the prohibition against assignment and subcontracting contained in Article 5 below. CITY may not control, direct, or supervise CONSULTANT'S assistants in the perfonnance of those services. CONSULTANT assumes full and sole responsibility for the payment of all compensation and expenses of these assistants and for all state and federal income tax, unemployment insurance, Social Security, disability insurance and other applicable withholding. D. Place of Work CONSULTANT shall perform the services required by this Agreement at any place or location and at such times as CONSULTANT shall determine is necessary to properly and timely perform CONSULTANT'S services. ARTICLE 4. COMPENSATION A. Consideration In consideration for the services to be performed by CONSULTANT, CITY agrees to pay CONSULTANT the amounts set forth in Exhibit "D" ("Payment Schedule"). In no event however shall the total compensation paid to CONSULTANT exceed $95,000 (-5% Continfzency). B. Invoices CONSULTANT shall submit invoices for all services rendered. C. Payment Payment shall be due according to the payment schedule set forth in Exhibit "D". No payment will be made unless CONSULTANT has first provided City with a written receipt of invoice describing the work performed and any approved direct expenses (as provided for in Exhibit "A", Section IV) incurred during the preceding period. If CITY objects to all or any portion of any invoice, CITY shall notify CONSULTANT of the objection within thirty (30) days from receipt of the invoice, give reasons for the objection, and pay that portion of the invoice not in dispute. It shall not constitute a default or breach of this Agreement for CITY not to pay any invoiced amounts to which it has objected until the objection has been resolved by mutual agreement of the parties. D. Expenses CONSULTANT shall be responsible for all costs and expenses incident to the performance of services for CITY, including but not limited to, all costs of equipment used or provided by CONSULTANT, all fees, fines, licenses, bonds or taxes required of or imposed against CONSULTANT and all other of CONSULTANT'S costs of doing business. CITY shall not be nnu_00a7_maa,,1 -2- including the loss of use thereof; and (b) Professional Liability Insurance (Errors & Omissions) with a minimum coverage of $1,000,000 per occurrence or claim, and $2,000,000 aggregate; provided however, Professional Liability Insurance written on a claims made basis must comply with the requirements set forth below. Professional Liability Insurance written on a claims made basis (including without limitation the initial policy obtained and all subsequent policies purchased as renewals or replacements) must show the retroactive date, and the retroactive date must be before the earlier of the effective date of the contract or the beginning of the contract work. Claims made Professional Liability Insurance must be maintained, and written evidence of insurance must be provided, for at least five (5) years after the completion of the contract work. If claims made coverage is canceled or non -renewed, and not replaced with another claims -made policy form with a retroactive date prior to the earlier of the effective date of the contract or the beginning of the contract work, CONSULTANT must purchase so called "extended reporting" or "tail" coverage for a minimum of five (5) years after completion of work, which must also show a retroactive date that is before the earlier of the effective date of the contract or the beginning of the contract work. As a condition precedent to CITY'S obligations under this Agreement, CONSULTANT shall furnish written evidence of such coverage (naming CITY, its officers and employees as additional insureds on the Comprehensive Liability insurance policy referred to in (a) immediately above via a specific endorsement) and requiring thirty (30) days written notice of policy lapse or cancellation, or of a material change in policy terms. E. Assignment Notwithstanding any other provision of this Agreement, neither this Agreement nor any duties or obligations of CONSULTANT under this Agreement may be assigned or subcontracted by CONSULTANT without the prior written consent of CITY, which CITY may withhold in its sole and absolute discretion. F. State and Federal Taxes As CONSULTANT is not CITY'S employee, CONSULTANT shall be responsible for paying all required state and federal taxes. Without limiting the foregoing, CONSULTANT acknowledges and agrees that: • CITY will not withhold FICA (Social Security) from CONSULTANT'S payments; • CITY will not make state or federal unemployment insurance contributions on CONSULTANT'S behalf; • CITY will not withhold state or federal income tax from payment to CONSULTANT; • CITY will not snake disability insurance contributions on behalf of CONSULTANT; • CITY will not obtain workers' compensation insurance on behalf of CONSULTANT. A -4- responsible for any expenses incurred by CONSULTANT in performing services for CITY, except for those expenses constituting "direct expenses" referenced on Exhibit "A." ARTICLES. OBLIGATIONS OF CONSULTANT A. Tools and Instrumentalities CONSULTANT shall supply all tools and instrumentalities required to perform the services under this Agreement at its sole cost and expense. CONSULTANT is not required to purchase or rent any tools, equipment or services from CITY. B. Workers' Compensation CONSULTANT agrees to provide workers' compensation insurance for CONSULTANT'S employees and agents and agrees to hold harmless, defend with counsel acceptable to CITY and indemnify CITY, its officers, representatives, agents and employees from and against any and all claims, suits, damages, costs, fees, demands, causes of action, losses, liabilities and expenses, including without limitation reasonable attorneys' fees, arising out of any injury, disability, or death of any of CONSULTANT'S employees. C. Indemnification of Liability, Duty to Defend 1. As to professional liability, to the fullest extent permitted by law, CONSULTANT shall defend, through counsel approved by CITY (which approval shall not be unreasonably withheld), indemnify and hold harmless CITY, its officers, representatives, agents and einployees against any and all suits, damages, costs, fees, claims, demands, causes of action, losses, liabilities and expenses, including without limitation attorneys' fees, to the extent arising or resulting directly or indirectly from any willful or negligent acts, errors or omissions of CONSULTANT or CONSULTANT'S assistants, employees or agents, including all claims relating to the injury or death of any person or damage to any property. 2. As to other liability, to the fullest extent permitted by law, CONSULTANT shall defend, through counsel approved by CITY (which approval shall not be unreasonably withheld), indemnify and hold harmless CITY, its officers, representatives, agents and employees against any and all suits, damages, costs, fees, claims, demands, causes of action, losses, liabilities and expenses, including without limitation attorneys' fees, arising or resulting directly or indirectly from any act or omission of CONSULTANT or CONSULTANT'S assistants, employees or agents, including all claims relating to the injury or death of any person or damage to any property. D. Insurance In addition to any other obligations under this Agreement, CONSULTANT shall, at no cost to CITY, obtain and maintain throughout the tern of this Agreement: (a) Commercial Liability Insurance on a per occurrence basis, including coverage for owned and non -owned automobiles, with a minimum combined single limit coverage of $1,000,000 per occurrence for all damages due to bodily injury, sickness or disease, or death to any person, and damage to property, -3- ARTICLE 6. OBLIGATIONS OF CITY A. Cooperation of City CITY agrees to respond to all reasonable requests of CONSULTANT and provide access, at reasonable times following receipt by CITY of reasonable notice, to all documents reasonably necessary to the performance of CONSULTANT'S duties under this Agreement. B. Assignment CITY may assign this Agreement or any duties or obligations thereunder to a successor governmental entity without the consent of CONSULTANT. Such assignment shall not release CONSULTANT from any of CONSULTANT'S duties or obligations under this Agreement. ARTICLE 7. TERMINATION OF AGREEMENT A. Sale of Consultant's Business/ Death of Consultant. CONSULTANT shall notify CITY of the proposed sale of CONSULTANT's business no later than thirty (30) days prior to any such sale. CITY shall have the option of terminating this Agreement within thirty (30) days after receiving such notice of sale. Any such CITY termination pursuant to this Article 7.A shall be in writing and sent to the address for notices to CONSULTANT set forth in Exhibit A, Subsection V.H., no later than thirty (30) days after CITY' receipt of such notice of sale. If CONSULTANT is an individual, this Agreement shall be deemed automatically terminated upon death of CONSULTANT. B. Termination by City for Default of Consultant Should CONSULTANT default in the performance of this Agreement or materially breach any of its provisions, CITY, at CITY'S option, may terminate this Agreement by giving written notification to CONSULTANT. For the purposes of this section, material breach of this Agreement shall include, but not be limited to the following: 1. CONSULTANT'S failure to professionally and/or timely perfonn any of the services contemplated by this Agreement. 2. CONSULTANT'S breach of any of its representations, warranties or covenants contained in this Agreement. CONSULTANT shall be entitled to payment only for work completed in accordance with the terms of this Agreement through the date of the termination notice, as reasonably determined by CITY, provided that such payment shall not exceed the amounts set forth in this Agreement for the tasks described on Exhibit C" which have been fully, competently and timely rendered by CONSULTANT. Notwithstanding the foregoing, if CITY terminates this Agreement due to CONSULTANT'S default in the performance of this Agreement or material breach by CONSULTANT of any of its provisions, then in addition to any other rights and remedies CITY nnz;_o,)a7_nnai„i -5- may have, CONSULTANT shall reimburse CITY, within ten (10) days after demand, for any and all costs and expenses incurred by CITY in order to complete the tasks constituting the scope of work as described in this Agreement, to the extent such costs and expenses exceed the amounts CITY would have been obligated to pay CONSULTANT for the performance of that task pursuant to this Agreement. C. Termination for Failure to Make Agreed -Upon Payments Should CITY fail to pay CONSULTANT all or any part of the compensation set forth in Article 4 of this Agreement on the date due, then if and only if such nonpayment constitutes a default under this Agreement, CONSULTANT, at the CONSULTANT'S option, may terminate this Agreement if such default is not remedied by CITY within thirty (30) days after demand for such payment is given by CONSULTANT to CITY. D. Transition after Termination Upon termination, CONSULTANT shall immediately stop work, unless cessation could potentially cause any damage or harm to person or property, in which case CONSULTANT shall cease such work as soon as it is safe to do so. CONSULTANT shall incur no further expenses in connection with this Agreement. CONSULTANT shall promptly deliver to CITY all work done toward completion of the services required hereunder, and shall act in such a manner as to facilitate any the assumption of CONSULTANT'S duties by any new consultant hired by the CITY to complete such services. ARTICLE 8. GENERAL PROVISIONS A. Amendment & Modification No amendments, modifications, alterations or changes to the terms of this Agreement shall be effective unless and until made in a writing signed by both parties hereto. B. Americans with Disabilities Act of 1990 Throughout the term of this Agreement, the CONSULTANT shall comply fully with all applicable provisions of the Americans with Disabilities Act of 1990 ("the Act") in its current form and as it may be amended from time to time. CONSULTANT shall also require such compliance of all subcontractors performing work under this Agreement, subject to the prohibition against assignment and subcontracting contained in Article 5 above. The CONSULTANT shall defend with counsel acceptable to CITY, indemnify and hold harmless the CITY OF GILROY, its officers, employees, agents and representatives from and against all suits, claims, demands, damages, costs, causes of action, losses, liabilities, expenses and fees, including without limitation reasonable attorneys' fees, that may arise out of any violations of the Act by the CONSULTANT, its subcontractors, or the officers, employees, agents or representatives of either. AAU?)a7_mri,m -6- C. Attorneys' Fees If any action at law or in equity, including an action for declaratory relief, is brought to enforce or interpret the provisions of this Agreement, the prevailing party will be entitled to reasonable attorneys' fees, which may be set by the court in the same action or in a separate action brought for that purpose, in addition to any other relief to which that parry may be entitled. D. Captions The captions and headings of the various sections, paragraphs and subparagraphs of the Agreement are for convenience only and shall not be considered nor referred to for resolving questions of interpretation. E. Compliance with Laws The CONSULTANT shall keep itself informed of all State and National laws and all municipal ordinances and regulations of the CITY which in any manner affect those engaged or employed in the work, or the materials used in the work, or which in any way affect the conduct of the work, and of all such orders and decrees of bodies or tribunals having any jurisdiction or authority over the same. Without limiting the foregoing, CONSULTANT agrees to observe the provisions of the Municipal Code of the CITY OF GILROY, obligating every contractor or subcontractor under a contract or subcontract to the CITY OF GILROY for public works or for goods or services to refrain from discriminatory employment or subcontracting practices on the basis of the race, color, sex, religious creed, national origin, ancestry of any employee, applicant for employment, or any potential subcontractor. F. Conflict of Interest CONSULTANT certifies that to the best of its knowledge, no CITY employee or office of any public agency interested in this Agreement has any pecuniary interest in the business of CONSULTANT and that no person associated with CONSULTANT has any interest that would constitute a conflict of interest in any manner or degree as to the execution or performance of this Agreement. G. Entire Agreement This Agreement supersedes any and all prior agreements, whether oral or written, between the parties hereto with respect to the rendering of services by CONSULTANT for CITY and contains all the covenants and agreements between the parties with respect to the rendering of such services in any manner whatsoever. Each party to this Agreement acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which are not embodied herein, and that no other agreement, statement or promise not contained in this Agreement shall be valid or binding. No other agreements or conversation with any officer, agent or employee of CITY prior to execution of this Agreement shall affect or modify any of the tenris or obligations contained in any documents comprising this Agreement. Such other agreements or conversations shall be considered as unofficial information and in no way binding upon CITY. na1r2)')a7_naa1„1 H. Governing Law and Venue This Agreement shall be governed by and construed in accordance with the laws of the State of California without regard to the conflict of laws provisions of any jurisdiction. The exclusive jurisdiction and venue with respect to any and all disputes arising hereunder shall be in state and federal courts located in Santa Clara County, California. I. Notices Any notice to be given hereunder by either party to the other may be effected either by personal delivery in writing or by mail, registered or certified, postage prepaid with return receipt requested. Mailed notices shall be addressed to the parties at the addresses appearing in Exhibit "A", Section V.H. but each party may change the address by written notice in accordance with this paragraph. Notices delivered personally will be deemed delivered as of actual receipt; mailed notices will be deemed delivered as of three (3) days after mailing. J. Partial Invalidity If any provision in this Agreement is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions will nevertheless continue in full force without being impaired or invalidated in any way. K. Time of the Essence All dates and times referred to in this Agreement are of the essence. A R'11-'))r7_fl'191,,1 -8- L. Waiver CONSULTANT agrees that waiver by CITY of any one or more of the conditions of performance under this Agreement shall not be construed as waiver(s) of any other condition of performance under this Agreement. Executed at Gilroy, California, on the date and year first above written. CONSULTANT: CITY: 4LEAF, INC. CITY OF GILROY By2: jaC/a1 % By: Naf e: Gene A Barry Name: Gabriel A. Gonzalez - Title: Vice President Title: City Administrator Social Security or Taxpayer Identification Number 94-3393574 Approved as to Form =FTE City At'forney i y Cle A Gu_'1)R7_nu1 „1 -9- EXHIBIT "A" SPECIFIC PROVISIONS L PROJECT MANAGER CONSULTANT shall provide the services indicated on the attached Exhibit "B", Scope of Services ("Services"). (All exhibits referenced are incorporated herein by reference.) To accomplish that end, CONSULTANT agrees to assign Mr. Gene Barrv, who will act in the capacity of Project Manager, and who will personally direct such Services. Except as may be specified elsewhere in this Agreement, CONSULTANT shall furnish all technical and professional services including labor, material, equipment, transportation, supervision and expertise to perform all operations necessary and required to complete the Services in accordance with the terms of this Agreement. II. NOTICE TO PROCEED/COMPLETION OF SERVICE A. NOTICE TO PROCEED CONSULTANT shall commence the Services upon delivery to CONSULTANT of a written "Notice to Proceed", which Notice to Proceed shall be in the form of a written communication from designated City contact person(s). Notice to Proceed may be in the form of e-mail, fax or letter authorizing commencement of the Services. For purposes of this Agreement, Faranak Mandavi shall be the designated City contact person(s). Notice to Proceed shall be deemed to have been delivered upon actual receipt by CONSULTANT or if otherwise delivered as provided in the Section V.H. ("Notices") of this Exhibit "A". B. COMPLETION OF SERVICES When CITY determines that CONSULTANT has completed all of the Services in accordance with the terms of this Agreement, CITY shall give CONSULTANT written Notice of Final Acceptance, and CONSULTANT shall not incur any further costs hereunder. CONSULTANT may request this determination of completion when, in its opinion, it has completed all of the Services as required by the terms of this Agreement and, if so requested, CITY shall make this determination within two (2) weeks of such request, or if CITY determines that CONSULTANT has not completed all of such Services as required by this Agreement, CITY shall so inform CONSULTANT within this two (2) week period. III. PROGRESS SCHEDULE The schedule for performance and completion of the Services will be as set forth in the attached Exhibit "C". IV. PAYMENT OF FEES AND DIRECT EXPENSES Payments shall be made to CONSULTANT as provided for in Article 4 of this Agreement. na1r,_')')a7_nza1„1 -1- Direct expenses are charges and fees not included in Exhibit "B". CITY shall be obligated to pay only for those direct expenses which have been previously approved in writing by CITY. CONSULTANT shall obtain written approval from CITY prior to incurring or billing of direct expenses. Copies of pertinent financial records, including invoices, will be included with the submission of billing(s) for all direct expenses. V. OTHER PROVISIONS A. STANDARD OF WORKMANSHIP CONSULTANT represents and warrants that it has the qualifications, skills and licenses necessary to perform the Services, and its duties and obligations, expressed and implied, contained herein, and CITY expressly relies upon CONSULTANT'S representations and warranties regarding its skills, qualifications and licenses. CONSULTANT shall perform such Services and duties in conformance to and consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Any plans, designs, specifications, estimates, calculations, reports and other documents furnished under this Agreement shall be of a quality acceptable to CITY. The minimum criteria for acceptance shall be a product of neat appearance, well -organized, technically and grammatically correct, checked and having the maker and checker identified. The minimum standard of appearance, organization and content of the drawings shall be that used by CITY for similar purposes. B. RESPONSIBILITY OF CONSULTANT CONSULTANT shall be responsible for the professional quality, technical accuracy, and the coordination of the Services furnished by it under this Agreement. CONSULTANT shall not be responsible for the accuracy of any project or technical information provided by the CITY. The CITY'S review, acceptance or payment for any of the Services shall not be construed to operate as a waiver of any rights under this Agreement or of any cause of action arising out of the performance of this Agreement, and CONSULTANT shall be and remain liable to CITY in accordance with applicable law for all damages to CITY caused by CONSULTANT'S negligent performance of any of the services furnished under this Agreement. C. RIGHT OF CITY TO INSPECT RECORDS OF CONSULTANT CITY, through its authorized employees, representatives or agents, shall have the right, at any and all reasonable times, to audit the books and records (including, but not limited to, invoices, vouchers, canceled checks, time cards, etc.) of CONSULTANT for the purpose of verifying any and all charges made by CONSULTANT in connection with this Agreement. CONSULTANT shall maintain for a minimum period of three (3) years (from the date of final payment to CONSULTANT), or for any longer period required by law, sufficient books and records in accordance with standard California accounting practices to establish the correctness of all charges submitted to CITY by CONSULTANT, all of which shall be made available to CITY at the CITY's offices within five (5) business days after CITY's request. A R u_0 W7_MCZ 1„t -2- D. CONFIDENTIALITY OF MATERIAL All ideas, memoranda, specifications, plans, manufacturing procedures, data (including, but not limited to, computer data and source code), drawings, descriptions, documents, discussions or other information developed or received by or for CONSULTANT and all other written and oral information developed or received by or for CONSULTANT and all other written and oral infonnation submitted to CONSULTANT in connection with the perforinance of this Agreement shall be held confidential by CONSULTANT and shall not, without the prior written consent of CITY, be used for any purposes other than the performance of the Services, nor be disclosed to an entity not connected with the performance of the such Services. Nothing furnished to CONSULTANT which is otherwise known to CONSULTANT or is or becomes generally known to the related industry (other than that which becomes generally known as the result of CONSULTANT'S disclosure thereof) shall be deemed confidential. CONSULTANT shall not use CITY'S naive or insignia, or distribute publicity pertaining to the services rendered under this Agreement in any magazine, trade paper, newspaper or other medium without the express written consent of CITY. E. NO PLEDGING OF CITY'S CREDIT. Under no circumstances shall CONSULTANT have the authority or power to pledge the credit of CITY or incur any obligation in the name of CITY. F. OWNERSHIP OF MATERIAL. All material including, but not limited to, computer information, data and source code, sketches, tracings, drawings, plans, diagrams, quantities, estimates, specifications, proposals, tests, maps, calculations, photographs, reports and other material developed, collected, prepared (or caused to be prepared) under this Agreement shall be the property of CITY, but CONSULTANT may retain and use copies thereof subject to Section V.D of this Exhibit "A". CITY shall not be limited in any way in its use of said material at any time for any work, whether or not associated with the City project for which the Services are performed. However, CONSULTANT shall not be responsible for, and City shall indemnify CONSULTANT from, damages resulting from the use of said material for work other than PROJECT, including, but not limited to, the release of this material to third parties for work other than on PROJECT. G. NO THIRD PARTY BENEFICIARY. This Agreement shall not be construed or deemed to be an agreement for the benefit of any third party or parties, and no third party or parties shall have any claim or right of action hereunder for any cause whatsoever. H. NOTICES. Notices are to be sent as follows: CITY: Faranak Mandavi City of Gilroy 7351.Rosanna Street Gilroy, CA 95020 CONSULTANT: Gene Barry Vice President 2126 Rheem Drive Pleasanton, CA 94588 I. FEDERAL FUNDING REQUIREMENTS. ❑ If the box to the left of this sentence is checked, this Agreement involves federal funding and the requirements of this Section V.I. apply. ❑ If the box to the left of this sentence is checked, this Agreement does not involve federal funding and the requirements of this Section V.I. do not apply. 1. DBE Program CONSULTANT shall comply with the requirements of Title 49, Part 26, Code of Federal Regulations (49 CFR 26) and the City -adopted Disadvantaged Business Enterprise programs. 2. Cost Principles Federal Acquisition Regulations in Title 48, CFR 31, shall be used to determine the allowable cost for individual items. 3. Covenant against Contingent Fees The CONSULTANT warrants that he/she has not employed or retained any company or person, other than a bona fide employee working for the CONSULTANT, to solicit or secure this Agreement, and that he/she has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage, brokerage fee, gift or any other consideration, contingent upon or resulting from the award or formation of this Agreement. For breach or violation of this warranty, the Local Agency shall have the right to annul this Agreement without liability or, at its discretion, to deduct from the agreement price or consideration, or otherwise recover, the full amount of such fee, commission, percentage, brokerage fee, gift or contingent fee. A P 7 F 99F711Q R1,1 -4- EXHIBIT "B" SCOPE OF SERVICES A AA F 9997 mci,,1 Attachment B City of Gilroy First Street Water Line Replacement Project Scope of Work — 4LEAF, Inc. 4LEAF views this project as having three (3) distinct elements: Pre -Construction, Construction, and Post - Construction. Task 1: Pre -Construction Phase During Pre -Construction, the 4LEAF team will establish immediate and routine contact and communication with the project's team including the City, the design team, the contractor, and other interested parties. We will take steps to ensure successful collaborations with each of these entities. During the Pre -Construction Phase of this project, we have identified the following key tasks: Task 1A: Biddability and Constructability Review — Upon receipt of the City's notice to proceed (NTP) to provide CM services for the project, 4LEAF's Project Manager and Construction Manager will hold an initial meeting with the City in order to compile a list of comments and concerns that the City has received to date from internal staff and management, the design team, and the public. Using this information, the 4LEAF team wil► perform a biddability and constructability (B & C) review of the 95 percent plans, specifications, and estimate (PS&E) package by analyzing the plans and specifications with respect to current construction standards and practices and materials used. Examples of specific items to be reviewed include, but are not limited to, the following: ✓ proposed method of installation of new water piping (cut and cover trenching or horizontal drilling techniques), ✓ connection collar detail for the tie in of service laterals into new water main piping, ✓ clear pipe penetration detail for connecting a new storm drain line to an existing storm drain manhole, ✓ review the specifications to ensure it contains include language that ties approval of the contractor's monthly pay requests to their timely submission of submittals (e.g., 3-week look ahead schedules) throughout the project, ✓ ensure the specifications include requirements forthe contractor properly disinfects, flushes, and tests all new water mains and laterals in accordance with American Water Works Association (AWWA) and City of Gilroy standards. The team will also determine if any additional standards, details, or clarifying construction notes should be added, modified, or removed. We understand that the City is currently revising their standard details, so it will be particularly important to review these revised details for accuracy and consistency in the 95 percent complete plans and any references in the project specifications. Once our draft B & C review is complete, 4LEAF's Project Manager and Construction Manager will hold subsequent meetings, as necessary, with the City to review the 4LEAF team's B & C review comments in order to confirm that all comments are in line with the City's vision for the project prior to sending the comments to the designer of record for incorporation into the contract documents. Task 113: Perform Pre -Construction Project Site Condition Inspection — Using digital and/or video cameras, the 4LEAF team will record the existing conditions of the project site and area(s) of new construction before the contractor starts work, during construction, and then again at the completion of construction activities. This documentation will be a useful tool in identifying and/or assigning ownership of any damage to existing City- or privately -owned facilities once work begins. We recommend that the Page 1 of 7 contractor perform the same documentation (if it isn't already a contract requirement) in order to adequately protect the City and themselves from outside influences on the areas that they will be performing their work. Task 1C: Assist the City with Contractor Procurement — The 4LEAF team will provide as -requested assistance to the City with the procurement process in identifying, interviewing, and selecting a contractor to construct the project in accordance with the project's plans and specifications. As requested, these services will include the following components: ✓ work with City staff to identify the procurement method to be utilized, ✓ assist the City with preparing and posting the public notice for the project solicitation including providing copies of the 100 percent complete plans and specifications, ✓ coordinate and hold the contractor pre -bid proposal meeting and site visit, ✓ review and evaluate contractor bids/proposals and assist the City with contract award recommendation, ✓ perform bid opening and notify successful bidder, ✓ assist the City with contract negotiations and contract award signing. Task 113: Pre -Construction Meeting —The 4LEAF team will conduct a pre -construction conference with the project team including City staff, the design team, the contractor and subcontractors, the materials testing laboratory's project manager, and representatives from various underground utilities. Topics to be discussed at the pre -construction meeting typically include: ✓ performing introductions and identifying roles/responsibilities. Circulate sign -in sheet for completing names, company names, phone numbers, fax numbers, and e-mail addresses of all attendees for use in generating project contact list, ✓ status of notifications made to underground utilities and protocols for submitting notices to Underground Service Alert (USA), ✓ scheduling and staging including where contractor may stage equipment and materials during the project, ✓ reviewing the status of any access agreements or right of way permits and identifying the responsible party(s) for completing if necessary, ✓ discussing allowable work hours and procedures for public work notices and discuss any signage that will need to be installed along the project route, ✓ discussing the contractor's Baseline Schedule (note that 4LEAF will require that the contractor provide a copy of the Baseline Schedule several days prior to the pre -construction meeting so that it can be reviewed in advance of the meeting), ✓ discussing required contractor submittals including [traffic control plan, storm water pollution prevention plan (SWPPP), contractor work plan (including their proposed phasing of the project, excavation and shoring plan, equipment and materials to be used, etc.)], ✓ discussing procedures for submitting and approving contractor pay requests and anticipated dates pay requests are typically paid by the City (e.g. 2"d Tuesday of every month, etc.) ✓ discussing health and safety protocols and expectations, ✓ discussing process for submitting RFIs, change orders, submittals, etc. Task 1E: Review Contractor Submittals — The contractor will be required to prepare detailed submittal items [such as phased traffic control plans, baseline schedule, a SWPPP, a work plan including an excavation and shoring plan, etc.] prior to the start of construction and submitted through the City's Page 2 of 7 chosen cloud -based Document Control System, Procore. 4LEAF's part-time Construction Manager will evaluate each submittal and assign to the applicable project participant (e.g. City staff or Design Engineer) for their review and approval. If a submittal has to be reviewed and approved by the designer of record, our review prior to forwarding it to the designer of record will provide a "sanity check" of the submittal before the designer spends time reviewing the submittal. This will streamline the submittal process for all parties, preventing the designer of record from wasting their time reviewing a submittal that may not meet contract requirements. The submittal log generated by Procore will be tracked and status will be updated at each weekly progress meeting with "Ball in Court" status indicating whose action is required to move the submittal process along as efficiently as possible. These procedures will be followed for the request for information (RFI) process as well. Task 2: Construction Phase From day 1, the 4LEAF team will run an efficient, quality project that exceeds the expectations of the City. Our part-time Construction Manager will actively lead our on -site construction inspector and materials testing subcontractor; and will ensure that all contracts, submittals, permits, etc. are in place before work commences, and that each member of our team is ready to get to work building your project. During the Construction Phase of this project, we have identified the following items that are key: Task 2A: QSD/QSP Water Quality Monitoring and SWPPP Support — 4LEAF recommends that the specifications require that the contractor is tasked with preparing the SWPPP and performing all of the required inspections for the project. 4LEAF's Qualified SWPPP Developer (QSD) will review the contractor's SWPPP submittal prior to it being submitted to the California State Water Resources Control Board (Water Board) to obtain coverage under the Construction General Permit for Storm Water Discharges (General Permit). We also recommend that the specifications require that the contractor act as the project's QSP and perform all Permit -required inspections for the project. 4LEAF will provide a "third set of eyes" on the project to confirm the contractor's QSP is performing daily site inspections of the installed best management practices (BMPs) employed at the site and report any BMPs that are in poor repair or other deficiencies to the contractor's QSP. We will also monitor weather forecasts on a daily basis to provide additional warning for the QSP of any upcoming "qualifying rain events" so team members have time to verify that all BPMs are in place and in good repair before, during, and after rain events as will be required by the SWPPP (and depending on the Risk Level determination for the project, e.g. Risk Level 1 or 2). Our proactive approach will provide added assurance to the City that storm water issues are being properly monitored, documented, and maintained throughout the project. Task 213: Construction Management, Field Inspection, and Quality Assurance — 4LEAF's on -site staff will observe and monitor the progress on the work in accordance with the plans, specifications, and contract documents and in alignment with the construction schedule; including work that affects the SWPPP. Progress photos will be taken and daily inspection reports will be prepared using the report format required or requested by the City. The information on the daily reports will include but not be limited to: weather, shift hours, traffic controls that are in place (both vehicular and pedestrian), SWPPP erosion control measure conditions, work activities, labor and equipment hours, work complete, quantities, and other related information and discussions. If the City would like, we will also prepare monthly summary reports that would include photos and a narrative of each major item of work completed during the month; including open issues, upcoming work, and a snapshot of the work progress at the end of each month by percent of budget spent and percent of working days used. 4LEAF's part-time Construction Manager will complete Weekly Statement of Working Days (WSWD) reports each week providing a snapshot of the project progress including contract time elapsed, weather Page 3 of 7 conditions, working and non -working days counted for the week, time extensions, computation of current Estimated Completion Date (ECD), and controlling operations progress made for the week. As controlling operations are performed, 4LEAF's inspector will collect certificates of compliance, AC weight tags, concrete batch tags, and bills of lading for materials delivered to the site. Our Construction Inspector will then compare these documents to the approved submittals before allowing the materials to be used on the project. Although the 4LEAF team would not be contracted to be the project safety officers; we would make the contractor aware of any unsafe condition that we notice on the job site throughout the life of the project. The 4LEAF team will coordinate with City departments (i.e., traffic signal technicians for possible signal modifications that may be necessary for traffic control plan implementation; water department for necessary service shutdowns; etc.). The 4LEAF team is prepared to provide personnel for daytime and/or night work as the limitations to service disruptions dictate. 4LEAF recommends that document control follow the Caltrans Local Assistance Procedures Manual (LAPM) since First Street is a Caltrans roadway. 4LEAF will do a thorough review of the contractor's monthly progress payment requests to ensure the City is only making payments for work completed each month. This will include measuring and calculating each bid item pay quantity on a Caltrans Form CEM-4801 Quantity Data Sheet. The monthly measurements and calculations will come from the quantities measured and reported on the inspector daily reports. Before the start of construction, 4LEAF and the contractor will develop a procedure that is acceptable to the City for submitting and reviewing monthly progress payments and the final payment. We will review the contractor's schedule of values for bid items and segregate them into a form that is acceptable to the City for reimbursement. Both 4LEAF's part-time Construction Manager and Cfull-time Construction Inspector will review the contractor's payment requests and will compare them to the quantities calculated and measured on the Quantity Data Sheets. If payment for materials on hand is allowed in this contract, we will verify the materials on the job site, or coordinate with the contractor for source verification at the time of the payment request. After 4LEAF and the contractor agree on the monthly progress payment amount, 4LEAF's part-time Construction Manager will prepare the final progress payment request using the form and procedure previously approved by the City (showing work completed each month, work completed to date, percentage complete for each item, and any applicable deductions to the net payment) for approval and execution by the City. Additionally, 4LEAF will provide a project progress summary in the monthly status report. This summary will include percent of budget spent and percent of working days used. Traffic Control Traffic control will be a key issue in maintaining safe conditions on the project and keeping positive relations with the public. For most of the project between Santa Teresa and Princevalle Street, there are two lanes in each direction and an open center median that the contractor can use to divert westbound traffic. Located further west at the intersection with Princevalle Street, First Street narrows down to one lane in each direction with a shared open median. In addition, Miller Park is on the south side of the street just west of Princevalle Street with street parking on either side of First Street for the rest of the project. In the westbound direction, First Street begins to narrow as it approaches Monterey Street, but the contractor will be able to keep one lane open in each direction at all times, paying particular attention to keeping access into business driveways open at all times. 4LEAF's Construction Inspector will coordinate with the property and business owners along the project route as well as the contractor so that any work along driveway entrances to businesses and roadway intersections are scheduled and performed at times that will minimize impacts to these businesses and Page 4 of 7 public traffic. Our staff will not only provide sufficient notification to property owners and businesses of upcoming work and the work hours but will also ensure the contractor performs the work when scheduled. 4LEAF's Construction Inspector will continuously monitor the contractor's traffic control measures and ensure they are in place before the start of each work day, maintained throughout the work day, and in place at the end of each work day. This will include ensuring the contractor provides all the required notification signage and the appropriate number of flagmen. If necessary, 4LEAF will request police patrol to enforce safe traffic speeds during construction throughout the project limits. 4LEAF is currently providing CM and inspection services for the heavily -travelled Geary Road in Walnut Creek. At the beginning of the Geary Road project, our inspector met with the Walnut Creek Police Department to provide added police presence along the project limits and police have been present along the length of project issuing moving violation and speeding tickets almost daily. Task 2C: Special Inspection and Materials Testing — 4LEAF's Construction Inspector will coordinate and schedule special inspections and materials testing with our materials testing and special inspections subconsultant, Construction Testing Services (CTS). 4LEAF and CTS have teamed up on more than 150 projects over our history including projects varying from infrastructure to site work, universities 'to hospitals, and hotels to parking garages. These inspections will be conducted per the City's Quality Assurance Plan, Caltrans Standard Specifications, and additional project specific quality assurance requirements. These tests will include but not be limited to: trench backfill compaction, roadway/pavement structural section compaction, rebar inspection, concrete sampling, and asphalt concrete sampling. 4LEAF will receive documentation for all tests, including retests, and observe and document the testing. We will notify the contractor immediately of any non -compliant test results. Task 2D: Construction Meetings — 4LEAF's part-time Construction Manager will schedule, write the agendas for, chair, and provide minutes for all meetings including the weekly progress meetings, periodic meetings with the City, as well as any additional meetings with utilities, the public, etc. that may be necessary to successfully complete the project. The weekly progress meeting will be used to review the contractor's 3-week look ahead schedule (highlighting critical project activities, operations, and necessary coordination), open issues, status of submittals, status of open RFls, deficient work, SWPPP concerns, and safety concerns. Task 2E: Schedule Management - The 4LEAF team will review the contractor's baseline schedule to ensure all the controlling operation's durations, critical path, and order of work follow a logical sequence to the project completion. We will then monitor the contractor's progress throughout the project and compare it to their baseline schedule so we can identify any deviations of the contract completion date as soon as possible; therefore, giving the contractor ample time to develop and present their plan on getting the project back on schedule. If schedule slippage occurs, we will meet with the Contractor to discuss ways in which to accelerate other portions of work. Another way to accommodate slippage in the schedule is to re -sequence work in order to make up for lost time. Task 2F: Public Relations-4LEAF will foster a team approach with the City, its Public Relations consultant, and the General Contractor to provide adequate notification to the public and business owners of water Page 5 of 7 service shut -offs, driveway closures, and road and pedestrian pathway closures. Starting with the pre - construction meeting and continuing through the weekly progress meetings, we will plan for and create notification protocols to ensure maximum lead time for public notifications of controlling operations that will directly impact the public and businesses. Task 2G: Contract Modifications, Extra Work, Change Orders, and Claims — 4LEAF will meet with the City to discuss utilizing any existing City change order tracking systems that are currently in place as well as suggest protocols for use on the project. Using Caltrans standards, 4LEAF will provide the City with assurance that the contractor is not presenting requests for change orders that are already included in the original scope of the contract. Our part-time Construction Manager and/or full-time Construction Inspector will meet face-to-face with the contractor's representative to gather more information on the nature of the potential change order. Quite often, a contractor only has a general knowledge of the plans and specifications and an item they feel is a change order may indeed be part of the plans and specifications that they were not aware of. We will ensure all potential changes and extra work requests to the contract have been reviewed and evaluated for cost and times impacts, and properly justify a response to the contractor. 4LEAF's part-time Construction Manager will review requests for change orders and extra work requests from the contractor for contractual and technical merit prepare independent cost estimates and schedule analysis for the proposed work, if directed by the City, 4LEAF can negotiate change orders on behalf of the City and prepare all required documents for execution by the City and the contractor. 4LEAF's part-time Construction Manager will keep the City informed of the cumulative cost and time impacts to the contract through a CCO log that will be updated upon execution of each change order. 4LEAF will take no action without the review and approval of the City. We pride ourselves on maintaining positive working relationships with the contractors that we work with, resulting in addressing most issues early enough to avoid potential claims. There will be times, however, that mutual agreements on issue resolution cannot be achieved. At that point the contractor may issue a Notice of Potential Claim. If we become aware of a potential claim, 4LEAF will require the contractor to submit documentation supporting the claimed delay (including a time -impact analysis). The 4LEAF team will compare the contractor's initial baseline schedule, revised schedules, actual time of work activity, the contractor's operational efficiencies, and the inspector's daily reports to determine the source and contractual responsibility for all delay claims. If the analysis results in a resolution that favors the contractor's stance on the issue, a CCO will be recommended. If this action does not adequately resolve the potential claim, 4LEAF's Construction Manager will generate and compile all backup data, copies of reports and correspondence that pertain to the Notice of Potential Claim on the issue. We will include this backup data in a claim settlement report package in case the contractor goes through a claim on the unresolved issue. All such packages will be forwarded to the City with a cover letter with the facts as 4LEAF sees them and recommended actions, if any. A log of Notices of, Potential Claims will be prepared and updated for discussion at regular City meetings and/or weekly progress meetings. We will work with the contractor on every unresolved issue throughout the life of the project with the goal of coming to a mutually agreeable resolution with the contractor prior to it escalating to higher levels of management. Task 3: Post -Construction Phase In order to obtain final completion and acceptance, the post -construction phase includes three distinct closeout elements: physical closeout, document closeout, and fiscal closeout. Task 3A: Final Inspections — Our Construction Inspector will be proactive in developing and maintaining a project punch list and maintaining a set of accurate as -built drawings during construction to compare Page 6 of 7 with the set of record drawings that will be maintained by the contractor. In our experience, contractors are much more willing to complete punch list items if they are made aware of them early. After all of the work is substantially complete, the 4LEAF team will walk the job site with the City, contractor(s), and Caltrans (if required) in order to generate a punchlist. After all contract related punch list items are complete and beneficial uses of the improvements are achieved, 4LEAF's Construction Inspector will issue a Notice of Substantial Completion to the City and the tracking of working days will cease. Once all extra work and all punch list items are complete, 4LEAF's Construction Manager will issue a Notice of Final Completion. Items may be placed on the punch list up untilthe Notice of Final Completion is issued. 4LEAF's Construction Inspector will also confirm all as -built conditions on the plans prior to the contractor sending their completed as -built drawings to the designer of record for compilation of the final as -built record drawings. Task 313: Contract Close-out — 4LEAF's part-time Construction Manager will work with our Construction Inspector to assemble and transfer the contract files to the City when the contract is complete. Documents typically include correspondence, CO's, Change Notices, RFIs, submittals, and claims. 4LEAF's Construction Manager will perform an on -going verification of the files throughout the duration of the project to ensure that complete files are transferred to the City at closeout. Contract administration, accounting, and financial functions are coordinated with physical closeout functions to ensure that no outstanding financial liability is present after the final payments and/or retentions are made to the contractor. Additional components of the fiscal closeout system that require simultaneous review and cross checking include: the submittal log, the RFI log, the record drawings, and punch lists. These will be reviewed and inspected to ensure that the final payment to the contractor does not leave any financial liability to the City. Page 7 of 7 EXHIBIT "C" MILESTONE SCHEDULE nazV_')')aznzal„l -1- MILESTONE SCHEDULE ALL DATES ARE TENTATIVE) MILESTONE DESCRIPTION CONSTRUCTION PHASE • CONSTRUCTION MANAGEMENT, FIELD INSPECTION, AND QUALITY ASSU RANCE • SPECIAL INSPECTION AND MATERIALS TESTING (SUBCONSULTANT - CTS) • CONSTRUCTION MEETINGS • SCHEDULE MANAGEMENT • AS -NEEDED PUBLIC RELATIONS SUPPORT • CONTRACT MODIFICATIONS, EXTRA WORK, CHANGE ORDERS, AND CLAIMS SUPPORT DATES DECEMBER 2018-JANUARY 2019 EXHIBIT "D" PAYMENT SCHEDULE 4835-2267-0361v1 LAC\04706083 Attachment D 4LEAF. I.- Interim Budget Request to Continue Performing g 9 g Construction Management and Inspection Services for the City of Gilroy First Street Water Line Improvement Project (REVISED December 5, 2018) i e ~ 0 a x° `w Sub — Task Task Task Description a. uo u a u 1 19 Notes Hourly Rate $185 I $150 $137 $185 $79 I I See Notes (a) and (b). 1 Preconstmctlon Phase Hours Hours Hours Hours Hours Hours i 1A Biddability and Constructability Review, 0 0 0 0 0 0 I $0 lB Perform Pre -Construction Project5ite Condition Inspection. 0 0 0 0 0 0 $0 1C Assist the City with Contractor Procurement. 0 0 0 0 0 0 $0 10 Prepare for and Attend Pre -Construction Meeting. 0 0 0 0 0 0 $0 1E Review Contractor Submittals. 0 a 0 0 0 D $0 Task l subtotal: 0 0 0 0 0 0 $0 2 Construction Phase Hours Hours Hours Hours Hours Hours 2A QSD/QSP Water Quality Monitoring and SWPPP Support. 0 0 0 0 0 0 $0 28 Construction Management, Field Inspection, and Quality Assurance. 0 160 312 78 0 550 $81,170 See Note (c) 2C Special Inspections and Materials Testing (CTS). MMM $8,000 See Note (d) Administrative Processing Fee (10°,6) far Subconsultant Invoices (CTS). $800 2D Construction Meetings. 0 0 0 0 0 0 I $0 ISee Note (e) 2E Schedule Management. 0 0 0 a 0 0 I 50 Isee Note (e) 2F Public Relations. 0 0 0 0 0 I 0 i $0 See Nate (f) 2G Contact Modifications, Extra Work, Change Orders, and Claims. 0 0 0 0 0 I 0 $0 See Note (d) Task 25ubtotak 0 160 312 78 0 550 $89,970 3 Past Canstructioa Phase Hours Hours Hours Hours Hours 3a Final Inspections and Provide Red -lined Set of Plans to Design Team. 0 0 0 0 0 0 $0 31b Contract Close-out. 0 0 0 0 0 0 $0 3c Project Management. 0 0 0 0 0 0 $0 Task 3 Subtotal:) 0 0 0 0 0 0 $0 Totals: I� 0 160 312 78 0 S50 I $89,970 See Note (g) Notes: (a) Assumes project requires compliance with California Prevailing Wage rate requirements under 58 854, and the Citywill be required to file a PWC-100 Form to the California Department of Industria Relations for the project. (b) Perthe new requirements being enforced under SB 854 and because it is assumed that a PWC-100 Form will be filed by the Cityto the CA DIR, 4LEAF is required to natify an authorized Apprenticeship Committee through submittal of a DAS-140 form. We are then required to make an official request to an authorized Apprenticeship Committee for an apprentice by submitting a OAS-142 form. We are not assured the apprenticeship committee will be able to provide a suitable / qualified apprentice forthe project. Per the apprenticeship requirements, the hours worked by the apprentice must be in a ratio of 1:5 forapprentice tojourneyman hours. Hours are included as a placeholder in the event that an apprenticeship for a public works inspector is required and dispatched by the apprenticeship committee. (c) Per a conversation with Franak Mandavi with the City of Gilroy on 10/11/18 and a follow-up call on 1215/18, 4LEAF will submit an interum budget request for anticipated hours for December 3, 2018 through January 31, 2019 because the Amendment No. 1 signed by 4LEAF on April 16, 2018 to extend the Contract end date was not executed by the City. This revised estimate now assumes (1) part-time CM for-8 weeks at 20 hrs/wk and (I)full-time Inspectorfor 39 working days (number of working days based on information provided by Caltrans, no work will be allowed between December 21 and 26, 2018 and accounting for no work on Christmas Day and New Years Day) at 8 hrs/day at regular time and 2 hrs/day at OT rate. Does not include any allowance for night, weekend, or holiday work. If night, weekend, or holiday work is necessary, the hours will be billed at the requirements under California Prevailing Wage Law requirements. 4LEAF will provide a separate estimate for completing the project between February 1, 2019 and project completion (currently project in June 2019). (d) For budgetary purposes, we have included a budgetary placeholder amount of $8,006 for special inspections that may be required during the period of December 2018 to Janaury 2019. (e) Hours for this task are included in subtask 2B "Construction Management, Field Inspection, and Quality Assurance". (f) Assumes TRCwill be responsible for costs related reproduction of public information flyers and notices priorto and during the project. (g) 4LEAF staff will be supplied with typical tools of the trade to perform their daily tasks (e.g. cell phone, laptop computer, and PPE). Assumes City will provide office space for CM and Inspector to finalize daily reports and other project paperwork. 1 of CONSTRUCTION TESTING SERVICES DATE: 09/26/18 PROPOSAL No.: P10260 CLIENT: 4LEAF, INC. PROJECT: WATER MAIN REPLACEMENT PROJECT LOCATION: GII.ROY, CA ITEM: I ONSITE TESTING & INSPECTIONS (UTILITY TRENCH BACKFILL PAVEMENTBASEROCK (ASPHALT COMPACTION (PORTAL TO PORTAL TRAVEL TIME FOR NUCLEAR GAUGE TRANSPORT (PORTAL TO PORTAL MILEAGE FOR NUCLEAR GAUGE TRANSPORT I I ITEM: II LABORATORY TESTING & ENGINEERING ICOMPACTION CURVE I WET DENSITY (CT 216 FOR ROADWAY AB) (SIEVE ANALYSIS, COARSE (SIEVE ANALYSIS, FINE+ WASH (SAND EQUIVALENT IDURABILITY INDEX, COARSE IDURABILITY INDEX, FINE IRESISTANCE "R" VALUE IHMA ACCEPTANCE TESTING (AGGREGATE GRADATION (ASSUME COLD FEED) ISAND EQUIVALENT IASPHALT BINDER CONTENT (ASPHALT BINDER CONTENT CORRECTION FACTOR IHMA MOISTURE CONTENT IPERCENT MAX THEORETICAL DENSITY I STABILOMETER (SPECIFIC GRAVITY OF CORE (PROVIDED BY CONTRACTOR) (AIR VOID CONTENT IPERCENT CRUSHED PARTICLES ILA RATTLER IFINE AGG ANGULARITY IFLAT AND ELONGATED PARTICLES IVOIDS FILLED WITH ASPHALT I V OIDS IN MINERAL AGGREGATE (DUST PROPORTION ISAMPLE PICK-UPS ICERTIFIED PAYROLL IFINAL LETTER (ENGINEERING REPORTING OF HMA I I PRELIMINARY ESTIMATE: INSPECTIONS G TESTING ESTIMATED I ESTIMATED D UNIT IM HOURSI PRICE I ESTIMATED 29 4 $92 $10,672 3 4 $92 $1,104 3 8 $92 $2,208 35 2.5 $92 $8,050 35 122 $0.54 $2,306 Preliminary Sub -Total of On -Site Testing & Inspection: (approx) $24,340 ESTIMATED UNIT ESTIMATED UNITSMOURS PRICE TOTAL $355 $355 $405 $1,215 $155 $155 $255 $255 $180 $180 $280 $280 $280 $280 $405 $405 3 $155 $465 3 $180 $540 3 $280 $840 I $280 $280 3 $255 $765 3 $280 $840 3 $255 $765 3 $180 $540 3 $255 $765 3 $255 $765 3 $355 $1,065 3 $255 $765 3 $255 $765 3 $255 $765 3 $255 $765 3 $180 $540 56 $16 $896 2 $163 $326 1 $300 $300 3 $155 $465 Preliminary Sub -Total of Laboratory Testing & Engineering (approx) $16,342 if unrk is performed at night a 12.546 differential frill be charged. A 7% project adnantstration fee ivill be charged monthly per invoice. No contingency is budgeted by CTSfor uncontrollable overtime, union ar p—.11hug tinge increases and unforeseen requirements that may arise in the specifications, as well ns for work over the erttneted hams. Owner should budget appropriate animal for budgetary purposes, Fstlmate based on Prelindanty Not for Constriction Plans by Nh5 dated October 10, 2014 and City RFP. No construction schedule was mailable at the nine this estimate ryas prepared. Sec nuached fee schedule fi- basis ofcharges. Durations based on estimated production of300 lineal feet of french per day during normal working hours. additional lab testing (aggregate and 11A1.-1) inay be required for acceptance testing ofPA14 within CaltransROM PAL( acceptance Testing based on Section 39 for Standard process based on test results representing 750 tons production or 1 dais production. whichever is less. Estunnte includes portal to portal trmel time for nuclear gmtge transport frmn laboratory per requirements ofthe C4 Radiological Health Branch. The liability of Construction Testing Services (CTS) is limited to CTS's contract value. INSPECTING CONSTRUCTION TESTING TESTING SERVICES ENGINEERING 2018 FEE SCHEDULE - P10260 9126118 PERSONNEL FEES AND BASIS OF CHARGES INSPECTIONS, ENGINEERING & SPECIAL SERVICES Standard Discounted * FIELD INSPECTION AND LABORATORY SERVICE Rate/Hour Rate/Hour Steel $218.00 Nondestructive- UT, MT, PT $223.00 Steel Visual/UT Combination $223.00 Concrete ACI $218.00 Concrete ICC $218.00 Masonry $218.00 Fireproofing $218.00 Soil Technician w/Nuclear Gauge and/or Sand Cone (portal-to-portal) $240.0 $92.00 Asphalt Technician (portal-to-portal) $248.ag $92.00 Shoring/Soldier Piers $218.00 Roofing & Waterproofing $218.00 Multi -Disciplined Inspector $218.00 Inspector Requiring G1 Pay Grade $253.00 Specialty Inspector or Where Formal Certification is Required $218.00 Field Inspectorwith Special Enhancement $218.00 Laboratory Technician $218.00 Technician Typist $218.00 **PROFESSIONAL ENGINEERING SERVICES Principal Engineer (Civil/Structural) $353.00 Geotechnical Engineer $303.00 Consulting Engineer (Civil/Structural) $273.00 Associate Engineer, Licensed $248.00 Project Manager $218.00 Staff Engineer $9 $155.00 Field Supervision $193.00 ASNT Level III $208.00 Drafting $153.00 Quality Control Manager QOR SPECIAL SERVICES Portable and Mobile Laboratories, NDT and Soils QOR Epoxy Bolt/Expansion Anchor- Installation Observation $218.00 Epoxy BoIVExpansion Anchor Proof Load Testing (portal-to-portal) $218.00 Coring, 1 Person (including equipment) (portal-to-portal) $278.00 Coring, 2 Persons (including equipment) (portal-to-portal) $443,00 * Asphalt Coring (portal-to-portal) $303.00 Project Research QOR Ultrasonic Testing for Non -Metallic Materials QOR Pavement Rehabilitation Analysis Using Deflections QOR Roof Moisture Survey QOR Soil Drilling Equipment QOR Geotechnical Site Investigations/Foundation Reports QOR Pachometer, Schmidt Hammer, Windsor Probe, Skidmore - Equipment Fee $115/Day (portal-to-portal) $288.00 Floor Flatness Testing FF/FL - Equipment Fee $115/Day (portal-to-portal) $288.00 Measuring Moisture Vapor Emission Rate (Calcium Chloride) - $55/Kit (portal-to-portal) ASTM F1869 $288.00 Relative Humidity Testing - $75/Kit (portal-to-portal) ASTM F2170 $288.00 Ferroscan - Equipment Fee $115/day (portal-to-portal) $288.00 GPR - Equipment Fee $115/day (portal-to-portal) $343.00 Administration, Secretarial, Special Projects, Notary, Certified Payroll $163.00 Concrete/Grout/Mortar Mix Design Review (less than 48 hours notice - $500) $345.00 Welding Procedure Review (less than 48 hours notice - $500) $345.00 Welder Qualification Test $233.00 DSA Interim Reports $178.00 Geotechnical Pad Letter (less than 48 hours notice - $550) $345.00 Final Letter (less than 48 hours notice - $550) $345.00 $300.00 EXPERT WITNESS TESTIMONY Court appearance, per day $2,420.00 Court appearance, per half day $1,210.00 * Field inspection and laboratory technician services will be billed in accordance with minimums shown on Basis of Charges. Professional engineering services will be billed in two hour increments. All fees subject to Basis of CI-ges CONSTRUCTION TESTING SERVICES GENERAL BASIS OF CHARGES INSPECTING TESTING ENGINEERING Fees for tests and inspection include cost of technician, normal equipment and regular reports. Engineering services will be charged at applicable rates and will require travel and mileage charges for equipment transport and storage per code (portal to portal) from the nearest CTS laboratory. Soils testing with nuclear gauge and/or sand cone equipment and inspections requiring equipment will require applicable travel and mileage charges for equipment transport and storage per code (portal-to-portal) from the nearest CTS laboratory. Fees for special projects, services overseas, or elsewhere in the United States, will be quoted on request. With prior notification to Client; charges are subject to change at any time. Construction Testing Services reserves the right to adjust the rates quoted in this contract based upon any Union or prevailing wage increases and/or changes in any industry requirements. MINIMUM HOURLY CHARGES —INSPECTION Technician personnel and the following minimum charges are contractual commitment: One-half day or less 4 Hours Over one-half day 8 Hours Show -up time (less than 2 hours notice = 4 hour charge) 2 Hours WORKING HOURS AND PREMIUM TIME Regular workday is the first 8 hours between 6:00 am and 6:00 pm Monday through Friday. Premium time is as follows: Overtime, Weekdays and Saturdays (first 8 hours) 1.5 x quoted hourly rate Overtime Saturdays (over 8 hours) and Sundays (first 8 hours) 2 x quoted hourly rate Overtime Sundays (over 8 hours) and Holidays 3 x quoted hourly rate Shift differential, swing and graveyard - (Work performed between 2:00 pm and 4:00 am) MISCELLANEOUS CHARGES - Only Where Applicable Notary Services Fee Facsimile Charges. Plus $1.00/page (n/c for cover page) Wireless Router/Data Card for Jobsite Internet !Pad Monthly Rental Fee Electronic Reporting Fees/Subscriptions (PlanGrid, BIM, etc.) Parking Fees Air Travel Outside Services Subsistence (per union contract) Mileage Sample Pickup Weekend Sample Pickup Project Administration Samples Made by Others: Concrete Cylinders Samples Made by Others: All Other Tests Laboratory Sample Witness Fee Laboratory Sample Storage Fee (per sample) EZ Cure Boxes (Thermostatically Controlled Curing Boxes) Returned Check Fee 12.5%/hour additional to base or quoted rate. $40.00/each $7.00/minimum $135.00/day $100.00/month At Cost At Cost Cost Plus 10 % Cost Plus 20% $130.00/day Standard Federal Rate $105.00/each $130 + Test $55.00 + Test $130.00 $120.00 QOR $150.00 $16.00/each 7 % of Monthly Invoice TESTS Testing fees shown include normal time for performing test. Samples requiring special preparation will be charged at the laboratory technician rate. Fees for tests not listed will be quoted upon request. There will be a minimum charge of $100.00 for any engineering report. Please note some tests maybe tested by subconsultants. Samples delivered to the laboratory after 3:00pm or samples needing results within 24 hours will incur a 50% mark-up. INSURANCE The liability of Construction Testing Services (CTS) is limited to CTS's contract value. PAYMENT Invoices will be submitted monthly or bimonthly for services performed during the preceding month and are payable on receipt. Interest of 1.5 % per month (but not exceeding the maximum rate allowable by law) will be payable on any amounts not paid within 30 days, payment thereafter to be applied first to accrued interest and then to the principle unpaid amount. Attorney's fees or other costs incurred in collecting any delinquent amount shall be paid by client. Visa, MasterCard and American Express payments are accepted however fees will apply. Visa and MasterCard payments require an additional 3% on top of the amount of the invoice being paid. American Express payments require an additional 4% on top of the amount of the invoice being paid. AOfees subject to Basis of Charges CONSTRUCTION TESTING SERVICES CONCRETE AND MASONRY TESTS CONCRETE Compressive Strength of Cylindrical Concrete Specimens (6x12) Compressive Strength of Cylindrical Concrete Specimens (4x8) Compressive Strength of Cylindrical Concrete Specimens (Over 8000 PSI) Cylinder molds. 6" x 12" and 4" x 8" Compressive Strength of Lightweight Insulating Concrete Obtaining and Testing Sawed Beams and Drilled Cores of Concrete (Cores) Flexural Toughness of Fiber Reinforced Concrete (Round Panel) Flexural Strength of Concrete (Using Simple Beam with Third -Point Loading) Flex Beams per Caltrans Test Methods Length Change of Hardened Hydraulic -Cement Mortar and Concrete (Shrinkage, 1 Sample) Shotcrete Nozzleman Qualification Letter (Per Nozzleman, Per Position) Shotcrete Pre -Qualification Cores (Compression and Visual) Shotcrete Production Cores Coefficient of Thermal Expansion Determining Density of Structural Lightweight Concrete (Cylinders) Standard Specification for Concrete Made by Volumetric Botching and Mixing Cement Quality Sampling Physical Testing of Gypsum, Gypsum Plasters and Gypsum Concrete Splitting Tensile Strength of Cylindrical Concrete Specimens Static Modulus of Elasticity and Poisson's Ratio of Concrete in Compression Grab Sample, Sealing and Storing in a Humidity and Temperature Controlled Room Density of Hydraulic Cement Testing of Controlled Low Strength Material (CLSM) Test Cylinders GFRC Pull Test GFRC Flexural Test Foaming Agents for Use in Producing Cellular Concrete Using Preformed Foam (Cell -Crete) MASONRY Compressive Testing of Grout (Masonry) Compressive Strength of Hydraulic Cement Mortars Using 2" Cube Specimens Compressive Strength of Masonry Prisms Testing Concrete Masonry Units and Related Units (Core Compression) Compressive Strength of Molded Masonry Mortar Cylinders and Cubes (2" Sample) Testing Concrete Masonry Units (CMU) and Related Units (Full Unit) Linear Drying Shrinkage of Concrete Masonry Units (Per Unit) Masonry Core Shear Testing Testing Concrete Masonry Units (Absorption, Moisture Content, Unit Weight) Brick and Clay Tile (modulus of rupture, compression, saturation coefficient, suction rate, efflorescence)` Mortar Molds. 2" x 4". Single Use Mortar or Grout, Stored and Cured, Not Tested (Including Mold) AGGREGATES (SOILS AND CONCRETE) Determining Sieve Analysis of Fine and Coarse Aggregates (Coarse Only) Sieve Analysis of Fine and Coarse Aggregates (Fine Only) Sieve Analysis of Fine and Coarse Aggregates (Wash Included) Sieve Analysis of Fine and Coarse Aggregates (200 Wash Only) Evaluating Cleanness of Coarse Aggregate Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate Unit Weight of Aggregate Clay Lumps and Friable Particles in Aggregates Flat Particles, Elongated Particles or Flat and Elongated Particles in Coarse Aggregate Organic Impurities in Fine Aggregates for Concrete Density, Relative Density(Specific Gravity), and Absorption of Coarse Aggregate Density, Relative Density(Specific Gravity), and Absorption of Fine Aggregate Resistance to Degradation of Small Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine Percentage of Crushed Particles/Standard Test Method for Determining the Percentage of Fractured Particles in Coarse Aggregate Uncompacted Void Content of Fine Aggregate (as Influenced by Particle Shape, Surface Texture, and Grading) Sand Equivalent Value of Soils and Fine Aggregate Durability Index (Fine) Durability Index (Coarse) Durability Index (Fine and Coarse) Lightweight Particles in Aggregate Resistance of Rock to Wetting and Drying 'Unusual sample preparation for brick specimen will be charged at the established hourly rate. ASTM C39 ASTM C39 ASTM C39 ASTM C470 ASTM C495 ASTM C42 ASTM C1550 ASTM C78 CT523 and CT524 ASTM C157 ACI 506, ASTM C42 and C1140 ACI 506, ASTM C42 and C1140 ASTM C1140 AASHTO T336 ASTM C567 ASTM C685 CBC 2010 ASTM C472 ASTM C496 ASTM C469 CBC ASTM C188 ASTM D4832 PCI PCI ASTM C796 ASTM C1019 ASTM C109 ASTM C1314 CBC 2105A.4 ASTM C780 A7.6 ASTM C140 ASTM C426 CBC 2105A.4 ASTM C140 ASTM C67 CT202/ASTM C136 CT202/ASTM C136 CT202/ASTM C117 ASTM C117 CT227 ASTM C88/CT214 CT212 ASTM C142 ASTM D4791/CT235 CT213/ASTM C40 ASTM C127/CT206 ASTM C128/CT207 ASTM C131(535)and C211 ASTM D5821/CT205 Standard Rate/Each' $84.00 $84.00 $143.00 $72.00 $94.00 $121.00 $440.00 $308.00 $308.00 $150.00 $440.00 $110.00 $110.00 $535.00 $405.00 $965.00 $667.00 $55.00 $253.00 $215.00 $150.00 $195.00 $150.00 $374.00 $374.00 $525.00 $121.00 $121.00 $187.00 $187.00 $121.00 $184.00 $270.00 $270.00 $340.00 $1,000.00 $121.00 $121.00 INSPECTING TESTING ENGINEERING Discounted RatelEach $220.90 $155.00 $295.00 $379.99 $255.00 $220.00 $370.00 $275.00 $158.00 $215.00 $370 00 $255.00 $336.00 $336.00 $336.00 $535.99 $355.00 $409.99 $255.00 ASTM C1252/AASHTO T304A $405.00 $255.00 ASTM D2419/CT217 $270:09 $180.00 ASTM D3744/CT229 $495..99 $280.00 ASTM D3744/CT229 $496.90 $280.00 ASTM D 3744/CT229 $405.00 ASTM C123/AASHTO T113 QOR CRD-C169 $590.00 All fees subject to Bmis of Cburges ECTING CONSTRUCTION INS TESTING TESTING SERVICES ENGINEERING SOILS, AGGREGATE, ASPHALTIC CONCRETE SERVICES & TESTS Standard Discounted SOILS Rate/Each Rate/Each Direct Shear Test of Soils Under Consolidated Drained Conditions ASTM D3080 $535.00 Caltrans Corrosivity Package $505.00 Determining Field and Laboratory Resistivity and pH Measurements for Soil and Water CT643 QOR Soils and Waters for Sulfate Content CT417 QOR Soils and Waters for Chloride Content CT422 QOR Particle -Size Analysis of Soils (with Hydrometer) ASTM D422 $590.00 Pore Water Extraction and Determination of the Soluble Salt Content of Soils by Refractometer ASTM D4542 $625.00 Standard Test Method for Particle -Size Analysis of Soils (without Hydrometer) ASTM D422 $535.00 Liquid Limit, Plastic Limit, and Plasticity Index of Soils ASTM D4318/CT204 $535.00 Laboratory Compaction Characteristics of Soil Using Modified/Standard Effort ASTM D1557/D698 $5g2.09 $355.00 Hydrometer Only ASTM D422 $535.00 pH of Soils ASTM D4972 $467.00 Relative Compaction of Untreated and Treated Soils and Aggregates CT216 $500.90 $405.00 Determining the Resistance "R" Value of Treated and Untreated Bases, Subbases, and Basement Soils by the Stabiliometer ASTM D2844/CT301 $590 09 $405.00 Laboratory Determination of Water(*moisture) Content of Soil and Rock by Mass ASTM D2216/CT226 $150.00 Density of Soil in Place by the Drive -Cylinder Method D2937 $116.00 Expansion Index of Soils ASTM D4829 $405.00 Hydraulic Conductivity of Saturated Porous Materials Using a Flexible Wall Permeameter (Permeability) ASTM D5084/CT220 $550.00 Lab Compaction Characteristics of Soil 1 Point Proctor (Check Point) ASTM D698/D1557 $337.00 Maximum Index Density and Unit Weight of Soils Using a Vibratory Table ASTM D4253 $285.00 Minimum Index Density and Unit Weight of Soils and Calculation of Relative Density ASTM D4254 $285.00 Density of Hydraulic Cement ASTM C188 $253.00 Volatile Organic Content EPA 8260E QOR Semi Volatile Organics by GC/Ms (Basic Target List) EPA 8270C QOR Total Organic Carbon ASTM 2974/EPA 5310Bm QOR ICP Metals Concentration EPA 6020 - CAM/CCR 17 QOR Total Extractable Petroleum Hydrocarbons: TPH, MTBE, Benzene,Toluene, Ethylbenzene, Zylenes, %SS EPA 8015E QOR ICP Metals Concentration EPA 6020 QOR pH EPA 9045D $535.00 Sequential Batch Extraction of Waste with Acidic Extraction Fluid ASTM D5284 QOR Chromium Soluble EPA 7196A QOR Moisture, Ash and Organic Matter of Peat and Other Organic Soils (Organic Content) ASTM D2974 $270.00 Universal Soil Classification System (USCS) Test ASTM D2487 $300.00 California Bearing Ratio Test ASTM D1883 $370.00 Unconfined Compressive Strength of Cohesive Soil ASTM D2166/CT221 $187.00 ASPHALT Quantitative Extraction of Bitumen from Bituminous Paving Mixtures (Solvent) ASTM D2172/CT310 $732.00 Determining Low Temperature Performance Grade (PG) of Asphalt Binders ASTM 6816 QOR Thickness/Height of Compacted Bituminous Paving Mixture Specimens (Cores) ASTM D3549/CT308 $27900 $180.00 Method of Prep of Bituminous Mixture Test Specimens ASTM D6926/CT304 $270.00 Bulk Specific Gravity and Density of Compacted Bituminous Mixtures (LTMD) ASTM D1188 and D2726/CT308 $990.00 Indirect Tensile (IDT) Strength of Bituminous Mixtures (TSR) ASTM D6931/CT371 $3,146.00 Mechanical Size Analysis (Coarse and Fine) of Extracted Aggregate ASTM D5444/CT202 $405.00 Marshall Stability and Flow of Bituminous Mixtures ASTM D6927 $990.00 Theoretical Maximum Specific Gravity and Density (Rice) ASTM D2041/CT309 $405.09 $280.00 Measuring the Permeability of Bituminous Pavements and Seal Coats CT341 Swell of Bituminous Mixtures CT305 $370.00 Moisture Vapor Susceptibility of Bituminous Mixtures/Moisture or Volatile Distillates in Asphalt ASTM D1461/CT307 $930.00 Stabilometer Value (1 sample) CT366 $379.99 $255.00 Determination of Asphalt Content of Bituminous Paving Mixtures by the Ignition Method CT382/ASTM D6307 $405.00 Determination of Correction Factor of Bituminous Paving Mixtures by the Ignition Method CT382/ASTM D6307 $405.00 Determination of Asphalt and Moisture Contents of Bituminous Mixtures by Microwave Oven CT370 $405.00 $255.00 Effect of Water on Compressive Strength of Compacted Bituminous Mixtures (Set of 6) ASTM D1075 $3,330.00 Compressive Strength of Bituminous Mixtures ASTM D1074 $270.00 Hamburg Wheel Track AASHTO T324 $3,630.00 Moisture Susceptibility AASHTO T283 $3,630.00 * Unusual sample preparation (dried clays, saturated clays, etc.) and all other tests for treated or untreated soils, aggregate subbase and aggregate base will be charged at established rates for laboratory technician. ** Does not include sample preparation or sieve analysis AUfees subject to Basis of Charges \ CONSTRUCTION TESTING SERVICES INSPECTING TESTING ENGINEERING Standard MATERIALS MECHANICAL TESTS Rate/Each Mechanical Testing of Steel Products (General Tensile) ASTM A370 $470.00 Fillet Weld Break Test for Qualification (Welding) AWS B4.0 $205.00 Tension Testing of Metallic Materials, Tension Testing Wrought and Cast Aluminum and Magnesium- $470.00 Alloy Products, (Welding Coupon Tensile) ASTM E8, B557 and AWS B4.0 Mechanical Testing of Steel Products (Couplers) ASTM A370 $460.00 Impact Testing of Miniaturized Charpy V-Notch Specimens, Notched Bar Impact Testing of Metallic QOR Materials ASTM E2248 and ASTM E23 Testing, Practices, and Terminology for Chemical Analysis of Steel Products ASTM A751 $336.00 Mechanical Testing of Steel Products & Bend Testing of Material for Ductility; #348 ASTM A370 and E290 $370.00 Mechanical Testing of Steel Products & Bend Testing of Material for Ductility; 49411 ASTM A370 and E290 $440.00 Mechanical Testing of Steel Products & Bend Testing of Material for Ductility; 414+ ASTM A370 and E290 QOR Mechanical Testing of Steel Products, Standard Specification for Steel Wire, Plain, for Concrete $440.00 Reinforcement ASTM A370, A82 and A185 Guided Bend Test for Ductility of Welds, Mechanical Testing of Welds ASTM E190 and AWS B4.0 $270.00 Determining the Mechanical Properties of Externally and Internally Threaded Fasteners, Anchor Bolts $528.00 Only (Tension and Yield) ASTM F307, F1554 and F606 Rockwell Hardness of Metallic Materials ASTM El $150.00 Proof Test for Carbon and Alloy Steel (Nuts Only) ASTM Al94 or A563 $337.00 Radiographic Examination of Metallic Castings/Weldments ASTM E94, El030 and El032 QOR Macroetching Metals and Alloys ASTM E340, E381 and AWS $337.00 Determining the Mechanical Properties of Externally and Internally Threaded Fasteners, Washers, $370.00 Direct Tension Indicators, and Rivets (HSB Assemblies) ASTM F606 Mechanical Testing of Steel Products (Terminators Tensile) ASTM A370 $370.00 Strength for Sewn or Bonded Seams of Geotextiles ASTM D4884 $336.00 Tearing Strength of Fabrics by the Tongue (Single Rip) Procedure ASTM D2261 $336.00 Breaking Strength and Elongation of Textile Fabrics (Grab Test) ASTM D5034 $270.00 Tensile Properties of Fiber Reinforced Polymer Matrix Composite Bars ASTM D3039 $990.00 Steel Strand, Uncoated Seven -Wire for Prestressed Concrete ASTM A416 and A1061 $1,463.00 FIREPROOFING Thickness and Density of Sprayed Fire -Resistive Material (SFRM) ASTM E605 $270.00 Cohesion/Adhesion of Sprayed Fire -Resistive Materials (Test Kit Only) ASTM E736 $77.00 CONTACT INFORMATION Headquarters: 2118 Rheem Drive - Pleasanton, CA 94588 • P 925.462.5151 • F 925.462.5183 Peninsula: One Embarcadero Center, Suite 535 • San Francisco, CA 94111 - P 415.334.4747 • F 415.438.2357 Oakland: 246 30th Street, Suite 101 • Oakland, CA 94601 • P 510.444.4747 • F 510.835.1825 San Jose: 2033 Gateway Place, 4500 • San Jose, CA 95110 • P 408.573.6992 • F 408.437.1201 Stockton: 343 East Main Street, #711 • Stockton, CA 95202 • P 209.507.7555 • F 209.507.7554 Rocklin: 4400 Yankee Hill Road • Rocklin, CA 95677 • P 916.419.4747 • F 916.419.4774 Las Vegas: 3842 E. Post Road • Las Vegas, NV 89120 • P 702.257.4747 • F 702.257.4718 All fees subject to Basis of Charges