Loading...
TRC Engineers - Construction Management, 15-PW-228 (2018) - Amendment No. 1�ypFcr� AMENDMENT TO THE AGREEMENT FOR SERVICES BETWEEN CITY OF GILROY AND TRC ENGINEERS INC. FOR WEST BRANCH LLAGAS CREEK TRAIL PROJECT NO. 15-PW-228 CONTRACT DATED JANUARY 19TH, 2018 P.O. NO. 180881 AMENDMENT NO. 1 This Amendment shall become effective when it has been signed by the City Administrator, Project Manager, and Consultant. All copies forwarded to Consultant for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Consultant's copy will be returned to him as his authoritv to Droceed with the work. Amend existing contract for TRC Solutions Inc. for the amount of $192,318.84 to work on Environmental permitting and any additional requirements to complete the construction management services for the project. See Exhibit A The original contract amount was for the amount of $311,334.36 and 10% contingency of $31,133.00, Amendment No. 1 is for the amount of $192,318.84, for the new total contract amount not to exceed $534,786.20 This amendment extends the term of the contract from February 5t', 2020 to June 30`h, 2020. All requirements of the original Agreement Documents shall apply to the above work except as specifically modified by this Amendment. TRC Engineers Inc. hereby agrees to perform the above work subject to the terms of this Amendment for design of the West Branch Llagas Creek Trail Project Trail. Consultant: TRC Solutions Inc. By D;ich& Date —:z> Cp l 1 1 i ,J ACCEPTED: 4G o020 �q D Project Manager I Date Z'/ 1,7 p ecm ate 01� City A ministrato�l Date Exhibit A UTRC Results you can rely on Local Assistance Procedures Exhibit 10-4 Cost Estimate Amendment No. 1 February 22, 2019 Title — Ronan Channel Trail Project City of Gilroy City Project No.: Federal Project No.: Consultant: TRC Engineers, Inc. Direct Labor Billing Classification Name Range Hours Rate Total Construction Task 2 Resident Engineer TBD PE 120 $ 241.72 $ 29,006.40 Structure Representative TBD PE 70 $ 219.74 $ 15,381.80 Inspector TBD 380 $ 162.06 $ 61,582.80 Admin Support TBD 76 $ 109.87 $ 8,350.12 Total Labor Cost Task 2 646 $ 114,321.12 Post Construction Task 3 Resident Engineer TBD PE 40 $ 241.72 $ 9,668.80 Structure Representative TBD PE 20 $ 219.74 $ 4,394.80 Inspector TBD 20 $ 162.06 $ 3,241.20 Admin Support TBD 16 $ 109.87 $ 1,757.92 Total Labor Cost Task 3 96 $ 19,062.72 Total Labor Sub -Consultants $ 58,935.00 ODC Vehicles Total Cost Estimate 742 $ 8.00 $ 5,936.00 192,318.84 F_)TRC Results you can rely on February 12, 2019 Title — Ronan Channel Trail Project City of Gilroy City Project No.: Federal Project No.: Sub -Consultant Costs: Firm Toure Associates Total Cost Task 1 Total Cost Task 2 Local Assistance Procedures Exhibit 10-4 Cost Proposal Amendment Environmental Cost Estimate $ 17,185.00 $ 41,750.00 TOTAL $ 58,935.00 Notes: 1. All hourly rates effective through December 2019. 2. All hourly rates are increased annually by the current CPI - Minimum 3%. 3. All rates include employee wages, salary, related benefits, overhead and profit. 4. Vehicle full sized truck, milege, gas, maintenance, license. 5. Overtime billed in accordance with State and Federal Law. 6. Estimate is based upon 95 Working Days. 7. Rates are subject to Prevailing Wage Requirements and changes per DIR. 8. All estimates and allowance costs are subject to verification and adjustment to actual costs. 9. Estimated costs above are in addition to those shown in the original proposal dated Aug 30, 2017.