Loading...
4LEAF - Standard Quality Assurance Construction Management (2019)AGREEMENT FOR SERVICES (For contracts over $5,000 - CONSULTANT) This AGREEMENT made this 22nd day of April, 2019, between: CITY: City of Gilroy, having a principal place of business at 7351 Rosanna Street, Gilroy, California and CONSULTANT: 4LEAF, INC., having a principal place of business at 2126 Rheem Drive, Pleasanton, CA 94588. ARTICLE 1. TERM OF AGREEMENT This Agreement will become effective on 05/20/19 and will continue in effect through 06/30/2020 unless terminated in accordance with the provisions of Article 7 of this Agreement. Any lapse in insurance coverage as required by Article 5, Section D of this AgreemePnitial terminate this Agreement regardless of any other provision stated herein. ARTICLE 2. INDEPENDENT CONTRACTOR STATUS It is the express intention of the parties that CONSULTANT is an independent contractor and not an employee, agent, joint venturer or partner of CITY. Nothing in this Agreement shall be interpreted or construed as creating or establishing the relationship of employer and employee between CITY and CONSULTANT or any employee or agent of CONSULTANT. Both parties acknowledge that CONSULTANT is not an employee for state or federal tax purposes. CONSULTANT shall not be entitled to any of the rights or benefits afforded to CITY' S employees, including, without limitation, disability or unemployment insurance, workers' compensation, medical insurance, sick leave, retirement benefits or any other employment benefits. CONSULTANT shall retain the right to perform services for others during the term of this Agreement. ARTICLE 3. SERVICES TO BE PERFORMED BY CONSULTANT A. Specific Services CONSULTANT agrees to: Perform the services as outlined in Exhibit "A" ("Specific Provisions") and Exhibit "B" ("Scope of Services"), within the time periods described in Exhibit "C" ("Milestone Schedule"). B. Method of Performing Services CONSULTANT shall determine the method, details and means of performing the above - described services. CITY shall have no right to, and shall not, control the manner or determine the method of accomplishing CONSULTANT'S services. 4835-2267-03610 LAC104706083 -1- C. Employment of Assistants CONSULTANT may, at the CONSULTANT'S own expense, employ such assistants as CONSULTANT deems necessary to perform the services required of CONSULTANT by this Agreement, subject to the prohibition against assignment and subcontracting contained in Article 5 below. CITY may not control, direct, or supervise CONSULTANT'S assistants in the performance of those services. CONSULTANT assumes full and sole responsibility for the payment of all compensation and expenses of these assistants and for all state and federal income tax, unemployment insurance, Social Security, disability insurance and other applicable withholding. D. Place of Work CONSULTANT shall perform the services required by this Agreement at any place or location and at such times as CONSULTANT shall determine is necessary to properly and timely perform CONSULTANT'S services. ARTICLE 4. COMPENSATION A. Consideration In consideration for the services to be performed by CONSULTANT, CITY agrees to pay CONSULTANT the amounts set forth in Exhibit "D" ("Payment Schedule"). In no event however shall the total compensation paid to CONSULTANT exceed $229,950 (including Continency). B. Invoices CONSULTANT shall submit invoices for all services rendered. C. Payment Payment shall be due according to the payment schedule set forth in Exhibit "D". No payment will be made unless CONSULTANT has first provided City with a written receipt of invoice describing the work performed and any approved direct expenses (as provided for in Exhibit "A", Section IV) incurred during the preceding period. If CITY objects to all or any portion of any invoice, CITY shall notify CONSULTANT of the objection within thirty (30) days from receipt of the invoice, give reasons for the objection, and pay that portion of the invoice not in dispute. It shall not constitute a default or breach of this Agreement for CITY not to pay any invoiced amounts to which it has objected until the objection has been resolved by mutual agreement of the parties. D. Expenses CONSULTANT shall be responsible for all costs and expenses incident to the performance of services for CITY, including but not limited to, all costs of equipment used or provided by CONSULTANT, all fees, fines, licenses, bonds or taxes required of or imposed against CONSULTANT and all other of CONSULTANT'S costs of doing business. CITY shall not be 4835-2267-03610 LAC104706083 responsible for any expenses incurred by CONSULTANT in performing services for CITY, except for those expenses constituting "direct expenses" referenced on Exhibit "A." ARTICLE 5. OBLIGATIONS OF CONSULTANT A. Tools and Instrumentalities CONSULTANT shall supply all tools and instrumentalities required to perform the services under this Agreement at its sole cost and expense. CONSULTANT is not required to purchase or rent any tools, equipment or services from CITY. B. Workers' Compensation CONSULTANT agrees to provide workers' compensation insurance for CONSULTANT'S employees and agents and agrees to hold harmless, defend with counsel acceptable to CITY and indemnify CITY, its officers, representatives, agents and employees from and against any and all claims, suits, damages, costs, fees, demands, causes of action, losses, liabilities and expenses, including without limitation reasonable attorneys' fees, arising out of any injury, disability, or death of any of CONSULTANT'S employees. C. Indemnification of Liability, Duty to Defend 1. As to professional liability, to the fullest extent permitted by law, CONSULTANT shall defend, through counsel approved by, CITY (which approval shall not be unreasonably withheld), indemnify and hold harmless CITY, its officers, representatives, agents and employees against any and all suits, damages, costs, fees, claims, demands, causes of action, losses, liabilities and expenses, including without limitation attorneys' fees, to the extent arising or resulting directly or indirectly from any willful or negligent acts, errors or omissions of CONSULTANT or CONSULTANT'S assistants, employees or agents, including all claims relating to the injury or death of any person or damage to any property. 2. As to other liability, to the fullest extent permitted by law, CONSULTANT shall defend, through counsel approved by CITY (which approval shall not be unreasonably withheld), indemnify and hold harmless CITY, its officers, representatives, agents and employees against any and all suits, damages, costs, fees, claims, demands, causes of action, losses, liabilities and expenses, including without limitation attorneys' fees, arising or resulting directly or indirectly from any act or omission of CONSULTANT or CONSULTANT'S assistants, employees or agents, including all claims relating to the injury or death of any person or damage to any property. D. Insurance In addition to any other obligations under this Agreement, CONSULTANT shall, at no cost to CITY, obtain and maintain throughout the term of this Agreement: (a) Commercial Liability Insurance on a per occurrence basis, including coverage for owned and non -owned automobiles, with a minimum combined single limit coverage of $1,000,000 per occurrence for all damages due to bodily injury, sickness or disease, or death to any person, and damage to property, 4835-2267-0361 v1 _3 LAM04706083 including the loss of use thereof; and (b) Professional Liability Insurance (Errors & Omissions) with a minimum coverage of $1,000,000 per occurrence or claim, and $2,000,000 aggregate; provided however, Professional Liability Insurance written on a claims made basis must comply with the requirements set forth below. Professional Liability Insurance written on a claims made basis (including without limitation the initial policy obtained and all subsequent policies purchased as renewals or replacements) must show the retroactive date, and the retroactive date must be before the earlier of the effective date of the contract or the beginning of the contract work. Claims made Professional Liability Insurance must be maintained, and written evidence of insurance must be provided, for at least five (5) years after the completion of the contract work. If claims made coverage is canceled or non -renewed, and not replaced with another claims -made policy form with a retroactive date prior to the earlier of the effective date of the contract or the beginning of the contract work, CONSULTANT must purchase so called "extended reporting" or "tail" coverage for a minimum of five (5) years after completion of work, which must also show a retroactive date that is before the earlier of the effective date of the contract or the beginning of the contract work. As a condition precedent to CITY' S obligations under this Agreement, CONSULTANT shall furnish written evidence of such coverage (naming CITY, its officers and employees as additional insureds on the Comprehensive Liability insurance policy referred to in (a) immediately above via a specific endorsement) and requiring thirty (30) days written notice of policy lapse or cancellation, or of a material change in policy terms. E. Assignment Notwithstanding any other provision of this Agreement, neither this Agreement nor any duties or obligations of CONSULTANT under this Agreement may be assigned or subcontracted by CONSULTANT without the prior written consent of CITY, which CITY may withhold in its sole and absolute discretion. F. State and Federal Taxes As CONSULTANT is not CITY' S employee, CONSULTANT shall be responsible for paying all required state and federal taxes. Without limiting the foregoing, CONSULTANT acknowledges and agrees that: • CITY will not withhold FICA (Social Security) from CONSULTANT'S payments; • CITY will not make state or federal unemployment insurance contributions on CONSULTANT'S behalf; • CITY will not withhold state or federal income tax from payment to CONSULTANT; • CITY will not make disability insurance contributions on behalf of CONSULTANT; • CITY will not obtain workers' compensation insurance on behalf of CONSULTANT. 4835-2267-0361 v1 LAC104706083 ARTICLE 6. OBLIGATIONS OF CITY A. Cooperation of City CITY agrees to respond to all reasonable requests of CONSULTANT and provide access, at reasonable times following receipt by CITY of reasonable notice, to all documents reasonably necessary to the performance of CONSULTANT'S duties under this Agreement. B. Assignment CITY may assign this Agreement or any duties or obligations thereunder to a successor governmental entity without the consent of CONSULTANT. Such assignment shall not release CONSULTANT from any of CONSULTANT'S duties or obligations under this Agreement. ARTICLE 7. TERMINATION OF AGREEMENT A. Sale of Consultant's Business/ Death of Consultant. CONSULTANT shall notify CITY of the proposed sale of CONSULTANT's business no later than thirty (30) days prior to any such sale. CITY shall have the option of terminating this Agreement within thirty (30) days after receiving such notice of sale. Any such CITY termination pursuant to this Article 7.A shall be in writing and sent to the address for notices to CONSULTANT set forth in Exhibit A, Subsection V.H., no later than thirty (30) days after CITY' receipt of such notice of sale. If CONSULTANT is an individual, this Agreement shall be deemed automatically terminated upon death of CONSULTANT. B. Termination by City for Default of Consultant Should CONSULTANT default in the performance of this Agreement or materially breach any of its provisions, CITY, at CITY' S option, may terminate this Agreement by giving written notification to CONSULTANT. For the purposes of this section, material breach of this Agreement shall include, but not be limited to the following: 1. CONSULTANT'S failure to professionally and/or timely perform any of the services contemplated by this Agreement. 2. CONSULTANT'S breach of any of its representations, warranties or covenants contained in this Agreement. CONSULTANT shall be entitled to payment only for work completed in accordance with the terms of this Agreement through the date of the termination notice, as reasonably determined by CITY, provided that such payment shall not exceed the amounts set forth in this Agreement for the tasks described on Exhibit C" which have been fully, competently and timely rendered by CONSULTANT. Notwithstanding the foregoing, if CITY terminates this Agreement due to CONSULTANT'S default in the performance of this Agreement or material breach by CONSULTANT of any of its provisions, then in addition to any other rights and remedies CITY 4835-2267-0361 v1 _5 _ LAC104706083 may have, CONSULTANT shall reimburse CITY, within ten (10) days after demand, for any and all costs and expenses incurred by CITY in order to complete the tasks constituting the scope of work as described in this Agreement, to the extent such costs and expenses exceed the amounts CITY would have been obligated to pay CONSULTANT for the performance of that task pursuant to this Agreement. C. Termination for Failure to Make Agreed -Upon Payments Should CITY fail to pay CONSULTANT all or any part of the compensation set forth in Article 4 of this Agreement on the date due, then if and only if such nonpayment constitutes a default under this Agreement, CONSULTANT, at the CONSULTANT'S option, may terminate this Agreement if such default is not remedied by CITY within thirty (30) days after demand for such payment is given by CONSULTANT to CITY. D. Transition after Termination Upon termination, CONSULTANT shall immediately stop work, unless cessation could potentially cause any damage or harm to person or property, in which case CONSULTANT shall cease such work as soon as it is safe to do so. CONSULTANT shall incur no further expenses in connection with this Agreement. CONSULTANT shall promptly deliver to CITY all work done toward completion of the services required hereunder, and shall act in such a manner as to facilitate any the assumption of CONSULTANT's duties by any new consultant hired by the CITY to complete such services. ARTICLE 8. GENERAL PROVISIONS A. Amendment & Modification No amendments, modifications, alterations or changes to the terms of this Agreement shall be effective unless and until made in a writing signed by both parties hereto. B. Americans with Disabilities Act of 1990 Throughout the term of this Agreement, the CONSULTANT shall comply fully with all applicable provisions of the Americans with Disabilities Act of 1990 ("the Act") in its current form and as it may be amended from time to time. CONSULTANT shall also require such compliance of all subcontractors performing work under this Agreement, subject to the prohibition against assignment and subcontracting contained in Article 5 above. The CONSULTANT shall defend with counsel acceptable to CITY, indemnify and hold harmless the CITY OF GILROY, its officers, employees, agents and representatives from and against all suits, claims, demands, damages, costs, causes of action, losses, liabilities, expenses and fees, including without limitation reasonable attorneys' fees, that may arise out of any violations of the Act by the CONSULTANT, its subcontractors, or the officers, employees, agents or representatives of either. 4835-2267-0361v1 LAC104706083 -6- C. Attorneys' Fees If any action at law or in equity, including an action for declaratory relief, is brought to enforce or interpret the provisions of this Agreement, the prevailing party will be entitled to reasonable attorneys' fees, which may be set by the court in the same action or in a separate action brought for that purpose, in addition to any other relief to which that party may be entitled. D. Captions The captions and headings of the various sections, paragraphs and subparagraphs of the Agreement are for convenience only and shall not be considered nor referred to for resolving questions of interpretation. E. Compliance with Laws The CONSULTANT shall keep itself informed of all State and National laws and all municipal ordinances and regulations of the CITY which in any manner affect those engaged or employed in the work, or the materials used in the work, or which in any way affect the conduct of the work, and of all such orders and decrees of bodies or tribunals having any jurisdiction or authority over the same. Without limiting the foregoing, CONSULTANT agrees to observe the provisions of the Municipal Code of the CITY OF GILROY, obligating every contractor or subcontractor under a contract or subcontract to the CITY OF GILROY for public works or for goods or services to refrain from discriminatory. employment or subcontracting practices on the basis of the race, color, sex, religious creed, national origin, ancestry of any employee, applicant for employment, or any potential subcontractor. F. Conflict of Interest CONSULTANT certifies that to the best of its knowledge, no CITY employee or office of any public agency interested in this Agreement has any pecuniary interest in the business of CONSULTANT and that no person associated with CONSULTANT has any interest that would constitute a conflict of interest in any manner or degree as to the execution or performance of this Agreement. G. Entire Agreement This Agreement supersedes any and all prior agreements, whether oral or written, between the parties hereto with respect to the rendering of services by CONSULTANT for CITY and contains all the covenants and agreements between the parties with respect to the rendering of such services in any manner whatsoever. Each party to this Agreement acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which are not embodied herein, and that no other agreement, statement or promise not contained in this Agreement shall be valid or binding. No other agreements or conversation with any officer, agent or employee of CITY prior to execution of this Agreement shall affect or modify any of the terms or obligations contained in any documents comprising this Agreement. Such other agreements or conversations shall be considered as unofficial information and in no way binding upon CITY. 4835-2267-0361v1 LAC104706083 H. Governing Law and Venue This Agreement shall be governed by and construed in accordance with the laws of the State of California without regard to the conflict of laws provisions of any jurisdiction. The exclusive jurisdiction and venue with respect to any and all disputes arising hereunder shall be in state and federal courts located in Santa Clara County, California. I. Notices Any notice to be given hereunder by either party to the other may be effected either by personal delivery in writing or by mail, registered or certified, postage prepaid with return receipt requested. Mailed notices shall be addressed to the parties at the addresses appearing in Exhibit "A", Section V.H. but each party may change the address by written notice in accordance with this paragraph. Notices delivered personally will be deemed delivered as of actual receipt; mailed notices will be deemed delivered as of three (3) days after mailing. J. Partial Invalidity If any provision in this Agreement is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions will nevertheless continue in full force without being impaired or invalidated in any way. K. Time of the Essence All dates and times referred to in this Agreement are of the essence. L. Waiver CONSULTANT agrees that waiver by CITY of any one or more of the conditions of performance under this Agreement shall not be construed as waiver(s) of any other condition of performance under this Agreement. - Executed at Gilroy, California, on the date and year first above written. CONSULTANT: 4LEAF, INC. By: Na Gene A. Barry Tifle: Vice President Social Security or Taxpayer Identification Number 94-3393574 4835-2267-0361v1 LAC104706083 `g` CITY: CITY OF GILROY By: - Name: Gabriel A. Gonzalez Title: Citv Administrator Approved as to Form City Attorn y n 4835-2267-0361v1 LAC104706083 _9_ EXHIBIT "A" SPECIFIC PROVISIONS I. PROJECT MANAGER CONSULTANT shall provide the services indicated on the attached Exhibit "B", Scope of Services ("Services"). (All exhibits referenced are incorporated herein by reference.) To accomplish that end, CONSULTANT agrees to assign Trisha Baxter, who will act in the capacity of Project Manager, and who will personally direct such Services. Except as may be specified elsewhere in this Agreement, CONSULTANT shall furnish all technical and professional services including labor, material, equipment, transportation, supervision and expertise to perform all operations necessary and required to complete the Services in accordance with the terms of this Agreement. II. NOTICE TO PROCEED/COMPLETION OF SERVICE A. NOTICE TO PROCEED CONSULTANT shall commence the Services upon delivery to CONSULTANT of a written "Notice to Proceed", which Notice to Proceed shall be in the form of a written communication from designated City contact person(s). Notice to Proceed may be in the form of e-mail, fax or letter authorizing commencement of the Services. For purposes of this Agreement, Faranak Mandavi shall be the designated City contact person(s). Notice to Proceed shall be deemed to have been delivered upon actual receipt by CONSULTANT or if otherwise delivered as provided in the Section V.H. ("Notices") of this Exhibit "A". B. COMPLETION OF SERVICES When CITY determines that CONSULTANT has completed all of the Services in accordance with the terms of this Agreement, CITY shall give CONSULTANT written Notice of Final Acceptance, and CONSULTANT shall not incur any further costs hereunder. CONSULTANT may request this determination of completion when, in its opinion, it has completed all of the Services as required by the terms of this Agreement and, if so requested, CITY shall make this determination within two (2) weeks of such request, or if CITY determines that CONSULTANT has not completed all of such Services as required by this Agreement, CITY shall so inform CONSULTANT within this two (2) week period. III. PROGRESS SCHEDULE The schedule for performance and completion of the Services will be as set forth in the attached Exhibit "C" IV. PAYMENT OF FEES AND DIRECT EXPENSES Payments shall be made to CONSULTANT as provided for in Article 4 of this Agreement. 4835-2267-0361v1 LAC104706083 -� - Direct expenses are charges and fees not included in Exhibit "B". CITY shall be obligated to pay only for those direct expenses which have been previously approved in writing by CITY. CONSULTANT shall obtain written approval from CITY prior to incurring or billing of direct expenses. Copies of pertinent financial records, including invoices, will be included with the submission of billing(s) for all direct expenses. V. OTHER PROVISIONS A. STANDARD OF WORKMANSHIP CONSULTANT represents and warrants that it has the qualifications, skills and licenses necessary to perform the Services, and its duties and obligations, expressed and implied, contained herein, and CITY expressly relies upon CONSULTANT'S representations and warranties regarding its skills, qualifications and licenses. CONSULTANT shall perform such Services and duties in conformance to and consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Any plans, designs, specifications, estimates, calculations, reports and other documents furnished under this Agreement shall be of a quality acceptable to CITY. The minimum criteria for acceptance shall be a product of neat appearance, well -organized, technically and grammatically correct, checked and having the maker and checker identified. The minimum standard of appearance, organization and content of the drawings shall be that used by CITY for similar purposes. B. RESPONSIBILITY OF CONSULTANT CONSULTANT shall be responsible for the professional quality, technical accuracy, and the coordination. of the Services furnished by it under this Agreement. CONSULTANT shall not be responsible for the accuracy of any project or technical information provided by the CITY. The CITY' S review, acceptance or payment for any of the Services shall not be construed to operate as a waiver of any rights under this Agreement or of any cause of action arising out of the performance of this Agreement, and CONSULTANT shall be and remain liable to CITY in accordance with applicable law for all damages to CITY caused by CONSULTANT'S negligent performance of any of the services furnished under this Agreement. C. RIGHT OF CITY TO INSPECT RECORDS OF CONSULTANT CITY, through its authorized employees, representatives or agents, shall have the right, at any and all reasonable times, to audit the books and records (including, but not limited to, invoices, vouchers, canceled checks, time cards, etc.) of CONSULTANT for the purpose of verifying any and all charges made by CONSULTANT in connection with this Agreement. CONSULTANT shall maintain for a minimum period of three (3) years (from the date of final payment to CONSULTANT), or for any longer period required by law, sufficient books and records in accordance with standard California accounting practices to establish the correctness of all charges submitted to CITY by CONSULTANT, all of which shall be made available to CITY at the CITY's offices within five (5) business days after CITY's request. 4835-2267-0361v1 LAC104706083 D. CONFIDENTIALITY OF MATERIAL All ideas, memoranda, specifications, plans, manufacturing procedures, data (including, but not limited to, computer data and source code), drawings, descriptions, documents, discussions or other information developed or received by or for CONSULTANT and all other written and oral information developed or received by or for CONSULTANT and all other written and oral information submitted to CONSULTANT in connection with the performance of this Agreement shall be held confidential by CONSULTANT and shall not, without the prior written consent of CITY, be used for any purposes other than the performance of the Services, nor be disclosed to an entity not connected with the performance of the such Services. Nothing furnished to CONSULTANT which is otherwise known to CONSULTANT or is or becomes generally known to the related industry (other than that which becomes generally known as the result of CONSULTANT'S disclosure thereof) shall be deemed confidential. CONSULTANT shall not use CITY' S name or insignia, or distribute publicity pertaining to the services rendered under this Agreement in any magazine, trade paper, newspaper or other medium without the express written consent of CITY. E. NO PLEDGING OF CITY' S CREDIT. Under no circumstances shall CONSULTANT have the authority or power to pledge the credit of CITY or incur any obligation in the name of CITY. F. OWNERSHIP OF MATERIAL. All material including, but not limited to, computer information, data and source code, sketches, tracings, drawings, plans, diagrams, quantities, estimates, specifications, proposals, tests, maps, calculations, photographs, reports and other material developed, collected, prepared (or caused to be prepared) under this Agreement shall be the property of CITY, but CONSULTANT may retain and use copies thereof subject to Section V.D of this Exhibit "A". CITY shall not be limited in any way in its use of said material at any time for any work, whether or not associated with the City project for which the Services are performed. However, CONSULTANT shall not be responsible for, and City shall indemnify CONSULTANT from, damages resulting from the use of said material for work other than PROJECT, including, but not limited to, the release of this material to third parties for work other than on PROJECT. G. NO THIRD PARTY BENEFICIARY. This Agreement shall not be construed or deemed to be an agreement for the benefit of any third party or parties, and no third party or parties shall have any claim or right of action hereunder for any cause whatsoever. 4835-2267-03610 _3 _ LAC104706083 H. NOTICES. Notices are to be sent as follows: CITY: Faranak Mandavi City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 CONSULTANT: Gene Barry Vice President 2126 Rheem Drive Pleasanton, CA 94588 I. FEDERAL FUNDING REQUIREMENTS. ® If the box to the left of this sentence is checked, this Agreement involves federal funding and the requirements of this Section V.I. apply. ❑ If the box to the left of this sentence is checked, this Agreement does not involve federal funding and the requirements of this Section V.I. do not apply. 1. DBE Program CONSULTANT shall comply with the requirements of Title 49, Part 26, Code of Federal Regulations (49 CFR 26) and the City -adopted Disadvantaged Business Enterprise programs. 2. Cost Principles Federal Acquisition Regulations in Title 48, CFR 31, shall be used to determine the allowable cost for individual items. 3. Covenant against Contingent Fees The CONSULTANT warrants that he/she has not employed or retained any company or person, other than a bona fide employee working for the CONSULTANT, to solicit or secure this Agreement, and that he/she has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage, brokerage fee, gift or any other consideration, contingent upon or resulting from the award or formation of this Agreement. For breach or violation of this warranty, the Local Agency shall have the right to annul this Agreement without liability or, at its discretion, to deduct from the agreement price or consideration, or otherwise recover, the full amount of such fee, commission, percentage, brokerage fee,gift or contingent fee. 4835-2267-0361 v1 LAC104706083 EXHIBIT "B" SCOPE OF SERVICES 4835-2267-0361v1 LAC104706083 EXHIBIT "B" SCOPE OF SERVICES Section 1: General Scope of Services To provide the City of Gilroy with Construction Management Services to execute the project and the City's Standard Quality Assurance Program. 4LEAF's team shall function in support of City staff, and with the personnel and practices established by the City while adding the expertise that 4LEAF can offer. 4LEAF shall provide project coordination by performing project administration; monitoring and reporting of project budget, schedule, progress, and issues; and managing the subconsultants. The aforementioned services include, but are not limited to, the following: • Pre -Construction o Review of design document (plans and specification). o Permits checklist and review for conformance with local and state agencies. • Construction o Budget and Payment Processing ■ Verification of pay quantities & review of pay requests ■ Review contractor billings, verify correctness and quantities, and provide recommendation to the City ■ Provide independent backup information to support costs paid • Quantity calculation sheets — each contract item each progress pay estimate • Independent estimate for proposed contract change order amounts o Materials ■ Materials testing as per specifications and in conformance with City of Gilroy Quality Assurance Program o Construction Documentation/ Inspections ■ Perform inspection services to monitor the contractor's work to ensure compliance with plans and specifications ■ General inspection of daily work & conformance with project plans & specifications ■ Verification of any required contractor notification of construction work and road closure notifications as required in the specifications ■ Be aware of and have contractor correct any unsafe conditions ■ Prepare, in consultation with City, field orders and change orders on city forms ■ Inspection of detour and construction signing/public safety ■ Collection of certificates of compliance and weight/quantity certificates ■ Coordination with City departments, as applicable ■ Resolution of construction issues, in consultation with City and/or contractor ■ Any other reasonable and customary construction management & inspection functions necessary to fairly, efficiently, and safely see a project to a successful completion, in conformance with the plans, specifications ■ Monitor compliance with environmental mitigations, if any ■ Monitor compliance with storm water pollution prevention measures ■ Perform pre -construction documentation of exiting site conditions and/or verify that the contractor has done so (as called for in specifications) ■ Coordinate, track, approve or reject, and process submittals and shop drawings ■ Issue field memos and CCO's; Assign and track change orders ■ Review change order requests and provide recommendation to the City ■ Log and track contractor RFIs ■ Conduct construction progress meetings and document meetings through minutes ■ Attend meeting(s) with City to discuss/review construction management issues ■ Coordinate special inspections, material testing and special testing ■ Prepare separate quantity sheets for each bid item ■ Closeout activities, including notice of completion, punch list, and final payments, including preparation of any final change order to account of the difference between bid quantities and final quantities as needed. ■ Administer Contract Time • Utilize weekly statement of working days • Address time in CCO's as project progresses ■ Checking to make sure slopes are in compliance with ADA requirements (e.g., ADA access ramps, sidewalk cross -slopes, etc.), as well as other ADA compliance issues ■ Have an organized file/record keeping system using the City provided construction management software (Procore). o Meeting and Communication ■ Schedule, attend, facilitate, and run pre -construction meeting, periodic ■ construction progress meetings ■ Resolution of citizen complaints related to the construction ■ Coordinate with the designer as necessary ■ Coordinate with the City of Gilroy ■ Coordination with adjacent landowners/business owners o Plan Review ■ Review proposed design changes, if any o EEO/Labor Compliance ■ Payrolls — certified by contractor, initialed by RE and Local Agency ■ Spot checked for hours and wage rates versus diaries ■ Make sure required poster posted in "Plain View" of works • Post -Construction o Closeout activities, including notice of completion, punch list, and final payments, o including preparation of any final change order to account of the difference o between bid quantities and final quantities as needed. o Final cost report o Warranty certificate o Prepare and submit project files (as -built, reports, and etc.) • All workers employed on this project must be paid the prevailing wage determined by the Director of the Department of Industrial Relations. SECTION 2: DETAILED NARRATIVE FOR SCOPE OF SERVICES PROJECT MANAGEMENT APPROACH If 4LEAF is selected to provide the City of Gilroy (City) with Construction Management (CM) services for the Downtown Monterey Road Rehabilitation Project (Project), we will be an advocate on behalf of the City and represent the City's best interests. Having worked with many public agencies, we know how to take a project from conception to completion. 4LEAF's team will function as an extension of City staff, seamlessly integrating with the personnel and practices established by the City while adding the expertise that 4LEAF can offer. We will provide project coordination by performing project administration; monitoring and reporting of project budget, schedule, progress, and issues; and managing our subconsultant. Progress Reports We will submit a monthly Budget Analysis Report with our monthly invoice. These reports will be updated monthly and submitted to the City's designated Project Manager. The frequency of reporting and content of each report will be discussed in detail with' City staff following contract award. The content of the report is outlined as follows: • Original Budget Amount • Percent Complete • Percent Expended • Percent of Project Completed • Amount Invoiced to Date • Remaining Budget to Date • Pertinent Comments • Dates Performed We have learned that an essential component of our service is the ability to engage in direct and candid discussions. No one wants to be the "bearer of bad news," however; 4LEAF believes that our role as a consultant is to present all information and data so that our client can make an informed decision. Project Files and Document Control 4LEAF will prepare a project documentation system capable of recording, logging, storing and retrieving information pertaining to technical, financial, and administrative aspects of the project. We understand the City's preference is to use Procore to manage project documents. 4LEAF's proposed staff are trained in the use of Procore and are currently using Procore while providing CM and Inspection Services for the City of Gilroy's First Street Waterline Improvements Project. CONSTRUCTION MANAGEMENT APPROACH 4LEAF views public works improvements projects as having three distinct elements: Pre -Construction, Construction, and Post -Construction. Pre -Construction Phase During Pre -Construction, the 4LEAF team will establish immediate and routine contact and communication with the project's team including the City, the contractor, utility companies, and other project stakeholders. We will take steps to ensure successful collaborations with each of these entities. Review Project Documents The first order of work for the 4LEAF team will be to understand the project scope and site and review the contract documents, including the construction drawings and specifications, addenda, cost estimates and quantities, design reports and studies, resource agency permits, utility relocations plans, etc. 4LEAF will gather available critical information on projects within a close proximity to this project to allow collaboration between the project teams and allow each project to meet its schedule while maintaining public safety within each project's limits. Perform Pre -Construction Project Site Condition Inspection Using digital and/or video cameras, the 4LEAF team will record the existing conditions of the project site and area(s) of new construction before the contractor starts work, during construction, and then again at the completion of construction activities. This documentation will be a useful tool in identifying and/or assigning ownership of any damage to existing facilities once work begins. Kick-off Meeting Once we have reviewed all of the contract documents, we will meet with the City for a kick-off meeting to discuss the schedule and scope of the project. We will discuss specific project requirements such as permits, document control, and appropriate locations for staging areas with the City for the project construction. Pre -Construction Meeting The 4LEAF team will conduct a pre -construction conference with the project team including City staff, the contractor and subcontractors, and other interested parties. Some of the topics to be discussed at the pre -construction conference will include: ✓ Performing introductions and identifying roles/responsibilities. ✓ Discussing lines of communication and authority for City's, contractor's and consultant's personnel. ✓ Identifying the status of notifications made to underground utilities and protocols for submitting notices to Underground Service Alert (USA). ✓ Coordination with other projects under construction within the area. Establish a collaborative role of every worker onsite as to maintaining the public's safety. Identifying construction phasing, scheduling and staging information including where contractor may stage equipment and materials during the project. Discussing material inspection requirements and coordination. Discussing cooperation with the public, minimizing public traffic delays, allowable work hours and procedures for public work notices and any signage that will need to be installed along the project route. Discussing construction staking and traffic handling. Discussing the contractor's Baseline Schedule and required contractor submittals. Discussing procedures for submitting and approving contractor pay requests and anticipated dates pay requests are typically paid by the City. Discussing process for submitting requests for information (RFIs), change orders, submittals, etc. Construction Phase The 4LEAF team will perform on -site inspections to check the quality and quantity of the work performed by all trades and guard the City against defects and deficiencies in the work by the contractor. As necessary, the 4LEAF team will inspect construction means, methods, techniques and sequences to evaluate the contractor's compliance with the intent of the construction documents and recommend necessary remedial action to the contractor as required. Progress Meetings 4LEAF's team will coordinate, prepare agendas for, chair, and provide minutes for all meetings including the weekly progress meetings, periodic meetings with the City, as well as any additional stakeholder meetings that may be necessary to successfully complete the project. The weekly progress meeting will be used to review the contractor's 3-week look ahead schedule (highlighting critical project activities, operations, and necessary coordination), open issues, status of submittals and open RFIs, deficient work, SWPPP concerns, and safety concerns. Review Contractor Submittals The contractor will be required to prepare detailed submittal items [phased traffic control plans, baseline schedule, SWPPP, etc.] prior to the start of construction. Assuming the City utilizes Procore as the Project's Document Control system, 4LEAF will utilize Procore to generate the submittal log and perform a timely, thorough review of all submittals as they are submitted by the contractor prior to either approving the submittal for use on the project or prior to forwarding them on to the designer of record for their review and approval. If a submittal needs to be reviewed and approved by the designer of record, our review prior to forwarding it to the designer of record will provide a "sanity check" of the submittal before the designer spends time reviewing the submittal. This will streamline the submittal process for all parties, preventing the designer of record from wasting their time reviewing a submittal that may not meet contract requirements. The submittal log will be tracked, and status will be updated at each weekly progress meeting with "Ball in Court" status indicating whose action is required to move the submittal process along as efficiently as possible. These procedures will be followed for the request for information (RFI) process as well. Construction Management, Field Inspection, and Quality Assurance 4LEAF's on -site staff will observe and monitor the progress of the work in accordance with the plans, specifications, and contract documents and in alignment with the construction schedule. Progress photos will be taken, and daily inspection reports will be prepared using the report format required or requested by the City. The information on the daily reports will include but will not be limited to: weather, shift hours, traffic controls that are in place (both vehicular and pedestrian), SWPPP erosion control measure conditions, work activities, labor and equipment hours, work complete, quantities, and other related information and discussions. 4LEAF's Construction Manager / Inspector will complete Weekly Statement of Working Days (WSWD) reports each week providing a snapshot of the project progress including contract time elapsed, weather conditions, working and non -working days counted for the week, time extensions, computation of current Estimated Completion Date (ECD), and controlling operations progress made for the week. As controlling operations are performed, 4LEAF's Construction Manager / Inspector will collect certificates of compliance, AC weight tags, and bills of lading for materials delivered to the site. Our Construction Manager / Inspector will then compare these documents to the approved submittals before allowing the materials to be used on the project. Although the 4LEAF team would not be contracted to be the project safety officers, we would make the contractor aware of any unsafe condition that we notice on the job site throughout the life of the project. 4LEAF will do a thorough review of the contractor's monthly progress payment requests to ensure the City is only making payments for work completed each month. The monthly measurements and calculations will come from the quantities measured and reported on the Construction Manager's / Inspector's daily reports. Before the start of construction, 4LEAF and the contractor will develop a procedure that is acceptable to the City for submitting and reviewing monthly progress payments and the final payment. We will review the contractor's schedule of values for bid items and segregate them into a form that is acceptable to the City for reimbursement. The 4LEAF team will review the contractor's payment requests and will compare them to the quantities calculated and measured on the Quantity Data Sheets. After 4LEAF and the contractor agree on the monthly progress payment amount, 4LEAF's Construction Manager / Inspector will prepare the final progress payment request using the form and procedure previously approved by the City (showing work completed each month, work completed to date, percentage complete for each item, and any applicable deductions to the net payment) for approval and execution by the City. Public Outreach Monterey Road is lined with businesses on both sides of the street throughout the entire limits of the project. In order to meet the expectations of the community, impacts to the businesses and community must be minimized during construction. With our experience managing the construction of these types of projects, we understand the need to communicate effectively with the public, keep them informed of planned activities and when schedules change, and address their concerns in a timely manner. Public forums and other advanced notices are a great start for the community at large; however, once construction begins it becomes more of an individual effort as the businesses will be more concerned with the direct impact to them as opposed to the community in general. Besides the initial site visit and providing them with contact information, follow-up visits are in order once the contractor's 3-week look -ahead schedule is provided, and we know the exact dates of when work will directly impact their location. Individual businesses need to know when they will be directly impacted and that we will listen to their concerns and also that access to their business will be maintained, traffic controls will be monitored and maintained throughout the project, construction noise will be minimized to the extent possible and only allowed during approved hours, access to parking will be maintained per the project's requirements, etc. They need to know we care about their concerns and will do whatever possible to minimize the impact. Quality Assurance Materials Testing 4LEAF will coordinate and schedule special inspections and materials testing with our team firm, Construction Testing Services (CTS), for materials testing and special inspections. These inspections will be conducted per project specifications and in conformance with the City of Gilroy Quality Assurance Program (QAP). 4LEAF will receive documentation for all tests, including retests, and observe and document the testing. We will notify the contractor immediately of any non -compliant test results and maintain test reports and logs of any verification tests performed. Contractor Labor Compliance 4LEAF's team firm, Contractor Compliance and Monitoring, Inc. (CCMI), will support our team by providing Labor Compliance for the Project. CCMI will review certified payroll for compliance with State and Federal regulations; monitor the subcontractors for compliance with the subcontractor listing; notify the City if the contractor is non -compliant with any prevailing wage requirement; perform employee interviews, as necessary; and monitor compliance of federal wage requirements, DBE requirements, etc. Schedule Management The 4LEAF team will perform a detailed review of the contractor's.,µ...= u -. ,_ ri baseline schedule to ensure all the controlling operation's durations critical path, and order of work follow a logical sequence to the projectAd! completion. We will then monitor the contractor's progress il ;: throughout the project and compare it to their baseline schedule so qR we can identifyan deviations of the contract completion date as soon v as possible; therefore, giving the contractor ample time to develop and r ;_ N ... present their plan on getting the project back on schedule. There are a number of City events that are anticipated to occur during construction, including the Wine Stroll and Health Fair in April, the Spring Sidewalk Sale in May, and the Downtown Live event in August. 4LEAF will ensure that the contractor is aware of these events and has properly cleared and cleaned the project sites prior to these events getting underway. In order to accomplish tasks in the time frame allotted and to further ensure the success of the project, we will do the following to provide good schedule management throughout the project: • We will consistently review and monitor the project schedule to ensure the contractor is updating the schedule frequently and providing 3-week look -ahead schedules. We will request updates as appropriate, and track delays or accelerations based on actual contractor operations. • We will continually assess critical project items to assist in determining the best use of schedule float in the contractors' critical path method (CPM) schedules to avoid down time. • We will coordinate regularly with the City regarding all construction activities and impacts to the baseline and 3-week look -ahead schedules. • We will recommend introducing various phasing options to deal with potential worst -case scenarios in scheduling for the project; such as concurrent project delays, inclement weather delays, etc. • We will include "what if" meetings as the project progresses; for example, what if we accelerate a portion of construction- how would that affect the overall CPM. If schedule slippage occurs, we will immediately meet with the contractor to discuss ways in which to accelerate other portions of work. Another way to accommodate slippage in the schedule is to re - sequence work in order to make up for lost time. Cost Management The 4LEAF team will provide as -needed cost accounting records, budget reviews, comparison of actual and planned expenditures, forecast of future expenditures, and monthly summary reports. Progress payments from the contractor will be reviewed, verified, and processed with recommendations for action. Payment requests, which must be returned to the contractor, will be returned with a written explanation of any deficiencies in the payment request. Other financial controls 4LEAF will provide include the following: • We will review the project budget continually, performing "what if" scenarios to better manage costs and cash flow as the project moves forward. • We will establish, implement and maintain cost monitoring and control procedures. • We will carefully document all information related to manpower, equipment, and time for extra or force account work. Contract Modifications, Extra Work, Change Orders, and Claims 4LEAF will meet with the City to discuss utilizing any existing City change order tracking systems that are currently in place as well as suggest protocols for use on the project. 4LEAF will provide the City with assurance that the contractor is not presenting requests for change orders that are already included in the original scope of the contract. Our Construction Manager / Inspector will meet face-to-face with the contractor's representative to gather more information on the nature of the potential change order. Quite often, a contractor only has a general knowledge of the plans and specifications and an item they feel is a change order may indeed be part of the plans and specifications that they were not aware of. We will ensure all potential changes and extra work requests to the contract have been reviewed and evaluated for cost and times impacts, and properly justify a response to the contractor. 4LEAF's Construction Manager / Inspector will review requests for change orders and extra work requests from the contractor for contractual and technical merit and prepare independent cost estimates and schedule analysis for the proposed work. If directed by the City, 4LEAF can negotiate change orders on behalf of the City and prepare all required documents for execution by the City and the contractor. 4LEAF's Construction Manager / Inspector will keep the City informed of the cumulative cost and time impacts to the contract through a CCO log that will be updated upon execution of each change order. 4LEAF will take no action without the review and approval of the City. We pride ourselves on maintaining positive working relationships with the contractors that we work with, resulting in addressing most issues early enough to avoid potential claims. There will be times, however, that mutual agreements on issue resolution cannot be achieved. At that point the contractor may issue a Notice of Potential Claim. If we become aware of a potential claim, 4LEAF will require the contractor to submit documentation supporting the claimed delay (including a time -impact analysis). The 4LEAF team will compare the contractor's initial baseline schedule, revised schedules, actual time of work activity, the contractor's operational efficiencies, and the Construction Manager / Inspector's daily reports to determine the source and contractual responsibility for all delay claims. If the analysis results in a resolution that favors the contractor's stance on the issue, a CCO will be recommended. If this action does not adequately resolve the potential claim, 4LEAF's Construction Manager / Inspector will generate and compile all backup data, copies of reports and correspondence that pertain to the Notice of Potential Claim on the issue. We will include this backup data in a claim settlement report package in case the contractor goes through a claim on the unresolved issue. All such packages will be forwarded to the City with a cover letter with the facts as 4LEAF sees them and recommend actions, if any. A log of Notices of Potential Claims will be prepared and updated for discussion at regular City meetings and/or weekly progress meetings. We will work with the contractor on every unresolved issue throughout the life of the project with the goal of coming to a mutually agreeable resolution with the contractor prior to it escalating to higher levels of management. Post -Construction Phase The post -construction and contract closeout phase consists of three distinct closeout elements: physical closeout, document closeout, and fiscal closeout. Physical closeout consists of a series of inspections performed to document that the work is complete to one of two levels: (1) Substantial Completion — when work, or a designated portion of the work, is sufficiently complete that the client or the public may utilize it; or (2) Final Completion — acceptance by the client that the project is completed in full. Applicable certificates will be issued at each stage of completion, and punch lists will be updated during each inspection. Document closeout is the process of assembling and transferring the required contract files from 4LEAF to the City when the contract is complete. Documents typically include project correspondence, change orders, change notices, RFls, submittals, and claims. 4LEAF's Construction Manager / Inspector will compare the contractor's "as-builts" to his as-builts and will submit drawings to the designer. Fiscal closeout includes the review of contract administration (submittal log, RFI log, punch lists, etc.), accounting, and financial functions to confirm they are coordinated with physical closeout functions to ensure that no outstanding financial liability is present after the final payments / retentions are made to the contractor. Section 3: Additional Services The need for additional type services .may be required during the term of the contract. The interested consultant shall submit a fee schedule for key staff and equipment which may be directly involved in the works outside of the scope of services above. This fee schedule shall be on anhourly basis. Consultant shall not be entitled to compensation for any Extra Work unless the City authorizes, in writing, the performance of such Extra Work prior to the performance of the work. The City shall not authorize payment .for work completed until all works has been completed and the deliverable has been submitted. The City may direct by written Change Order or Field Directive that the work be done on a force account basis. The term "force account" shall be understood to mean that payment for the work will be done on a time and expense basis, that is, on an accounting of the consultant's forces, materials,, equipment and other items of cost as required and used to do the work. For the work performed, payment will be made for the documented actual cost of the following: a) Direct labor cost for workers, who are directly assigned to the force account work: Direct labor cost is the actual payroll cost, including wages, fringe benefits as established by negotiated labor agreements or state prevailing wages, wo6cers' compensation and labor insurance, and labor taxes as established by law. No other fixed labor burdens will be considered, unless approved in writing by .the City. b) Material delivered and used on the designated work, including sales tax, if paid for by the consultant or its sub -consultant. c) Equipment :rental, including necessary transportation for items having a value in excess of One Thousand Dollars ($1,000.00). To the preceding costs, there shall be added the following fees for the Contractor, subcontractor, or sub -subcontractor actually performing the work: • A fixed fee not to exceed fifteen (15) percent of the costs of Items a, b, and c above. • For work performed by an approved sub -consultant, the consultant may add to the total. of the actual costs and fixed fees allowed under the preceding paragraph an additional fixed fee often (10) percent of said total. No further compensation will be allowed for the Contractor's administration of the work performed by the subcontractor. The Consultant shall maintain its records in such a manner as to provide a clear distinction between the direct costs of work paid for on a force account basis and the costs of other operations. To receive partial payments and final payment for force account work, the Contractor shall submit, in a manner approved by the City, detailed and complete documented verification of the consultant's and any of its pertinent Change Order or Field Order. Such costs shall be submitted within thirty (30) 'days after said work has been performed. No payments will be made for work billed and submitted to the City after the thirty (30) day period has expired. EXHIBIT "C" MILESTONE SCHEDULE -Notice to Proceed -Project Kick-off Meeting -Preconstruction Phase -Construction Document Review and Comments -Construction Bid Advertisement -Bid Opening and Review -Construction Notice of Award and Contract Execution -Construction Phase -Preconstruction Meeting -Monthly Progress Report -Post Construction Phase -Substantial Completion -Punch. lists -Document Closeout -Fiscal Closeout EXHIBIT "D" PAYMENT SCHEDULE 4835-2267-0361v1 LAC104706083 EXHIBIT "D" PAYMENT SCHEDULE Section 1: Contract Works L O L O U ++ LL U V Q c U N CL H c C i a a a W d N 41 O co h Q O BA ccco G @ ccC G CJ to v u Z 0 o X ~ L Sub {' U °p L Id L Q C J i LL � Q O J V = 4J O 41 Task Task Task Description a` U - U v .e a +�+ F°- u Notes Hourly Rate $155 $144 $162 $92 See Notes (a), (b), & (c). 1 Preconstruction Phase Hours Hours Hours Hours 1a Attend Kickoff Meeting w/ Client via Teleconference. 2 2 0 4 $598 1b Document Existing Site Conditions. 0 16 0 16 $2,304 1c Review Existing Project Documents 8 16 0 24 $3,544 See Note (d). 1d J Prepare for and Attend Pre -Construction Meeting. 8 24 0 32 $4,696 1e IReview Contractor Submittals. 8 16 0 24 $3,544 1f 113roject Management (including LAPM requirements). 40 0 0 40 $6,200 See Note (e). Task 1 Subtotal: 66 74 0 140 $20,886 2 Construction Phase Hours Hours Hours _ Hoursi 2a Perform Construction Management. 0 340 0 340 $48,960 See Note (f). 2b Perform Construction Inspection. 0 340 80 420 $61,920 See Note (f). 2c Perform Materials Testing and Special Inspection Services $21,966 See Note (g). (CTS). 2d Perform Contractor Labor Compliance (CCMI). $12,195 See Note (h). 2e Project Management (including LAPM requirements). 98 0 0 98 $15,190 See Note (i). Task 2 Subtotal: 98 680 1 80 858 $160,231 3 Post Construction Phase Hours Hours Hours = Hours 3a Final Inspections and Provide Red -Lined Set of Plans to Client. 0 40 0 40 I $5,760 See Note (j). 3b Construction Management - Project Closeout. 0 40 0 40 $5,760 See Note (j). 3c Project Management (including LAPM requirements). 56 0 0 56 $8,680 See Note (k). Task 3 Subtotal: 56 80 0 136 $20,200 TOTAL (4LEAF, CTS and CCMI): 220 I 834 80 1,134 $201,317 4 Public Works Inspection Apprenticeship (if Required) Hours Hours Hours Hours) Hours) 4a Provide Public Works Inspection Apprentice 0 ` 0 0 84 I 84 I $7,728 See Notes (a) and (b). Task 4 Subtotal (Apprentice Only) I I 0 1 I 0 I 0 I 84 I 84 i $7,728 I I TOTAL (4LEAF + CTS + CCMI + Apprentice if required) ( 220 ( 834 I 80 I 84 ' 1,218 I $209,045 Notes: (a) Assumes project will require compliance with California Prevailing Wage rate requirements under SB 854, and the Client will be required to file a PWC-100 Form to the California Department of Industrial Relations for the project. (b) Per the new requirements being enforced under SB 854 and because it is assumed that a PWC-100 Form will be filed by the City to the CA DIR, 4LEAF is required to notify an authorized Apprenticeship Committee through submittal of a DAS-140 form. We are then required to make an official request to an authorized Apprenticeship Committee for an apprentice by submitting a DAS-142 form. We are not assured the apprenticeship committee will be able to provide a suitable / qualified apprentice for the project. Per the apprenticeship requirements, the hours worked bythe apprentice must be in a ratio of 1:5 for apprentice to journeyman hours. Hours are included as a placeholder in the event that an apprenticeship for a public works inspector is required and dispatched by the apprenticeship committee. We have assumed the public works apprentice assigned to the project will be classified as a Period 1 Apprentice as defined by the DIR's Wage Determination dated 8/17. In the event that a higher classification apprentice is assigned to the project, we will contact the City to request a change order for this line item. (c) 4LEAF staff will be supplied with typical tools of the trade to perform their daily tasks (e.g. cell phone, laptop computer, and PPE). (d) Not intended as a Biddability and Constructability Review. Only includes hours for project team to review existing documents to become familiar with the project. (e) Hours included for Project Manager oversight during Pre -Construction Phase, hours to set up files according to LAPM requirement, and hours to complete Pre -Construction Review Checlins (Caltrans Exhibit 19- A) (f) Per the RFP, NTP is scheduled for April, 2019. Assumes Pre -Construction Phase begins April 1, 2019, and Construction Phase begins April 15, 2019. Per the RFP, duration of construction phase is 95 working days (19 weeks). Per the contract specifications, micro -surfacing work between 4th Street to 8th Street (Stage 4) will be performed at night. It is assumed that the duration of night work will be (10) working days. It is assumed that 4LEAF's Construction Manager / Inspector will work 4 hours per day for 85 working days performing CM duties and 4 hours per day for 85 working days performing inspection duties at regular daytime rate. Per the Caltrans Encroachment permit included with the project specifications, the allowable daytime work hours are 9:00 am to 3:00 pm (6 hours), so 4LEAF's Construction Manager / Inspector will be able to verify the contractor sets up and takes down traffic control according to the contract specifications within the 8-hour work day. It is assumed that 4LEAF's Construction Manager / Inspector will work 4 hours per night for 10 working days performing CM duties and 4 hours per night for 10 working days performing inspection duties at night-time rate. Does not include any allowance for overtime, weekend, or holiday work. If overtime, weekend or holiday work is required, the requirements for these hours will be billed in accordance with California Prevailing Wage Law. If construction duration extends past 95 working days, 4LEAF will submit a budget amendment request and hours will be billed in accordance with 4LEAF's 2019 Standard Fee Schedule. (g) See detailed cost estimate provided by CTS. (h) See detailed cost estimate provided by CCMI. (i) Assumes 2 hrs/week for 19 weeks for Project Manager to coordinate with 4LEAF Construction Manager / Inspector and City's Project Manager. Also includes hours to provide document control in accordance with Caltrans LAPM, hours to complete Mid-Propject Review Checklist (Caltrans LAPM Exhibit 19-13), and hours to prepare and attend 4-hour meeting with Caltrans for Mid -Project Audit. (j) Assumes Construction Manager / Inspector will perform final inspections for (5) working days at (8) hours per day and project closeout activities for (5) working days at (8) hours per day during Post Construction Phase. (k) Hours included for Project Manager to perform project management duties during Post Construction Phase. Also includes hours for Project Manager to perform project close-out activities according to Caltrans LAPM and complete Post -Construction Review Checklist (Caltrans LAPM Exhibit 19-C). 1 ofl CONSTRUCTION IMIkAkU TESTING SERVICES DATE: 03/07/19 PROPOSAL No.: P15824 CLIENT: CITY OF GILROY c/o 4LEAF, INC. PROJECT: CITY OF GILROY DOWNTOWN MONTEREY ROAD REHABILITATION LOCATION: GILROY, CALIFORNIA ITEM: I ONSITE TESTING & INSPECTIONS CONCRETE OTHER - MIS C CONCRETE GEOTECHNICAL SERVICES �SITEWORK SUBGRADE AND/OR BASEROCK A/C COMPACTION PORTAL TO PORTAL TRAVEL TIME FOR NUCLEAR GAUGE USE PORTAL TO PORTAL MILEAGE FOR NUCLEAR GAUGE USE ITEM: III LABORATORY TESTING & ENGINEERING PRELIMINARY ESTIMATE: INSPECTIONS R TESTING ESTIMATED I ESTIMATED I UNIT I ESTIMATED DAYS HOURS PRICE TOTAL 3 1 4 1 $125 1 $1,500 4 4 $125 $2,000 4 8 $125 $4,000 8 2 $125 $2,000 8 100 $0.58 $464 Preliminary Sub -Total of Onsite Testing & Inspection (approx.) $9,964 ESTIMATED UNIT ESTIMATED UNITS/HOURS PRICE TOTAL j CONCRETE COMPRESSION TESTS 12 $40 $480 GRADATION, COARSE (CT202) 4 $125 $500 GRADATION, FINE + WASH (CT202) 4 $200 $800 GRADATION COMBINED + WASH (CT202) 1 $300 $300 SAND EQUIVALENT 5 $245 $1,225 A/C - THEORETICAL MAX DENSITY 4 $300 $1,200 MAXIMUM WET DENSITY (CT 216) 3 $300 $900 RESISTANCE "R" VALUES (CT 301) 1 $400 $400 �HMA / RHMA MOISTURE CONTENT (CT370) 4 $250 $1,000 ISTABILOMETER(CT366) 4 $200 $800 ASPHALT BINDER CONTENT (T308/A) 2 $300 $600 ASPHALT BINDER CONTENT CORRECTION FACTOR (T308/A) 1 $300 $300 SAMPLE PICK-UPS 45 $20 $900 FINAL LETTER 1 $300 $300 CERTIFIED PAYROLL 3 $100 $300 Preliminary Subtotal of Laboratory Testing & Engineering (approx.) $10,005 A 10%project administration fee will be charged monthlyper invoice. No contingency is budgeted by CTSfor uncontrollable overtime, union or prevailing wage increases and unforeseen requirements that may arise in the specifications, as well as for work over the estimated hours. Owner should budget appropriate amount for budgetary purposes. Estimate based on RFPprepared by City of Gilroy undated, plans prepared by BKF dated Jan 2018, and QAP dated 314116. No construction schedule was available at the time this estimate was prepared. See attached fee schedule for basis of charges. The liability of Construction Testing Services (CTS) is limited to CTS's contract value. Estimate inchides portal to portal travel time for nuclear gauge transport from laboratory per requirements of the CA Radiological Health Branch. Local Assistance Procedures Manual EXHIBIT 10-HI Cost Proposal .EXHIBIT 10-HI COST PROPOSAL Page I of ACTUAL COST -PEGS -FIXED FEE OR LUMP SUM (FIRM FIXED PRICE) CONTRACTS (DESIGN, ENGINE EERING AND ENVIRONMENTAL STUDIES) Note., Mark-ups are Not Allowed ❑ Prime Consultant A Subconsultant El 2"' Tier Subconsultant Consu1tantf}�1-I�l� Project No. Contract No. Date .�J/I 1 DIRECT LABOR Classification/Title Name Hours Actual Hourly Rate Total ,: of 164v3 J H 0 $ `" $ ! 0 t 0 *9;CA(C'0\4TCS' � aLJ o a 3 a) Subtotal Direct Labor Costs . b) Anticipated Salary Increases (see page 2 for calculation) $ c) TOTAL DIRECT LABOR COSTS [(a) + (b)] $ INDIRECT COSTS d) Fringe .Benefits (Rate: .5 %) e) Total Fridge Benefits [(c) x (d)] $ % b Overhead (Rate:%) g) Overhead [(c) x (f)] $t� h) General and Administrative (Rate: %) i) Gen & Admin [(c) x (h)] $ f� J) TOTAL INDIRECT COSTS [(e) + (g) + (i)] $ .;J 7 S l�J_.._ . FIXED FEE k) TOTAL FIXED FEE [(c) +j)] x fixed fee %] $ �I _ 1) CONSULTANT'S OTHER DIRECT COSTS (ODC) - ITEMIZE (Add additional pages if necessary) Description of Item Quantity Unit Unit Cost Total Mileage Costs $ $ Equipment Rental and Supplies $ Permit Fees ,,.-�- $ $ Plan Sheets $ $ 'rest $ $ 1) TOTAL OTHER DIRECT COSTS $ m) SUBCONSULTANTS' COSTS (Adel additional pages if necessary) Subconsultant 1: $ ,J Subconsultant 2: $ �- Subconsultant 3: $ - Subconsultant 4: m) TOTAL SUBCONSULTANTS' COSTS $ n) TOTAL OTHER. DIRECT COSTS INCLUDING SUBCONSULTANTS [(I)+(m)] $ NOTES: TOTAL COST [(c) + (1) + (k) + (n)] $ j 1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**)..All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals. 2, The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with the consultant's annual accounting period and established by a cognizant agency or accepted by Caltrans. 3. Anticipated salary increases calculation (page 2) must accompany. Page I of 9 January 2018 Local assistance Procedures Manual EXHIBIT 10-H1 COST PROPOSAL Page of Certification of Direct Casts: EXHIBIT 10-H1 Cost Proposal 1, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements: 1. ccouritmg i-� i,�i�-(vA�l')��.��`+f �'o�:�.� Ole t: t-� vtq 2. Terms and conditions of the contract 3. Title 23 United States Code Section 112. - Letting of Contracts 4. 48 Code of Federal ReVulations Part 31 - Contract Cost Principles and Procedures 5. 23 Code of Federal Re.pulations Part 172 - Procurement, Management, and Administration of Engineering and Design Related Service 6. 48 Code of Federal Regulations Pail 9904 - Cost Accountinv Standards Board. (when applicable) All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement. Local governments are responsible for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate(s). Prime Consultant or Subconsultant Certifvina: N a i n e 0 c � _ .�r3 c � Ale Signature : )oLrj. Email :, 7? t ,+t Title Date of Certification (mm/dd/yyyy): -;�l � k kn I4 Phone Number: Address: ' 3 d �� & r.� Ala * *A�in victual executive or financial officer of the consultant's or subconsultant s organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract. List services the consultant is providing under the proposed contract: kav\ LAV,, 1'4rt'Y1 w i ice'' t c d- -A5 tam r c & A - C , ,�e .. vvw ` r `c Page 3 of 9 January 2018 Section 2: Additional Works 2019 FEE SCHEDULE CM SERVICES FOR THE CITY OF GILROY DOWNTOWN MONTEREY ROAD REHABILITATION PROJECT No. 19-RFP-PW-423 Project Management Services* Principal -in -Charge $185 per hour Project Manager $155 per hour Construction Management / Inspection Services* Construction Manager / Public Works Inspector (Regular Time) $144 per hour Construction Manager / Public Works Inspector (Night Time) $162 per hour Construction Manager / Public Works Inspector (Overtime) $194 per hour Construction Manager/ Public Works Inspector (Double Time) $266 per hour Public Works Inspector Apprentice $92.04 - $138.04 per hour *Ali Fees Subject to Basis of Charges. Rates shown are for January 1, 2019 through December 31, 2019 and are subject to an Annual Escalation of 3% starting on January 1, 2020. BASIS OF CHARGES A. Rates shown assume projects under this contract will require compliance with California Prevailing Wage rate requirements and assumes the City will be filing a PWC-100 Form to the California Department of Industrial Relations (DIR) for the project. B. Rates for prevailing wage categories are subject to annual escalations in accordance with the bi-annual wage determinations from the California DIR. Rates based on California DIR's wage determinations dated August 2017. C. Per the new requirements being enforced under SB 854 and because it is assumed that a PWC-100 Form will be filed by the City to the CA DIR for each project, 4LEAF is required to notify an authorized Apprenticeship Committee through submittal of a DAS-140 form. We are then required to make an official request to an authorized Apprenticeship Committee for an apprentice by submitting a DAS-142 form. We are not assured the apprenticeship committee will be able to provide a suitable / qualified apprentice for the project. Per the apprenticeship requirements, the hours worked by the apprentice must be in a ratio of 1:5 for apprentice to journeyman hours. 4LEAF will not know the labor classification of the Public Works Apprentice until an Apprentice is dispatched to the site; therefore, the rates for the five Periods listed under the California DIR's Wage determination for Building Construction Inspector issued August 2017 were used to determine the range of Calendar Year 2018 hourly rates for Public Works Inspector Apprentice. D. All invoicing will be submitted monthly. E. Overtime and Premium time will be charged as follows: - Night Time (work begun after 4PM or before 5AM) 1.125 x hourly rate - Overtime (over 8 hour M-F or Saturdays) 1.35 x hourly rate - Overtime (over 8 hours Sat or 1" 8 hour Sun) 1.85 x hourly rate - Overtime (over 8 hours Sun or Holidays) 2.35 x hourly rate F. All work with less than 8 hours rest between'shifts will be charged the appropriate overtime rate. G. Project -related mileage for inspections will be billed at the allowable IRS Rate plus 20%. All Client -authorized billable expenses will be charged at cost plus 20%. H. Payment due on receipt. All payments over 30 days will be assessed a 1.5% interest charge. I. Client shall pay attorneys' fees, or other costs incurred in collecting delinquent amounts. J. Client agrees that 4LEAF's liability will be limited to the value of services provided. 2126 RHEEM DRIVE a PL.EASANTON, CA 94588 a PHONE (925) 462.5959 a FAX (925) 462.5958 INSPECTING CONSTRUCTION TESTING TESTING SERVICES ENGINEERING 2019 FEE SCHEDULE - P15824317119 PERSONNEL FEES AND BASIS OF CHARGES INSPECTIONS, ENGINEERING & SPECIAL SERVICES Standard Discounted * FIELD INSPECTION AND LABORATORY SERVICE Rate/Hour Rate/Hour Steel $218.00 Nondestructive - UT, MT, PT $223.00 Steel Visual/UT Combination $223.00 Concrete ACI $24999 $125.00 Concrete ]CC $218:99 $125.00 Masonry $218,00 Fireproofing $218.00 Soil Technician w/Nuclear Gauge and/or Sand Cone (portal-to-portal) $218-99 $125.00 Asphalt Technician (portal-to-portal) $218.99 $125.00 Shoring/Soldier Piers $218.00 Roofing & Waterproofing $218.00 Multi -Disciplined Inspector $218.00 Inspector Requiring G1 Pay Grade $253.00 Specialty Inspector or Where Formal Certification is Required $218.00 Field Inspector with Special Enhancement $218.00 Laboratory Technician $218.00 Technician Typist $218.00 "PROFESSIONAL ENGINEERING SERVICES Principal Engineer (Civil/Structural) $353.00 Geotechnical Engineer $303.00 Consulting Engineer (Civil/Structural) $273.00 Associate Engineer, Licensed $248.00 Project Manager $218.00 Staff Engineer $218.00 Field Supervision $193.00 ASNT Level III $258.00 Drafting $153.00 Quality Control Manager QOR SPECIAL SERVICES Portable and Mobile Laboratories, NDT and Soils QOR * Epoxy Bolt/Expansion Anchor - Installation Observation $218.00 • Epoxy Bolt/Expansion Anchor Proof Load Testing (portal-to-portal) $218.00 • Coring, 1 Person (including equipment) (portal-to-portal) $278.00 * Coring, 2 Persons (including equipment) (portal-to-portal) $443.00 • Asphalt Coring (portal-to-portal) $303.00 Project Research QOR Ultrasonic Testing for Non -Metallic Materials QOR Pavement Rehabilitation Analysis Using Deflections QOR Roof Moisture Survey QOR Soil Drilling Equipment QOR Geotechnical Site Investigations/Foundation Reports QOR Pachometer, Schmidt Hammer, Windsor Probe, Skidmore - Equipment Fee $115/Day (portal-to-portal) $288.00 Floor Flatness Testing FF/FL - Equipment Fee $115/Day (portal-to-portal) $288.00 Measuring Moisture Vapor Emission Rate (Calcium Chloride) - $55/Kit (portal-to-portal) ASTM F1869 $288.00 Relative Humidity Testing - $75/Kit (portal-to-portal) ASTM F2170 $288,00 Ferroscan - Equipment Fee $115/day (portal-to-portal) $288.00 GPR - Equipment Fee $115/day (portal-to-portal) $343.00 Administration, Secretarial, Special Projects, Notary, Certified Payroll $46g99 $100.00 Concrete/Grout/Mortar Mix Design Review (less than 48 hours notice - $500) $345.00 Welding Procedure Review (less than 48 hours notice - $500) $345.00 Welder Qualification Test Record (WQTR) $250.00 DSA Interim Reports $178.00 Geotechnical Pad Letter (less than 48 hours notice - $550) $345.00 Final Letter (less than 48 hours notice - $550) $345-99 $300.00 EXPERT WITNESS TESTIMONY Court appearance, per day $2,420.00 Court appearance, per half day $1,210.00 Field inspection and laboratory technician services will be billed in accordance with minimums shown on Basis of Charges. -Professional engineering services will be billed in two hour increments. All fees subject to Basis of Charges CONSTRUCTION TESTING SERVICES GENERAL BASIS OF CHARGES INSPECTING TESTING ENGINEERING Fees for tests and inspection include cost of technician, normal equipment and regular reports. Engineering services will be charged at applicable rates and will require travel and mileage charges for equipment transport and storage per code (portal to portal) from the nearest CTS laboratory. Soils testing with nuclear gauge and/or sand cone equipment and inspections requiring equipment will require applicable travel and mileage charges for equipment transport and storage per code (portal-to-portal) from the nearest CTS laboratory. Fees for special projects, services overseas, or elsewhere in the United States, will be quoted on request. With prior notification to Client; charges are subject to change at any time. Construction Testing Services reserves the right to adjust the rates quoted in this contract based upon any Union or prevailing wage increases and/or changes in any industry requirements. MINIMUM HOURLY CHARGES — INSPECTION Technician personnel and the following minimum charges are contractual commitment: One-half day or less 4 Hours Over one-half day 8 Hours Show -up time (less than 2 hours notice = 4 hour charge) 2 Hours WORKING HOURS AND PREMIUM TIME Regular workday is the first 8 hours between 6:00 am and 6:00 pm Monday through Friday. Premium time is as follows: Overtime, Weekdays and Saturdays (first 8 hours) 1.5 x quoted hourly rate Overtime Saturdays (over 8 hours) and Sundays (first 8 hours) 2 x quoted hourly rate Overtime Sundays (over 8 hours) and Holidays 3 x quoted hourly rate Shift differential, swing and graveyard - (Work performed between 2:00 pm and 4:00 am) 12.5%/hour additional to base or quoted rate. MISCELLANEOUS CHARGES - Only Where Applicable Notary Services Fee $40.00/each Facsimile Charges. Plus $1.00/page (n/c for cover page) $7.00/minimum Wireless Router/Data Card for Jobsite Internet $135.00/day iPad Monthly Rental Fee $100.00/month Electronic Reporting Fees/Subscriptions (PlanGrid, BIM, etc.) At Cost Parking Fees At Cost Air Travel Cost Plus 10% Outside Services Cost Plus 20% Subsistence (per union contract) $130.00/day Mileage Standard Federal Rate Sample Pickup $26.09/eaGh Weekend Sample Pickup $105.00/each Project Administration 10% of Monthly Invoice Samples Made by Others: Concrete Cylinders $130 + Test Samples Made by Others: All Other Tests $55.00 + Test Laboratory Sample Witness Fee $130.00 Laboratory Sample Storage Fee (per sample) $120.00 EZ Cure Boxes (Thermostatically Controlled Curing Boxes) QOR Returned Check Fee $150.00 $20.00/each TESTS Testing fees shown include normal time for performing test. Samples requiring special preparation will be charged at the laboratory technician rate. Fees for tests not listed will be quoted upon request. There will be a minimum charge of $100.00 for any engineering report. Please note some tests maybe tested by subconsultants. Samples delivered to the laboratory after 3:00pm or samples needing results within 24 hours will incur a 50% mark-up. INSURANCE The liability of Construction Testing Services (CTS) is limited to CTS's contract value. PAYMENT Invoices will be submitted monthly or bimonthly for services performed during the preceding month and are payable on receipt. Interest of 1.5% per month (but not exceeding the maximum rate allowable by law) will be payable on any amounts not paid within 30 days, payment thereafter to be applied first to accrued interest and then to the principle unpaid amount. Attorney's fees or other costs incurred in collecting any delinquent amount shall be paid by client. Visa, MasterCard and American Express payments are accepted however fees will apply. Visa and MasterCard payments require an additional 3% on top of the amount of the invoice being paid. American Express payments require an additional 4% on top of the amount of the invoice being paid. All fees subject to Basis of Charges k CONSTRUCTION lim TESTING SERVICES CONCRETE AND MASONRY TESTS CONCRETE Compressive Strength of Cylindrical Concrete Specimens (6x12) Compressive Strength of Cylindrical Concrete Specimens (4x8) Compressive Strength of Cylindrical Concrete Specimens (Over 8000 PSI) Cylinder molds. 6" x 12" and 4" x 8" Compressive Strength of Lightweight Insulating Concrete Obtaining and Testing Sawed Beams and Drilled Cores of Concrete (Cores) Flexural Toughness of Fiber Reinforced Concrete (Round Panel) Flexural Strength of Concrete (Using Simple Beam with Third -Point Loading) Flex Beams per Caltrans Test Methods Length Change of Hardened Hydraulic -Cement Mortar and Concrete (Shrinkage, 1 Sample) Shotcrete Nozzleman Qualification Letter (Per Nozzleman, Per Position) Shotcrete Pre -Qualification Cores (Compression and Visual) Shotcrete Production Cores Coefficient of Thermal Expansion Determining Density of Structural Lightweight Concrete (Cylinders) Standard Specification for Concrete Made by Volumetric Batching and Mixing Cement Quality Sampling Physical Testing of Gypsum, Gypsum Plasters and Gypsum Concrete Splitting Tensile Strength of Cylindrical Concrete Specimens Static Modulus of Elasticity and Poisson's Ratio of Concrete in Compression Grab Sample, Sealing and Storing in a Humidity and Temperature Controlled Room Density of Hydraulic Cement Testing of Controlled Low Strength Material (CLSM) Test Cylinders GFRC Pull Test GFRC Flexural Test Foaming Agents for Use in Producing Cellular Concrete Using Preformed Foam (Cell -Crete) MASONRY Compressive Testing of Grout (Masonry) Compressive Strength of Hydraulic Cement Mortars Using 2" Cube Specimens Compressive Strength of Masonry Prisms Testing Concrete Masonry Units and Related Units (Core Compression) Compressive Strength of Molded Masonry Mortar Cylinders and Cubes (2" Sample) Testing Concrete Masonry Units (CMU) and Related Units (Full Unit) Linear Drying Shrinkage of Concrete Masonry Units (Per Unit) Masonry Core Shear Testing Testing Concrete Masonry Units (Absorption, Moisture Content, Unit Weight) Brick and Clay Tile (modulus of rupture, compression, saturation coefficient, suction rate, efflorescence)* Mortar Molds. 2" x 4". Single Use Mortar or Grout, Stored and Cured, Not Tested (Including Mold) AGGREGATES (SOILS AND CONCRETE) Determining Sieve Analysis of Fine and Coarse Aggregates (Coarse Only) Sieve Analysis of Fine and Coarse Aggregates (Fine Only) Sieve Analysis of Fine and Coarse Aggregates (Wash Included) Sieve Analysis of Fine and Coarse Aggregates (200 Wash Only) Evaluating Cleanness of Coarse Aggregate Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate Unit Weight of Aggregate Clay Lumps and Friable Particles in Aggregates Flat Particles, Elongated Particles or Flat and Elongated Particles in Coarse Aggregate Organic Impurities in Fine Aggregates for Concrete Density, Relative Density(Specific Gravity), and Absorption of Coarse Aggregate Density, Relative Density(Specific Gravity), and Absorption of Fine Aggregate Resistance to Degradation of Small Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine Percentage of Crushed Particles/Standard Test Method for Determining the Percentage of Fractured Particles in Coarse Aggregate Uncompacted Void Content of Fine Aggregate (as Influenced by Particle Shape, Surface Texture, and Grading) Sand Equivalent Value of Soils and Fine Aggregate Durability Index (Fine) Durability Index (Coarse) Durability Index (Fine and Coarse) Lightweight Particles in Aggregate Resistance of Rock to Wetting and Drying *Unusual sample preparation for brick specimen will be charged at the established hourly rate. ASTM C39 ASTM C39 ASTM C39 ASTM C470 ASTM C495 ASTM C42 ASTM C1550 ASTM C78 CT523 and CT524 ASTM C157 ACI 506, ASTM C42 and C1140 ACI 506, ASTM C42 and C1140 ASTM C1140 AASHTO T336 ASTM C567 ASTM C685 CBC 2010 ASTM C472 ASTM C496 ASTM C469 CBC ASTM C188 ASTM D4832 PC] PC] ASTM C796 ASTM C1019 ASTM C109 ASTM C1314 CBC 2105A.4 ASTM C780 A7.6 ASTM C140 ASTM C426 CBC 2105A.4 ASTM C140 ASTM C67 CT202/ASTM C136 CT202/ASTM C136 CT202/ASTM C117 ASTM C117 CT227 ASTM C88/CT214 CT212 ASTM C142 ASTM D4791/CT235 CT213/ASTM C40 ASTM C127/CT206 ASTM C128/CT207 ASTM C131(535) and C211 ASTM D5821/CT205 Standard Rate/Each $143.00 $72.00 $94.00 $121.00 $440.00 $308.00 $308.00 $150.00 $440.00 $110.00 $110.00 $535.00 $405.00 $965.00 $667.00 $55.00 $253.00 $215.00 $150.00 $195.00 $150.00 $374.00 $374.00 $525.00 $121.00 $121.00 $187.00 $187.00 $121.00 $184.00 $270.00 $270.00 $340.00 $1,000.00 $121.00 $121.00 $229.99 $299.99 $379.09 $220.00 $370.00 $275.00 $158.00 $215.00 $370.00 $336.00 $336.00 $336.00 $535.00 $405.00 ASTM C1252/AASHTO T304A $405.00 ASTM D2419/CT217 $279.99 ASTM D3744/CT229 $405.00 ASTM D3744/CT229 $405.00 ASTM D 3744/CT229 $405.00 ASTM C123/AASHTO T113 QOR CRD-C169 $590.00 INSPECTING TESTING ENGINEERING Discounted Rate/Each $40.00 $40.00 $125.00 $200.00 $300.00 $200.00 All fees subject to Basis of Charges INSPECTING CONSTRUCTION TESTING TESTING SERVICES ENGINEERING SOILS, AGGREGATE, ASPHALTIC CONCRETE SERVICES & TESTS Standard Discounted SOILS Rate/Each Rate/Each Direct Shear Test of Soils Under Consolidated Drained Conditions ASTM D3080 $535.00 Caltrans Corrosivity Package $505.00 Determining Field and Laboratory Resistivity and pH Measurements for Soil and Water CT643 QOR Soils and Waters for Sulfate Content CT417 QOR Soils and Waters for Chloride Content CT422 QOR Particle -Size Analysis of Soils (with Hydrometer) ASTM D422 $590.00 Pore Water Extraction and Determination of the Soluble Salt Content of Soils by Refractometer ASTM D4542 $625.00 Standard Test Method for Particle -Size Analysis of Soils (without Hydrometer) ASTM D422 $535.00 Liquid Limit, Plastic Limit, and Plasticity Index of Soils ASTM D4318/CT204 $535.00 Laboratory Compaction Characteristics of Soil Using Modified/Standard Effort ASTM D1557/D698 $502.00 Hydrometer Only ASTM D422 $535.00 pH of Soils ASTM D4972 $467.00 Relative Compaction of Untreated and Treated Soils and Aggregates CT216 $598 89 $300.00 Determining the Resistance "R" Value of Treated and Untreated Bases, Subbases, and Basement Soils by the Stabiliometer ASTM D2844/CT301 0 $400.00 Laboratory Determination of Water(*moisture) Content of Soil and Rock by Mass ASTM D2216/CT226 $150.00 Density of Soil in Place by the Drive -Cylinder Method D2937 $116.00 Expansion Index of Soils ASTM D4829 $405.00 Hydraulic Conductivity of Saturated Porous Materials Using a Flexible Wall Permeameter (Permeability) ASTM D5084/CT220 $550.00 Lab Compaction Characteristics of Soil 1 Point Proctor (Check Point) ASTM D698/D1557 $337.00 Maximum Index Density and Unit Weight of Soils Using a Vibratory Table ASTM D4253 $285.00 Minimum Index Density and Unit Weight of Soils and Calculation of Relative Density ASTM D4254 $285.00 Density of Hydraulic Cement ASTM C188 $253.00 Volatile Organic Content EPA 8260B QOR Semi Volatile Organics by GC/Ms (Basic Target List) EPA 8270C QOR Total Organic Carbon ASTM 2974/EPA 5310Bm QOR ICP Metals Concentration EPA 6020 - CAM/CCR 17 QOR Total Extractable Petroleum Hydrocarbons: TPH, MTBE, Benzene,Toluene, Ethylbenzene, Zylenes, %SS EPA 8015B QOR ICP Metals Concentration EPA 6020 QOR pH EPA 9045D $535.00 Sequential Batch Extraction of Waste with Acidic Extraction Fluid ASTM D5284 QOR Chromium Soluble EPA 7196A QOR Moisture, Ash and Organic Matter of Peat and Other Organic Soils (Organic Content) ASTM D2974 $270.00 Universal Soil Classification System (USCS) Test ASTM D2487 $300.00 California Bearing Ratio Test ASTM D1883 $370.00 Unconfined Compressive Strength of Cohesive Soil ASTM D2166/CT221 $187.00 ASPHALT Quantitative Extraction of Bitumen from Bituminous Paving Mixtures (Solvent) ASTM D2172/CT310 $732.00 Determining Low Temperature Performance Grade (PG) of Asphalt Binders ASTM 6816 QOR Thickness/Height of Compacted Bituminous Paving Mixture Specimens (Cores) ASTM D3549/CT308 $270.00 Method of Prep of Bituminous Mixture Test Specimens ASTM D6926/CT304 $270.00 ASTM D1188 and $990.00 Bulk Specific Gravity and Density of Compacted Bituminous Mixtures (LTMD) D2726/CT308 Indirect Tensile (IDT) Strength of Bituminous Mixtures (TSR) ASTM D6931/CT371 $3,146.00 Mechanical Size Analysis (Coarse and Fine) of Extracted Aggregate ASTM D5444/CT202 $405.00 Marshall Stability and Flow of Bituminous Mixtures ASTM D6927 $990.00 Theoretical Maximum Specific Gravity and Density (Rice) ASTM D2041/CT309 $405.00 Measuring the Permeability of Bituminous Pavements and Seal Coats CT341 Swell of Bituminous Mixtures CT305 $370.00 Moisture Vapor Susceptibility of Bituminous Mixtures/Moisture or Volatile Distillates in Asphalt ASTM D1461/CT307 $930.00 Stabilometer Value (1 sample) CT366 $370.09 $200.00 Determination of Asphalt Content of Bituminous Paving Mixtures by the Ignition Method CT382/ASTM D6307 $405.00 Determination of Correction Factor of Bituminous Paving Mixtures by the Ignition Method CT382/ASTM D6307 $405.00 Determination of Asphalt and Moisture Contents of Bituminous Mixtures by Microwave Oven CT370 $495.99 $250.00 Effect of Water on Compressive Strength of Compacted Bituminous Mixtures (Set of 6) ASTM D1075 $3,330.00 Compressive Strength of Bituminous Mixtures ASTM D1074 $270.00 Hamburg Wheel Track AASHTO T324 $3,630.00 Moisture Susceptibility AASHTO T283 $3,630.00 * Unusual sample preparation (dried clays, saturated clays, etc.) and all other tests for treated or untreated soils, aggregate subbase and aggregate base will be charged at established rates for laboratory technician. ** Does not include sample preparation or sieve analysis Al[ fees subject to Basis of Charges 0-k CONSTRUCTION TESTING SERVICES INSPECTING TESTING ENGINEERING Standard MATERIALS MECHANICAL TESTS Rate/Each Mechanical Testing of Steel Products (General Tensile) ASTM A370 $470.00 Fillet Weld Break Test for Qualification (Welding) AWS B4.0 $205.00 Tension Testing of Metallic Materials, Tension Testing Wrought and Cast Aluminum and Magnesium- $470.00 Alloy Products, (Welding Coupon Tensile) ASTM E8, B557 and AWS B4.0 Mechanical Testing of Steel Products (Couplers) ASTM A370 $460.00 Impact Testing of Miniaturized Charpy V-Notch Specimens, Notched Bar Impact Testing of Metallic QOR Materials ASTM E2248 and ASTM E23 Testing, Practices, and Terminology for Chemical Analysis of Steel Products ASTM A751 $336.00 Mechanical Testing of Steel Products & Bend Testing of Material for Ductility; #348 ASTM A370 and E290 $370.00 Mechanical Testing of Steel Products & Bend Testing of Material for Ductility; #9411 ASTM A370 and E290 $440.00 Mechanical Testing of Steel Products & Bend Testing of Material for Ductility; #14+ ASTM A370 and E290 QOR Mechanical Testing of Steel Products, Standard Specification for Steel Wire, Plain, for Concrete $440.00 Reinforcement ASTM A370, A82 and Al85 Guided Bend Test for Ductility of Welds, Mechanical Testing of Welds ASTM El90 and AWS B4.0 $270.00 Determining the Mechanical Properties of Externally and Internally Threaded Fasteners, Anchor $528.00 Bolts Only (Tension and Yield) ASTM F307, F1554 and F606 Rockwell Hardness of Metallic Materials ASTM El $150.00 Proof Test for Carbon and Alloy Steel (Nuts Only) ASTM Al94 or A563 $337.00 Radiographic Examination of Metallic Castings/Weldments ASTM E94, E1030 and El032 QOR Macroetching Metals and Alloys ASTM E340, E381 and AWS $337.00 Determining the Mechanical Properties of Externally and Internally Threaded Fasteners, Washers, $370.00 Direct Tension Indicators, and Rivets (HSB Assemblies) ASTM F606 Mechanical Testing of Steel Products (Terminators Tensile) ASTM A370 $370.00 Strength for Sewn or Bonded Seams of Geotextiles ASTM D4884 $336.00 Tearing Strength of Fabrics by the Tongue (Single Rip) Procedure ASTM D2261 $336.00 Breaking Strength and Elongation of Textile Fabrics (Grab Test) ASTM D5034 $270.00 Tensile Properties of Fiber Reinforced Polymer Matrix Composite Bars ASTM D3039 $990.00 Steel Strand, Uncoated Seven -Wire for Prestressed Concrete ASTM A416 and A1061 $1,463.00 FIREPROOFING Thickness and Density of Sprayed Fire -Resistive Material (SFRM) ASTM E605 $270.00 Cohesion/Adhesion of Sprayed Fire -Resistive Materials (Test Kit Only) ASTM E736 $77.00 CONTACT INFORMATION Headquarters: 2118 Rheem Drive • Pleasanton, CA 94588 • P 925.462.5151 • F 925.462.5183 Peninsula: One Embarcadero Center, Suite 535 • San Francisco, CA 94111 • P 415.334.4747 • F 415.438.2357 Oakland: 246 30th Street, Suite 101 • Oakland, CA 94601 • P 510.444.4747 • F 510.835.1825 San Jose: 2033 Gateway Place, #500 San Jose, CA 95110 • P 408.573.6992 • F 408.437.1201 Stockton: 343 East Main Street, #711 • Stockton, CA 95202 • P 209.507.7555 • F 209.507.7554 Rocklin: 4400 Yankee Hill Road • Rocklin, CA 95677 • P 916.419.4747 • F 916.419.4774 Las Vegas: 3842 E. Post Road • Las Vegas, NV 89120 • P 702.257.4747 • F 702.257.4718 All fees subject to Basis of Charges