Loading...
PIA No. 2019-01 - Christopher Family Partnership - Miller RealignmentRECORDING REQUESTED BY: City of Gilroy WHEN RECORDED, MAIL TO: Shawna Freels City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 24194869 Regina Aloomendras Santa Clara County -- Clerk -Recorder 06/04/20-19 10:23 AM Titles: 1 Pages: 40 Fees: 0.00 Taxes: 0 Total: 10.00 mill �li� ,o��`t��awsai�� VV014,41 k 11111 (SPACE ABOVE THIS LINE FOR RECORDER'S USE) Property Improvement Agreement No. 2019-01 Miller Realignment APN: 808-18-003, 808-19-022, and 808-19-023 The Christopher Family Partnership, A California Limited Partnership; Donald Christopher; Donald C. Christopher; and Filice Family Estate, A California Limited Partnership. 4828-0143-80260 _ 1 _ 9/18/12 JH104706091 PROPERTY IMPROVEMENT AGREEMENT AGREEMENT FOR EXTENSIONS OF WATER DISTRIBUTION SYSTEMS: IMPROVEMENT OF STREETS: INSTALLATION OF SEWERS, STORM DRAINS AND OTHER PUBLIC WORKS FACILITIES Property Improvement Agreement No. 2019-01 This Property Improvement Agreement ("Agreement") is made and entered into this 901day of `t'All , 2019, by and between the City of Gilroy, a municipal corporation, herein called the "City," and Filice Family Estate, a California Limited Partnership; The Christopher Family Partnership, A California Limited Partnership; Donald Christopher; and Donald C. Christopher, herein called "Owner", and Pacific West Communities, Inc. herein called the "Developer". WHEREAS, a parcel map of subdivision, record of survey or building permit (Site Clearance) application has now been submitted to the City for approval and acceptance, covering certain real estate and property improvements known as and called: Miller Realignment, APN: 808-18-003, 808-19-022, and 808-19-023, a legal description of which is attached hereto and incorporated herein as Exhibit "A" (the "Property"), and as described in the project improvement plans entitled Miller Realignment. WHEREAS, the Developer is the fee owner of the Property and requires certain utilities and public works facilities in order to service the Property under the minimum standards established by the City and, WHEREAS, the City, by and through its City Council, has enacted certain Codes, Ordinances and Resolutions and certain Rules and Regulations have been promulgated concerning the subject matter of this Agreement and, WHEREAS, the City has certain responsibilities for maintenance and operation of such utilities and public service facilities after acceptance by City, and for providing the necessary connecting system, general plant and appurtenances, and the City is agreeing to discharge those responsibilities, provided that Developer has faithfully and fully complied with all of the terms, covenants, conditions to be performed by Developer pursuant to this Agreement. NOW THEREFORE, in consideration of the foregoing premises and in order to carry on the intent and purpose of said Codes, Ordinances, Resolutions and Regulations and established policies of the City and the laws of the State of California and the United States of America it is agreed by and between the parties as follows: SECTION 1 That all Codes, Ordinances, Resolutions, Rules and Regulations and established policies of the City and the laws of the State of California and the United States of America concerning the subject matter of this Agreement are hereby referred to and incorporated herein to the same effect as if they were set out at length herein. Said Codes, Ordinances, Resolutions, Rule and Regulations include, but are not limited to, the following: the Code of the City of Gilroy, the current Zoning Ordinance, and the currently adopted Uniform Building Code. 4828-0143-80260 -2- 9/18/12 JH104706091 SECTION 2 The Developer agrees: a. To perform each and every provision required by the City to be performed by the Developer in each and every one of said Codes, Ordinances, Resolution, Rules and other Regulations and established policies of the City and the laws of the State of California and the United States of America, including without limitation, the California Labor Code and California Public Contract Code. Developer further agrees and acknowledges that it is its obligation to determine whether, and to what extent, the work performed under this Agreement is subject to any Codes, Ordinances, Resolutions, Rules and other Regulations 'and established policies of the City and the laws of the State of California, the United States of America, the California Labor Code and Public Contract Code relating to public contracting and prevailing wage laws. b. To grant to the City without charge, free and clear of encumbrances, any and all easements and rights of way in and to the Property necessary for the City in order that its water, electricity, storm, and/or sewer lines in or to said Property may be extended. c. To indemnify, defend with counsel of City's choice and hold the City free and harmless from all suits, fees, claims, demands, causes of action, costs, losses, damages, liabilities and expenses (including without limitation attorneys' fees) incurred by City in connection with (i) any damage done to any utility, public facility or other material or installation of the City on said Property which the Developer or any contractor or subcontractor of the Developer, or any employee of the foregoing, shall do in grading or working upon said Property; or (ii) arising or resulting directly or indirectly from any act or omission of Developer or Developer's contractors, or subcontractors, or any employee of the foregoing in connection with the work performed by them in connection with this Agreement, including without limitation all claims relating to injury or death of any person or damage to any property. d. To construct and improve all public works facilities and other improvements described in this Agreement and the improvement plans submitted to the City of Gilroy in furtherance of this Agreement on file with the City of Gilroy. All construction and improvements shall be completed in accordance with all standards established in the Codes, Ordinances, Resolutions, Rules and Regulations and established policies of the City and the laws of the State of California and the United States of America and this agreement, and in accordance with the grades, plans, and specifications approved by the City Engineer. Developer shall furnish two good and sufficient bonds, a Payment Bond on a form provided by the City and a Faithful Performance Bond, both of which shall be secured from a surety company admitted to do business in California. Each bond shall set forth a time period for performance by the contractor of its obligations and the terms and conditions on which the City may obtain the proceeds of the bond. The Faithful Performance Bond shall be in an amount not less than one hundred percent (100%) of the total estimated amount payable for the improvements described in this Agreement, and shall secure payment to City and the Developer of any loss due to the default of the contractor or its inability or refusal to perform its contract. The performance bond shall by its terms remain in full force and effect for a period of not less than one year after completion of the improvements by Developer and acceptance of the improvements by City, to guarantee the repair and replacement of defective material and faulty workmanship. Upon completion of the improvements by Developer and acceptance of the improvements by City, Developer may request a substitute for the performance bond securing maintenance described above, a separate maintenance bond issued by an 4828-0143-8026v3 _3 _ 9/ 18/12 JH104706091 admitted surety in the amount of ten percent (10%) of the total contract price of the improvements (provided that the amount of said bond shall not be less than One Thousand Dollars ($1,000) to cover the one-year maintenance period. The Payment Bond shall be in an amount not less than one hundred percent (100%) of the total estimated amount payable for the improvements described in this Agreement. The Payment Bond shall secure the payment of those persons or entities to whom the Developer may become legally indebted for labor, materials, tools, equipment or services of any kind used or employed by the contractor or subcontractor in performing the work, or taxes or amounts to be withheld thereon. The Payment Bond shall provide that the surety will pay the following amounts should the Contractor or a Subcontractor fail to pay the same, plus reasonable attorneys' fees to be fixed by the court if suit is brought upon the bond: (1) amounts due to any of the persons named in California Civil Code Section 9100; (2) amounts due under the Unemployment Insurance Code with respect to work or labor performed for the improvements described in this Agreement; and (3) any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of the Contractor and Subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with respect to the work and labor. The Payment Bond shall, by its terms, inure to the benefit of any of the persons named in Civil Code Section 3181 so as to give a right of action to those persons or their assigns in any suit brought upon the bond. Simultaneously with the submission of its building permit application (Site Clearance), the Developer shall submit the following for both the surety that furnishes the Payment Bond and the surety that furnishes the Faithful Performance Bond: (1) a current printout from California Department of Insurance's website (www.insurance.ca.gov) showing that the surety is admitted to do business in the State; or (2) a certificate from the Clerk of the County of Santa Clara that the surety's certificate of authority has not been surrendered, revoked, canceled, annulled, or suspended or in the event that it has, that renewed authority has been granted. e. Except as otherwise expressly provided in this Agreement, all plan check and inspection fees which are payable by Developer pursuant to the attached comprehensive fee schedule are due and payable to the City prior to Council approval of the Final Map or Parcel Map of the subdivision. Upon approval of the record of survey or the building permit covering the real estate to be improved and before any work is done therein, the Developer shall pay to the City all other sums payable by Developer pursuant to the attached comprehensive fee schedule. f. At all times during the term of this Agreement and until the improvements constructed by Developer are accepted by City, Developer shall, at no cost to City obtain and maintain (a) a policy of general liability and property damage insurance in the minimum amount of One Million Dollars ($1,000,000), combined single limit for both bodily injury and property damage; (b) workers' compensation insurance as required by law; and (c) broad form "Builder's Risk" property damage insurance with limits of not less than 100% of the estimated value of the improvements to be constructed by Developer pursuant to this Agreement. All such policies shall provide that thirty (30) days written notice must be given in advance to City prior to termination, cancellation or modification. The insurance specified in (a) above shall name City as an additional insured and the insurance specified in (c) shall name City as a loss payee, and shall provide that City, although an additional insured or loss payee, may recover for any loss suffered by reason of the acts or omissions of Developer or Developer's contractors or subcontractors or their respective employees. Developer hereby waives, and Developer shall cause each of its contractors and subcontractors to waive, all rights to recover against City for any loss or 4828-0143-8026v3 -4- 9/18/12 JH104706091 damage arising from a cause covered by the insurance required to be carried pursuant to this Agreement or actually carried by Developer in connection with the work described in this Agreement, and will cause each insurer to waive all rights of subrogation against City in connection therewith. All policies shall be written on an occurrence basis and not on a claims made basis and shall be issued by insurance companies acceptable to City. Prior to commencing any work pursuant this Agreement, Developer shall deliver to City the insurance company's certificate evidencing the required coverage, or if required by City a copy of the policies obtained. SECTION 3 That all the provisions of this Agreement and all work to be done pursuant to the terms of this Agreement are to be completed to City's satisfaction within one year from and after the date and year of this Agreement first above written. Developer shall maintain such public works facilities and other improvements described in this Agreement at Developer's sole cost and expense at all times prior to acceptance by City in a manner which will preclude any hazard to life or health or damage to property. SECTION 4 That the faithful and prompt performance by the Developer of each and every term and condition contained herein is made an express condition precedent to the duty of the City to perform any act in connection with this transaction, and the failure, neglect or refusal of the Developer to so perform, or to pay any monies due hereunder when due shall release the City from any and all obligations hereunder and the City, at its election, may enforce the performance of any provision herein, or any right accruing to the City or may pursue any remedy whatsoever it may have under applicable laws or the Codes, Ordinances, Resolutions, Rules and Regulations of the City, in the event of any such default by Developer. SECTION 5 That this Agreement, including without limitation the general stipulations outlined in Section 6 below, is an instrument affecting the title or possession of the real property and runs with the land. Except as expressly provided in the second sentence of Item 9 of the general stipulations set forth in Section 6 below (relating to the payment of reimbursement to the original Owner named in this Agreement), all the terms, covenants and conditions herein imposed shall be binding upon and inure to the benefit of City, Developer, the successors in interest of Developer, their respective successors and permitted assigns and all subsequent fee owners of the Property. The obligations of the Developer under this Agreement shall be the joint and several obligations of each and all of the parties comprising Developer, if Developer consists of more than one individual and/or entity. Upon the sale or division of the Property, the terms of this Agreement shall apply separately to each parcel and the fee owners of each parcel shall succeed to the obligations imposed on Developer by this Agreement. SECTION 6 That the following general stipulations shall be completed subject to the approval of the Public Works Director/City Engineer: 1. The Project shall comply with all Tentative Map conditions and applicable mitigation measures as contained in City Council Resolution 2014-19 (TM 13-08 approval). 2. All work within the public right-of-way shall be subject to the approval of the City Engineer. 4828-0143-80260 -5- 9/18/12 JH104706091 3. The Developer shall perform all work in compliance with the City of Gilroy Specifications Standards Design Criteria, Glen Loma Ranch Development Agreement and Glen Loma Ranch Specific Plan and is subject to all laws of this community by reference. Street improvements and the design of all storm drainage, sewer lines, water, and all street sections shall be in accordance with City Standards and Glen Loma Ranch Specific Plan, Glen Loma Ranch Development Agreement and Glen Loma Ranch Master Plans as shown on the approved TM 13-08, and shall follow the most current City Master plan for streets and each utility. 4. The Developer shall defend, indemnify, and hold harmless the City, its City Council, Planning Commission, agents, officers, and employees from any claim, action, or proceeding against the City or its City Council, Planning Commission, agents, officer, and employees to attack, set aside, void, or annul an approval of the City, City Council, Planning Commission, or other board, advisory agency, or legislative claim, action, or proceeding against it, and will cooperate fully in the defense. This condition is imposed pursuant to California Government Code Section 66474.9. 5. No building permit shall be issued in connection with this project if the Owner or Developer of such development (i) is not in compliance with the City's Residential Development Ordinance (City Zoning Ordinance Sections 50.60 et seq.) referred to as the RDO, any conditions of approval issued in connection with such development or other City requirements applicable to such development; or (ii) is in default under any agreement entered into with the City in connection with such development pursuant to the RDO. The project must also comply with any of condition of exemption granted from the RDO, including but not limited to time limits in obtaining City approvals and completion of construction of the dwelling units. 6. The City shall be notified at least two (2) working days prior to the start of any construction work and at that time the contractor shall provide a project schedule and a 24-hour emergency telephone number list. 7. At least one week prior to commencement of work, the Developer shall post the site and mail to owners of property within (500') five hundred feet of the exterior boundary of the project site, to the homeowner associations of nearby residential projects and to the Engineering Division, a notice that construction work will commence on or around the stated date. The notice shall include a list of contact persons with name, title, phone number and area of responsibility. The person responsible for maintaining the list shall be included. The list shall be current at all times and shall consist of persons with authority to initiate corrective action in their area of responsibility. The names of individuals responsible for dust, noise and litter control shall be expressly identified in the notice. 8. If the Developer proposes to phase construction with building occupancy, the developer shall create, for City Engineer approval prior to first occupancy, a construction staging plan that addresses the ingress and egress location for all construction vehicles, parking and material storage area separate from occupied residential units. 9. Locate and properly dispose of any wells, septic tanks and underground fuel storage facilities. NOTE: The capping of any well will require inspection by the Santa Clara Valley Water District. 10. Schedule the construction of improvements along existing public roads so that the work affecting vehicular traffic is completed with a minimum interruption to traffic, except for the portion of Miller Avenue closure between Luchessa Avenue and Christmas Hill Park entrance. Miller Avenue and Luchessa Avenue shall be accessible at all times to the Garlic Festival designated vehicles during the week of Garlic Festival. Developer shall construct acceptable temporary road through all 4828-0143-80260 -6- 9/18/12 JH104706091 construction sites and provide all necessary flag and traffic control measures and personnel to meet Garlic Festival needs and Garlic Festival traffic through all construction zones. 11. All work shall be coordinated so that the existing residents on all adjacent streets have access to their properties. 12. Before construction utilizing combustible materials may proceed, an all-weather access must be provided to within 150 feet of the building site; and at least one in service fire hydrant, or other water source (i.e. temporary tank) acceptable to the Fire Chief, must be available within 150 feet of each portion of the site wherein this construction is to take place. Location of the fire hydrants will be determined by the Fire Chief. 13. A complete construction schedule, which shall include a detailed phasing plan (including traffic control for each proposed phase), shall be submitted and approved by the City Engineer prior to start of construction. Any deviation from the approved construction schedule and phasing plan shall be coordinated with the City Engineer. Deviating from the approved construction schedule and phasing plan without prior coordination with the City Engineer may prolong issuance of further building permits. (a) Upon request by the City Engineer, the developer shall provide information for public outreach purposes, which may include maps and schedules for each phase of construction. 14. The developer shall obtain the required Habitat Conservation Plan (HCP) Permit and pay the applicable fees prior to the issuance of a grading permit or improvement plan approval. 15. One hard copy and electronic copy of the approved/stamped PG&E Joint Trench Composite Plans shall be submitted to the Engineering Division. Should there be a delay in obtaining the PG&E - approved joint trench plans, the Developer will be allowed to commence joint trench work "at - risk". The Developer assumes responsibility for any required redesign, and all costs associated with the redesign and additional city review resulting from the at -risk work completed without PG&E - approved joint trench plans. Design revisions and ultimate joint trench construction shall be completed to the satisfaction of the City Engineer. 16. Site preparation and fill construction shall be conducted under the observation of, and tested by, a licensed soils or geotechnical engineer. A report shall be filed with the City of Gilroy stating that all site preparation and fill construction meets the requirements of the geotechnical investigation. This shall be subject to review and approval by the Building Division. [CBC] 17. All grading operations and soil compaction activities shall be per the approved soils or geo-tech report and shall meet with the approval of the City Engineer. 18. New and existing utility lines, appurtenances, and associated equipment, including but not limited to electrical transmission, street lighting, and cable television shall be required to be placed underground. [Municipal Code Section 21, Article V] 19. Construction activity shall be restricted to the period between 7:00 a.m. to 7:00 p.m. Mondays through Fridays, Saturday 9:00 a.m. to 7:00 p.m. No work shall be done on Sundays and City Holidays. The City Engineer will apply additional construction period restrictions, as necessary, to accommodate standard commute traffic along arterial roadways and along school commute routes. Extended hours will be allowed to facilitate construction upon request and City Engineer approval. 4828-0143-8026v3 -7- 9/18/12 JH104706091 20. Any damage resulting from project construction operations to existing city infrastructure on or adjacent to the subject property shall be repaired to the satisfaction of the City Engineer, at the full expense of the developer/contractor. This shall include slurry seal, overlay, street reconstruction, and repair to curb, gutter and sidewalk, driveway approach if reasonably deemed warranted by the City Engineer. 21. This project is subject to post -construction stormwater quality requirements per Section 27D of the Gilroy Municipal Code. 22. Storm water BMP Operation and Maintenance Agreement (a) Prior to the issuance of any building permit requiring stormwater management BMPs or as otherwise determined by the City Engineer, the owner(s) of the site shall enter into a formal written Stormwater BMP Operation and Maintenance Agreement ("Stormwater Agreement") with the City. The City shall record the Stormwater Agreement, against the property or properties involved, with the County of Santa Clara and it shall be binding on all subsequent owners of land served by the storm water management treatment BMPs. The City -standard Stormwater Agreement will be provided by Public Works Engineering. (b) The Agreement shall require that the BMPs not be modified and BMP maintenance activities not alter the designed function of the facility from its original design unless approved by the City prior to the commencement of the proposed modification or maintenance activity. (c) The Stormwater Agreement shall also provide that in the event that maintenance or repair is neglected, or the stormwater management facility becomes a danger to public health or safety, the city shall have the authority to perform maintenance and/or repair work and to recover the costs from the owner. (d) All on -site stormwater management facilities shall be operated and maintained in good condition and promptly repaired/replaced by the property owner(s), an owners' or homeowners' association or other legal entity approved by the City. (e) Any repairs or restoration/replacement and maintenance shall be in accordance with City - approved plans. (f) The property owner(s) shall develop a maintenance schedule for the life of any stormwater management facility and shall describe the maintenance to be completed, the time period for completion, and who shall perform the maintenance. This maintenance schedule shall be included with the approved Stormwater Runoff Management Plan. 23. Stormwater BMP Inspections will be required for this project and shall adhere to the following: (a) The property owner(s) shall be responsible for having all stormwater management facilities inspected for condition and function by a knowledgeable third party. (b) Unless otherwise required by the City Engineer or designee, stormwater facility inspections shall be done at least twice per year, once in Fall, in preparation for the wet season, and once in winter. Written records shall be kept of all inspections and shall include, at minimum, the following information: 1. Site address; 4828-0143-8026v3 -8- 9/18/12 JH104706091 2. Date and time of inspection; 3. Name of the person conducting the inspection; 4. List of stormwater facilities inspected; 5. Condition of each stormwater facility inspected; 6. Description of any needed maintenance or repairs; and 7. As applicable, the need for site re -inspection. 24. Upon completion of each inspection, an inspection report shall be submitted to Public Works Engineering no later than October 1st for the fall report, and no later than March 15th of the following year for the winter report. 25. A minimum of one exterior monument shall be set. Additional monuments can be required by the City Engineer or City Surveyor as deemed necessary. Location of monuments shall be tied out prior to work. 26. In accordance with the California Professional Land Surveyors' Act (California Business and Professions Code Sections 8771 and 8725), California Penal Code Section 605, and California Government Code Section 27581, the Developer, its employees, subcontractors, and/or any person performing construction activities that will or may disturb an existing roadway/ street monument, corner stake, or any other permanent surveyed monument shall show all current monuments on the plans and shall ensure that a Corner Record and/or Record of Survey are filed with the County Surveyor Office prior to disturbing said monuments. All disturbed or destroyed monuments shall be reset and filed in compliance with California Business and Professions Code Section 8771 at the Developer's sole expense. 27. Bonding as required by the Section 2.d of this agreement will be accepted for the proposed improvements for an amount of $2,770,279 as shown on the attached Cost Estimate spreadsheet. 28. If there are any reimbursements payable to the Owner, they must be specifically identified in this Agreement. Any such reimbursements shall be payable to the original Owner named in this Agreement above, if any, and shall not inure to the benefit of any subsequent owners of all or any portion of the .Property. All reimbursements payable to Owner shall be subject to the City's reimbursement policies and ordinances in effect from time to time, including without limitation any expiration dates identified in such policies and ordinances. Such reimbursement shall be solely contingent upon the availability of the City's Traffic Impact Fee Funds and in no case shall the reimbursement be paid beyond ten (10) years after the execution of the Agreement. In addition to any other conditions, requirements and limitations set forth in the City's reimbursement policies and ordinances from time to time, (i) in no event shall any reimbursements be payable to Owner if City determines in its sole and absolute discretion from time to time that there are not sufficient reserves then on hand in the specific reimbursement fund from which Owner's reimbursement is payable, over and above any amounts anticipated to be required to be expended from such reimbursement fund, which reserves, at a minimum, are equal to at least half of the remaining average yearly anticipated expenditures of such reimbursement fund as determined by City from time to time; (ii) City may, in its sole and absolute discretion, make partial reimbursement payments to Owner in yearly increments, as determined by City; and (iii) City may defer payments in any given year if projects deemed by City to be of high importance are determined by City, in its sole and absolute discretion, to be warranted or necessary, and the funds in such reimbursement fund are designated by the City for use on such projects of high importance. a. The Developer/Owner shall be reimbursed for the following improvements: 4828-0143-80260 -9- 9/18/12 JH104706091 i. 24" Domestic Water Line — 840 LF has an estimated reimbursement cost of $50,400, per the City's development fee schedule ($60/LF x 840LF = $50,400) and as shown in the attached Figure E.. ii. TIF reimbursement for reimbursable portion of W. Luchessa Avenue improvements, portion of segment 19a, and portion of section 18 as shown on the attached Figure B, Figure C, and Figure D for Reimbursement Area Scope of Work, and identified in City of Gilroy Traffic Circulation Master Plan not to exceed an estimated TIF reimbursement amount of $436,914.67 (Section 18: $237,528.47 and Segment 19: $199,386.20). iii. Recycled water system improvements for the Santa Clara Valley Water District completed by this development will not be reimbursed until a recycled water reimbursement agreement is fully executed with the City and until such time as the City fully executes a separate recycled water reimbursement agreement with the Santa Clara Valley Water District. Recycle Water system must be installed prior to any roadway pavement. Recycle Water reimbursement shall not exceed the estimated amount of $199,047.01 determined by the Santa Clara Valley Water District as shown in the attached Figure F. SECTION 7 That the attached Development Cost Schedule enumerates all fees and their extensions. TOTAL AMOUNT DUE CITY $2429928.44 4828-0143-8026v3 _ 1 0_ 9/ 18/ 12 JH104706091 OWNER: THE CHRISTOPHER FAMILY PARTNERSHIP, A CALIFORNIA LIMITED PARTNERSHIP A � d 4F?ejL By: Date: 1�6. 1 7 Name: Frank Artie Christopher, Jr. Title: General Partner By: C -_ Name: Anna Noreen Christopher Title: General Partner Date: 4828-0143-8026v3 -11 _ 9/ 18/ 12 JH104706091 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 ''\�,.f.��..i��..��..'\�.. •\1.5��, ill.. A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of San& Clam On Aon-1 Ito, ?.O1 q before me, Date _ personally appeared leosa rrta. 11 -P �, Nab �4 4hc, Her Insert Name and Title of the Officer Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence -to be the person(s) whose name(s) ifWare subscribed to the within instrument and acknowledged to me that /they executed the same in Wft4hw/their authorized capacity(ies), and that by f /their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. ROSANNA AR GUELLE S -PATTON WITNESS my hand and official seal. Notary Public - California. 4MY Santa Clara CountyCommission #t 2162602 Signature . Comm. Expires Aug13. 2020 Signature of Notary Public Place Notary Seal Above OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document-pi"P&A /maomvew.,-1 MO. Title or Type of Document: �w iWiller / Document Date: u an2tl Aid -S y Number of Pages: Siggner's=rAMA er Than N me Above: /ncGucli.a 140t®nG >� rt� a®P,riLco( Capacity(ies) Clamed bUge ner (s) Signer's Name: 7yank Nrr�op).r,Jr. Signer's Name: tuna Alor.een i%r7xkjo xr ❑ Corporate Officer — Title(s): eye AaAUr El Corporate Officer -- Title(s): Cvurari AmA Gartner — i ited ❑ General 14-1` artner — C ited Cl General ❑ Individual I -1 Attorney in Fact ❑ Individual [--I Attorney in Fact ❑ Trustee I] Guardian or Conservator ❑ Trustee 1 Guardian or Conservator ❑ Other: CI Other: Signer Is Representing: 71--c C krFS'1bpher Signer Is Representing: C ►�s�apk�e' r-am►1 Pa;4nersti'ro ©2014 National Notary Association - www.NationalNotary.org - 1-800-US NOTARY (1-800-876-6827) Item #5907 OWNER: DONALD CHRISTOPHER, A MARRIED MAN AS HIS SOLE AND SEPARATE PROPERTY BY: Name: D®ncact Ckrtsiarhe.,- Title: Date: _A1 --- ,) 4�'> — le?r> 4828-0143-8026v3 _ 12_ 9/18/12 JH104706091 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT ------------------- CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California ) County of San4L Clam ) On 4/�/ Ito, 2_41q before me, 164,anm /6e/14i_j0a*r7, tV01�r� Pu b)ie Date 10t7aa Here Insert Name and Title of the Officer personally appeared cb rix' jvheK Name(s) of Signer(e' who proved to me on the basis of satisfactory evidence -to be the person(s) whose name(4 is/ subscribed to the within instrument and acknowledged to me that he/sheAhey executed the same in his/laefAheir authorized capacity(ie*, and that by his/hef signature(* on the instrument the person(4 or the entity upon behalf of which the person(s) acted, executed the instrument. ------------------ ROSANNA ARGUELLES-PATTON �.. Notary Public - California. ' Santa Clara County z Z Commission # 2162602 My Comm. Expires Au� 13, 2020 Place Notary Seal Above certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature Signature o Notary Public OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document- yU1�Q /�»Prv�@�aT1 mod• �o19-nl Title or Type of Document: ►' ��! �' ilt.a r '► ?t" Document Date: Alont uifi/ Number of Pages: 'n ig er(s) Other Than Named Above: Capacity(ies) CI 'med by Signer(s) evu nb!� AteApt , , eui (gccr�, 1x Signer's Name: 0nQR Signer's Name: ❑ Corporate Officer — Title(s): ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited El General [:__] Partner — C] Limited Cl General rd"ividual I_J Attorney in Fact ❑ Individual f I Attorney in Fact ❑ Trustee i=] Guardian or Conservator C.1 Trustee ! 1 Guardian or Conservator ❑ Other: Cl Other: Signer Is Representing: Signer Is Representing: J ©2014 National Notary Association - www.NationalNotary.org • 1-800-US NOTARY (1 -800-876-682 7) Item #5907 OWNER: DONALD C. CHRISTOPHER By: Name: oov)Q C 4-rr5+0p61- Title: 4828-0143-8026v3 JH104706091 Date: Y - / f _j 3_ 9/18/12 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California Jan County of I& alaM On Apk; l Ice , d.olq before me, Date personally appeared e0j'anAA �j U,*110S_rawvn, &)0_1nrt1 10awic, Here Insert Name and Title of the Officer Name(} of Signer(s� who proved to me on the basis of satisfactory evidence -to be the person(s) whose name(* is/ate subscribed to the within instrument and acknowledged to me that he/qhs e" executed the same in his/her * authorized capacity(kw4, and that by his/heW4h4ir signatures} on the instrument the person(s), or the entity upon behalf of which the person(&) acted, executed the instrument. . , ROSANNA ARGUELLES-PATTCN Notary Public - California IL Z "i Santa Clara County Z Commission # 2162602 A My Comm. Expires Au� 13, 2020 Place Notary Seal Above I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature Signature o'Notary Public OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Awpedy lmptvw*um�' -�- n!o . 20�//q —® Title or Type of Docum nt: �r ►��' iP.�a1> i-nment Document Date: /v10�e Number of Pages: Signer(s) ther Than Named Above: At Capacity(ies) Claimed Signer(s) ,� '� Signer's Name: Ida'b C. ('Gara�'p�ler' Signer's Name: ❑ Corporate Officer — Title(s): C] Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General Ll Partner — C._l Limited D General ividual I. -I Attorney in Fact 1-1 Individual [-_I Attorney in Fact ❑ Trustee _ l Guardian or Conservator ❑ Trustee I Guardian or Conservator ❑ Other: ❑ Other: Signer Is Representing: Signer Is Representing: ✓r 02014 National Notary Association - www.NationalNotary.org - 1-800-US NOTARY (1-800-876-6827) Item #5907 OWNER: FILICE FAMILY ESTATE, A CALIFORNIA LIMITED PARTNERSHIP By: J Date: 41.*cZ Name: Al �-.—' Title: 4828-0143-8026v3 _ j 4_ 9/18/12 JH104706091 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Son Clara On 461 lui 2vjq before me, e0farlAA cie1(4.r- Pagan , i�d�nj Public, - a Date Hert1sert Name and Title of the Officer personally appeared a ► I , Jr, . Name(4 of Signer(} who proved to me on the basis of satisfactory evidence -to be the person( - whose name(s)- is/tee subscribed to the within instrument and acknowledged to me that he/fey executed the same in his/fir authorized capacity(ies), and that by his/h@W44 r signature(.&) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. ROSANNA ARGUELLES-PATTON Notary Public - California a , «�► Santa Clara County i z Commission # 2162602 " My Comm. Expires Aug 13, 2020.� Place Notary Seal Above I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature 'e. Si ature of Notary Public OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document—!"vpp lmprw�er►�n- ��°° ®Qr®I Title or Type of Document: /W %ii,/t��' Number of Pages: 3q, S°gn r(s) Ot er Capacity(ies) Claimed by Signer(s)j Signer's Name: John 41. Phu,, Jr. ❑ Corporate Officer — Title(s): Curtner — ! -United ❑ General ❑ Individual I--1 Attorney in Fact ❑ Trustee I ! Guardian or Conservator ❑ Other: Signer Is Representing: Pbig 7--amlfw 65afL t f Document Date: ADQ U45CI An sifnaAere T an Named Above: WA r.q Signer's Name: El Corporate Officer .— Title(s): L] Partner — ❑ Limited Cl General ❑ Individual f -I Attorney in Fact ❑ Trustee ! Guardian or Conservator [_J Other: Signer Is Representing: 02014 National Notary Association - www.NationalNotary.org - 1-800-US NOTARY (1 -800-876-682 7) Item #5907 DEVELOP PACIFIC WEST COMMUNITIES, INC. By: Date: A,pri f / 0) A 0 / g Name: Title: 4828-0143-8026v3 _ 15 _ 9/ 18/ 12 JH104706091 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of Idaho County of Ada On April 10, 2019 before me, Katie Callen, Notary Public, personally appeared Caleb Roope, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of Idaho that the foregoing paragraph is true and correct. WITNESS mWhhh.na offic' I seal. SignatureCxpires: 7/8/2021 (Seal) I(pTIE CALLEN COMIMiE ®Rl PUBLIC g NOTAR STATE OF IDAHO MY COMMISSION EXPIRES 07/08/2021 CITY OF GILROY By: Gabriel A. Gonzalez City Administrator Date: 60P ? 67>4 2� ATTEST: 11VV1�J, -M V1V111 APPROVED AS TO FORM: C Andrew L. Faber, City Attorney NOTE: If Developer is a corporation, the complete legal name and corporate seal of the corporation and the corporate titles of the persons signing for the corporation shall appear above. [ATTACK CURRENT NOTARY FORM(S)] 4828-0143-8026v3 -11- 9/ 18/ 12 JH104706091 CALIFORAIIA ACKNOWLEDGMENT D• �.: .`r.' 5.4..�•'•-�.:`S `4+:s-. a.. v..�.. �..,a.. �..�.....�.=:4':•�.:.:�.f..-�'}�:`.S'r.:�?.ig:o.�:....iyy.i..w2.:c�...� �:`4:?�' A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. p State of California County of c nm-�o r1nn - On Nbefore me, 9,o2-o it F010I I Date Here Insert Name and !Title of thelfficer personally appeared Aglori P1 A 61ovi-zo lP_ 2 Nome(s) of Signer(s) 9 who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. • cF r $UZANNE GUZZETTA Notary Public -California x Santa Clara County it Commission # 2281205 My Comm. Expires Apr 12, 2023 Place Notary Seal andlor Stamp Above I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand an official seal. *- Signature ture of Notary Public OPTIONAL Completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: conPC-7 I'm ru'v kau/ii-- IN() c� ,. PvLe � � � go)q — 0 � Document Date: Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer is Representing: ©2018 National Notary Association Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer is Representing: Exhibit A Parcel M and Parcel N as shown on that certain map entitled Tract 10254, Mataro, filed October 22, 2014 in Book 876 of Maps, at Pages 42 through 53, Records of Santa Clara County, California and all of Parcel 1 as shown on that certain Record of Survey filed July 8, 1966 in Book 211 of Maps, at Page 53, Records of Santa Clara County, California. 4828-0143-8026v3 _ 1 ]_ 9/18/12 JH104706091 i ,� A- 4 ui LL c ca 2x(.9 Mow Lt Ll- W ro kl > Z z WZ Z>-o -co W, �zj zcoo AIM 3: z LLI uj LL o m U -9 -1 x z W ui O ui z =) Z Z 0 2z uj W U) W!4 Gi LU Zn X- ui z w 0 w W W F= F- CL OL F= Lmzj < Q < (,) Z ch Cf) w Z CY OZZ LU t: ui ui D -i < m U) LU W z It_ LU uj w 0 Ld Ill V) w w Ix w -i z 0 6MP'ZO-VO-6WZre64 jugw6qS--juew9sjnqwi9H �IrHX3\SIRW3 aa:j joedwi OUJEJ.L luawasinqwlacl\sllq!qx3\Iuewu6ileal:I J8jjjjNyjeJGAO bjE)VeUl�kS6UIME?jo\60OZO L\% Sqop\:M :HlVd 311:1 6 WZ 19 jjjdV :BIVC) 101d CITY OF GLIROY TRAFFIC CIRCULATION MASTER PLAN SEGMENT DETAIL STREET CROSS SECTION: 19a, b, c, d, e. Luchessa Ave STREET CLASSIFICATION: 2-Lane and 4-Lane Arterial BIKE LANE CLASSIFICATION: Class 2 STREET LENGTH: ??? BETWEEN: Ex. Miller Road to Monterey Road FUTURE FC-FC/EP-EP: Varies R/W 481+- Reimbursement Area - Includes curbs, hardscape, landscape, pavement, drainage/utilities, signing & striping, plus lnterconneot/quad. duct Raised Median 81± 121± Width Varies 121± 8'± 2-Lane Arterial Ex. Miller Rd to Cimino St - Segments 19a and b R/W 1 00'± S/W S/131- k - - - - - - - - - - - S/131- S/W 14'± Raised 1+ 1+ 81± 12'± 121± Median 12- 121± 81± 4-Lane Arterial Cimino St to Monterey Rd - Segments 19c, d, and e Note: Center RAB median is counted as a landscape/hardscape median through minor intersections that are not separately funded TIF intersections. oo r w C� z W w w�._ 0 Lu z w - -�`'� -�' w¢ w U-F-►- ZCPLL (_ hww az O �w0 r. W9 `—t h auaw CL Z w *1r. EX N111-DER _ / ,LL WQ .,...1 m N U.l" O Q Lu - w 0 P 0 U. ` o �► O w in wNl (;l.l 9 0) CO Z m +n ' o$ �, Oo 000 + o,'r� i g r� w � o C z w in _ o N lul , �h Q Z �3: W © p� W W a. Q- U- F- F- Q Q 4 Z W O � T W �'' W u.l 0 DUN w Q 0 6MP'6Z-EO.KOZ ISV3 Vt Hd s3laminamam Ail.-HX3lsliglgx3 aad aoedwi of ej.L auawasingwiaaOsligigx31luawu6ileaa a8piy4UjeJanO alE)Veuid\sBu{Meaa160OZO1\o4 sgofl:M Hlbd 311d 64OZ'B I!adV :31`da fold CITY OF GLIROY TRAFFIC CIRCULATION MASTER PLAN SEGMENT DETAIL STREET CROSS SECTION: 18. Luchessa Ave STREET CLASSIFICATION: 2-Lane Arterial BIKE LANE CLASSIFICATION: Class 2 STREET LENGTH: 400'± BETWEEN: East of Reservoir Canyon Creek to Ex. Miller Rd. FUTURE FC-FC/EP-EP: 48'and varies Reimbursement Area - Includes curbs, hard-scape, landscape, pavement, drainage/utilities, signing & f—.striping, plus interconnect/quad, duct R/W 48't Raised Median 12'± Width Varies 12'± 8'+- Note: Center RAB median is counted as a landscapelhardscape median through minor intersections that are not separately funded TIF intersections. 1 ('ems, -- 0 • 1 General Plan i3uildout: Luchessa Avenue from Old Miller Ave. to Tenth St. 2012 SEGMENT 19a PROJECT DESCRIPTION/NOTES- 1a u ac na: base SF 2,25 7.500 SF 16,875.00 1b Surfacina: pavement SF 2.70 7,500 SF 20.250.00 1c Sidewalk: new SF 8.50 0 SF 0.00 1d Sidewalk: replace SF 11.50 0 SF 0.00 le Curb and Gutter: new LF 22,50 669 LF 14.625.00 1f Curb and Gutter: replace LF 31.00 0 LF 0.00 1a Curb Ramos EA 1.050.00 0 EA 0.00 1h Resurfacina SF 2.70 0 SF 0.00 11 Landscaped Median SF 19.00 2,500 SF 47.500.00 1i Hardscaned Median SF 11.60 2,400 SF 27.600.00 1k Guard Rail LF 27.00 0 LF 0.00 11 Bike Path: base I SF 2.25 0 SF 0.00 Ilm Bike Path: pavement SF 2.55 0 SF 0.00 1n Striolno & Pavement Markers LF 3.40 760 LF 2,550.00 10 Electroilers EA 3.860.00 0 EA 0.00 1 o Traffic Slanal (base price): 3 leas - 6 lanes EA 136.000.00 0 EA 0.00 Additional cost per lane EA 19.100.00 0 EA 0,00 1a Traffic Slanal (base price): 4 leas - 8 lanes EA 164,000.00 0 EA 0.00 Additional cost Der lane EA 19,100.00 0 EA 0.00 1 Item 1 Total -. -« 129.400.00 2 Earthwork CF 0.75 0 CF 9,00 3 Sianina (3% Item 1) I LS >' ,_: :: -. ;._ z `.'S'' ., s a':` - i,?i2:���' - -' ply 0 3. US32.Up LS 0.06 5 0% LS 0.00 6a Bridge: new §F 155.00 0 SF 0.00 6b Bridae: widen SF 195.00 0 SF 0.00 7a Retainina Wall: < = 4 feet SF 48-00 " 0.00 7b Retainina Wail: a 4 feet SF 62,20 0 SF"' 0.00 8 Removal of Existina Pavement SF 40.00 0 SF 0.00. 9 Removal of Existino Bridaes SF 23.75 0 SF 0.00 9a Utility Underoroundina (trenching) LF 107.00 0 LF 0.00 PGE, Charter and Verizon cost for Utility 9b Underaroundina (Pulling wire, undergroundinq Doles) LF 132.00= 0 LF 0.00 9c Traffic Siqnal Interconnect LF 21 p0_ 750 LF 15.750.00 10a SITE PPEC1F}C COSTS* 0.00 10b SITE SPECIFIC COSITS* 0.00 10c SITE sPi~CiFic (;osTS* �. 0.0 IOd. SITE SPECIFIC COSTS* 0.0 1qe SITESPgCIFIC CQST'S- 0.00 10 SITE SPECIFIC coSTS* 0.00 1 - 1n Suhtnfa/ 1 >?, :t., -.' : , ...: r v, ,,,,, ,,; , , ,; '; x_',: ,_ : _. ,.:• 4AA Awn AA 11 Mobilization (7,5% Items 1 -101 l LS 11.177 12 Construction Staoina & Traffic Control (13% Item 1) LS u 16.822 .12 Subtotal A' <, 1 . _.. `= . 1)7 Ann 13 Preliminary & Final Design (10% Items 1 -10) 1 LS 14.903.20 14 CM, Inspection. & Testing 112 5% items 1 - 10) LS ) 18.629.00 Prc�ectldrr►lnis#ratlon {25% lterns'.1 L5 _. ' 3,725.80 16a Caitrans Processina (50% Items 1-101 LS Caltrans Rdwv only 0,00 16b Union Pacific Railroad Processina (2% Items 1-101 LS Railroad Encroachment oniy _ 0.00 16c Bridae Additional Desian Cost (2.5% Items 1-10) LS Bridges Only 0.00 Administrative and Legal Fees for Land Right -Cif -Way 16d ourchase (15% items 17-181 LS 0.00 13. 16 Subtotal 17 9.90 nn 17a Residential SF 23.66- 0 SF 0.00 17b Commercial SF 18.65 0 SF 0.00 17c Industrial SF 6.60 0 SF 0.00 17d Aaricultural SF 2,49 0 SF 0.00 17e Buildinas: $0 - $150 SF 4 SF ( 0.00 T - 18 Subtotal 1-10 LABOR & MATERIALS - 149,032.00 11-12 CONSTRUCTION MART{ -UPS 27,999.40 13.16 ENGINEERING COSTS 37,258.00 17 - 18 LAND RIGHT-OF-WAY 0.00 1 -18 SUBTOTAL 214,289,40 CONTINGENCY - 25% (Labor & Materials & Land Right -Cif -Way Only 1 37.268.00 TOTAL, PROJECT COST I $ 251,647 OUTSIDE FUNDING $ :r ,�lil{,Aifr.RE1M0.14.SAB�E \korg-srvrkdepts$\Pubiic Works\Traffic reiat"Traffic Circulation Master Plan Files\TIF UpdataWxcei112.7-2016 PWCIB400 FUNDS-JOIDLuch_Mont-Thom & Green 2 (2 4/15/2019 4:33 PM F ) /v - D . Z General Plan BuildouCt: Luchessa from New Miller Ave. to Old Miller Ave. 2012 PROJECT DESCRIPTION/NOTES: Segment Improvements PORTION OF SEGMENT 18 ITEM LABOR , UNIT UNIT COST QUANTITY COST - 1a Surfacina: base SF 2.25 4.900 SF 11.025.00 1b Surfacina: pavement SF 2.70 4,900 SF 13.230.00 1c Sidewalk: new SF 8.50 0 SF 0.00 1d Sidewalk: replace SF 11.50 0 SF 0.00 1e Curb and Gutter: new LF 22.50 650 LF 14.625.00 1f Curb and Gutter: replace LF 31.00 0 LF 0.00 la Curb Ramos EA 1,050.00 0 EA 0.00 1h Resurfacina SF 2.70 0 SF 0.00 1i Landscaped Median SF 19.00 5.000 SF 95,000.00 1i Hardscaoed Median SF 11.50 1,200 SF 13,800.00 1k Guard Rail LF 27.00 0 LF 0.00 11 Bike Path: base SF 2.25 0 SF 0.00 1 m Bike Path: pavement SF 2.55 0 SF 0.00 1n StriDina & Pavement Markers LF 3.40 1.325 LF 4.505.00 to Electroliers EA 3.650.00 0 EA 0.00 1 o Traffic Sianal (base price): 3 leas - 6 lanes EA 135.000.00 0 EA 0.00 Additional cost Der lane EA 19.100.00 0 EA 0.00 1a Traffic Sianal (base price): 4 leas - 8 lanes EA 164,000.00 0 EA 0.00 Additional cost Der lane EA 19.100.00 0 EA 0.00 1 Item 1 Total -- -- -- 152.185.00 2 Earthwork CF 0.75 0 CF 0.00 3 Sianina "°',pro -Rear) 1.5% LS fit; '• :, ; � �; l'' '` , 2,282.78 4 Utilities Wlt Item 1) 1.5% LS1. 25 �i 2,282.78 Drainaae H2S( Items -1 2) 6% LS ;. w. k, 0.00 6a Bridae: new SF 155.00 0 SF 0.00 6b Bridae: widen SF 195.00 0 SF 0.00 7a Retainina Wall: < = 4 feet SF 48.00 0 SF 0.00 7b Retainina Wall: > 4 feet SF 62.20 0 SF 0.00 8 Removal of Existina Pavement SF 40.00 0 SF 0.00 9 Removal of Existina Bridaes SF 23.75 0 SF 0.00 9a Utilitv Underaroundina (trenchina) LF 107.00 0 LF 0.00 PGE, Charter and Verizon cost for Utility Undergrounding 9b (Pullina wire, underaroundina Doles) LF 132.00 0 LF 0.00 9c Traffic Signal Interconnect LF 21.00 1.000 LF 21.000.00 10a SITE SPECIFIC COSTS" 0.00 10b SITE SPECIFIC COSTS' 0.00 10c SITE SPECIFIC COSTS' 0.00 10d SITE SPECIFIC COSTS' 0.00 10e SITE SPECIFIC COSTS'' 0.00 10f SITE SPECIFIC COSTS" 0.00 11 Mobilization.(7.5% Items 1 -10) 12 Construction Staaina & Traffic Control (13% Item 1) 1 -12 Subtotal ENGINEERING• LS LS 13 Preliminary & Final Desian (10% Items 1 -10) LS 14 CM, Inspection. & Testing (12.5% Items 1 -10) LS pc 15 .Project Administration (2.a /o Items 1 -10) LS 16a Caltrans Processina (5% Items 1-10) LS Caltrans Rdwv only 16b Union Pacific Railroad Processina (2% Items 1-10) LS Railroad Encroachment 16c Bridae Additional Desian Cost (2.5% Items 1-10) LS Bridges Only Administrative and Legal Fees for Land Right -Of -Way purchase 16d (15% Items 17-18) LS 13.331. 19,784. 17.775.06 22.218.82 ,I 4,443.76 Hs « 0.00 1 0.00 0.00 0.00 17a Residential SF 23.56 0 SF 0.00 17b Commercial SF 18.85 0 SF 0.00 17c Industrial SF 6.60 0 SF 0.00 17d Aaricultural SF 2.49 0 SF 0.00 17e Buildinas: $0 - $150 SF „ „j 0 SF 0.00 17 - 18 Subtotal TOTAL•COST 0.00 1 - 10 LABOR & MATERIALS 177,750.55 11-12 CONSTRUCTION MARK-UPS 33,115.34 13 -16 ENGINEERING COSTS 44,437.64 17 -18 LAND RIGHT-OF-WAY 0.00 1 - 18 SUBTOTAL 255,303.53 CONTINGENCY - 25% (Labor & Materials & Land Right -Of -Way Only) 44,437.64 TOTAL PROJECT COST $ 299,741 OUTSIDE FUNDING S - MAX. REIMBURSABLE $ 237,528 \\org-srvr\depts$\Public Works\Traffic related\Traffic Circulation Master Plan Files\TIF Update\Excel\12-7-2016 PWCIB400 FUNDS-JO18a Luch_New Miller -Old Miller 4/17/2019 11:16 AM UVZV-NMSN2r-lV MOM qVis CON SVOLSAS SNY'ld !DNIMID ONV lN21^GAO8d.hl Hid rmll I JSS v, ism I zoo 'la TWO k Id w if .9 0 os- PA VON ca, o 0 t to 9 a �D n 00 o m r. w r. a co m .4 m o m m o em r1l .+ ma* to �: o vi rri (4 +ti m %6 .-4 rri v u� o a o N v o°0i or'o m m So' °� nri iti ip�pvp}p N N mN M '•3 Yf N m N N I .�i O r V)NN NNNNNNNN NNN N N NN N V> N Vf N V). N a to n O O a O O u1 an O oq N aa u n n r• en O L.,Vf 01 *3 O a+ O to �O.r J r+ G 7 �+ 1-4 N CL N , (nn .N-1 In N Mi N 0co �1 m 0 G r a r W 9 N N ra-1 h LnLA m N N 0 C a � a :9 �+ C C N t Q O N VTNtn•NNNN ViNNNNNN v! VfN a a44 E QZ M n o'e C e Cc d d mm mm a, mmm mrnm an mm a C � a. M d d 'a m f0 u p w N o� c Vt « a88 888 8 88$ $ e m Lo .fl u W W' O S' Ln ' S 8 0' O ' O 0 H N 0. N N S � OMn 0ry0� 0 0 Y1 Ln O Ql rl N � NNt/►NNNNN NNN V►N V1 Vf V► V}N } 1 47 v C �LLLLaaaaaWa�W aa a a�W yJ .i boo 00o No a�Nooa.+ v �.i N N C M rn y C3 M u =„4 m S O C8 N N N 1» O ci. m g mSO g 10 A h� O V %DD Op0 N M (9 �' R N f\ N b ft) "r t(1 W _ W •i r cm N V►VI. NN Vl N NN NNN NN NN N N Vl Vf Vf 16 if/ �i IQ 8 0 to�1 .1 O, Qc,Cd " n M Ln 8 c7i uQi m c ry p� a = cri W ri .o In C Q G R i E c VfNV>UfNV?NiAV�-NN V?NV1N N NN V e IL Ln a o o �U.�W J J W aaaaaaaaaaW�a� �' W_ W W W W W W W W J W R - m 0 ro E ¢ o a p oc > a m a A Q z s m m 0 W c c Q o m t- m 'm v o « 3 a .2 a s h ?> as wo a .m A. Z O _ 0 E a a T z A E E W v- fC °/ a i m co > 0 0¢ x a s o O O w 0 0> m m m o w= 0 0 0 �C � u � o a o c u a 0 g 'N - - Q Q a A [] o o m N '� o v N 0 _ a M c c *a' a aEi ID O 'd' O D O� ry i0 d Q1 .(}n� m N rt M N r^f w Rd,' b �. d' i"Y UD tJ C 1n tN-1 m H rWi H L r a - ENCOMPASS NO: DATE: NUMBER: PROJECT LOCATION: PARCEL NUMBER: OWNER/DEVELOPER: MAILING ADDRESS: TELEPHONE NO: PREPARED BY: Account No. 100-2601-0000-3625 100-2601-0000-3605 420-2600-0000-3660 432-2600-0000-3660 433-2600-0000-3660 435-2600-0000-3660 436-2600-0000-3660 440-2600-0000-3660 720-0433-0000-3620 801-2601-PWDO-3899 801-2601-PWDO-3899 CITY OF GILROY PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION COST ESTIMATE EFFECTIVE 7/1/2018 E1 116120010 08-Dec-16 Key Code 4904 4702 4501 3301 4905 4509 4510 4515 2202 4703 4703 Fee Total Glen Loma Ranch - Miller Ave. Realignment N/A The Glen Loma Corporation 7888 Wren Ave. D143 Gilroy, CA 95020 408-847-2424 Payment Bond Amount for all improvements Performance Bond Amount for all improvements Fee: $3,925.00 $239, 003.44 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $242,928.44 Credits: $83, 395.64 $2,770,279 $2,770,279 Total 4/15/2019 11:19 AM Revised: 27-Feb-19 Revision Number: 1 Revision By: Whill Amount Due: Account Description Paid on Invoice # $3,925.00 Special Public Works Ser✓ $155,607.80 Eng Plan Check & Insp 3/6/2017 #21529951 $0.00 Storm Development Fee $0.00 Str Tree Development Fee $0.00 Traffic Impact Fee $0.00 Sewer Development Fee $0.00 Water Development Fee $0.00 Public Facility Fee $0.00 Const Water Use Fee $0.00 Reimbursements $0.00 Other Reimbursements $159,532.80 G:\COMDEV\ENGINEER]NG\DEVELOPMENT PROJECTS\06 OTHER PROJECTS\GLEN LOMA RANCH\BACKBONE STREETS\Glen Loma Phase 113- Miller Ave. Realignment\Fees\Dev COST SCHEDULE Fees Last Revised January 20,-2012 1 Fees 7-1-2018 - Miller Realignment 4/15/2019 11:19 AM CITY OF GILROY COMMUNITY DEVELOPMENT DEPARTMENT ENGINEERING DIVISION COST ESTIMATE ENCOMPASS NO: E1 116120010 1 DATE: 8-Dec-2016 NUMBER: PROJECT LOCATION: Glen Loma Ranch - Miller Ave. Realignment PARCEL NUMBER: N/A OWNER/DEVELOPER: The Glen Loma Corporation MAILING ADDRESS: 7888 Wren Ave. D143 Gilroy, CA 95020 TELEPHONE NO: 408-847-2424 PREPARED BY: FINAL ENGINEERING COST SCHEDULE TYPE: COST ESTIMATE ? y PLAN CHECK ? n INCENTIVE AGREEMENT ONLY? N DEFER PUBLIC FACILITY FEE? TO PERMIT? N TO FINAL? N DEFER SEWER, WATER, TRAFFIC FEES ? TO PERMIT? N TO FINAL? N NOTE: This Preliminary Cost Schedule is an estimate and will be adjusted to the rates in effect at the time permits are issued. Site Information: Gross Acres: Lots: Units: Sq Ft: Residential -Low ? 0.000 0 0 Residential -High ? 0.000 3 0 Commercial -Low ? 0.000 0 0 Commercial -High ? 0.000 .0 0 Industrial -General ? 0.000 0 0 Industrial -Warehouse ? 0.000 0 0 Assembly Hall? 0.000 0 0 Common Area? 0.000 0 Commercial/Industrial Allocations: Sewer GPD: Water GPD: 0 0 Reimbursements and credits: Front Footage/Square Footage Charges Street Tree FF: Water FF: Sewer FF: Storm FF: Const Water Acres to be Developed: 0.0 0.0 0.0 0.0 0.000 Pavement SF: Median SF: Sidewalk SF: Curb/Gutter FF: Construction Water FF: 0.0 0.0 0.0 0.0 0.0 SPECIAL PUBLIC WORKS SERVICES 100-2601-0000-3625 $3,925.00 Maps: Final Map $1,755.00 + $15.70 / lot N $0.00 Fee ID NO-FINALM Parcel Map $2,035.00 + $630.00 / lot Y $3,925.00 Fee ID NO-PARCELM Re -assessment Map (Assessment District Parcels) $1,710.00 + $630.00 / lot N $0.00 Fee ID N-ASSESM Administration Fees: (Cost Schedules, Agreements, R/W Reviews and Other Misc. Services) 0 hr Misc Services $185.00 / hr. Y $0.00 Fee ID N-MISC Special Staff Analysis 0 hr Special Analysis $143.44 / hr. N $0.00 G:\COMDEV\ENGINEERING\DEVELOPMENT PROJECTS\06 OTHER PROJECTS\GLEN LOMA RANCH\BACKBONE STREETS\Glen Loma Phase 113- Miller Ave. Realignment\Fees\Dev COST SCHEDULE Fees Last Revised January 20,-2012 2 Fees 7-1-2018 - Miller Realignment ENGINEERING PLAN CHECK & INSPECTION 100-2601-0000-3605 COST ESTIMATE ACTUAL COST OF PUBLIC IMPROVEMENTS FINAL ENGINEERING PLAN CHECK At time of Improvement Plan/Final Map submittal 40% of fee is due for Plan Check. Remainder 60% due prior to submittal of Final Map for Council approval Additional Plan Review After First Three Submittals or Review of Changes, Additions or Revisions to Approved Plans 0 hr Additional Plan Review $143.44 / hr. N $0.00 Fee ID NO-GRADINS (2 Hour Minimum) Re -Inspection Fee 0 hr Re -Inspection $125.00 / hr. N $0.00 Fee ID NO-GRADINS Inspections outside of normal business hours 0 hr Inspection $475.00 + $160.00 / hr. after 3hrs N $0.00 Fee ID NO-GRADINS COST ACTUAL (Based on total cost of improvements) ESTIMATE COST DIFFERENCE Estimated Cost of Improvements $2,770,279 $0 Fee ID NO-PCKINSP 12.6% $0 $100,000 Y $12,600.00 Y $0.00 10.5% $100,000 $200,000 Y $10,500.00 Y $0.00 8.4% over $200,000 Y $215,903.44 Y $0.00 Payment Bond Amount for all improvements $2,770,279 Performance Bond Amount for all improvements $2,770,279 IMPACT FEES Storm Drain Impact Fee 420-2600-0000-3660 a.Residential-Low $564.00 / acre Y $0.00 Fee ID NO-SD-LD b.Residential-High $886.00 / acre Y $0.00 Fee ID NO -SD -HD c.Commercial $1,528.00 / acre Y $0.00 Fee ID NO-SD-C d.Industrial $1,128.00 / acre Y $0.00 Fee ID NO -SD -I e.Assembly Hall $564.00 / acre Y $0.00 Fee ID NO-SD-AH Street Tree Fee 432-2600-0000-3660 a.City Planting and Replacement $3.06 / f.f. x N 0.0 = $0.00 Fee ID NO-TREEPLT b.lnspection and Replacement $0.41 / f.f. x Y 0.0 = $0.00 Fee ID NO-TREEINS Traffic Impact Fee 433-2600-0000-3660 a.Residential-Low $11,561.00 / unit Y $0.00 Fee ID N1-TRAF-LD b.Residential-High $9,372.00 / unit Y $0.00 Fee ID N2-TRAF-HD c.Commercial-Low Traffic (< 10.75 trips/1000 sf) $12,792.00 / k.s.f. Y $0.00 Fee ID N3-TRAF-CL d.Commercial-High Traffic (>= 10.75 trips/1000 so $25,840.00 / k.s.f. Y $0.00 Fee ID N3-TRAF-CH e.lndustrial-General $5,069.00 / k.s.f. Y $0.00 Fee ID N4-TRAF-IG f.Industrial-Warehouse $3,674.00 / k.s.f. Y $0.00 Fee ID N4-TRAF-IW 4/15/2019 11:19 AM $239,003.44 $0.00 ($239,003.44) $0.00 $0.00 $0.00 G:\COMDEV\ENGINEERING\DEVELOPMENT PROJECTS\06 OTHER PROJECTS\GLEN LOMA RANCH\BACKBONE STREETS\Glen Loma Phase 113- Miller Ave. Realignment\Fees\Dev COST SCHEDULE Fees Last Revised January 20,-2012 3 Fees 7-1-2018 - Miller Realignment 4/15/2019 11:19 AM Sewer Impact Fee 435-2600-0000-3660 $0.00 a.Residential-Low $12,501.00 / unit Y $0.00 Fee ID NI-SS-LD b.Residential-High $6,764.00 / unit Y $0.00 Fee ID N2-SS-HD c.Commercial/Industrial $3,956.00 / cgpd Y $0.00 Fee ID N5-SS-C/I Water Impact Fee 436-2600-0000-3660 $0.00 a.Residential-Low $4,294.00 / unit Y $0.00 Fee ID N1-WATR-LD b.Residential-High $1,737.00 / unit Y $0.00 Fee ID N2-WATR-HD c.Commercial/Industrial $6,731.00 / kgpd Y $0.00 Fee ID N5-WTR-C/I Public Facilities Impact Fee 440-2600-0000-3660 $0.00 a.Residential-Low $20,498.00 / unit Y $0.00 Fee ID NI-PF-LD b.Residential-High $17,246.00 / unit Y $0.00 Fee ID N2-PF-HD c.Commercial $3,089.00 / k.s.f. Y $0.00 Fee ID N3-PF-C d.lndustrial $1,368.00 / k.s.f. Y $0.00 Fee ID N4-PF-I Water User Fee (Construction) 720-0433-0000-3620 Y $0.00 $3.00 / f.f. $0.00 Fee ID NO-CONWTFF plus $182.73 / a.c. $0.00 Fee ID NO-CONWTAC FRONT FOOT CHARGES (Used to charge and reimburse fees for existing infrastructure) The Half Pipe schedule is used to determine the front footage reimbursement to former developers for infrastructure previously installed along the front footage of the development. The Full Pipe schedule is used to determine the oversizing reimbursement to the developer for installing water, sewer, and storm main extensions to sizes required by each master plan that are greater than the sizes required by the development. The oversized portion is the difference between the master planned size for the main and the greater of the main size required by the development or the developer's minimum responsibility for each main. Water 801-2601-PWDO-3899 $0.00 Water Mains - including fire hydrants, valves, valve boxes and other pertinences. Developer responsibility is up to and including 12" mains Half Pipe Lineal Footaae 6 inch Main $39.00 / LF x N 0.0 = $0.00 Fee ID N-WR06-1/2 8 inch Main $41.00 / LF x N 0.0 = $0.00 Fee ID N-WR08-1/2 10 inch Main $47.00 / LF x N 0.0 = $0.00 Fee ID N-WR10-1/2 12 inch Main $52.00 / LF x N 0.0 = $0.00 Fee ID N-WR12-1/2 14 inch Main $57.00 / LF x N 0.0 = $0.00 Fee ID N-WR14-1/2 16 inch Main $62.00 / LF x N 0.0 = $0.00 Fee ID N-WR16-1/2 18 inch Main $68.00 / LF x N 0.0 = $0.00 Fee ID N-WR18-1/2 20 inch Main $76.00 / LF x N 0.0 = $0.00 Fee ID N-WR18-1/2 24 inch Main $82.00 / LF x N 0.0 = $0.00 Fee ID N-WR24-1/2 30 inch Main $91.00 / LF x N 0.0 = $0.00 Fee ID N-WR30-1/2 36 inch Main $106.00 / LF x N 0.0 = $0.00 Fee ID N-WR36-1/2 G:\COMDEV\ENGINEERING\DEVELOPMENT PROJECTS\06 OTHER PROJECTS\GLEN LOMA RANCH\BACKBONE STREETS\Glen Loma Phase 113- Miller Ave. Realignment\Fees\Dev COST SCHEDULE Fees Last Revised January 20,72012 4 Fees 7-1-2018 - Miller Realignment 4/15/2019 11:19 AM Front Foot Charges Continued (Used to charge and reimburse fees for existing infrastructure) Sewer 801-2601-PWDO-3899 Sewer Mains - including manhole and other pertinences. Developer responsibility is up to and including 12" mains. Half Pipe 6 inch Main $73.00 / LF x 8 inch Main $75.00 / LF x 10 inch Main $81.00 / LF.x 12 inch Main $83.00 / LF x 15 inch Main $87.00 / LF x 18 inch Main $93.00 / LF x 21 inch Main $102.00 / LF x 24 inch Main $106.00 / LF x 27 inch Main $122.00 / LF x 30 inch Main $144.00 / LF x 33 inch Main $158.00 / LF x 36 inch Main $178.00 / LF x 39 inch Main $212.00 / LF x 42 inch Main $265.00 / LF x Street Improvements Pavement. Sidewalks & Medians AC/Bike path: base $2.55 / SF x AC/Bike path: pvmt $2.50 / SF x Sidewalk: new $9.75 / SF x Sidewalk: replace $13.25 / SF x Resurfacing $2.55 / SF x Landscaped Median $20.35 / SF x Hardscaped Median $11.63 / SF x Traffic Sianals (eauioment only) Traffic Signal-3 leg $130,200.00 / LS x Traffic Signal-4 leg $158,500.00 / LS x Curb and Gutter Curb/Gutter: new $25.85 / LF x Curb/Gutter: replace $33.40 / LF x Curb Ramps $1,057.63 / LF x Lineal Footaae N 0.0 = $0.00 Fee ID N-SS06-1/2 N 0.0 = $0.00 Fee ID N-SS08-1/2 N 0.0 = $0.00 Fee ID N-SS10-1/2 N 0.0 = $0.00 Fee ID N-SS12-1/2 N 0.0 = $0.00 Fee ID N-SS15-1/2 N 0.0 = $0.00 Fee ID WSS18-1/2 N 0.0 = $0.00 Fee ID N-SS21-1/2 N 0.0 = $0.00 Fee ID N-SS24-1/2 N 0.0 = $0.00 Fee ID N-SS27-1/2 N 0.0 = $0.00 Fee ID N-SS30-1/2 N 0.0 = $0.00 Fee ID N-SS33-1/2 N 0.0 = $0.00 Fee ID N-SS36-1/2 N 0.0 = $0.00 Fee ID N-SS39-1/2 N 0.0 = $0.00 Fee ID N-SS42-1/2 801-2601-PWDO-3899 Square Footaae N 0.0 = $0.00 Fee ID N-STR-ACB N 0.0 = $0.00 Fee ID N-STR-ACP N 0.0 = $0.00 Fee ID N-STR-S/W N 0.0 = / $0.00 Fee ID N-STR-S/WR N 0.0 = $0.00 Fee ID N-STR-RESU N 0.0 = $0.00 Fee ID N-STR-LANM N 0.0 = $0.00 Fee ID N-STR-HARD % of LumD Sum N 0% = $0.00 Fee ID N-STR-TS3L N 0% = $0.00 Fee ID N-STR-TS4L Lineal Footaae N 0.0 = $0.00 Fee ID N-STR-C/G N 0.0 = $0.00 Fee ID N-STR-C/GR N 0.0 = $0.00 Fee ID N-STR-CR $0.00 $0.00 G:\COMDEV\ENGINEERING\DEVELOPMENT PROJECTS\06 OTHER PROJECTS\GLEN LOMA RANCH\BACKBONE STREETS\Glen Loma Phase 1 B- Miller Ave. Realignment\Fees\Dev COST SCHEDULE Fees Last Revised January 20,72012 5 Fees 7-1-2018 - Miller Realignment 4/15/2019 11:19 AM Front Foot Charges Continued (Used to charge and reimburse fees for existing infrastructure) Storm Drain 801-2601-PWDO-3899 Storm Mains - including manholes, catch basins and other pertinences. Developer responsibility is up to and including 24" mains. Half Pipe 18 inch Main $63.00 / LF x 21 inch Main $69.00 / LF x 24 inch Main $70.00 / LF x 27 inch Main $82.00 / LF x 30 inch Main $89.00 / LF x 33 inch Main $91.00 / LF x 36 inch Main $95.00 / LF x 42 inch Main $99.00 / LF x 48 inch Main $117.00 / LF x 54 inch Main $137.00 / LF x 60 inch Main $158.00 / LF x 66 inch Main $179.00 / LF x 72 inch Main $200.00 / LF x 78 inch Main $216.00 / LF x 84 inch Main $231.00 / LF x 90 inch Main $246.00 / LF x 96 inch Main $261.00 / LF x Lineal Footaoe N 0.0 = $0.00 Fee ID N-SD18-1/2 N 0.0 = $0.00 Fee ID N-SD21-1/2 N 0.0 = $0.00 Fee ID N-SD24-1/2 N 0.0 = $0.00 Fee ID N-SD27-1/2 N 0.0 = $0.00 Fee ID N-SD30-1/2 N 0.0 = $0.00 Fee ID N-SD33-1/2 N 0.0 = $0.00 Fee ID N-SD36-1/2 N 0.0 = $0.00 Fee ID N-SD42-1/2 N 0.0 = $0.00 Fee ID N-SD48-1/2 N 0.0 = $0.00 Fee ID N-SD54-1/2 N 0.0 = $0.00 Fee ID N-SD60-1/2 N 0.0 = $0.00 Fee ID N-SD66-1/2 N 0.0 = $0.00 Fee ID N-SD72-1/2 N 0.0 = $0.00 Fee ID N-SD78-1/2 N 0.0 = $0.00 Fee ID N-SD84-1/2 N 0.0 = $0.00 Fee ID N-SD90-1/2 N 0.0 = $0.00 Fee ID N-SD96-1/2 NOTE: All deferred and/or estimated fees will be adjusted to the rates in effect at the time fees are paid. The undersigned agrees to provide actual construction costs for recalculation of fees and pay any underestimated fees prior to final acceptance. If the recalculated fees are less than the estimate, the City of Gilroy will refund the difference. Additional plan review required by changes, additions or revisions to approved plans, reinspections and inspections outside of normal business hours will be billed as shown in the City of Gilroy's most current comprehensive fee schedule at the hourly rates in effect at the time of inspection. Accepted by: Print Name: Date: $0.00 G:\COMDEV\ENGINEERING\DEVELOPMENT PROJECTS\06 OTHER PROJECTS\GLEN LOMA RANCH\BACKBONE STREETS\Glen Loma Phase 113- Miller Ave. Realignment\Fees\Dev COST SCHEDULE Fees Last Revised January 20,3012 6 Fees 7-1-2018 - Miller Realignment 4/15/2019 11:19 AM OVERSIZING SCHEDULE (Used to reimburse oversized infrastructure) Total Oversized Water, Sewer and Storm Drain Main Reimbursement $0.00 Total Oversized Water Main Reimbursement (Developer is responsible for up to and including 12" mains) $0.00 Oversized Minimum 12" main Oversized Full Pipe $/foot Full Pipe $/foot Oversized Footage Reimbursement 14 inch Main $114.00 - $104.00 x 0.0 = $0.00 N 16 inch Main $124.00 - $104.00 x 0.0 = $0.00 N 18 inch Main $135.00 - $104.00 x 0.0 = $0.00 N 20 inch Main $151.00 - $104.00 x 0.0 = $0.00 N 24 inch Main $164.00 - $104.00 x 0.0 = $0.00 N 30 inch Main $182.00 - $104.00 x 0.0 = $0.00 N 36 inch Main $211.00 - $104.00 x 0.0 = $0.00 N Total Oversized Sewer Main Reimbursement (Developer is responsible for up to and including 12" mains) $0.00 Oversized Minimum 12" main Oversized Full Pipe $/foot Full Pipe $/foot Oversized Footage Reimbursement 15 inch Main $174.00 - $166.00 x 0.0 = $0.00 N 18 inch Main $186.00 - $166.00 x 0.0 = $0.00 N 21 inch Main $204.00 - $166.00 x 0.0 = $0.00 N 24 inch Main $211.00 - $166.00 x 0.0 = $0.00 N 27 inch Main $244.00 - $166.00 x 0.0 = $0.00 N 30 inch Main $287.00 - $166.00 x 0.0 = $0.00 N 33 inch Main $315.00 - $166.00 x 0.0 = $0.00 N 36 inch Main $356.00 - $166.00 x 0.0 = $0.00 N 39 inch Main $423.00 - $166.00 x 0.0 = $0.00 N 42 inch Main $529.00 - $166.00 x 0.0 = $0.00 N Total Oversized Storm Drain Main Reimbmnt (Developer is responsible for up to and including 24" mains) $0.00 Oversized Minimum 24" main Oversized Full Pipe $/foot Full Pipe $/foot Oversized Footage Reimbursement 27 inch Main $164.00 - $140.00 x 0.0 = $0.00 N 30 inch Main $177.00 - $140.00 x 0.0 = $0.00 N 33 inch Main $182.00 - $140.00 x 0.0 = $0.00 N 36 inch Main $189.00 - $140.00 x 0.0 = $0.00 N 42 inch Main $197.00 - $140.00 x 0.0 = $0.00 N 48 inch Main $233.00 - $140.00 x 0.0 = $0.00 N 54 inch Main $273.00 - $140.00 x 0.0 = $0.00 N 60 inch Main $315.00 - $140.00 x 0.0 = $0.00 N G:\COMDEV\ENGINEERING\DEVELOPMENT PROJECTS\06 OTHER PROJECTS\GLEN LOMA RANCH\BACKBONE STREETS\Glen Loma Phase 1 B- Miller Ave. Realignment\Fees\Dev COST SCHEDULE Fees Last Revised January 20,-2012 7 Fees 7-1-2018 - Miller Realignment 4/15/2019 11:19 AM Oversizing Schedule Continued (Used to reimburse oversized infrastructure) Oversized Storm Drain Main Reimbmnt Continued Oversized Minimum 24" main Oversized Full Pipe $/foot Full Pipe $/foot Oversized Footage Reimbursement 66 inch Main $357.00 - $140.00 x 0.0 = $0.00 N 72 inch Main $399.00 - $140.00 x 0.0 = $0.00 N 78 inch Main $431.00 - $140.00 x 0.0 = $0.00 N 84 inch Main $461.00 - $140.00 x 0.0 = $0.00 N 90 inch Main $492.00 - $140.00 x 0.0 = $0.00 N 96 inch Main $522.00 - $140.00 x 0.0 = $0.00 N G:\COMDEV\ENGINEER[NG\DEVELOPMENT PROJECTS\06 OTHER PROJECTS\GLEN LOMA RANCH\BACKBONE STREETS\Glen Loma Phase 113- Miller Ave. Realignment\Fees\Dev COST SCHEDULE Fees Last Revised January 20,722012 8 Fees 7-1-2018 - Miller Realignment