Loading...
Monterey Peninsula Engineering - 1st Street Water Utility Improvements - Change Order No. 12Citp of Offrop Public Works Department - Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0451; Fax (408) 846-0429 CHANGE ORDER NO. 12 To contract for: City of Gilroy First Street Water Utility Improvements City Project No.: 16-PW-217 Contractor: Monterey Peninsula Engineering Contract Date: 7/18/2018 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authoritv to proceed with the work. Description of Work This change order is for material only for extra fittings and their accessories needed to install all 4", 6", and 8" hydrant laterals, fire service laterals, and tie-in runs due to all of the unforeseen underground conditions such as existing Water Main, Conduits, Fiber Optics, and Concrete Caps. All material inspected by and approved daily by on site inspector. This CCO includes RCCO U. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. Change in working time granted by this change order ► All Extra Work authorized under this Change Order must be billed separately from the original contract. All bills for work done under this Change Order shall reference this Change Order No. 12. 01Calendar Days Cost Percentaa( Initial Original Contract Price $5,451,990.00 Previous Change Orders $419,051.09 7.69% DM Total to Date $5,871,041.09 This Change Order $29,802.67 Total Change Orders to Date $447,913.76 8.22% DM Revised Contract Price $5,899,903.76 I (We) agree to make the above change subject to the Change Order references RCCO U Additional Fittings and terms of this Change Order for a NET INCREASE not Accessories. to exceed $28,862.67. Jv p V_ CONTRACTOR % By( Date: 7/ i � i9 RECOMMENDED BY: v Construction Manager , a ACCEPTED BY: PA'eedEngineer/Project Manager t EnkinT\f dministra 7 -/ S'—(Y Date 71r1f11 Date