Monterey Peninsula Engineering - 1st Street Water Utility Improvements - Change Order No. 14Cftp of Oflrop
Public Works Department - Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0451; Fax (408) 846-0429
CHANGE ORDER NO. 14
To contract for: City of Gilroy First Street Water Utility Improvements City Project No.: 16-PW-217
Contractor: Monterey Peninsula Engineering
Contract Date: 7/18/2018
This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and
Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon
acceptance by the City, the Contractor's copy will be returned to him as his authoritv to proceed with the work.
Description of Work
This change order is for labor, time material to excavate by hand digging lateral trenches due unforeseen utilities not
shown on plans. RCCO's 0, 0.2 and 0.3 covers the lateral pipe trenches from Santa Teresa Blvd to Monterey Rd.
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained
herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses
associated with this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit,
delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra
Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the
Contract associated with the Extra Work.
Change in working time granted by this change order
► All Extra Work authorized under this Change Order
must be billed separately from the original contract. All
bills for work done under this Change Order shall
reference this Change Order No. 14.
241Calendar Days I
Cost Percentam Initial
Original Contract Price
$5,451,990.00
Previous Change Orders
$452,277.28 8.30% DM
Total to Date
$5,904,267.28
This Change Order
$85,907.17
Total Change Orders to Date $538,184.45 9.87% DM
Revised Contract Price $5,990,174.45
I (We) agree to make the above change subject to the Change Order references RCCO 0, 0.2 and 0.3
terms of this Change Order for a NET INCREASE not
to exceed $85,907.17.
mpc—
CONTRACTOR r�
By: Date: Alt 9X q
RECOMMENDED BY:
Construction Manager
ACCEPTED BY: QN_9'
ro e4 Engineer/Project Manager
C't-,,1"F gineer
Ci _ Administrat r
10\
Date/
Date
Eate
D ite