Monterey Peninsula Engineering - 1st Street Water Utility Improvements - Change Order No. 2City of Gilroy
• Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0450; Fax (408) 846-0429
CHANGE ORDER NO. 2
To contract for: City of Gilroy first Street Water Utility Improvements Project No. 16-P W-217
Contractor: Monterey Peninsula Engineering Contract Date: June 18, 2018
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractors copy will be
returned to him as his authority to proceed with the work.
Description of Work
This change order provides for the following: Provide all labor, equipment and material to prepare and implement Caltrans Risk
Level 2 SWPP. The change is necessary to meet the requirement by Caltrans in the issuance of the Double Permit.
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are
in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this
Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss
of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives
any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the
Extra Work.
Monterey Peninsula Engineering hereby agrees to
make the above changes
subject to the terms of this Change Order
for the NET INCREASE of $20,409.00
�J ,t CON���jCTO7R- tl
I�iCiFi� Atnr7�, �Ib�014 G2Y�
PRINTNATV AN)�TITLE
Date:
�(�/ /!
Initial
Original Contract Price
Previous Change Orders
Total to Date
Percentage
Cost
55;4 1,99ti.40
$14,949.00 0.27%
$5,466,939.00
This Change Order $20,409.00
Total Change Orders to Date $35,358.00 0.6%
Revised Contract Price $5,487,348
RECOMMENDED BY:,16
Cc struction Manager
C_
ACCEPTED BY: City Administ6tor
City Engineers
Project Engineer
Date
/Ci"/"
Date
10/S-// q