Loading...
Monterey Peninsula Engineering - 1st Street Water Utility Improvements - Change Order No. 3City of Gilroy y • Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0450; Fax (408) 846-0429 CHANGE ORDER NO. 3 To contract for: City of Gilroy First Street Water Utility Improvements Project No. 16-PW-217 Contractor: Monterey Peninsula Engineering Contract Date: June 18, 2018 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Descriution of Work This change order provides for the following: Credit for all labor, equipment and material for elimination of the requirement to install Polywrap around the new ductile iron pipe, as set forth in the contract documents, revised per RFI 004. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. Monterey Peninsula Engineering hereby agrees to make the above changes subject to the terms of this Change Order for the NET DECREASE of $11,500 CONTR-ACTO 11c-1�rvvb . rrv,,ee�u<x�w Date: 10 A411 K RECOMMENDED BY: .% �,e— Construction Manager ACCEPTED BY: City Administrator 'ngineer e. roject Engineer Percentaae Initial Cost Original Contract Price $5,451,990.00 Previous Change Orders $35,358 0.65% Total to Date $5,466,939.00 This Change Order $(11,500) Total Change Orders to Date $23,858 0.43% Revised Contract Price $5,443,081 Date l Date Date Date