Monterey Peninsula Engineering - 1st Street Water Utility Improvements - Change Order No. 10Citp of O Prop
Public Works Department - Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0451; Fax (408) 846-0429
CHANGE ORDER NO. 10
To contract for: City of Gilroy First Street Water Utility Improvements City Project No.: 16-PW-217
Contractor: Monterey Peninsulat Engineering Contract Date: 7/18/2018
This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and
Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon
acceptance by the City, the Contractor's copy will be returned to him as his authoritv to proceed with the work.
Description of Work
This change order is for labor, equipment and material to transfer seven (7) water and two (2) fire hydrant laterals from
exisiting 6" water main to existing 12" water main on Monterey St. from Leavesley Road to Howson St . Work includes
abandoning the existing 6" from Leavesley Road to Howson Street, traffic control and final trench restoration. All work will
be completed at night per Caltrans permit rider number 04-18-N-RW-2670. All work completed on a lump sum basis and
approved by on site inspector. The City acknowledges possible material cost increases for asphalt and slurry delivery for
night operations per attached RCO 14B.
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained
herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses
associated with this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit,
delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra
Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the
Contract associated with the Extra Work.
Change in working time granted by this change order: I 241 Calendar Days I Cost Percentam Initial
► All Extra Work authorized under this Change Order Original Contract Price $5,451,990.00
must be billed separately from the original contract. All Previous Change Orders $228,491.24 4.19%
bills for work done under this Change Order shall Total to Date $5,680,481.24
reference this Change Order No. 10. This Change Order $190,29 OO
Total Change Orders to Date $408,784.24 7.50%
Revised Contract Price $5,860,774.24
I (We) agree to make the above change subject to the Change Order references RCCO 14B.
terms of this Change Order for a NET INCREASE not
to exceed $180,293.00.
/ ems1 eww s �wjv«ri
CONTRACTOR
Date: 6��1
RECOMMENDED BY:
Construc ion Manager
ACCEPTED BY:
eject Engine /Project Mana er
ADZ"
�c< City Engineer
City Administrator
Date//
(", / //
Date / f �/ / "
6'/ NA i
Date
Date
C/"-Qlp
IF. N\