Monterey Peninsula Engineering - 1st Street Water Utility Improvements - Change Order No. 15City of Offrup Public Works Department - Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0451; Fax (408) 846-0429 CHANGE ORDER NO. 15 To contract for: City of Gilroy First Street Water Utility Improvements City Project No.: 16-PW-217 Contractor: Monterey Peninsula Engineering Contract Date: 7/18/2018 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authoritv to proceed with the work. Description of Work This change order is for non-compensable addition of 30 calendar days. Delays due to Caltrans non working days before holiday's and City of Gilroy Public Works unable to staff night work through. RCCO BB lists the affected contract calendar days. Note: 1.4 calendar days for each working day per mutual agreement at Contract start. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. Change in working time granted by this change order: I 301 Calendar Days I Cost Percentaa( Initial ► All Extra Work authorized under this Change Order Original Contract Price $5,451,990.00 must be billed separately from the original contract. All Previous Change Orders $538,184.45 9.87% DM bills for work done under this Change Order shall Total to Date $5,990,174.45 reference this Change Order No. 15. This Change Order $0.00 Total Change Orders to Date $538,184.45 9.87% DM Revised Contract Price $5,990,174.45 I (We) agree to make the above change subject to the Change Order references RCCO BB terms of this Change Order with NO CHANGE IN PRICE. CONTRACTOR V By: Date: 9/ 3/ g RECOMMENDED BY: Construction Manager ACCEPTED BY: Project,,Engineer/Project Manager Engineer City Administrator Date C1I(-IIIy Date /+-7 7 Date ATT n- Date e��1 y e����►�-� I . \ P� • MONTEREY PENINSULA ENGINEERING CONTRACTORS & ENGINEERS P.O. BOX 2317 MONTEREY, CA 93942 (831) 384-4081 August 12, 2019 Dan Mount 4Leaf, Inc. 8896 N. Winding Way Fair Oaks, CA 95628 Re: First St. Water Utility Upgrade- RCCO #027.1 (BB.1), Time Extension Request Dan, This is an exclusive, non-compensable change order request in which an extension of Contract Time is requested for the purpose of allowing M.P.E., the Contractor, to satisfactorily complete Contract work. Included, and limited, in this time extension request is sufficient time to allow for delays caused Caltrans lane closure rejections/impacts and insufficient City staffing for critical path night work operations through August 12, 2019. CALTRANS DELAYS DATE DESCRIPTION W DAYS C DAYS 8/31/2018 FRIDAY PRIOR TO LABOR DAY WEEKEND 1 1.4 11/21/2018 WEDNESDAY PRIOR TO THANKSGIVING WEEKEND 1 1.4 12/21/2018 FRIDAY PRIOR TO CHRISTMAS WEEKEND 1 1.4 12/24/2018 CHRISTMAS EVE 1 1.4 12/26/2018 DAY AFTER CHRISTMAS 1 1.4 12/27/2018 NO WORK DUE TO CUT-UP HOLIDAY SCHEDULE BY 1 1.4 CALTRANS 12/28/2018 NO WORK DUE TO CUT-UP HOLIDAY SCHEDULE BY 1 1.4 CALTRANS 12/31/2018 NO WORK DUE TO CUT-UP HOLIDAY SCHEDULE BY 1 1.4 CALTRANS 7/3/2019 WEDNESDAY PRIOR TO 4th 1 1.4 7/5/2009 FRIDAY AFTER 4TH OF JULY 1 1.4 8/30/2019 FRIDAY BEFORE LABOR DAY 1 1.4 TOTAL 11 15.4 NIGHT WORK/CITY DELAYS DATE DESCRIPTION W DAYS C DAYS 4/23/2019 MONTEREY RD. TIE-IN 1 1.4 5/24/2019 NO CITY STAFF 1 1.4 5/31/2019 NO CITY STAFF 1 1.4 6/7/2019 NO CITY STAFF 1 1.4 6/14/2019 NO CITY STAFF 1 1.4 6/21/2019 NO CITY STAFF 1 1.4 6/28/2019 NO CITY STAFF 1 1.4 7/12/2019 NO CITY STAFF 1 1.4 7/19/2019 NO CITY STAFF 1 1.4 7/26/2019 NO CITY STAFF 1 1.4 TOTAL 10 14 Please review the above request for time extension and issue a Contract Change Order extending our contract completion date thirty (30) calendar days, for said delays. If you have any questions, please feel free to contact me by phone at (831) 277-5917, or by email at bart(a mve2000.com. Sincerely, D4 &M1" Bart Bruno Project Manager