Monterey Peninsula Engineering - 1st Street Water Utility Improvements - Change Order No. 16Citp of Oitrop Public Works Department - Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0451; Fax (408) 846-0429 CHANGE ORDER NO. 16 To contract for: City of Gilroy First Street Water Utility Improvements City Project No.: 16-PW-217 Contractor: Monterey Peninsula Engineering Contract Date: 7/18/2018 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authoritv to proceed with the work. Description of Work This change order is for additional work outside the original contract scope and unforeseen conditions. Change order includes delays due to concrete encasements around existing water mains and dewatering to install new water main laterals. Includes RCCO's W, X, Y, Z, Z.1 and AA. All time and material totals verified by on site inspector. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. Change in working time granted by this change order ► All Extra Work authorized under this Change Order must be billed separately from the original contract. All bills for work done under this Change Order shall reference this Change Order No. 16. 71Calendar Days I Cost Percentaa( Initial Original Contract Price $5,451,990.00 Previous Change Orders $538,184.45 9.87% DM Total to Date $5,990,174.45 This Change Order $24, .844 Total Change Orders to Date $563,181.29 10.33% DM Revised Contract Price $6,015,171.29 I (We) agree to make the above change subject to the Change Order references RCCO W, X, Y, Z, ZA and AA terms of this Change Order for a NET INCREASE not to exceed $24,996.84. Co NTRACTOR c/ By: Date: RECOMMENDED BY: Construction Manager ACCEPTED BY: P6'ect Engineer/Project Manager Engineer /City Administrator �e Date Ott 1-1 It`1 Date c) Date AT T ST: Date • MONTEREY PENINSULA ENGINEERING CONTRACTORS & ENGINEERS P.O. BOX 2317 MONTEREY, CA 93942 (831)384-4081 August 06, 2019 Dan Mount 4Leaf, Inc. 8896 N. Winding Way Fair Oaks, CA 95628 Re: First St. Water Utility Upgrade- RCCO W — Steel Encasement around Existing Water Main. M.P.E. proposes to provide all labor, equipment, and material to expose, work around, and eliminate the unidentified steel encasement around the existing water main found at the Wren North Tie -In location. Work Performed on a Force Account Basis (Extra Work): • Expose, excavate, hand dig, eliminate, and work around existing unidentified steel encasement around the existing water main found at the Wren North Tie -In location. It is mutually agreed that for such change the contract price is increased by $3,197.15 (THREE THOUSAND ONE HUNDRED NINETY SEVEN DOLLARS and FIFTEEN CENTS) M.P.E. specifically excludes the following items: • Engineering, permits, and/or fees • All bonds, as-builts, and/or construction staking • All construction testing • SWPPP installation and/or maintenance • Any items not specifically listed above Please review the above cost proposal and issue a change order for the work described. In addition, we request a Contract Time Extension of ONE (1) calendar day(s). If you have any questions, please feel free to contact me by phone at (831) 277-5917, or by email at bart(Fdmoe2000.com. Sincerely, Bart Bruno Project Manager C) 0 n� c-> 0 vi (D (D U (D V) (D N m O O 00 r r r O O 0 0 :E vo O o o 0 D O y O � c m n m O c < r, 00cn O co < Z c --I A m O O m N Y A m cn m a m m a r 0 0 c c A N m rn O O J O O O 0 o cn o 0 0 � N D o 0 m O C T m m c c 2. 0 0 A 0 a 0 EA 69 N Oo O (n 69 69 EA O O O A O O O O O O 0 0 O O O D 3 o L D O OL w W 0) Oo O OJ 69 69 69 O O O A O V O O O O O (Ji 0 0 0 p cz m r m a tr r c m c m cn m :Z- v :3- o p 3 o (D o T C)A D D C)y A y m p 0 o O o 0 0 0 0 0 0 0 0 p CD O O O O O O O O O O (7 m O �, D A O m C 3 cn m S a Z 41 O � � D m n r O Z m r, -'O� 0CD 0 O 1 c > O m o r o � o 69 69 69 69 f9 69 �. 69 '.69 69 69 69 'fA 69 69 69 69 IHi I i 69 En a» Fn D m -X1 i A O Z N Z O o , O O O O O O O O O O O O O O O p 1" m oo m y �1 0 y r a N O X A W C O z a 0 m O x O X O �u O 7u 'O � ',1 O Z7 O O x O' A O x O m '-I O N D -I -I -I -I -! -I -I' -I -1 -i -i -1 -i - -1 -i -1 2 D 0 D o T X ----I c -- O X r N y m0 II 70 O o c ZDi C) o, o o, .rfl o' o' o 0) rn: rn fn Oz m p z �O Fa 69 69 69 �69 w !i69 En Efl to 69 �':69 69 to 69 69 ,69 69 'f.9 [» O � W 2 m m y o r O O = m p O ,-p > c_ O Yr �69' o m e G) m m U) Q icr k 69 69 69 69 69 69 69 69 Hi 69 69 69 {A' 1ii 69 69 'Hi 69 69 69 '69 69 11 69 69 �' 69 69 69 �'M 69 w i69 69 D m c` ��i Oc Z ZZN o0 III n I' 'I z D �„ t0 N O A O o w I'i j o 0 A W I. W --Im m � V rn m co m 69 w N O A W N O] O N A OJ I w o 0 � O l0 O] m N N �1 O A c0 r i C) 41 A O i , i i i i I i i i n i t W• m m • N A • A `Z Q% • MONTEREY PENINSULA ENGINEERING CONTRACTORS & ENGINEERS P.O. BOX 2317 MONTEREY, CA 93942 (831) 384-4081 August 06, 2019 Dan Mount 4Leaf, Inc. 8896 N. Winding Way Fair Oaks, CA 95628 Re: First St. Water Utility Upgrade- RCCO X — Concrete Encasement around Gas Line @ Kern. M.P.E. proposes to provide all labor, equipment, and material to expose, demo, and eliminate the unidentified Concrete Encasement around a existing Gas Line located at the Kern Tie-in Work Performed on a Force Account Basis (Extra Work): • Expose, excavate, hand dig, and work around existing unidentified concrete encasement around the existing water main found at the Wren North Tie -In location. It is mutually agreed that for such change the contract price is increased by $9,387.18 (NINE THOUSAND THREE HUNDRED EIGHTYSEVENDOLLARS and EIGHTEEN CENTS) M.P.E. specifically excludes the following items: • Engineering, permits, and/or fees • All bonds, as-builts, and/or construction staking • All construction testing • SWPPP installation and/or maintenance • Any items not specifically listed above Please review the above cost proposal and issue a change order for the work described. In addition, we request a Contract Time Extension of THREE (3) calendar day(s). If you have any questions, please feel free to contact me by phone at (831) 277-5917, or by email at bart(a mpe2000.com. Sincerely, Bart Bruno Project Manager �Q n n 0 Po 0 0 N n O N (D (D N (D (D X 0 N Q. (D m (o N (D O O O D r D r D r O O O O O O p D 0 -A C D 0 o W K T Z T n m O � r- 00 0 { c � 2 O O m D cn N m m m ( O O O O O O O O O N O p 0 0 � i Do 0 0 0 0 0 0 0 0 D m S O C A m cn . � m; W Z; A .� � W n � 2 O � m 0 0 c c A - O 0 0 0 0 0 0 0 0 0 0 0 N � o D O cn T m A c v m m c c �0 0 W A N W 69 N 69 fA O 0 O O N O 00 O O O O O O O C. O O O D 3 o D L 69 �- 3 O O 0 N 69 OD L W 69 (n 0 69 �-. O O O m O O 0 0 0 0 0 0 0 0 0 O z M 0.z r Do o a r ' co o o O m o m o n O � D D C N � T N O o O Z (n D y m D 0 0 u 2 Wo zz m zz fn z m < 0 c � r m m -u p m O o m m0 A m c D O bq Efl EA to (fi 1q 69 69 W N w OO N N -I O y W W W Oo N 69 O N A Cn O O W J m O N O O O m A T O o � 0 �Q !0 I'O �0 o X '!O ;u Ir0 x !Ox x o i0' x 0 A x --(� --I � --A 1-1 -A-i 1 �� 'i '-i -i -I -I --I-i i'' -i -t -1 '-1 -1 2 L_ O e, fn fA fA Im, fA !!W 69 Iw 69 !w 169 IW 09 'w '69 '�69 d, �40 O D A 1> IC m fA 69 ',69 69 '69 'A 9 EA li 69 Vi 'i69 69 F9 69 IW d) ffl 69 ll&i fA D m X o o ZD C r m 0 0 o O 0 0 0 0 o p m W W m x - r A f W ti Z m m m Z y r n Z m rn ^Z^ Y! r it N A N G1 m U) d D m p A I'0 ;u O' m O A 0 X 0 x O X IO X'p T'10 x O A'O �u O O O O O1 Q) I � 'm 69 6. fA 69 69 W 69 ''�'w w 'Iw 69 '!69 Hi IfA W ';10 69 69 S9 69 W EA W 2 A r o 3 0 a o m < rn in I�'i'W IIIS9 a 1!i f!A 69 69 1169 ffl l69 {fl W W W :to 69 ',.fo to 1W Sfl '4A W to 1.t9 W fA ffl It» EA X (� O m 2 Z O O Z Z O w to --I m CD, Cn � i i i i i V O O N N CO � � � qo y� { a m z �� �m •, MONTEREY PENINSULA ENGINEERING CONTRACTORS & ENGINEERS P.O. BOX 2317 MONTEREY, CA 93942 (831) 384-4081 August 06, 2019 Dan Mount 4Leaf, Inc. 8896 N. Winding Way Fair Oaks, CA 95628 Re: First St. Water Utility Upgrade- RCCO Y — Large Concrete Mass @ STA 72+50 M.P.E. proposes to provide all labor, equipment, and material to expose, demo, and eliminate the unidentified Concrete Mass located at STA 72+50 Work Performed on a Force Account Basis (Extra Work): • Expose, excavate, hand dig, eliminate, and work around existing unidentified Large Concrete Mass at STA 72+50 It is mutually agreed that for such change the contract price is increased by $4,693.59 (FOUR THO USAND SLY HUNDRED NINETY THREE DOLLARS and FIFTY NINE CENTS) M.P.E. specifically excludes the following items: • Engineering, permits, and/or fees • All bonds, as-builts, and/or construction staking • All construction testing • SWPPP installation and/or maintenance • Any items not specifically listed above Please review the above cost proposal and issue a change order for the work described. In addition, we request a Contract Time Extension of ONEYOUR (1.4) calendar day(s). If you have any questions, please feel free to contact me by phone at (831) 277-5917, or by email at bartamoe2000.com. Sincerely, Bart Bruno Project Manager X (D Q fD m cn (7D (D 0 0 0 O r- r- � o 0 o O O C o 0 0 0 o N 0 0 n 000 Via' m 0 0 D 0 0 O o 0 O o 0 o D m � O 0 �' 0 0 -' m � C 0 D O O m D 0 m Q C D O r o C ox m 5 m Cl) Z G � n m C Z 0 00 A < ; m = m o n c n T C) Om O � m Z n n, m 0 0 a 00 000 Z m o { 0700x0�u0;0I0m0;u0T0m10�u0X0;u v `� m m O n z m N -a m m �lw cc H) W 69 69 69 69 '.fo 69 w 69 I69 69H3 {fl Efl ifl ',69 [fi Hi fA EA w m �o o am x0 rn 69 A Dc m m o cNii ,N.,, o 0 0 o �I -i m .i7 A O O O O O O O O O O O p p D 3 - 'tn w sn ien to to to to [n sn fn ^ Y! ` r M c D 5 r� 0 0 m fA w 69 M o [n to {n o 3 z O N N 0 <n 0 0 O o 0 0 0_ o o o o h m N o of OI of o O 1 Cn C� Cl) of o o cnl >I > o 0 0 0 0 0 0 0 o O r O o Q o o v m D D ° -i ° -y x O 0 c c > x 0 j m m r Cl) m m A D N O CD ° p n O 0cu D D C O 0 > o I o 0' O' O 0� O �u O; 0 x 0 m � au 0 0I' 0 ' O �o x2O O D -1 0 ° v D -- c O o O O O N W o a O O O O O O O O O W OD OD M _ 0 y m m� O c z m a) Z 'D ',(!i 69 '.E9 69 ':61 [n 'iw 69 69 69 69 69 69 'E9 69 69 69 fn 69 ',fn 69 w 69 K I69 _ m iii 69 69 69 69 69 b9 69 69 69 69 I69 (A 69 69 69 IFn 69 69 69 69 69 6. 69 69 69 69 69 �69 69 '69 69 'b9 [n D X O1 x p o m ZZOO 00 en e z z o -4 M Ao Ao m � O l0 2 � \o\n \m\� � � � m � ' • MONTEREY PENINSULA ENGINEERING CONTRACTORS & ENGINEERS P.O. BOX 2317 MONTEREY, CA 93942 (831) 384-4081 August 6, 2019 Dan Mount 4Leaf, Inc. 8896 N. Winding Way Fair Oaks, CA 95628 Re: First St. Water Utility Upgrade- RCCO Z — Dewatering at Westwood South Tie-in. M.P.E. proposes to provide all labor, equipment, and material to Dewater the excess water in the Tie-in trench due to not having a 100% shut down of the existing line. Work Performed on a Force Account Basis (Extra Work): • Dewatering of the excess water in the Tie -In trench. It is mutually agreed that for such change the contract price is increased by $498.50 (FOUR HUNDRED NINETY EIGHT DOLLARS and FIFTY CENTS) M.P.E. specifically excludes the following items: • Engineering, permits, and/or fees • All bonds, as-builts, and/or construction staking • All construction testing • SWPPP installation and/or maintenance • Any items not specifically listed above Please review the above cost proposal and issue a change order for the work described. In addition, we request a Contract Time Extension of ZERO (0) calendar day(s). If you have any questions, please feel free to contact me by phone at (831) 277-5917, or by email at bart a,moe2000.com. Sincerely, Bart Bruno Project Manager m n n O N —I 90 0 0 �7 0 v� (1 m a CA CD v CD m co m OQ (D m m (D O O O O C) O O O O (n -fi U) -- D O o o � i m p p D O y O r � � 0 -nm o r O --I c { m O D to m M X m 0 0 C C O O O O O O W 0 O m m O O 0 0 0 0 0 0 0 0 o zp col p n n a 0 0 0 0 0 0 0 0 0 0 o p m � o 0 _c a m z O m n m A Z G� n y m O 3 IF51 ° i3 O Z n) 0 M C X 10 X =rn Z c m C rn -- Cx cn m m II °° n > 'A w ss m iI169 rA Ito rA ',Hi ffl w rA A EA r9 rfl 'En w 69 EA rn w 2 Z O O Xo m Dc m 69 69w ci rn r» vi rn rn w:rn I 63 D rfl en W sv -- r» sv 'sa 3 i rn m r D O m ° c z �o v> rn W r» EH 6n 0 0 0 0 0 0 z O V � m N 0 0 0 0 0 0 —1 co m co m co o 0 o O 0 0 0 0 o O lr Cr o m m m ;U O O r o o D �T Cl) m � m ro D 8 -4o Q O O N O N O T O O A�o X > ~ ~ ~ ~ O C_ "D N cn M O o Z o 3 O A J Xl OA O u OOOO ;u IO 'O O �7 O D o D D -I-i --I --A �-�-1 -1 -I --A 4 1 -I -I -i -i 2 c r N o O D c j N � cn 0 o c W o o p O O O O O O O O N N N I O fn z m O C z T r D e. n va r» '�itn rn w. Efl tti rn 'rn to rn to Ge rn w r» !rs rn ':rn to O A m [D ` ° = a O D z p A I A O p 1 O S m 0 j N -DI m O C. ( m c O ° ° �Ivi' IirA p R1 W >7' TO I�vi yq rA En En vi rn 'En 69 r» rA Hi rA rA lus vi rnW W rA rn rn En 69 6v 6v rA �Ev Vi I�w rii ra rn D m 0 m t` O Z N Z z N pp (D cD rA w �I o O ID O A A A O , A O ', O --Im cn Q (p v i v O O (O O O il� . . i , i i i W G V cn o O OD W O I, A O W D n m O —I a C rn r 0 n O O n o m f C_ 0 o �� m cn m v m a < XIT a a v vz� L} V, �J D � r (� v D Zm o0 po JD 9 m _I z m D r D O� a X r � O 2 ;C1 m a O o O M A a V c cn N 03 0 o W A D r O z 0 N O o c 0 A v m z m 0 O r. o A >1j I m m I X.)v_ 2 9 0 0 Z I I 0 � C p x m D < 1 3 i y m Y v X z P +j p � b � • � 1 m m m m m m O m O m O O c� c� a V N 0 p m OL v co O0 z o z 0 x m j � 3 c Z z Co mm v D m m O m 0 X a m m z O C: m 'V m Z m X z G) • MONTEREY PENINSULA ENGINEERING CONTRACTORS & ENGINEERS P.O. BOX 2317 MONTEREY, CA 93942 (831) 384-4081 August 6, 2019 Dan Mount 4Leaf, Inc. 8896 N. Winding Way Fair Oaks, CA 95628 Re: First St. Water Utility Upgrade- RCCO ZA — Dewatering at Kern North Tie-in. M.P.E. proposes to provide all labor, equipment, and material to Dewater the excess water in the Tie-in trench due to not having a 100% shut down of the existing line. Work Performed on a Force Account Basis (Extra Work): • Dewatering of the excess water in the Tie -In trench. It is mutually agreed that for such change the contract price is increased by $498.50 (FOUR HUNDRED NINETY EIGHT DOLLARS and FIFTY CENTS) M.P.E. specifically excludes the following items: • Engineering, permits, and/or fees • All bonds, as-builts, and/or construction staking • All construction testing • SWPPP installation and/or maintenance • Any items not specifically listed above Please review the above cost proposal and issue a change order for the work described. In addition, we request a Contract Time Extension of ZERO (0) calendar day(s). If you have any questions, please feel free to contact me by phone at (831) 277-5917, or by email at bartna,mpe2000.com. Sincerely, Bart Bruno Project Manager C) 0 0 v To (D (D U) CD CD .Q (D N a (D m n CD (D O 0 D C N O o z N D DD T r N D o o O z m O C r C Dp z D �z O m mV m O -I m O O = m p m 1 c p fA iA fA H1 EA O O O ro m CD OC O 0 C) n o 0 0 0 0 0 o O o O O O p a OC 3 O O O O O O O O O O O m ` O O O 0 A 0 m z �' m � c O rn- Q tr o m m � D mm c W Z Z cn Z � '� 0 m cn O m ci 0 0 n O m > m am U) m 2 n y rrn a z z Toc 0 cm 00 000 x o O O O O O O > >> > > > m Ox�0X'O;u0xcrT�'pm0x0;u,0m0;uo� Z m -- -1 -4. -1 -A -i z !-I A Oc c n m Ilw, z > ;I',{n to v s, v, -6a a Id, v. "n rn w v, v, 'A O ! =or za D 0 0 m 9 9 0 ev m 0 0 0 0 0 0 I'tn D to [n �It» to sv sv +E» to rn '.w F» ivi E» ''! ,69 W M 4» to cn t» En r c D m 0 D X 3 O m it o c z to z 0 N 0 0 0 0 0 0 0 0 0 0 0 o 0 0 f m O w ha0 -� to m co m co O o o O o O o o O p T O 0. e Q C' e m W m D Cl)0 m c a -i r a i I v m m D N N N ca O O n l l W M 69 CD W Qp (O 69 EA cD O 4 (Jlt O O 00 m p �u 1 N W O 0 0 EA ffl 1 EA fA d3 ffl {ii 69 � W A A A O � io 0 w o ! O � O � 'O A O � O O O O fA Efl Efl EA fA Efl IfA fA O O O N EA EA 69 (fl 4fl EA '69 fH i N t9 fA 1w ffl �w fA � ifl 1.11 1. d: 0 m 9 SA i A = m D m O C N (y A� am r o , X O o m < O C)m CD o- A Q 9 EA D m X o m Z z 0 00 z o ny;o ��o W 1 1D -i O r n 0 0 0 0 N m A z m N m X W Z v O O D r W W A 0 m (r oz r z o c c a z m m 0 N c 0 0 rD- m m m m o m m m m o c v 0 cNi A x v z m 0 n z X m m co z 0 zz m 0 A D N Nv z 0 3 m 10 ;a 0 m 1 z C 7� } A o mo ' 0 0 T 0 c � y r,� x r.rl � A m Z m D j J1 3 x o m c z f V o 0 N p m z :? O 20 0 O 3 m0 TV O (� O m W G X m III X z C) x 0 c p 0�N 0 z j o z O x m { i� I� 3 o m c z Z o (Am 0 `• MONTEREY PENINSULA ENGINEERING CONTRACTORS & ENGINEERS P.O. BOX 2317 MONTERFY, CA 93942 (831)384-4081 August 6, 2019 Dan Mount 4Leaf, Inc. 8896 N. Winding Way Fair Oaks, CA 95628 Re: First St. Water Utility Upgrade- RCCO AA — Concrete Kicker at Hannah Tie -In. M.P.E. proposes to provide all labor, equipment, and material to expose, excavate, and demo the Unidentified Concrete Kicker at the Hannah Tie -In. Work Performed on a Force Account Basis (Extra Work): • Expose, excavate and demo unidentified concrete kicker. It is mutually agreed that for such change the contract price is increased by $6,721.88 (SIX THOUSAND SEVENHUNDRED TWENTY ONE DOLLARS and EIGHTYEIGHT CENTS) M.P.E. specifically excludes the following items: • Engineering, permits, and/or fees • All bonds, as-builts, and/or construction staking • All construction testing • SWPPP installation and/or maintenance • Any items not specifically listed above Please review the above cost proposal and issue a change order for the work described. In addition, we request a Contract Time Extension of ONEYOUR (1.4) calendar day(s). If you have any questions, please feel free to contact me by phone at (831) 277-5917, or by email at bart(a,mve2000.com. Sincerely, Si 9AM+4 Bart Bruno Project Manager O.O_o_ y r v r D W W O O O O m CDO Cn O O O O o N N 0� 0 0 0 0 a 1 D O co)O O O O O O O A m o O 3 Om 0 0 � m O O C D 0 > I C r 4 0 y K- m A co m Z C . = fD < A Z cnO m n � D Cl) m v m A y cnm N n rrn a 0 0 v O o�n o o a 0 00 000 a 0 OT < 0 0� 0 X® X 0;a 9 x6H�6?� 0 0�',0;l -t m 10 I_ y m m c cn v m °° °° a m Z -Di ;° as �p m w (A Hi C m .� o 0 0 0 0 0 3 vi irA rA ��, f9IE9 fA !vs va r9 r9 'er v, vi EA eA v, EA r9 4A go IEA D m D x n 3 om m N E9 f9 EA ° py W dy w c z z O co V o p 0 0 O o 0 0 0 0 o ',V o in o m cn 0 IV A 0 0 0 0 0 0 m o 0 0,0 o N 0 0 0l Oc o 0 0 0 0 C.rD 1� 0 0. o C o o� a D O a D y y y O O O O 0 m c m c m 0 p ? - ? m ;u m cn m m cn 0 T� W cn o 0 co ° m z O 41 T O O A N y D y y y I W 0 C X U N 0 z K 0 x I'10 ;7 O O X Ip X 10 X '0 X 0� 0' X 0 M 0 A ',0 ;l O o D D 0 y o c r N T` D j � 0 c o o o. s s O O o 0 0 0 a oo m ao m Qo 4 O z O c ''I� om z VA TAImo' IIf9 �m W 164 I 16s 6q 9 � ' ', -9 �, � Imo, t. IE, ' � M < m = m y oc r o m ;01 c m c o , o o O o o °a m {n' E9 ffl f9 EA bi 69 4A EA W <A �fs 69 93 fA &i EA IS9 fA jw w I69 EA fA {A (9 Efl {9 4A ':fA EA EA 19 I49 w III M y x rn to I�i C m s Z Z N 00 a 0 0 i W O W 6Vl O FA co VO A A A A A O 1 m CO O V N V (n O O O O o M I.„ i N N Cn Ui 1 (T O '' W 0 ((� co 0 0 N W O O W W 0 �i, N N n n m 0 r i O O z A N m m Z m X U) z m CO) A z v O X 7 m m 0 1 I 1 1 o I c a 1 C 1 o I � f m z p o c O m N n A p 0_ x Zn O o m ° O0 A O 1 I e �/! m C m _ x n ° 1 � 0 1 \I, 1 1 c cr'I" m I � { m D i �- 1 3 � 1 / z z o O -a m N O z D 00 `I1 n X r n O CO) -i O r� D W O i'a o N 0 a W D r X p m p m a m p m p m p m pJlk It m x 9 z X r � o � m m m m —�1 z 0 o A O C: 'O M \X z z m m X