Monterey Peninsula Engineering - 1st Street Water Utility Improvements - Change Order No. 20City of rpIYCDp Public Works Department - Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0451; Fax (408) 846-0429 CHANGE ORDER NO. 20 To contract for: City of Gilroy First Street Water Utility Improvements City Project No.: 16-PW-217 Contractor: Monterey Peninsula Engineering Contract Date: 7/18/2018 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authoritv to proceed with the work. Description of Work This change order is for additional work outside the original contract scope. Contractor unable to cold plane asphalt as bid due to additional concrete and pavement depths in trench excavations. This CCO is for additional sawcut standby time not accounted for in pipe trench excavation (RCCO P). All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. Change in working time granted by this change order: ► All Extra Work authorized under this Change Order must be billed separately from the original contract. All bills for work done under this Change Order shall reference this Change Order No. 20. OI Calendar Days I Cost Percentam Initial Original Contract Price $5,451,990.00 Previous Change Orders $729,856.38 13.39% DM Total to Date $6,181,846.38 This Change Order $2, 4.80 Total Change Orders to Date $731,931.18 13.43% DM Revised Contract Price $6,183,921.18 I (We) agree to make the above change subject to the Change Order references RCCO P terms of this Change Order for a NET INCREASE not to exceed $2,074.80. /A1PE CONTRACT R By: (--I C7' RECOMMENDED BY: Construction Manager ACCEPTED BY: Project'Engineer/Project Manager City Engineer City Administrator Nk Date: I it 01" Date Date / 7—e) 7-p Date Date ST., City Clerk • MONTEREY PENINSULA ENGINEERING CONTRACTORS & ENGINEERS P.O. BOX 2317 MONTEREY, CA 93942 (831) 384-4081 December 3, 2019 Dan Mount 4Leaf, Inc. 8896 N. Winding Way Fair Oaks, CA 95628 Re: First St. Water Utility Upgrade- RCCO #P — SAWCUTTING STANDBY TIME M.P.E. proposes to bill for the Lombardo sawcutting standby time. This RCCO #P ONLY includes sawcutting standby time not billed from previous RCCO's. Work Performed on a Force Account Basis (Extra Work): • Billing of accumulated Lombardo Core Drilling's standby time: • RCCO #006.1 — 10/1 to 10/12 • RCCO #006.2 —10115 to 10/18 • RCCO #006.3 —10/22 to 11/09 • RCCO #006.4 —11/12 to 11/30 Total this Change: $4,148.60 Agreed 50/50 Split: $2,074.30 It is mutually agreed that for such change the contract price is increased by $2,074.30 (TWO THOUSAND, SEYENTYFOUR DOLLARS and THIRTY CENTS) M.P.E. specifically excludes the following items: • Engineering, permits, and/or fees • All bonds, as-builts, and/or construction staking • All construction testing • SWPPP installation and/or maintenance • Any items not specifically listed above Please review the above cost proposal and issue a change order for the work described. In addition, we request a Contract Time Extension of zero (0) calendar day(s). If you have any questions, please feel free to contact meby phone at (831) 277-5917, or by email at bartna,mpe2000.com. Sincerely, RMI a Bart Bruno Project Manager .m •� • MONTEREY PENINSULA ENGINEERING CONTRACTORS & ENGINEERS P.O. BOX 2317 MONTEREY, CA 93942 (831) 384-4081 February 14, 2019 Dan Mount 4Leaf, Inc. 8896 N. Winding Way Fair Oaks, CA 95628 Re: First St. Water Utility Upgrade- RCCO #P — SAWCUTTING STANDBY TIME M.P.E. proposes to bill for the Lombardo sawcutting standby time. This RCCO #P ONLY includes sawcutting standby time not billed from previous RCCO's. Work Performed on a Force Account Basis (Extra Work): • Billing of accumulated Lombardo Core Drilling's standby time: • RCCO #006.1-10/1 to 10/12 • RCCO #006.2 — 10115 to 10/18 • RCCO #006.3 —10/22 to 11/09 • RCCO #006.4 — 11/12 to 11/30 It is mutually agreed that for such change the contract price is increased by $4,148.60 (FOUR THOUSAND ONE HUNDRED FOURTYEIGHT DOLLARS and SIXTY CENTS) M.P.E. specifically excludes the following items: • Engineering, permits, and/or fees • All bonds, as-builts, and/or construction staking • All construction testing • SWPPP installation and/or maintenance • Any items not specifically listed above Please review the above cost proposal and issue a change order for the work described. In addition, we request a Contract Time Extension of zero (0) calendar day(s). If you have any questions, please feel free to contact me by phone at (831) 277-5917, or by email at bart(a,mpe2000.com. Sincerely, Bart Bruno Project Manager o N ' w F Q Q Q Cl z Z Z Z W o w o m W J W O a -' ox a e o D O_ � o � w O m g Cr �O° o Q u O J m m U O O O O O O O O O O O O O O O O O O I O I O O Co m J Co J O CO F LO O O O O O O 0 0 0 0 0 O N O N t� O Z o o W O E C fA f9 F Q U w a E Q) W o 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 Z� > . . . . . . . . . . . . . . W~ K F',i O O 69 to > o frU U W (9 j f— 2 Z ¢ I w W I. w cQ a O 2 m O t~/) w Cl)J O_ tLLJ i 0 W � � 0 C, 0 Of 0 of o D 0 of w 0� 0 m o� 0 m 0' N N N N N o } W x x x= x W o 0 0 o O T v m v o 0 WU f6 F- Z O o o > > OIrH o d Q O w z z m O w J 0 z WU w N Q W �! O Z Q W = N 2 W m o M K F O V N = o p m U F N O} W Q F N N N m N\ \l j F W N 0 O O o L Wof Y Y W z O N n v ,n d W O F w d i C a F Q Y 0 0 0 0 0 O U U U U U w LL O O O p w o 0 0 0 0 0 0 0 0 0 0 w of cf w w N O N d O O O a Q a U U U i u D O o 0 0 0 0 0 0 0 0 0 o J J p N o z w I 0 0 0 O r.r r r r o o Lof, w no 0 Z¢ O a w m o z m 0 g D o w z N o o m F < Oy N J e O F OF O � a N Y 0 0 W } m O z F fn Z D U Q O U U MONTEREY PENNISULA ENGINEERING 192 HEALY AVENUE MARINA, CA 93933 ATTN: DARIN HOPKINS 831.277.6132 DARIN@MPE2000.COM FIRST STREET WATER UTILITY IMPROVEMENTS PURCHASE ORDER# 1810 10/1/2018 OVERALL SURFACE DEPTH 17" 325 LF OF 12" ASPHALT OVER 5" CONCRETE $3.66 PER LF / $1,189.50 1 SAW OPERATOR 1 HOUR STAND BY 8:30AM TO 9:30AM $145.00 PER HR TOTAL: $1,334.50 10/2/18 OVERALL SURFACE DEPTH 13" 880 LF OF 8" ASPHALT OVER 5" CONCRETE $2.97 PER LF / $2,613.60 TOTAL: $2,613.60 10/5/18 OVERALL SURFACE DEPTH 14" 200 LF OF 9" ASPHALT OVER 5" CONCRETE $3.13 PER LF / $626.00 TOTAL: $626.00 10/8/18 OVERALL SURFACE DEPTH 13" 1,030 LF OF 9" ASPHALT OVER 5" CONCRETE $2.97 PER LF / $3,059.10 2 SAW OPERATORS 2.5 HOURS EA STAND BY FOR LAYOUT: $145.00 PER HR / $725.00 TOTAL: $3,784.10 10/9/18 OVERALL SURFACE DEPTH 11" 600 LF OF 6" ASPHALT OVER 5" CONCRETE $2.64 PER LF / $1,584.00 1 SAW OPERATOR 0.5 HOURS EA STAND BY FOR LAYOUT: $145.00 PER HR / $72.50 TOTAL: $1,656.50 10/12/18 OVERALL SURFACE DEPTH 10" 780 LF OF 10" ASPHALT $1.71 PER LF / $1,333.80 1 SAW OPERATOR 0.5 HOURS EA STAND BY FOR LAYOUT: $145.00 PER HR / $72.50 TOTAL: $1,406.30 10/15/18 OVERALL SURFACE DEPTH 10" & 11" 65 LF OF 10" ASPHALT 3 POT HOLES $1.71 PER LF / $111.15 630 LF OF 7" ASPHALT OVER 4" CONCRETE $2.49 PER LF / $1,568.70 1 SAW OPERATOR 1.5 HOURS EA STAND BY FOR LAYOUT: $145.00 PER HR / $217.50 TOTAL: $1,901.35 10/16/18 OVERALL SURFACE DEPTH 12" & 14" 300 LF OF 7" ASPHALT OVER 5" CONCRETE $2.80 PER LF / $840.00 300 LF OF 7" ASPHALT OVER 7" CONCRETE $3.45 PER LF / $1,035.00 TOTAL: $1,875.00 10/18/18 OVERALL SURFACE DEPTH 13" 30 LF OF 6" ASPHALT OVER 6" CONCRETE POT HOLES $2.96 PER LF / $88.80 230 LF OF 7" ASPHALT OVER 6" CONCRETE $3.11 PER LF / $870.80 1 SAW OPERATOR 3.0 HOURS EA STAND BY FOR LAYOUT: $145.00 PER HR / $435.00 TOTAL: $1,394.60 10/22/18 OVERALL SURFACE DEPTH 12" 84 LF OF 6" ASPHALT OVER 6" CONCRETE POT HOLES 4) EA 3.25 HRS $145.00 PER HR / $471.25 1 SAW OPERATOR 3.5 HOURS EA STAND BY FOR LAYOUT: $145.00 PER HR / $507.50 TOTAL: $978.75 10/23/18 OVERALL SURFACE DEPTH 15" 60 LF OF 7" ASPHALT OVER 8" CONCRETE POT HOLES 2) EA 1.0 HRS $145.00 PER HR / $145.00 360 LF OF 7" ASPHALT OVER 8" CONCRETE POT HOLES $3.75 PER LF / $1,350.00 1 SAW OPERATOR 1.5 HOURS EA STAND BY FOR LAYOUT: $145.00 PER HR / $217.50 TOTAL: $1,712.50 10/24/18 OVERALL SURFACE DEPTH 15" 515 LF OF 8" ASPHALT OVER 7" CONCRETE POT HOLES $3.60 PER LF / $1,854.00 TOTAL: $1,854.00 10/29/18 OVERALL SURFACE DEPTH 15" 820 LF OF 8" ASPHALT OVER 7" CONCRETE POT HOLES $3.60 PER LF / $2,812.60 TOTAL: $2,952.00 10/30/18 OVERALL SURFACE DEPTH 15" 84 LF OF 8" ASPHALT OVER 7" CONCRETE POT HOLES 7) EA 5.0 HRS $145.00 PER HR / $725.00 1 SAW OPERATOR 1.0 HOURS EA STAND BY FOR LAYOUT: $145.00 PER HR / $145.00 TOTAL: $870.00 MONTEREY PENNISULA ENGINEERING 192 HEALY AVENUE MARINA, CA 93933 ATTN: DARIN HOPKINS 831.277.6132 DARIN(@MPE2000.COM FIRST STREET WATER UTILITY IMPROVEMENTS PURCHASE ORDER#1810 11/1/2018 OVERALL SURFACE DEPTH 15" 620 LF OF 8" ASPHALT OVER 7" CONCRETE $3.60 PER LF / $2232.00 1 SAW OPERATOR 1 HOUR STAND BY 8:30AM TO 9:30AM and 10:45 TO 11:15 $145.00 PER HR TOTAL: $2377.00 11/2/18 OVERALL SURFACE DEPTH 14" 160 LF OF 9" ASPHALT OVER 5" CONCRETE $3.13 PER LF / $500.80 TOTAL: $500.80 11/5/2018 OVERALL SURFACE DEPTH 15" 675LF OF 8" ASPHALT OVER 7" CONCRETE $3.60 PER LF / $2430.00 730 LF OF 9" ASPHALT $1.54 PER LF / 1124.20 2 SAW OPERATOR 1.25 HOUR STAND BY $145.00 PER HR / $362.50 TOTAL: $3916.70 11/8/18 OVERALL SURFACE DEPTH 14" 566 LF OF 14" ASPHALT $2.38 LF / $1347.08 346 LF 9" ASPHALT $1.53 LF / $529.38 TOTAL PRICE$1,876.48 11/9/18 OVERALL SURFACE DEPTH 14" 258 LF OF 9" ASPHALT $1.53 LF / $394.74 154 LF OF 7" ASPHALT $1.19 LF / $183.26 412 LF OF 5" CONCRETE $1.60 LF / $659.20 TOTAL PRICE: $1,237.20 11/13/2018 - OVERALL SURFACE DEPTH 14" 70OLF OF 8" ASPHALT $1.36 PER LF / $952.00 700 LF OF 6" CONCRETE $1.93 PER LF / $1,351.00 1 SAW OPERATOR 1.0 HOUR STAND BY 8:15AM TO 9:15AM $145.00 PER HR / $145.00 TOTAL: $2,448.00 11/16/2018 OVERALL SURFACE DEPTH 14" 420LF OF 8" ASPHALT $1.53 PER LF / $642.60 210 LF OF 6" CONCRETE $1.60 PER LF / $336.00 1 SAW OPERATOR .75 HOUR STAND BY 8:15AM TO 9:OOAM $145.00 PER HR / $108.75 TOTAL: $1,087.35 11/19/2018 OVERALL SURFACE DEPTH 16" 714LF OF 10" ASPHALT $1.70 PER LF / $1,213.80 714 LF OF 8" ASPHALT $1.36 PER LF / $971.04 714 LF OF 6" CONCRETE $1.93 PER LF / $1,378.02 1 SAW OPERATOR 1.0 HOUR STAND BY 8:15AM TO 9:15AM $145.00 PER HR / $145.00 TOTAL: $3,707.86 11/19/2018 OVERALL SURFACE DEPTH 11" 636LF OF 11" ASPHALT $1.87 PER LF / $1,189.32 1 SAW OPERATOR 1.75 HOUR STAND BY 8:15AM TO 9:30AM & 12:45 TO 1:15PM $145.00 PER HR / $253.75 TOTAL: $1,443.07 MONTEREY PENNISULA ENGINEERING 192 HEALY AVENUE MARINA, CA 93933 ATTN: DARIN HOPKINS 831.277.6132 DARIN MPE2000.COM FIRST STREET WATER UTILITY IMPROVEMENTS PURCHASE ORDER# 1810 12/3/2018 OVERALL SURFACE DEPTH 6" 330 LF OF 6" ASPHALT $1.03 PER LF / $360.50 TOTAL: $360.50 12/4/2018 OVERALL SURFACE DEPTH 15" 300 LF OF 6" ASPHALT $1.03 PER LF / $309.00 120 LF OF 9" ASPHALT $1.53 PER LF / $183.60 1040 LF OF 12" ASPHALT $2.04 PER LF / $2,121.60 120 LF OF 6" CONCRETE $1.93 PER LF / $231.60 TOTAL: $2,845.80 12/6/2018 OVERALL SURFACE DEPTH 12" 660 LF OF 12" ASPHALT $2.04 PER LF / $1,346.40 TOTAL: $1,346.40 12/11/2018 OVERALL SURFACE DEPTH 12" 686 LF OF 12" ASPHALT $2.04 PER LF / $1,399.44 TOTAL: $1,399.44 12/14/2018 OVERALL SURFACE DEPTH 12" 580 LF OF 12" ASPHALT $2.04 PER LF / $1,183.20 TOTAL: $1,183.20 12/17/2018 OVERALL SURFACE DEPTH 20" 46 LF OF 6" ASPHALT $1.03 PER LF / $47.38 420 LF OF 12" ASPHALT $2.04 PER LF / $856.80 46 LF OF 14" CONCRETE $4.48 PER LF / $206.08 TOTAL: $1,110.26 i. 0 0uj N O Z Z z LU K O W D Q' rz 0 z r Z p .- m w ow O N U U 0 Q O _ IK- 00 W Z O o s O z O U W K O W fVs_ O Q 0 U. I- y 4 O 0 W LL g O a O z �I LL p Z -j < m z m a a a_ W W Y a y Z W U O Y O= O W a a 3: 0 N 1 = 1 0 O : f i Q w 4� Qb u II� u I a. � 0 W Z Q FI W o O I o a m w y co N a Q O O g Q o Q w 7 ti O ►Y U 15 i00 z o W m 06 o a a J CL a Y of 0 0 W Z. J ` V 0� w U a Z, to J z ZN O = o 0. Y. w O IX Z J Oz C u W a O Y O Z a, J a w a a W z W W W rc C C a N K o d w 0 U) 1 H O F- Off 4 t,�. d LL 0 ^ w o� pf F y O w i O 0 z LL- O a_ F a °- Y Dr V � w 0 W N G z Z W O WW Q i rc wl 0 0 �V x F; (7 r L7 ~ Ix 0 0. ZI —1 0 z Z ti o W Q J O FW J rc 0 x Q m o I O w in in A0 1 J O a Q � O F— g a Li. a 14 O W raLl 10 O 2 fj� Q W Q � 0 ~ CY W 06 o a a D J Y N � O x O �V\ w �J 0 z N J a� U W o. 1 a Z fn �, ❑. m � Q W O J Z z Q: O 0 °zW � O Q! z �j W z >� Z w a O W N a Z a' ° Q W O W a ~Q o CO O: J O Q Fw- ~ W Q O U 0 Z R LU Z Z c ` W w �G a ce J l D O o co Z LL O rc w Z x 11 w W w a 0 0. J W 0 w WIN z 2 0- w � O F W ~ w b o w F- w r w r w o�o�occ 0: o��o� L Y I� W I o ZI, W o' a W` r c r Z J C O 7 N S t o� z LLI 0 W a o a o Q w U. a o K o z o x 0 F Nw a a rc a N w Y U O z� 0p 0 O w w z m z Q u a IL( a m o 0. I0 w C: ►- N_ 0 O _ F- � Q 00 g 3 a O L Q O fA ui Q O U � J Q H O I - Z w � D Ci w atf O QIL a � o � c � Y Q' O 0 Z a U) � w w t Q Z w w 1\\ I- a Z w a 1 d � LU U r e 0 LIJ O n~. w Q W " o Z W =— -- ---- -- 0 � a V}l J � f z 0 z m 4 a o I K Q Q x K 4 z III ~ w~ w~ w~ 00 d d d 6 w~ w~ w ~ w~ w ! ! w x w d w d a o c d af I w w V F- n '\ de— I �_ w a Q w � I Z x W w w W a �- _ J W o w _ r o w Z � j O ` 0 o �} 0 �3 O U w V 0 w F L SC O ¢ a0 f w o ° o z 0 w z w of o " a a a Z w LLi Y 4 o O n LU U z m z t U - 3 00 w ce O OQ 5 LL O O U J Fa- O F- GQ W O IL W U) fn o 0 a 3 p z ~ a J Q w a zz w _a w m w O a D 1 ' a >• Z w kL 0 Q Fy- �~ Y W------ 3 V) z 4- o m � W _-- Z N Y oy W r a O w I 11 �l W z a a D �c 2 o a ° a 4�C c LLJI 2 o W " u.. L �C' Fa- O a w d 0 Z w W W z W a a 0 J Y — o ❑ '^ w V' � Z 0 O w Z k a W " ❑ Z W w o y J 0 W O w S O z o 0 z O m O w o � rz x � w~ w ~ w~ w~ w~ w~ w~ O O w~ O O O O O O O 0 a --,Id Z° W a w w a - }, ❑ o I o Z w0 f uj Q O W Q 1 {W r o w' N 4 C o 0 00 _ f 1Z 1! r� O y < O K O z w a 0 0 o 0 w a z J [0 a w w z u Q 0 O w Z d O (L 3: ❑ ° d W Z z v J Q V W �- a N Z� W z O z O 0 z ^ Y O O o � z -� o d g a N w Q ❑ Q M O IL w H U F- 0 � 3 Q O g z ~ Q LL O J R � w a v J Q Z w O F- °' D CY m 06 W 0 a Q D Y o Y O ?� O c z J g w w ' F- a a Z W Z z W a a w � Z U W o LL O H b,4 � O uw U U Q '� �o Yd O u. 2 J W N f W 0 E IG Q A4,j _z W fn Z O O �\ Y Z_ o LL it C� W x a LU uj fO `L J w w LU fie. N ZZ — — W o — WW Q J z o w J � -- IL \� o U F• j w 0. O Q � O cl W u o AL� LL a_ 0 0 O z o r J LLI N m z 0 a Nci O °¢ o a o--- O Z \ F Ix O O t- O O J Fa— O F- W z to — — J a O a EU U 0 F- a 3 zz I O ~ a w a z w a a � w 06 Z O a a. J Y Fq- Of O < -J C I r V V A�jj 1. V z w uj Z Z W a J D co Z Z a w W Z O 2 9 1 m O m A � � a o g LL 0 H N U 3 � d F- J o m as a J Q H 0 a O J T Ul 0 Z N �l Qtb � i o w r 0C a O � v a N F tol M r a LL ! 7 G 0 W Y itIr � L W 0 a w a J 4 i- 0 z R LLJ z_ a W Q J z a ui Ix O i r a 5 i �• d� V 1 i h 0 o a w N !C Y Ix cr F' C K a C W W c S 4 I N f� I� 'v w •i t � , 1 •:1 Y G 2 ¢ C O_. i Q W O fb i1. 0 [D O 0 � U J � d J h O � m a O V Q r 0 mr•' nI I 0 Z FE W LLJ � V W J D Z a it LLJ Z 0 1Cul O O K O O K O K O C[ O z O C �q r W }j W w 0 5 LL O r to 0 U Q O r r I Q J w S —_ a O o � a �� w w x 6 1 ra a W r o 4 7y 0 b w fn r J H O r 0 Z w W W Z 0 w J ''D^ V/ Z W IL LLJ .z V L � o x f w a J W C 4 Z i 0 O Q rc O s O O O GGw/ O w O w A a m I w O m 5 U. 0 F- O U J H O F- a J � � O W Lcn a \ O 0 A c_►�f LC Q i *r 0 ti N 2 a t� t W W 1 �•� Q � o o uj W i O �T p U U Z �r W LLJ Z M z LL% W J cn n z Z a o W M LLLI w 1 -�- Z J S g � � a E� 3 V� F w 2 Q m `o Q a w Z a � � o = � U f- � Y a � 3 O m z Q O F- � 0 � � U J � W W } 0] Z Q cis O y Q a J � Y O H 0 0 2 C 8 o a O g u V z w W W 0 W Z_ Z LU Q. W w Z 0 �7 a 2 i I � � t o K F o } f � J W o r O 1 Q A W 4 Q m I V _Z R Lu Lli Z LU J Z uj a. LLI WX LU O 1 U w O w O wo co O O O iu W r 1 U9 J F E w -- d x d w O i 1 1� — 4 I ct 2 m c � p 2 v 0 _Z R W w Z uj a Z a W W Z O ,.: O r 0 F 2�- a� a : O� 2 r O O mo O T O a O¢ 0 0 m 0 K O ce a m 3 0 m 0 U J Q N O F- m A to ado Y Q o LL O z a a W i a � a � N J F- 0 LL. � U u -r 0 _z R W W Z_ CD Z W � —i D U) z Z uj a. � W w W � z 0 I-t e § § § _Q) � . k § 2k — -- Q k ! f o � �o ®o B § G § § E § $ 0 � § 82 � f\ Ix 0 � k w ' � � � � — | 2 J � LU CNI �» �-s ;7 � � b � z } L / l � � § zz:s95 2 « « co r ( 2 ui e 7 & k K & � \ / \ L o � r § .§ k � � ■ a � ) � } 0 a | a ; [ § § :wow t; : !a% \(n a » « � ) .■ �• 4� � 2 ) � ) � � L)L � ix o q k 0 z « � § § \ . w \ /k � IL B 7 IL �! . yu §� 0 � ( xl V Z W LU W J cn Z W LLJ 0. LU 0 Q W O d ws '1 O Y �p � g Q O U Y � J J Q D =Y a Q a a O 3 ~ R W r- d ME z W a. C9 w z o a a 5 Y d W cr- Q 0. N m , C a o'°°'VI ` N a o l a VI u w j g ° w uj s -- W Z = xx o - • W Q -}1 m a ry =WN L N t a. ci Z m a 0 a Y � U H O O rc d a o = o F 0 S° O rc 0 0 w 0 a 0 0 0 0 a Q Z Q o g 0 0 Q W U W IM w Z J O a O ~ Z 0 �� Q m z W w �. o _ Q Y G� W m d o rc IL W W o Z � %� 1 G. r = _ — Z J J F o --- W Q W a �Jlz94 Y LL _ _'' (� z —-------- w — — Z z .N.1 Z),_ Q Q } $ p z° �ti Ix> W r 3 W a )wo f. Z W Q z a ui z z � W\o w U 1 z a @� o w d z LU W w o ¢ a Q o a w a O a_ o LL N a d a n —LLJ -- -- F-a.O p N o z L/ U m` z¢ U a 3 oW W --- -- ~ Q zW N — Z W 0 ' �.! F O • W 6 O S z ci Z 0 — — — — — 0 onIL ow rc of Q Q N M 9 ° o o w o W o rc o 0 o D o W o W z w w w m � � JJQ w a C L LU J D Y '— 3 z W � O U d z a ox �. w w w w W i- z z J w fLLI — } w zO w — — — — O O N C � c O `.J F z W aw �l w o a a w 3 0 O a O O U W --- — — z ww N z r IL U o z° O 3: O W m zQ ¢ v a w ------ —_ Q O m� Q In F 1 o � O Q. W � N U rc F o o a o � F z Q Q w Q z uw E 2 cr w 06 o J � Q Y O � w _ z ---- J v o '' o W aEz _ (% j 4C D ul Z O) t J d D Y o z W w F cc_ O —_ ,_. _ . �_ F `_ R W �? _ W Z w rc z Q o a QJ jo U H H