Loading...
Monterey Peninsula Engineering - 1st Street Water Utility Improvements - Change Order No. 22Citp of OpiCrop Public Works Department - Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0451; Fax (408) 846-0429 CHANGE ORDER NO. 22 To contract for: City of Gilroy First Street Water Utility Improvements City Project No.: 16-PW-217 Contractor: Monterey Peninsula Engineering Contract Date: 7/18/2018 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authoritv to proceed with the work. Description of Work This change order is for additional work outside the original contract scope. This change order isl for the over quantity of Bid Item #13 — 6" DICL Water Pipe, at the agreed upon bid item amount of $4001F. The original bid quantity amount for this Bid Item is 1351-F, whereas 150LF has been installed in the field, thus leading to the over quantity of 151-F. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. Change in working time granted by this change order: ► All Extra Work authorized under this Change Order must be billed separately from the original contract. All bills for work done under this Change Order shall reference this Change Order No. 22. 01Calendar Days Cost Percentam Initial Original Contract Price $5,451,990.00 Previous Change Orders $802,804.92 14.72% DM Total to Date $6,254,794.92 This Change Order $6AD0.00 Total Change Orders to Date $808,804.92 14.84% DM Revised Contract Price $6,260,794.92 I (We) agree to make the above change subject to the Change Order references RCCO QQ terms of this Change Order for a NET INCREASE not to exceed $6,000.00. MPE CONTRACTOR By: - 6 Date: RECOMMENDED BY: Construction Manager ACCEPTED BY: O �� Pr 'ec Engineer/Project Manager ,i Cit �gineer City Administrator � //,s 12 Date Date �/ 7 3 / Z.ov Z.d Date J el f —'fir Date T• • MONTEREY PENINSULA ENGINEERING �\ CONTRACTORS & ENGINEERS om P.O. BOX 2317 MONTEREY, CA 93942 (831)384-4081 December 12, 2019 Dan Mount 4Leaf, Inc. 8896 N. Winding Way Fair Oaks, CA 95628 Re: First St. Water Utility Upgrade- RCCO QQ — Bid Item 13 Over Quantity MPE is proposing to bill for the over quantity of Bid Item #13 — 6" DICL Water Pipe, at the agreed upon bid item amount of $400/LF. The original bid quantity amount for this Bid Item is 135LF, whereas 150LF has been installed in the field, thus leading to the over quantity of 15LF. Bid Quantity: 135LF Actual Quantity: 150LF Total This Change: 15LF @ $400/LF = $6,000 It is mutually agreed that for such change the contract price is increased by $6,000 (Slv Thousand Dollars and 0/100 Cents) M.P.E. specifically excludes the following items: • Engineering, permits, and/or fees • All bonds, as-builts, and/or construction staking • All construction testing • SWPPP installation and/or maintenance • Any items not specifically listed above Please review the above cost proposal and issue a change order for the work described. In addition, we request a Contract Time Extension of ZERO (0) calendar day(s). If you have any questions, please feel free to contact me by phone at (831) 277-5917, or by email at bait C,mne2000.com. Sincerely, Bart Bruno Project Manager