CHANGE ORDER NO. 1
To contract for: Bridge Preventative Maintenance Program City Project No.: 18-PW-246
Contractor: American Civil Constructors West Coast LLC Contract Date: 5/23/2D20
This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and
Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon
acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work.
Description of Work
This Change Order directs the Contractor to substitute PCMS signs with 2'x3' hard signs mounted on Type II barricades.
Paragraph 11.0 of Section 01500 "Construction Facilities and Temporary Controls" makes reference to the placement of
PCMS signs (bid item numbers 8, 16, 26, 35, 40, and 46) to be placed at each end of the project 10 days prior to the start of
work. After the initial site visit, it was determined that the project locations are surrounded by residential and commercial
properties with little or no shoulders. Therefore, the PCMS signs would have to be placed on sidewalks or driveways, and will
likely block the sidewalks and access to residential and commercial driveways. Placing the PCMS signs in the roadway will
obstruct the traffic lanes and bicycle lanes. RFI #2 recommends substituting PCMS signs with 2'x3' hard signs mounted on
Type II barricades. The unit cost for PCMS signs differs from the unit cost for hard signs.
Additionally, the Bid List shows a total of 13 PCMS signs for the project. However, it was confirmed by Submittal #7 (Traffic
Control Plan) that only 12 hard signs will need to be utilized for temporary traffic control. Note that the I.O.O.F bridge only
requires 2 signs, in lieu of the 3 signs noted in Item 40 in the Bid List. Therefore, the City gets a credit for 1 PCMS sign and
for the difference in unit cost between the PCMS signs and the hard signs.
The change amount due to this change order is as listed below:
Unit cost of PCMS signs x (12 signs as approved by submittal # 7 - 13 signs per bid item) _ $500 (12 -13) _ - $500.00
(Unit cost of Hard Sign -Unit Cost of PCMS) x total signs = ($389 - $500) x 12 signs =-$1,332.00
Total change amount due to this change order is-$1,832.00
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with
this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss
of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives
any right to claim any further cost and time impacts at any time during and after completion of the Contract associated v�ith
the Extra Work.
Change in working time granted by this change order:
► All Extra Work authorized under this Change Order
must be billed separately from the original contract. All
bills for work done under this Change Order shall
reference this Change Order No. 1.
O�Working Days �
Cost Percentaarlru'tiel
Original Contract Price
$180,620.00 //
Previous Change Orders
$0.00 N/A U� nc.
Total to Date
$180,620.00
This Change Order
($1,832.00) Q
Total Change Orders to Date
($1,832.00) -1.01% _
Revised Contract Price $178,788.00
I (We) agree to make the above change subject to the
terms of this Change Order for a NET DECREASE of
$1,832.00.
A can it Constructors West Coast LLC
By. (\ CONT,�R TOR) � / Date:
RECOMMENDED BY: ^�Gtt l
J
�tla���>er
ACCEPTED BY: ��� ���
Ll¢�®ject Manager
U'ch31�t�AF�S'y: 35...
9iwtwtln �OV%iS
'tyr,�mnsi�tcat�r .
� J
7/16/2020
Date
7/16/2020
Date
7/16/2020
Date
7/19/2020
Date
DocuSign Envelope ID: OBOOE308-F2CB-4708-8BOC-B9F3BOA19A06
ATTEST:
���'D++,�ocuSigned by: oo
Jna '�'LP�PL4'
�t �9��F�E76461...
DocuSign Envelope ID: OBOOE308-F2C6-4708-860C-69F3BOA19A06
10.0 PROJECT OFFICE
The Contractor shall maintain project copies of the Contract Documents, project
progress records, project schedule, shop drawings, and other relevant
documents which shall be accessible to the City and City's Representative during
normal working hours.
11.0 PUBLIC NOTIFICATION
Prior to Start of Project
As determined by the City designee/construction manager, all residents and
businesses affected by the project shall be provided notice, in writing in the form
of a door knob hanger, at least five (5) working days in advance of the start of
work by the Contractor.
Approved notices will be hand -delivered to each adjacent business or residence
within a 500-foot radius of the bridge being treated, including each tenant of each
building. All notices will be in the format of door hangers (14 inches by 4 inches,
110 Springhill Index or approved equal stock) and be hung at the main door of
each residence or business affected. When required by the Engineer, the text of
notices will be printed in English with the reverse in Spanish.
All schools within a 1,000-foot radius of the bridge being treated shall be
provided notice, in writing, in the form of a letter at least 2 weeks in advance and
again 48 hours in advance of the start of work by the Contractor.
The notices) must, at a minimum, include a brief description of the work, the
start date and expected duration of the work, the name and phone number of the
Contractor's representative, the name and phone number of the City's
representative, and any other information requested by the City
designee/construction manager. All notices must be approved by the City
designee/construction manager for content and delivery schedule at least 48
hours prior to actual delivery. Sample notices are included as an appendix to
these specifications.
s
�..�. ... ,.... .. ...e
wording shall be submitted to, and approved by, the Engineer in advance of
performing the work. The Contractor shall revise the message and location of
It is the Contractor's responsibility to obtain trash pickup schedules and
coordinate work so that trash pickup is maintained. No street or lane shall be
City of Gilroy Bridge Preventative Maintenance Program
December 2019 SECTION 01500
18-PW-246 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS-198
DocuSign Envelope ID: OBOOE308-F2C6-4708-860C-69F3BOA19A06
closed on trash pickup day of each respective street.
It is the Contractor's responsibility to coordinate with the City Street Maintenance
Division when working on a street that is on a street sweeping schedule (where
applicable).
It is the Contractor's responsibility to arrange the construction schedule in such a
way to allow for daily mail delivery on work streets. Such coordination with
representatives of U.S. Post Office shall occur not less than each day.
The Contractor shall make all necessary arrangements prior to start of work on a
bridge. A minimum of 72 hours advance notice must be provided to the following:
1. City Engineering Division - (408) 846-0451
2. City Police Department - (408) 846-0300
3. City Fire Department - (408) 846-0370
4. United States Post Office Station Manager - (408) 842-1354
5. Garbage Company - (408) 842-3358
6. VTA (Gilroy Area Transit) - (408) 321-2300
7. Gilroy Unified School District — (669) 205-4080
�_1:7:/I � [r1:7 X+� �:7 [� � [�] �l+�_1 � I �11�I+� � I � [r17�]:i l�\�i%Vi%\'1
"NO PARKING" signs posted by the Contractor shall be of heavy card stock and
not less than 1.75 square feet of surface area on the face. Background color
shall be white and letters shall be printed in red water-resistant ink except that
day, date, time of restriction and date posted may be printed in black water-
resistant ink. The signs shall be printed with the words "Tow Away," "No Driving"
and "No Parking" with a character height of not less than 2.75 inches and a
stroke width of not less than 0.5 inches. The day, date, and time of the particular
restriction shall be printed below the above mentioned wording in characters of
not less than 2.0 inches in height and 0.4 inches in stroke width. The day of the
week shall be written out or properly abbreviated with three or four letters; date or
dates of restriction shall be listed completely; the beginning and ending times
shall be clearly listed on the sign. Each sign shall list the name and local phone
number of the Contractor's Representative in letters of not less than 0.75 inch in
height; the Contractor shall staff such phone lines to answer all phone inquiries
by the public between the hours of 7 a.m. and 6 p.m. on working days.
City of Gilroy Bridge Preventative Maintenance Program
December 2019 SECTION 01500
18-PW-246 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS-199
DocuSign Envelope ID: OBOOE308-F2C6-4708-860C-69F3BOA19A06
ACC -Hard Sign Unit Cost Breakdown
CCO Analysis for PCMS replacement w/ hard sign -Traffic Crew
Two man tra%c crew and traffic track for installation of 12 hard signs.
**assume 1 hr load time, 4 hr round trip Navel, 30 minutes installation time per structure location; total time 8 hours.
�EQ. NO. (EQUIPMENT �. o orn,,. I RATE I OTr.�o. (TOTAL
_ INSTALLATION
7721 IF-450 traffic truck ) I 8 I $ 36.04 I 0.88 $ 288.32
48 cones 4ea x 121ocations 8 $ 8.53 0.00 $ 68.24
REMOVAL
7721 F-450 tra%c truck 8 $ 36.04 0.88 $ 288.32
TOTAL EQUIPMENT $ 644.88
�� MATERIAL &VENDERS � QTY � Rate AMOUNT I
�2'x3'hard sign 12 ea $75.00 $ 900.00
type 2 barricade 12 ea $50.57 $ 606.84
$ -
$ _
$ -
TOTAL MATERIAL VENDORS $ 1,506.84
SUB -CONTRACTORS � � AMOUNT I�
TOTAL SUB -CONTRACTORS $ -
�� NON MARKUP INVOICES BIV. DATE AMOUNT
TOTAL MARKUP INVOICES 0.00
LABOR
HRS RATE REG
O.T.
SUBSIST
INSTALLATION
Foreman
8.0 $ 57.08 $
456.64
0.0 $ 85.62
$
-
Laborer
8.0 $ 52.44 $
419.48
0.0 $ 78.65
$
-
REMOVAL
Foreman
8.0 $ 57.08 $
456.64
0.0 $ 85.62
$
-
Laborer
8.0 $ 52.44 $
419.48
0.0 $ 78.65
$
-
$
-
$ -
$
-
SUB -TOTAL LABOR $
1,752.24 $
- $
-
TOTAL REGULAR HOURS
$
1,752.24
LABOR SURCHARGE
0%
$
-
TOTAL O.T. HOURS
$
-
PREMIUM LABOR SURCHARGE
0 %
$
-
SUB -TOTAL LABOR
$
1,752.24
LABOR MARKUP
25 %
$
438.06
TOTAL COST LABOR
$
2,190.30
COST MATERIAL VENDORS
$
1,506.84
MATERIAL MARKUP
15 %
$
226.03
TOTAL COST VENDORS
$
1,732.87
COST OF EQUIPMENT
$
644.88
EQUIPMENT MARKUP
15 %
$
96.73
TOTAL COST EQUIPMENT
$
741.61
SUB -CONTRACTORS
$
-
SUB -CONTRACTOR MARKUP
10%
$
-
TOTAL COST SUBCONTRACTORS
$
-
GRAND TOTAL
$
4,664.78
TOTAL COST INST/RMV PER PCMS LOCATION
$
388.73
BCA verified with I.C.E.
DocuSign Envelope ID: OBOOE308-F2CB-4708-8BOC-B9F3BOA19A06
City of Gilroy
7351 Rosanna Street
Gilroy, California 95020
Phone: (408) 846-0451
Fax:64-9817-3635
TO
DATE INITIATED:
LOCATION:
PROJECT STAGE:
SUB JOB:
COST IMPACT:
DRAWING NUMBER:
LINKED DRAWINGS:
RFI #2
Project: City: 18-PW-246 Federal: BPMP-5034(026) -Bridge Preventative
Maintenance Program
PCMS notification
John Alciati (Biggs Cardosa Associates, Inc.) FROM: Doug Van Note (American Civil Constructors
Ron Oen (Biggs Cardosa Associates, Inc.) West Co)
Nikhil Patel (Biggs Cardosa Associates, Inc.) 2990 Bay Vista Court, Suite D
05/28/2020 Benicia, California 94510
STATUS: Closed on 05/30/20
Pre -Construction DUE DATE: 06/03/2020
COST CODE:
No SCHEDULE IMPACT: No
SPEC SECTION: 01500 -Construction Facilities and Temporary
Controls
REFERENCE:
RECEIVED FROM: Doug Van Note (American Civil Constructors West Coast )
COPIES TO:
John Alciati (Biggs Cardosa Associates, Inc.), Faranak Mandavi (City of Gilroy), Julie Oates (City of Gilroy), Ron Oen (Biggs Cardosa
Associates, Inc.), Nikhil Patel (Biggs Cardosa Associates, Inc.), Doug Van Note (American Civil Constructors West Coast )
Paragraph 11.0 of section 01500 "Construction facilities and temporary controls" makes reference to the placement of PCMS to be placed at each end
of the project 10 days prior to the start of work.
American Civil Constructors (ACC) has inspected the project site and notes that the closure locations on the project are local surface streets with little,
or no, road shoulders to locate each PCMS.
This would require the PCMS be located partially on sidewalks, or blocking driveways.
ACC would propose that the same notification can be made using a 2'x3' (+/-) hard sign mounted to a type 2 folding barricade.
The footprint of the hard sign is small enough to allow placement on a road shoulder without impeding traffic.
Proposed sign language:
"ROAD WORK
AHEAD
INTERMITTENTLY
6/8 TO 7/24
EXPECT DELAYS"
Official Response: Nikhil Patel (Biggs Cardosa Associates, Inc.) responded on Saturday, May 30th, 2020 at 4:47PM PDT
The proposed replacement of PCMS boards with a 2'x3' (+/-) hard sign mounted to a Type 2 folding barricade with the proposed language in
this RFI is acceptable provided the contractor provides the City with the cost of the 2'x3' (+/-) signs so the cost difference between the
PCMS (at $500 each) and 2'x3' hard signs mounted to Type 2 folding barricades can be credited to the City.
Attachments:
All Replies:
City of Gilroy Page 1 of 2 Printed On: 05/30/2020 05 :13 PM
DocuSign Envelope ID: OBOOE308-F2CB-4708-8BOC-B9F3BOA19A06
CiyOF G�!
" ��<
�::..:_
� ���#�;�
0 0 „0
RFI #2
The proposed replacement of PCMS boards with a 2'x3' (+/-) hard sign mounted to a Type 2 folding barricade with the proposed language in
this RFI is acceptable provided the contractor provides the City with the cost of the 2'x3' (+/-) signs so the cost difference between the PCMS
(at $500 each) and 2'x3' hard signs mounted to Type 2 folding barricades can be credited to the City.
Attachments:
��
By NIKF��L PATEL
05/30/2020
i.�_��a
I:K•ldl�'�t•]
City of Gilroy Page 2 of 2 Printed On: 05/30/2020 05:13 PM
DocuSign Envelope ID: OBOOE308-F2CB-4708-8BOC-B9F3BOA19A06
•
�- .�
City of Gilroy
7351 Rosanna Street
Gilroy, California 95020
Phone: (408) 846-0451
Fax:64-9817-3635
Submittal #01500-8.0.0
01500 -Construction
Facilities and Temporary
Controls
Project: City: 18-PW-246 Federal: BPMP -Bridge Preventative
Maintenance Program
ACC submittal #07 -traffic control plan
REVISION:
0
SUBMITTAL MANAGER:
Nikhil Patel (Biggs Cardosa Associates,
Inc.)
STATUS:
Open
DATE CREATED:
06/1/2020
ISSUE DATE:
SPEC SECTION:
01500 -Construction Facilities and Temporary
Controls
RESPONSIBLE
American Civil Constructors West Coast LLC
RECEIVED FROM:
Doug Van Note
CONTRACTOR:
RECEIVED DATE:
SUBMIT BY:
FINAL DUE DATE:
06/19/2020
LOCATION:
SUB JOB:
COST CODE:
TYPE:
Plans
APPROVERS:
John Alciati (Biggs Cardosa Associates, Inc.), Ron
Oen (Biggs Cardosa Associates,
Inc.), Nikhil Patel (Biggs Cardosa
Associates, Inc.)
BALL IN COURT:
John Alciati (Biggs Cardosa Associates, Inc.), Ron Oen (Biggs Cardosa Associates, Inc.), Nikhil Patel (Biggs Cardosa Associates, Inc.)
DISTRIBUTION:
Doug Van Note (American Civil Constructors West Coast L) ,Nikhil Patel (Biggs Cardosa Associates, Inc.) ,Ron Oen (Biggs Cardosa
Associates, Inc.) ,Julie Oates (City of Gilroy) , Faranak Mandavi (City of Gilroy) ,John Alciati (Biggs Cardosa Associates, Inc.)
DESCRIPTION:
ACC traffic control plan.
ATTACHMENTS:
15-PW-246 ACC Submittal 07 - TCP.odf
SUBMITTAL WORKFLOW
RETURNED
NAME
DUE DATE
RESPONSE ATTACHMENTS COMMENTS
DATE
John Alciati
6/19/2020
Pending
Ron Oen
6/19/2020
Pending
Nikhil Patel
6/19/2020
Pending
Reviewed ® Make Camecbans
Noted
Revise antl Resubmit � Reiec[etl
Checking is only for general conformance with the
design c ncept of the project and general
compliance with the information given in the
contract documents. Any action shown is subject
to the requirements of the plans and
specifications Contractor i responsible for:
dimensions which shall be confirmed and
correlated at the lob site; fabncation processes
and techniques of constmdion; coordination of his
work with that of all other trades; and the
satisfactory pertormance of his work.
BIGGS CARDOSA ASSOCIATES, INC
Date O6/04/2020 By BCA
BY
DATE
COPIES TO
City of Gilroy
Page 1 of 1 Printed On: 06/02/2020 11:54 AM
DocuSign Envelope ID: OBOOE308-F2CB-4708-8BOC-B9F3BOA19A06
rnerican
IVI�
vnstructvrs
2990 Bay Vista Court
Benicia, CA 94510-1246
(707) 746-8028 Fax (707) 746-0936
TO: Julie Oates
City of Gilroy Public Works department
7351 Rosanna Street
Gilroy, CA 95020
Phone 408-846-0451
WE ARE SENDING YOU 0 Attached
Shop Drawings � Prints � Plans
Copy of letter � Change Order
Copies Date No.
1 6/1/2020 1 Traffic control plan
THESE ARE TRANSMITTED as checked below:
LETTER OF SUBMITTAL #07
(Date:
06/01/20 IJob: 20015-106
Attention:
Julie Oates
�
Gilroy bridge maintenance �
various locations
contract # 18-PW-246
Under separate cover via
the following
items:
Samples
� SpeciScations
I � (Submittals
Description
For approval
� Approved as submitted
� Resubmit copies for approval
For your use
� Approved as noted
� Submit copies for distribution
As requested
� Returned for corrections
� Return corrected prints
For review and comment
n For Payment
REMARKS:
If you need additional information or have any questions, please contact me directly at 707-249-0845 or
via email at dvannote@accbuilt.com
Reviewed ® Make Corrections
Sincerely,
Noted
Revise and Resubmit � Rejected
Checking is only for general conformance with the
��]]
design concept of the project and general
SIGNED:
compliance with the information given in the
contract documents. Any action shown is subject
DOUg VariNOte
to the requirements of the plans and
specifications. Contractor is responsible for:
If enclosures are not as noted, kindly notify us at once...
dimensions which shall be confirmed and
correlated at the job site; fabrication processes
and techniques of construction; coordination of his
work with that of all other trades; and the
satisfactory performance of his work.
BIGGS CARDOSA ASSOCIATES, INC.
Date O6/04/2020 By BCA
C�cuSign Envelope ID: OBOOE308-F2C6-4708-860C-69F3BOA19A06
NOTES:
1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSTALL THE TRAFFIC
CONTROL DEVICES AS SHOWN HEREON, AS WELL AS ANY ADDITIONAL TRAFFIC
CONTROL DEVICES AS MAY BE REQUIRED TO ENSURE THE SAFE MOVEMENT
OF TRAFFIC AND PEDESTRIANS THROUGH OR AROUND THE WORK ZONE, AND
PROVIDE MAXIMUM PROTECTION AND SAFETY TO CONSTRUCTION WORKERS.
2. ALL TRAFFIC CONTROL DEVICES AND THEIR PLACEMENT SHALL CONFORM
TO THE REQUIREMENTS OF THE CALIFORNIA FORM TRAFFIC
CONTROL DEVICES (CA-MUTCD}, 2014 EDITION VI 10 Revision 5
3. PLAN IMPLEMENTATION AND DEVICE PLACEM E PERFORMED BY
TRAINED PERSONNEL.
4. ALL FLAGGERS SHALL BE CERTIFIED AS REQUIRED BY CAL OSHA.
5. TRAFFIC CONTROL DEVICES MUST BE MONITORED AND MAINTAINED BY THE
CONTRACTOR ATALL TIMES.
6. TRAFFIC CONTROL DEVICES SHALL NOT BE PLACED ON PRIVATE PROPERTY
WITHOUT PERMISSION FROM PROPERTY OWNER.
7. CONTRACTOR SHALL MAINTAIN ACCESS TO ALL DRIVEWAYS, RESIDENCES AND
BUSINESS AT ALL TIMES UNLESS OTHERWISE NOTED. CONTRACTOR SHALL
NOTIFY ALL AFFECTED RESIDENCES AND BUSINESSES 72 HRS IN ADVANCE PRIOR
TO CLOSURE OF A DRIVEWAY OR ACCESS.
8. ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED AT THE END OF THE
WORKING DAY.
9. TEMPORARY NO PARKING SIGNS MUST BE PLACED 72 HRS IN ADVANCE OF
SCHEDULE CLOSURE.
10. ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED AT THE END OF THE WORKING DAY.
WORKING HOURS AUTHORIZED BY THE CITY SHALL NOT BE VIOLATED.
11. FIELD CHANGES, OTHER THAN MINOR ADJUSTMENTS APPROVED BY THE CITY'S INSPECTOR
OR AUTHORIZED AGENT, MUST BE AUTHORIZED IN WRITING BY CITY ENGINEER.
LEGEND
WORK END O RO D E • PREPARED
AHEAD ROAD WORK �� TO STOP
G20-2
W20-1 W20-4 C9A(CA) W3-q.
LANE SHARE r.,. PCMS
CLOSED THE PORTABLE
ROAD
FLAGGER CHANGEABLE
C30(CA) W11-1 W1Ei-1P MESSAGE
SIGNS
• • • •
TRAFFIC WORK
CONE SIGN ZONE
Tat�le fiC-1. Recommended Advance Warning Sigh � Spacing
Raad Type
distance Between Signs"
n � e � c
Urben#lerrepaeel}- 25 mph or less'••
100 feet
100 feek
100 fear
Urban - mvre than 25 rnph 90 dQ mph"'
254 ippt
254 fait
25Q tact
Urban ��� mora then 40 mph'"'
350 reei
350 feel
350 feel
Rural
500 reei
500 feel
5�0 ieel
Expressway 1 Freeway
1,000 feet
1,5t)0 feet
2.840 feet
VICINITY MAP
- : '
- - I ___..,-..,.,,
,r=�
�_ � ���
�� —..t ��i;,.i�..�,,.-
� _�
i,
-' `�61�.
__ _3i`I�. �'11 �' �+
,a� � -.
Mkt►-E+e:B�apra�t7r.
� � _ ;�Clrt�gar--__-_,
�� _ `�=��a��antia:tlr�
Advance warning signs shall be
space per the attached table
' ' � I�eq�si
���.: Y
Reviewed ® Make Corrections
Noted
Revise and Resubmit � Rejected
Checking is only for general conformance with the
design concept of the project and general
compliance with the information given in the
contract documents. Any action shown is subject
to the requirements of the plans and
specifications. Contractor is responsible for:
dimensions which shall be confirmed and
correlated at the job site; fabrication processes
and techniques of construction; coordination of his
work with that of all other trades; and the
satisfactory pertormance of his work.
BIGGSCARDOSAASSOCIATES INC
a �
�r
SAFETY Cd... lahlC ,
7821 W. SUNNWIEW AVE
VISALIA. CA 93291
559 - 732 - 0393
TRAFFIC CONTROL PLANS
LICENSE # 507950 (A,C31)
IF KRC SAFETY CO INC IS NOT
PERFORMING THE ACTUAL TRAFFIC
CONTROL, THEN IT IS
THE RESPONSIBILITY OF THE
CONTRACTOR OR SUBCONTRACTOR
TO ENSURE THAT PROPERLY TRAINED
PERSONNEL MAINTAIN AND MAKE
NEEDED FIELD ADJUSTMENTS
FOR UTMOST VEHICULAR AND
PEDESTRIAN SAFETY. IFATRAFFIC
CONTROL SETUP VARIES FROM,
AND OR CHANGES ARE MADE TO THE
APPROVED TRAFFIC CONTROL PLAN,
THE CONTRACTOR SHALL ASSUME
ALL RESPONSIBILITYAND RISK
ASSOCIATED WITH IMPLEMENTATION,
MAINTENANCE AND REMOVAL
OF THE TRAFFIC CONTROL.
�, � � �
o: -�
� C9 2
No_ 80702
EXP. 03/31 /21 �
`��' CIVIL �'�
9TF � cn��F
Ce-�-ZoZA
CONTRACTOR:
AMERICAN CIVIL
CONSTRUCTORS
CONTACT:
DOUG VANNOTE
707-249-0845
AGENCY/ LOCATION:
-GILROY-
VARIOUS LOCATIONS
PROJECT:
BRIDGE PREVENTATIVE
MAINTENANCE PROGRAM
START DATE:
PER PERMIT
WORK HOURS:
PER PERMIT
DURATION:
PER PERMIT
SUBMITTAL:
05.29.20 -SUBMITTED
TCP DRAWN BY:
Hannah L (HannahL@kresafety.com;t
COVER SHEET
Date O6/04/2020 By BCA
SHtET:
AMERICAN CIVIL CONSTRUCTORS - GILROY -VARIOUS LOCATIONS - 05.29.2020 1 O F 22
DocuSign Envelope ID: OBOOE308-F2CB-4708-8BOC-B9F3BOA19A06
'gym �
`(J'1 Z
/ Z ��
/ ��m
2
S W �
? � '�
�� W11-1
_ � W16-1P
Reviewed ® Make Corrections
Noted
Revise and Resubmit � Rejected
Checking is only for general conformance with the
design concept of the project and general
compliance with the information given in the
contract documents. Any action shown is subject
to the requirements of the plans and
specifications. Contractor is responsible for:
dimensions which shall be confirmed and
correlated at the job site; fabrication processes
and techniques of construction; coordination of his
work with that of all other trades; and the
satisfactory performance of his work.
BIGGS CARDOSA ASSOCIATES, INC.
Date 06/04/2020 By BCA
W20-1 s�
N� Q�►1
� l25 M
l G20-2
�V a o �� '
_�� -`r
SAFETY CQ_� �IVC .
7821 W.SUNNYVIEWAVE
VISALIA, CA 93291 '
559 - 732 - D393 '
TRAFFIC CONTROL PLANS
LICENSE # 50795D (A,C31)
IF KRC SAFETY CO INC IS NOT
PERFORMING THE ACTUAL TRAFFIC
CONTROL, THEN IT IS
THE RESPONS181LITY OF THE
CONTRACTOR OR SUBCONTRACTOR
TO ENSURE THAT PROPERLY TRAINED
PERSONNEL MAINTAIN AND MAKE
NEEDED FIELD ADJUSTMENTS
FOR UTMOST VEHICULAR AND
PEDESTRIAN SAFETY. IF A TRAFFIC
CONTROL SET UP VARIES FROM,
AND OR CHANGES ARE MADE TO THE
APPROVED TRAFFIC CONTROL PLAN,
THE CONTRACTOR SHALLASSUME
ALL RESPONSIBILITYAND RISK
ASSOCIATED WITH IMPLEMENTATION,
MAINTENANCE AND REMOVAL
OF THE TRAFFIC CONTROL.
~`v���O��i N sT` Z
� � � �
� � -1
W c9 VV =
o� No. 80702
EXP. 03/31 /21 Q,
J')qT C ! V 1 �- ���
F OF CA�-�F
�o )-Zot-b
CONTRACTOR:
AMERICAN CIVIL
CONSTRUCTORS
CONTACT
DOUG VANNOTE
707-249-0845
AGENCY/ LOCATION:
-GILROY-
FARREL AVE
PROJECT:
BRIDGE PREVENTATIVE
MAINTENANCE PROGRAM
START DATE:
PER PERMIT
WORK HOURS:
PER PERMIT
DURATION:
PER PERMIT
SUBMITTAL:
05.29.20 -SUBMITTED
TCP DRAWN BY:
Hannah L (HannahL@kresafety.com)
N -
TCP 1
SHEET:
20F22
DocuSign Envelope ID: OBOOE308-F2CB-4708-8BOC-B9F3BOA19A06
100' ""
2
�_
VVLU-1
� G 0-2
,���M��'pNl
l2yM
250'
BCA:
ENSURE A
TO THE E�
RESIDENT
DRIVEWAI
PROVIDEC
DURATION
CONSTRUI
125'l"' C9A(CA)
125' w3-4 MpNi
� � P�� l30
� � FP����
it
/LJV
250' "
W20-1
W20-4
✓/ �
� G20-2
Reviewed ® Make Corrections
Noted
Revise and Resubmit � Rejected
Checking is only for general conformance with the
design concept of the project and general
compliance with the information given in the
contract documents. Any action shown is subject
to the requirements of the plans and
specifications. Contractor is responsible for:
dimensions which shall be confirmed and
correlated at the job site; fabrication processes
and techniques of construction; coordination of his
work with that of all other trades; and the
satisfactory performance of his work.
BIGGS CARDOSA ASSOCIATES, INC.
Date 06/04/2020 By BCA
S�
G2o-2��,c1 �l
s�`� 125Mp
sVla o r~
S'rt 'ram.
SAFETY CIO-� �IVC .
7821 W. SUNNYVIEW AVE
VISALIA, CA 93291
559 - 732 - 0393
TRAFFIC CONTROL PLANS
LICENSE # 507950 (A,C31)
IF KRC SAFETY CO INC IS NOT
PERFORMING THE ACTUAL TRAFFIC
CONTROL, THEN IT IS
THE RESPONSIBILITY OF THE
CONTRACTOR OR SUBCONTRACTOR
TO ENSURE THAT PROPERLY TRAINED
PERSONNEL MAINTAIN AND MAKE
NEEDED FIELD ADJUSTMENTS
FOR UTMOST VEHICULARAND
PEDESTRIAN SAFETY. IFATRAFFIC
CONTROL SET UP VARIES FROM,
AND OR CHANGES ARE MADE TO THE
APPROVED TRAFFIC CONTROL PLAN,
THE CONTRACTOR SHALLASSUME
ALL RESPONSIBILITY AND RISK
ASSOCIATED WITH IMPLEMENTATION,
MAINTENANCEAND REMOVAL
OF THE TRAFFIC CONTROL.
� O S�
a .�- --t
� c� r
No. 80702
EXP. 03/31 /21 �
sT crvt� ��
�TF OF CALF
�-I -ZoZU
CONTRACTOR:
AMERICAN CIVIL
CONSTRUCTORS
CONTACT:
DOUG VANNOTE
707-249-0845
AGENCY/ LOCATION:
-GILROY-
FARRELAVE
PROJECT:
BRIDGE PREVENTATIVE
MAINTENANCE PROGRAM
START DATE:
PER PERMIT
WORK HOURS:
PER PERMIT
DURATION:
PER PERMIT
SUBMITTAL:
05.29.20 -SUBMITTED
TCP DRAWN BY:
Hannah L (HannahL@kresafety.com)
N
i TCP 1
SHEET:
30F22
DocuSign Envelope ID: OBOOE308-F2CB-4708-8BOC-B9F3BOA19A06
�R���PJ�l3�MpNl 1 s
Fr
Reviewed ® Make Corrections
Noted
Revise and Resubmit � Rejected
Checking is only for general conformance with the
design concept of the project and general
compliance with the information given in the
contract documents. Any action shown is subject
to the requirements of the plans and
specifications. Contractor is responsible for:
dimensions which shall be confirmed and
correlated at the job site; fabrication processes
and techniques of construction; coordination of his
work with that of all other trades; and the
satisfactory performance of his work.
BIGGS CARDOSA ASSOCIATES, INC.
Date 06/04/2020 By BCA
. �
. �
.mm �
♦ � �+
1 � ,mom m
W11-1 !� W
� �� W16-1P '_
Y
�3�
125'
�t
V
��`� � �,
P�� 5��..
i''..
100`�� w2o-1 S�
��NN �Q�l
/12��J
� G20-2
250'
\\
w'v Q o rr--I
s� �si.i.r
SAFETY CO_- �IVC .
7821 W. SUNNYVIEW AVE
VISALIA, CA93291
559 - 732 - 0393
TRAFFIC CONTROL PLANS
LICENSE # 507950 (A,C31)
IF KRC SAFETY CO INC IS NOT
PERFORMING THE ACTUAL TRAFFIC
CONTROL, THEN IT IS
THE RESPONS181LITY OF THE
CONTRACTOR OR SUBCONTRACTOR
TO ENSURE THAT PROPERLY TRAINED
PERSONNEL MAINTAIN AND MAKE
NEEDED FIELD ADJUSTMENTS
FOR UTMOST VEHICULARAND
PEDESTRIAN SAFETY. IFATRAFFIC
CONTROL SET UP VARIES FROM,
AND OR CHANGES ARE MADE TO THE
APPROVED TRAFFIC CONTROL PLAN,
THE CONTRACTOR SHALL ASSUME
ALL RESPONSI8ILITYAND RISK
ASSOCIATED WITH IMPLEMENTATION,
MAINTENANCE AND REMOVAL
OF THE TRAFFIC CONTROL.
y��� o�t,�(l/f �N S� F�
� ✓ - Imo- -+ i
w c� _ !
°C No. 80702
EXP. 03/31/21
sT9TF OF CA �F�/
� - (- 26Z-0
CONTRACTOR:
AMERICAN CIVIL
CONSTRUCTORS
CONTACT:
DOUG VANNOTE
707-249-0845
AGENCY/ LOCATION:
-GILROY-
FARRELAVE
PROJECT:
BRIDGE PREVENTATIVE
MAINTENANCE PROGRAM
START DATE:
PER PERMIT
WORK HOURS:
PER PERMIT
DURATION:
PER PERMIT
SUBMITTAL:
05.29.20 -SUBMITTED
TCP DRAWN BY:
Hannah L (HannahL@kresafety.com)
N
TCP 2
SHEET:
40F22
DocuSign Envelope ID: OBOOE308-F2CB-4708-8BOC-B9F3BOA19A06
W20-1
250'
100'�f �' W20-1
i-2 -
-.
G� G2o-2
.���M��'QNl
l25 M
5�
W2J/
W20-1
�, � G20-2
� Q o �—
sv �►��..
SiAFETY CO-. �IVC .
7821 W. SUNNYVIEW AVE
VISALIA, CA 93291
559 - 732 - 0393
TRAFFIC CONTROL PLANS
LICENSE # 507950 (A,C31)
IF KRC SAFETY CO INC IS NOT
PERFORMING THE ACTUAL TRAFFIC
CONTROL, THEN IT IS
THE RESPONSIBILITY OF THE
CONTRACTOR OR SUBCONTRACTOR
TO ENSURE THAT PROPERLY TRAINED
PERSONNEL MAINTAIN AND MAKE
NEEDED FIELD ADJUSTMENTS
FOR UTMOST VEHICULAR AND
PEDESTRIAN SAFETY. IFATRAFFIC
CONTROL SET UP VARIES FROM,
AND OR CHANGES ARE MADE TO THE
APPROVED TRAFFIC CONTROL PLAN,
THE CONTRACTOR SHALLASSUME
ALL RESPONSIBILITYAND RISK
ASSOCIATED WITH IMPLEMENTATION,
MAINTENANCEAND REMOVAL
OF THE TRAFFIC CONTROL.
QRpr wa 1 pN'9\
���O �
c�0�`l N S� �c
a � ��
w c� _
a No. 80702
EXP. 03/31 /21 �
ST �'! V IL �'�
qTF OF CA�`�OQ.
�" 1 -2�ZU
CONTRACTOR:
AMERICAN CIVIL
CONSTRUCTORS
CONTACT:
DOUG VANNOTE
707-249-0845
AGENCY/ LOCATION:
-GILROY-
FARRELAVE
PROJECT:
BRIDGE PREVENTATIVE
MAINTENANCE PROGRAM
START DATE:
PER PERMIT
WORK HOURS:
PER PERMIT
DURATION:
PER PERMIT
SUBMITTAL:
05.29.20 -SUBMITTED
TCP DRAWN BY:
Hannah L (HannahL(a�kresafety.com)
N
TCP 2
SHEET:
50F22
DocuSign Envelope ID: OBOOE308-F2CB-4708-8BOC-B9F3BOA19A06
`I �NP�
,ASS PNl
l25 M
s��3o
��,��.
5r
�.Q' �ti
P��
Reviewed ® Make Corrections
Noted
Revise and Resubmit � Rejected
Checking is only for general conformance with the
design concept of the project and general
compliance with the information given in the
contract documents. Any action shown is subject
to the requirements of the plans and
specifications. Contractor is responsible for:
dimensions which shall be confirmed and
correlated at the job site; fabrication processes
and techniques of construction; coordination of his
work with that of all other trades; and the
satisfactory performance of his work.
BIGGS CARDOSA ASSOCIATES, INC.
Date 06/04/2020 By BCA
� Q o �
s Y r�
SAFETY CO-. �IVC .
7821 W.SUNNWIEWAVE
VISALIA, CA 93291
559 - 732 - 6393
TRAFFIC CONTROL PLANS
LICENSE # 507950 (A,C31)
IF KRC SAFETY CO INC IS NOT
PERFORMING THE ACTUAL TRAFFIC
CONTROL, THEN IT IS
THE RESPONSIBILITY OF THE
CONTRACTOR OR SUBCONTRACTOR
TO ENSURE THAT PROPERLY TRAINED
PERSONNEL MAINTAIN AND MAKE
NEEDED FIELD ADJUSTMENTS
FOR UTMOST VEHICULARAND
PEDESTRIAN SAFETY. IF A TRAFFIC
CONTROL SET UP VARIES FROM,
AND OR CHANGES ARE MADE TO THE
APPROVED TRAFFIC CONTROL PLAN,
THE CONTRACTOR SHALLASSUME
ALL RESPONSIBILITY AND RISK
ASSOCIATED WITH IMPLEMENTATION,
MAINTENANCE AND REMOVAL
OF THE TRAFFIC CONTROL.
V ,�
� i��,�o�%��N s� F2�%
(� a' ♦ �/T � rZ+1
w c9 = m
°G No. 80702 �
EXP. 03/31 /21 �
s�q ClVIL ��
TF OF CALF
:o -t"ZoZA
CONTRACTOR:
AMERICAN CIVIL
CONSTRUCTORS
CONTACT:
DOUG VANNOTE
707-249-0845
AGENCY/ LOCATION:
-G I LROY-
CHURCH ST
PROJECT:
BRIDGE PREVENTATIVE
MAINTENANCE PROGRAM
START DATE:
PER PERMIT
WORK HOURS:
PER PERMIT
DURATION:
PER PERMIT
SUBMITTAL:
05.29.20 -SUBMITTED
TCP DRAWN BY:
Hannah L (HannahL@kresafety.com)
N
TCP 3
SHEET:
60F22
DocuSign Envelope ID: OBOOE308-F2CB-4708-8BOC-B9F3BOA19A06
TEMPORARY NO PARKING SIGNS TO BE
PLACED ON BOTH SIDES OF THE STREET
FOR THIS STRETCHA MINIMUM
OF 72 HOUR PRIOR TO THE START OF
CONSTRUCTION.
BCA:
ENSURE ACCESS TO THE
EXISTING MAINTANACE
ROADS IS PROVIDED AS
NEEDED
5
�N�'�N�6�'�
MP��sN���' , �
SE�,� � \
�',-,. ws� , � y
,� G
\� ��
W11-1 , , y
W16-1P ` � N�
125' , �
�\ �
S
�, CHAPPELL CT
�(25 MPH) G{-2
J
f
►���/♦
• ' 1���►�
� '� 4►
►l►��
i�, �
�i� 4♦
�V���
r—� �, �
�J100'
100'
W;-4
�=
Reviewed ® Make Corrections
Noted
Revise and Resudmlt � Rejected
Checking is only for general conformance with the
design concept of the project and general
compliance with the information given in the
contract documents. Any action shown is subject
to the requirements of the plans and
specifcations. Contractor is responsible for:
dimensions which shall be confirmed and
correlated at the job site; fabrication processes
and techniques of construction; coordination of his
work with that of all other trades; and the
satisfactory pertormance of his work.
BIGGS CARDOSA ASSOCIATES, INC.
Date O6/04/2020 By BCA
,- 100'
C9 �(CA)
WOODWORTH WAY
(25 MPH)
�� 1��
��
3-4
��
, � 125'
14 .1 _
��t1 1! ,L � IC 6 J1
. MATCH LIN GHT
SEE �PpER RI
TGH LINE 6
SEE LOWER+LEFT, .
' � ` � t l -
I
ra.C9A(CA)
2
D_
`
�
W -1
�
�O
F-
(A "
2
�`
U
G20-2
�
U
I I
� II
II
I I
II
II
' 250'
100'
W20-1
� LIMAN AVE
(25 MPH)
' �
G20-2
�.w2o-1
2��'
A Q o r
s�rn�a..
SAFETY CO_, �IVC .
7821 W. SUNNYVIEW AVE
VISALIA, CA 93291
559 - 732 - 0393
TRAFFIC CONTROL PLANS
LICENSE # 507950 (A,C31)
IF KRC SAFETY CO INC IS NOT
PERFORMING THE ACTUAL TRAFFIC
CONTROL, THEN IT IS
THE RESPONS181LITY OF THE
CONTRACTOR OR SUBCONTRACTOR
TO ENSURE THAT PROPERLY TRAINED
PERSONNEL MAINTAIN AND MAKE
NEEDED FIELD ADJUSTMENTS
FOR UTMOST VEHICULARAND
PEDESTRIAN SAFETY. IFATRAFFIC
CONTROL SET UP VARIES FROM,
AND OR CHANGES ARE MADE TO THE
APPROVED TRAFFIC CONTROL PLAN,
THE CONTRACTOR SHALLASSUME
ALL RESPONSIBILITYAND RISK
ASSOCIATED WITH IMPLEMENTATION,
MAINTENANCE AND REMOVAL
OF THE TRAFFIC CONTROL.
� o s� tic
� � ��
� " _ `-
No. 80702
EXP. 03/31 /21 Q,
s ClVIL �'�
T,gTF OF CAL�F��
io - ! - 2oZ�
CONTRACTOR:
AMERICAN CIVIL
CONSTRUCTORS
CONTACT
DOUG VANNOTE
707-249-0845
AGENCY/ LOCATION:
-GILROY-
CHURCH ST
PROJECT:
BRIDGE PREVENTATIVE
MAINTENANCE PROGRAM
START DATE:
PER PERMIT
WORK HOURS:
PER PERMIT
DURATION:
PER PERMIT
SUBMITTAL:
05.29.20 -SUBMITTED
TCP DRAWN BY:
Hannah L (HannahL@kresafety.com)
N
TCP 3
SHEET:
70F22
GocuSign Envelope ID: OBOOE308-F2CB-4708-8BOC-B9F3BOA19A06
100'�w2o-1 �G�(�P�
NNE^/� MQNI
lV
25
Reviewed ® Make Corrections
Noted
no�...�_ __, o_�. �m.. n o�.�_.�a
�� v
S
*�P���NI R�' � �
1�'G � � � �
S�Vi O \' \ \
� ,., W3-4 � �
��
��
W11-1 � �
W16-1P � �
125' � �
��
1 •
50'
�, CHAPPELL CT
�(25 MPH) Gi-2
1
,� �� �--' ',W�20-1
1
TEMPORARY NO PARKING SIGNS TO BE
PLACED ON BOTH SIDES OF THE STREET
FOR THIS STRETCH A M!NlMUM
OF 72 HOUR PRIOR TO THE START OF
CONSTRUCTION.
130'
WORK
ZONE
;�u��H� 100' �
C9A(CA) W20-1
- ��-
WOODWORTH WAY Gro-2
(25 MPH)
��'
II `
I I ��
M
ti ti 1,
� � 4,W11-1 125'
` � W16-1P
�� `
��
��
� � 3-4
��
� 125'
� � ( r1 -
M `TCH LANE 9
SEE SHEET
sQo�
�� �►`.
SAFETY CO_, �IVC .
7821 W.SUNNYVIEWAVE
VISALIA, CA93291
559 - T32 - 0393
TRAFFIC CONTROL PLANS
LICENSE # 507950 (A,C31)
IF KRC SAFETY CO INC IS NOT
PERFORMING THE ACTUAL TRAFFIC
CONTROL, THEN IT IS
THE RESPONSIBILITY OF THE
CONTRACTOR OR SUBCONTRACTOR
TO ENSURE THAT PROPERLY TRAINED
PERSONNEL MAINTAIN AND MAKE
NEEDED FIELD ADJUSTMENTS
FOR UTMOST VEHICULARAND
PEDESTRIAN SAFETY. IF ATRAFFIC
CONTROL SET UP VARIES FROM,
AND OR CHANGES ARE MADE TO THE
APPROVED TRAFFIC CONTROL PLAN,
THE CONTRACTOR SHALLASSUME
ALL RESPONSIBILITYAND RISK
ASSOCIATED WITH IMPLEMENTATION,
MAINTENANCE AND REMOVAL
OF THE TRAFFIC CONTROL.
�����oR� N s �Fti
ply G
� � "
c� _
N o. 80702
EXP. 03/31/21 �
�TqT ClViL �/
F OF CA1-�F
CONTRACTOR:
AMERICAN CIVIL �
CONSTRUCTORS
CONTACT:
DOUG VANNOTE
707-249-0845
AGENCY/ LOCATION:
-GILROY-
CHURCH ST
PROJECT:
BRIDGE PREVENTATIVE
MAINTENANCE PROGRAM
START DATE:
PER PERMIT
WORK HOURS:
PER PERMIT
DURATION:
PER PERMIT
SUBMITTAL:
05.29.20 -SUBMITTED
TCP DRAWN BY:
Hannah L (HannahL@kresafety.com; I
N
TCP 4
SHEET: '
80F22
DocuSign Envelope ID: OBOOE308-F2CB-4708-8BOC-B9F3BOA19A06
MATCH LINE 8
SEE SHEET g- � _ �l p
' ��� 11` -
�� 4 i
2C
C
0
M
F
ur.C9A(CA)
' 250'
,_ 100' --r
W20-1
� �IJ LIMAN AVE
(25 MPH)
/ G20-2
II
I I � �W20-4
I
II
II
I
II
I
II
I
II
II I I
I' I I
I
I I I
l
I I
I. .
(4
�.W20-1
250'
Reviewed ® Make Corrections
Noted
Revise and Resubmit � Rejected
Checking is only for general conformance with the
design concept of the project and general
compliance with the information given in the
contract documents. Any action shown is subject
to the requirements of the plans and
specifications. Contractor is responsible for:
dimensions which shall be confirmed and
correlated at the job site; fabrication processes
and techniques of construction; coordination of his
work with that of all other trades; and the
satisfactory performance of his work.
BIGGS CARDOSA ASSOCIATES, INC.
Date 06/04/2020 By BCA
■ Q o �
�� �a�
SAFETY CO_. �IVC .
7821 W.SUNNYVIEWAVE
VISALIA, CA93291
559 - 732 - 0393
TRAFFIC CONTROL PLANS
LICENSE # 507950 (A,C31)
IF KRC SAFETY CO INC IS NOT
PERFORMING THE ACTUAL TRAFFIC
CONTROL, THEN IT IS
THE RESPONSi81LiTY OF THE
CONTRACTOR OR SUBCONTRACTOR
TO ENSURE THAT PROPERLY TRAINED
PERSONNEL MAINTAIN AND MAKE
NEEDED FIELD ADJUSTMENTS
FOR UTMOST VEHICULAR AND
PEDESTRIAN SAFETY. IFATRAFFIC
CONTROL SET UP VARIES FROM,
AND OR CHANGES ARE MADE TO THE
APPROVED TRAFFIC CONTROL PLAN,
THE CONTRACTOR SHALLASSUME
ALL RESPONSIBILITY AND RISK
ASSOCIATED WITH IMPLEMENTATION,
MAINTENANCE AND REMOVAL
OF THE TRAFFIC CONTROL.
� � '11
a � -� �
w c9 2 r'
� N o. 80702 �
EXP. 03/31 /21 �
s� C 1 V 11- ��'�
/9TF OF CALF
iv�I^2oZo
CONTRACTOR:
AMERICAN CIVIL
CONSTRUCTORS
CONTACT:
DOUG VANNOTE
707-249-0845
AGENCY/ LOCATION:
-GILROY-
CHURCH ST
PROJECT
BRIDGE PREVENTATIVE
MAINTENANCE PROGRAM
START DATE:
PER PERMIT
WORK HOURS:
PER PERMIT
DURATION:
PER PERMIT
SUBMITTAL
05.29.20 -SUBMITTED
TCP DRAWN BY:
Hannah L (HannahL@kresafety.com; I
N
TCP 4
SHEET:
90F22
DocuSign Envelope ID: OBOOE308-F2CB-4708-8BOC-B9F3BOA19A06
'F 1
W20-1
E
9
MP . nV�� t
ADD NOTE:
Contractor shall coordinate with Santa Clara Valley
Transportation Authority (VTA) to temporarily
relocate bus stops on northbound and southbound
Murray Avenue during preparation and treatment
activities on the Murray Avenue bridge.
TEMPORARY NO PARKING SIGNS TO BE
PLACED ON BOTH SIDES OF THE STREET
FOR THIS STRETCH A MINIMUM
OF 72 HOUR PRIOR TO THE START OF
CONSTRUCTION.
BCA:
ENSURE ACCESS TO THE
EXISTING MAINTANACE
ROADS IS PROVIDED AS
NEEDED
`BCA:
BUS STOP TO BE RELOCATED
TEMPORARILY. CONTRACTOR TO
COORDINATE WITH VTA
125'
��jIP
SEE 1
C3
t
50'
15a' �
WORK
ZONE
I�1
��
25
Reviewed ® Make Corrections
Noted
Revise and Resubmit � Rejected
Checking is only for general conformance with the
design concept of the project and general
compliance with the information given in the
� contract documents. Any action shown is subject
to the requirements of the plans and
specifications. Contractor is responsible for:
dimensions which shall be confirmed and
correlated at the job site; fabrication processes
and techniques of construction; coordination of his
work with that of all other trades; and the
satisfactory performance of his work.
BIGGS CARDOSA ASSOCIATES, INC.
Date 06/04/2020 By BCA
100'�w2o-1
50'
� , � 100 C9A(CA)
q .
� W3�� N G20-2
�� l25 M
�N
` �GO
125'
\.
\' �>�
P��NNEE� �1
. -� SEE s
�v Q (o +�—
� r� ��
SAFETY CO-� �IVC .
7821 W. SUNNYVIEW AVE
VISALIA, CA 93291
559 - 732 - 0393
TRAFFIC CONTROL PLANS
LICENSE # 507950 (A,C31)
IF KRC SAFETY CO INC IS NOT
PERFORMING THE ACTUAL TRAFFIC
CONTROL, THEN IT IS
THE RESPONSIBILITY OF THE
CONTRACTOR OR SUBCONTRACTOR
TO ENSURE THAT PROPERLY TRAINED
PERSONNEL MAINTAIN AND MAKE
NEEDED FIELD ADJUSTMENTS
FOR UTMOST VEHICULAR AND
PEDESTRIAN SAFETY. IFATRAFFIC
CONTROL SET UP VARIES FROM,
AND OR CHANGES ARE MADE TO THE
APPROVED TRAFFIC CONTROL PLAN,
THE CONTRACTOR SHALLASSUME
ALL RESPONSIBILITY AND RISK
ASSOCIATED WITH IMPLEMENTATION,
MAINTENANCE AND REMOVAL
OF THE TRAFFIC CONTROL.
�� oRY N S'`�c
�jA,
� /_� �
U J 2
N o. 80702
EXP. 03/31/21 P
rT� IV1L,��
OF CAt
�- �- � Zc,
CONTRACTOR:
AMERICAN CIVIL
CONSTRUCTORS
CONTACT:
DOUG VANNOTE
707-249-0845
AGENCY/ LOCATION:
-GILROY-
MURRAY AVE
PROJECT:
BRIDGE PREVENTATIVE
MAINTENANCE PROGRAM
START DATE:
PER PERMIT
WORK HOURS:
PER PERMIT
DURATION:
PER PERMIT
SUBMITTAL:
05.29.20 -SUBMITTED
TCP DRAWN BY:
Hannah L (HannahL@kresafety.com)
N
TCP 5
SHEET:
100F22
DocuSign Envelope ID: OBOOE308-F2CB-4708-8BOC-B9F3BOA19A06
1�
G� �1N � ��'"��
MP�� sN��'
sE,
• � � W3-4r
R
t
100�20-1
�O� G�
�EN � MpNI
J �^
G20-2
125'
� W20-1
✓p���-p'N�l
M
� l25 c2`o-2
i W20-1
100' ON G�
Mpo �PNI
� l2
�G20-2
1
Reviewed ® Make Corrections
Noted
Revise and Resubmit � Rejected
Checking is only for general conformance with the
design concept of the project and general
compliance with the information given in the
contract documents. Any action shown is subject
to the requirements of the plans and
specifications. Contractor is responsible for:
dimensions which shall be confirmed and
correlated at the job site; fabrication processes
and techniques of construction; coordination of his
work with that of all other trades; and the
satisfactory performance of his work.
BIGGS CARDOSA ASSOCIATES, INC.
Date 06/04/2020 By BCA
� Q o r~
t � ��
SAFETY CO-� [IVC .
7821 W. SUNNYVIEW AVE
VISALIA, CA 93291
559 - 732 - 0393
TRAFFIC CONTROL PLANS
LICENSE # 507950 (A,C31)
IF KRC SAFETY CO fNC IS NOT
PERFORMING THE ACTUALTRAFFIC
CONTROL, THEN IT IS
THE RESPONSIBILITY OF THE
CONTRACTOR OR SUBCONTRACTOR
TO ENSURE THAT PROPERLY TRAINED
PERSONNEL MAINTAIN AND MAKE
NEEDED FIELD ADJUSTMENTS
FOR UTMOST VEHICULARAND
PEDESTRIAN SAFETY. IFATRAFFIC
CONTROL SET UP VARIES FROM,
AND OR CHANGES ARE MADE TO THE
APPROVED TRAFFIC CONTROL PLAN,
THE CONTRACTOR SHALLASSUME
ALL RESPONSIBILITY AND RISK
ASSOCIATED WITH IMPLEMENTATION,
MAINTENANCE AND REMOVAL
OF THE TRAFFIC CONTROL.
�� �
��
c� r a
N o. 80702
EXP. 03/31/21
��qT C! V 1 L\�o���
F OF CAS
�-1-Zola
CONTRACTOR:
AMERICAN CIVIL
CONSTRUCTORS
CONTACT:
DOUG VANNOTE
707-249-0845
AGENCY/ LOCATION:
-GILROY-
MURRAY AVE
PROJECT:
BRIDGE PREVENTATIVE
MAINTENANCE PROGRAM
START DATE:
PER PERMIT
WORK HOURS:
PER PERMIT
DURATION:
PER PERMIT
SUBMITTAL:
05.29.20 -SUBMITTED
TCP DRAWN BY:
Hannah L (HannahL@kresafety.com;�
N
TCP 5
SHEET:
11 OF 22
DocuSign Envelope ID: OBOOE308-F2CB-4708-8BOC-B9F3BOA19A06
W2 - �
F
250'
l25
'F 1
W20-1
Reviewed ® Make Corrections
Noted
Revise and Resubmit � Rejected
Checking is only for general conformance with the
design concept of the project and general
compliance with the information given in the
contract documents. Any action shown is subject
to the requirements of the plans and
specifications. Contractor is responsible for:
dimensions which shall be confirmed and
correlated at the job site; fabrication processes
and techniques of construction; coordination of his
work with that of all other trades; and the
satisfactory performance of his work.
BIGGS CARDOSA ASSOCIATES, INC.
Date 06/04/2020 By BCA
BCA:
ENSURE ACCESS TO THE
EXISTING COMMERCIAL
DRIVEWAY IS PROVIDED
FOR THE DURATION OF
CONSTRUCTION
1'�
GN ��N��EF� .
MPS ��R`,, , .
SEE�o,,,.
�•�' �
�,7
W3 \
1�, W11-1 �
1W16-1P �
125'
BCA;
ENSURE ACCESS TO THE
EXISTING MAINTANACE
ROADS IS PROVIDED AS
NEEDED
1 BCA:
\ BUS STOP TO BE RELOCATED
TEMPORARILY. CONTRACTOR TO
COORDINATE WITH VTA
125'
\ ' � �,,
1
.,-�N ��� R�G�
. MP �QP�R
S��
50\'
1
Q o �
�`
SAFETY CO—. ■IVC .
7821 W. SUNNYVIEW AVE
VISALIA, CA93291
559 - 732 - 0393
G
TRAFFIC CONTROL PLANS
LICENSE # 507950 (A,C31)
IF KRC SAFETY CO INC IS NOT
PERFORMING THE ACTUAL TRAFFIC
CONTROL, THEN IT IS
-t7
THE RESPONSIBILITY OF THE
G
CONTRACTOR OR SUBCONTRACTOR
TO ENSURE THAT PROPERLY TRAINED
\
PERSONNEL MAINTAIN AND MAKE
�
NEEDED FIELD ADJUSTMENTS
S
ADD NOTE:
FOR UTMOST VEHICULAR AND
PEDESTRIAN SAFETYIFATRAFFIC
Contractor shall coordinate with Santa Clara Valley
CONTROL SET UP VARIES FROM,
AND OR CHANGES ARE MADE TO THE
� �
Transportation Authority (VTA) to temporarily
APPROVED TRAFFIC CONTROL PLAN,
THE CONTRACTORSHALLASSUME
relocate bus stops on northbound and southbound
ALL RESPONSIBILITY AND RISK
ASSOCIATED WITH IMPLEMENTATION,
�
Murra Avenue durin re aration and treatment
Y g p p
MAINTENANCE AND REMOVAL
�
OF THE TRAFFIC CONTROL.
•
activities on the Murray Avenue bridge.
��
ESS f Ob
TEMPORARY NO PARKING SIGNS TO BE
QRpF
��� �Y N q�F
� s� ti�
PLACED ON BOTH SIDES OF THE STREET
�
FOR THIS STRETCH AMINIMUM
�
- � � ;, m
150' OF 72 HOUR PRIOR TO THE START OF
w � _ '''
�
WORK CONSTRUCTION.
°� No. ao7o2
ZONE
EXP. 03/31/21 �.
�T�TF
OF CA �FO��\
5'
MP�I
�� l25 �
�M��
��SN
G20-2
W3-4
C9A(CA) 100'
W2o-1 /100'
100'�W2o-1
� i
50'
�A'i' 100' C9A(CA)
t
W11-1 W3�% � G20-2
W16-1 P 25 Mp�l
G� l
�N
�°
125'
W11-\W16-1P.,�
� i`
-� �'���NE11
,�P-(G S���T
S��
�--t��2o
CONTRACTOR:
AMERICAN CIVIL
CONSTRUCTORS
CONTACT:
DOUG VANNOTE
707-249-0845
AGENCY/ LOCATION:
-GILROY-
MURRAY AVE
PROJECT:
BRIDGE PREVENTATIVE
MAINTENANCE PROGRAM
START DATE:
PER PERMIT
WORK HOURS:
PER PERMIT
DURATION:
PER PERMIT
SUBMITTAL:
05.29.20 -SUBMITTED
TCP DRAWN BY:
Hannah L (HannahL@kresafety.com)
N
TCP 6
SHEET:
120F22
DocuSign Envelope ID: OBOOE308-F2CB-4708-8BOC-B9F3BOA19A06
MPTG SNEE �? �
SEE.. ��
\\
f � W20-1
100' "� �.� G�
��NN �pNl
`��
G20-2
W�1
5M
G20-2
250'
�■ry Q o
�� �►�.
SAFETY CO_. ■IVC .
7821 W. SUNNYVIEW AVE
VISALIA, CA 93291
559 - 732 - 0393
TRAFFIC CONTROL PLANS
LICENSE # 507950 (A,C31)
IF KRC SAFETY CO INC IS NOT
PERFORMING THE ACTUAL TRAFFIC
CONTROL, THEN IT IS
THE RESPONSIBILITY OF THE
CONTRACTOR OR SUBCONTRACTOR
TO ENSURE THAT PROPERLY TRAINED
PERSONNEL MAINTAIN AND MAKE
NEEDED FIELD ADJUSTMENTS
FOR UTMOST VEHICULARAND
PEDESTRIAN SAFETY. IFATRAFFIC
CONTROL SET UP VARIES FROM,
AND OR CHANGES ARE MADE TO THE
APPROVED TRAFFIC CONTROL PLAN,
THE CONTRACTOR SHALLASSUME
ALL RESPONSIBILITY AND RISK
ASSOCIATED WITH IMPLEMENTATION,
MAINTENANCE AND REMOVAL
OF THE TRAFFIC CONTROL.
"�(
���
���Y!
S�
���V
,Nf
✓ 4Q
Reviewed ® Make Corrections
Noted
w c� =
a N o. 80702
m
�
Revise and Resubmit � Rejected
EXP. 03/31 /21 Q,
Checking is only for general conformance with the
�TqT C I V � �- ���
design concept of the project and general
F pF-
compliance with the information given in the
CA��F
contract documents. Any action shown is subject
/
to the requirements of the plans and
-' 1 ' �Zd
specifications. Contractor is responsible for:
CONTRACTOR:
dimensions which shall be confirmed and
correlated at the job site; fabrication processes
AMERICAN CIVIL
and techniques of construction; coordination of his
work with that of all other trades; and the
CONSTRUCTORS
satisfactory performance of his work.
CONTACT:
BIGGS CARDOSA ASSOCIATES, INC.
DOUG VANNOTE
Date osioaizozo By ecA
707-249-0845
AGENCY/ LOCATION:
-GILROY-
M URRAY AVE
PROJECT
BRIDGE PREVENTATIVE
MAINTENANCE PROGRAM
-�.
START DATE:
W20-1
PER PERMIT
100'�
,�'
G�C
WORK HOURS:
ON
�PQ�
PER PERMIT
Mp`
`�
DURATION:
l`Z
PER PERMIT
�
�0_2
SUBMITTAL:
05.29.20 -SUBMITTED
TCP DRAWN BY:
Hannah L (HannahL@kresafety.com)
N —
TCP 6
SHEET:
130F22
DocuSign Envelope ID: OBOOE308-F2CB-4708-8BOC-B9F3BOA19A06
remove this note
(The posted speed limit is 30
mph at this location.
W20-1
100'
Traffic control devices shall not be
placed within 50' of the centerline of the
railroad tracks. w2o-1
100'
' G20-2
100 w2o-4
*TRAFFIC CONTROL D VICES SHALL NOT
BE PLACED WITHIN 25' OF RAILROAD TRACKS. 100' C9A(CA)
C N C O T O IL
PRIOR TO START OF CONSTRUCTION.
W3-4
50' �Q�l
C30(CA) �`2�
r �
WORK ���� Q`
/ ZONE
G20-2 /
\ \
\ \
\ W3-4
\ \ \� � 100'
� C9A(CA)
V �O •����
•
\
y�m.0 \
_/
Q 1
G20-2
� 100'�
(Allow a minimum of 50' clearance from the
centerline of the railroad tracks.
100'
\ W20-1
As practicable, allow a minimum of 50' clearance from
the centerline of the railroad tracks.
Reviewed ® Make Corrections
Noted
Revise and Resubmit � Rejected
Checking is only for general conformance with the
design concept of the project and general
compliance with the information given in the
contract documents. Any action shown is subject
to the requirements of the plans and
specifications. Contractor is responsible for:
dimensions which shall be confirmed and
correlated at the job site; fabrication processes
and techniques of construction; coordination of his
work with that of all other trades; and the
satisfactory performance of his work.
BIGGS CARDOSA ASSOCIATES, INC.
Date 06/04/2020 By BCA
�rlv a o I�~
SAFETY CO_. �IVC .
7821 W. SUNNWIEW AVE
VISALIA, CA 93291
559 - 732 - 0393
TRAFFIC CONTROL PLANS
LICENSE # 507950 (A,C31)
IF KRC SAFETY CO INC IS NOT
PERFORMING THE ACTUAL TRAFFIC
CONTROL, THEN IT IS
THE RESPONSIBILITY OF THE
CONTRACTOR OR SUBCONTRACTOR
TO ENSURE THAT PROPERLY TRAINED
PERSONNEL MAINTAIN AND MAKE
NEEDED FIELD ADJUSTMENTS
FOR UTMOST VEHICULARAND
PEDESTRIAN SAFETY. IF ATRAFFIC
CONTROL SET UP VARIES FROM,
AND OR CHANGES ARE MADE TO THE
APPROVED TRAFFIC CONTROL PLAN,
THE CONTRACTOR SHALLASSUME
ALL RESPONSIBILITY AND RISK
ASSOCIATED WITH IMPLEMENTATION,
MAINTENANCE AND REMOVAL
OF THE TRAFFIC CONTROL.
2`<Y ORY N s'�F�
� � c
� �;
� _
� No. 80702
EXP. 03/31 /21 �
s�q�. C 1 V 1 �-\�ot j
F OF CAS
ia-I-2oZ0
CONTRACTOR:
AMERICAN CIVIL
CONSTRUCTORS
CONTACT:
DOUG VANNOTE
707-249-0845
AGENCY/ LOCATION:
-GILROY-
IOOFAVE
PROJECT:
BRIDGE PREVENTATIVE
MAINTENANCE PROGRAM
START DATE:
PER PERMIT
WORK HOURS:
PER PERMIT
DURATION:
PER PERMIT
SUBMITTAL:
05.29.20 -SUBMITTED
TCP DRAWN BY:
Hannah L (HannahL@kresafety.com)
N
TCP 7
SHEET:
140F22
DocuSign Envelope ID: OBOOE308-F2CB-4708-8BOC-B9F3BOA19A06
remove this note
IThe posted speed limit is 30
mph at this location.
G20-2
W2 1 \ \
\ \
\ \
100' \ \
\ \
G20-2
Traffic control devices shall not be
placed within 50' of the centerline of the
railroad tracks.
*TRAFFIC CONTROL �EVICES SHALL NOT
BE PLACED W1TH1N 25' OF RAILROAD TRA
TO START OF CONSTRUCTION.
W3-4
� �� 100'
� C9A(CA)
'11
s• w
�50� a � y�Q�l
���2
OF P
��
C9A(CA)
�W20-1
100
100' W2� G20-2
� 130'
WORK
ZONE
r
W20-4
100
100' Allow a minimum of 50' clearance from the
� centerline of the railroad tracks.
As practicable, allow a minimum of 50' clearance from
the centerline of the railroad tracks.
Reviewed ® Make Corrections
Noted
Revise and Resubmit � Rejected
Checking is only for general conformance with the
design concept of the project and general
compliance with the information given in the
contract documents. Any action shown is subject
to the requirements of the plans and
specifications. Contractor is responsible for:
dimensions which shall be confirmed and
correlated at the job site; fabrication processes
and techniques of construction; coordination of his
work with that of all other trades; and the
satisfactory performance of his work.
BIGGS CARDOSA ASSOCIATES, INC.
Date 06/04/2020 By BCA
�V Q o �"'
■r � a+�
SAFETY CO-� �IVC .
7821 W. SUNNYVIEW AVE
VISALIA, CA 93291
559 - 732 - 0393
TRAFFIC CONTROL PLANS
LICENSE # 507950 (A,C31)
IF KRC SAFETY CO INC IS NOT
PERFORMING THE ACTUAL TRAFFIC
CONTROL, THEN IT IS
THE RESPONSIBILITY OF THE
CONTRACTOR OR SUBCONTRACTOR
TO ENSURE THAT PROPERLY TRAINED
PERSONNEL MAINTAIN AND MAKE
NEEDED FIELD ADJUSTMENTS
FOR UTMOST VEHICULAR AND
PEDESTRIAN SAFETY. IFATRAFFIC
CONTROL SET UP VARIES FROM,
AND OR CHANGESARE MADE TO THE
APPROVED TRAFFIC CONTROL PLAN,
THE CONTRACTOR SHALLASSUME
ALL RESPONSIBILITY AND RISK
ASSOCIATED WITH IMPLEMENTATION,
MAINTENANCE AND REMOVAL
OF THE TRAFFIC CONTROL.
���� o�Y N S `�\
� � � a
w c9 2 n
� No. 80702 �
EXP. 03/31 /21 �
��qp ClV1\� o��\
F OF CA�-�F
fo - (-202�
CONTRACTOR:
AMERICAN CIVIL
CONSTRUCTORS
CONTACT:
DOUG VANNOTE
707-249-0845
AGENCY/ LOCATION:
-GILROY-
IOOFAVE
PROJECT
BRIDGE PREVENTATIVE
MAINTENANCE PROGRAM
START DATE:
PER PERMIT
WORK HOURS:
PER PERMIT
DURATION:
PER PERMIT
SUBMITTAL:
05.29.20 -SUBMITTED
TCP DRAWN BY:
Hannah L (HannahL@kresafety.com)
N
r � TCP 8
SHEET
150F22
GocuSign Envelope ID: OBOOE308-F2CB-4708-8BOC-B9F3BOA19A06
,1
I,
250
1
W20-�
100' �
P
RP��NP�c�I
P
E�3
PTGH DER �EF�
SE.
W3-4 `�
`Y `
i `
W11-
I-2 16-1
� 125'
N��
CSC O<
�2
2 C30(CA)
G2o-z SP �25 N1
G20-2
C9A
` � 'FW20-1 1
l
� � O
� `� �� G2�
\ N�
250' `� N�
� W
� O
s
�20-1
�9n �100
LN G2o-2
125' `25
1 �. ��' �3
'� ' .,��N SIN R���T
ME �ppER
SE
1
P.�PP�125
EDR�UN�
,W _ 1
WORK
ZONE
1
3-4
100'
`O�
� N�
� ! tA0 TEMPORARY NO PARKING SIGNS TO BE
� � PLACED ON BOTH SIDES OF THE STREET
1 �.p FOR THE LENGTH OF THE WORK ZONEA
y MINI STAROT OF CONSTRUCT ON. THE
12'
Reviewed ® Make Corrections
Noted
50' � Revise and Resubmit � Rejected
Checking is only for general conformance with the
design concept of the project and general
compliance with the information given in the
contract documents. Any action shown is subject
to the requirements of the plans and
specifications. Contractor is responsible for:
dimensions which shall be confirmed and
correlated at the job site; fabrication processes
and techniques of construction; coordination of his
work with that of all other trades; and the
W11-1 satisfactory performance of his work.
� W16-1P1 BIGGSCARDOSAASSOCIATES,INC.
i Date 06/04/2020 By BCA
W3-4 .
125'
� 1
� C9A(CA)� �
,,,. �
E
1
.- AT�H BEET ��
SEE SN
■V Q lo. P
S �t ��.
SAFETY CO_. �IVC ,
7821 W. SUNNW IEW AVE
VISALIA, CA93291
559 - 732 - 0393
TRAFFIC CONTROL PLANS
LICENSE # 507950 (A,C31)
IF KRC SAFETY CO INC IS NOT
PERFORMING THE ACTUAL TRAFFIC
CONTROL, THEN IT IS
THE RESPONSIBILITY OF THE
CONTRACTOR OR SUBCONTRACTOR
TO ENSURE THAT PROPERLY TRAINED
PERSONNEL MAINTAIN AND MAKE
NEEDED FIELD ADJUSTMENTS
FOR UTMOST VEHICULARAND
PEDESTRIAN SAFETY. IFATRAFFIC
CONTROL SET UP VARIES FROM,
AND OR CHANGES ARE MADE TO THE
APPROVED TRAFFIC CONTROL PLAN,
THE CONTRACTOR SHALL ASSUME
ALL RESPONSIBILITYAND RISK
ASSOCIATED WITH IMPLEMENTATION,
MAINTENANCE AND REMOVAL
OF THE TRAFFIC CONTROL.
�v `( N '�
/�'�- =�
�� =a
No. eo7o2
EXP. 03/31 /21 Q,
s�gTF OF CA ���/
(�-t-ZoZt>
CONTRACTOR:
AMERICAN CIVIL
CONSTRUCTORS
CONTACT:
DOUG VANNOTE
707-249-0845
AGENCY/ LOCATION:
-G I LROY-
FOREST ST
PROJECT:
BRIDGE PREVENTATIVE
MAINTENANCE PROGRAM
START DATE:
PER PERMIT
WORK HOURS:
PER PERMIT
DURATION:
PER PERMIT
SUBMITTAL:
05.29.20 -SUBMITTED
TCP DRAWN BY:
Hannah L (HannahL@kresafety.com)
N
TCP 9
SHEET
160F22
DocuSign Envelope ID: OBOOE308-F2CB-4708-8BOC-B9F3BOA19A06
rJ�
�E� MpNI
G2o-2 �30
3
,� r�
• W2e o 1-100
1_
100��1
��
� �
1 � `� W20-4
'C� �
O
�� \
N \
� �
N�
O �
-O
z
G20-2
250'
Reviewed ® Make Corrections
Noted
Revise and Resubmit � Rejected
Checking is only for general conformance with the
design concept of the project and general
compliance with the information given in the
contract documents. Any action shown is subject
to the requirements of the plans and
specifications. Contractor is responsible for:
dimensions which shall be confirmed and
correlated at the job site; fabrication processes
and techniques of construction; coordination of his
work with that of all other trades; and the
satisfactory performance of his work.
BIGGS CARDOSA ASSOCIATES, INC.
Date 06/04/2020 By BCA
■Q��
SAFETY CO-, �1VC .
7821 W.SUNNYVIEWAVE
VISALIA, CA93291
559 - 732 - 0393
TRAFFIC CONTROL PLANS
LICENSE # 507950 (A,C31)
IF KRC SAFETY CO INC IS NOT
PERFORMING THE ACTUAL TRAFFIC
CONTROL, THEN IT IS
THE RESPONSIBILITY OF THE
CONTRACTOR OR SUBCONTRACTOR
TO ENSURE THAT PROPERLY TRAINED
PERSONNEL MAINTAIN AND MAKE
NEEDED FIELD ADJUSTMENTS
FOR UTMOST VEHICULARAND
PEDESTRIAN SAFETY. IF A TRAFFIC
CONTROL SET UP VARIES FROM,
AND OR CHANGES ARE MADE TO THE
APPROVED TRAFFIC CONTROL PLAN,
THE CONTRACTOR SHALLASSUME
ALL RESPONSIBILITYAND RISK
ASSOCIATED WITH IMPLEMENTATION,
MAINTENANCE AND REMOVAL
OF THE TRAFFIC CONTROL.
.�
� � -,
� ''d = r
N o. 80702
EXP. 03/31/21 �,
`P�' �' ! V I L ��
,9TF OF Cp,1,�F0�
�-j-Lo2-p
CONTRACTOR:
AMERICAN CIVIL
CONSTRUCTORS
CONTACT:
DOUG VANNOTE
707-249-0845
AGENCY/ LOCATION:
-GILROY-
FOREST ST
PROJECT:
BRIDGE PREVENTATIVE
MAINTENANCE PROGRAM
START DATE:
PER PERMIT
WORK HOURS:
PER PERMIT
DURATION:
PER PERMIT
SUBMITTAL:
05.29.20 -SUBMITTED
TCP DRAWN BY:
Hannah L (HannahL�kresafety.com)
N
TCP 9
SHEET:
170F22
DocuSign Envelope ID: OBOOE308-F2CB-4708-8BOC-B9F3BOA19A06
�1,
w2o-�
�100'�
1
N G2o-2
�I PLN pNl
l25 M
` `1
250'
W20-�
100' �
P
p,�`F�NpNI
E�5
P�GN DER LEF1
SEE .
'`1 W3-4 `�
� 125'
N� 1
0
2
s l25 M
G20-2
C9A
� �N G2o-2
�I P�-NMP�►1
l25
���,.
�,.-�E �5
�,.� P��H ��R Rr,GNT
S E UPPE
F�R�UNPjP
W2�1
��
�-� �
100'�
1
r�
l
_�
$5'
WORK
ZONE
C30(CA)50'
.c �
TEMPORARY NO PARKING SIGNS TO BE
PLACED ON BOTH SIDES OF THE STREET
FOR THE LENGTH OF THE WORK ZONE A
MINIMUM OF 72 HOUR PRIOR TO THE
START OF CONSTRUCTION.
I } 13-4 � !f
100' � 125'
� W11-1
W16-1 P
O� W3-4
N� ` 125'
t�i� `
O �
y �
�' � C9A(CA)�
,,.,-
N ���NE 19
N►A�G SHEET
SEE
Reviewed ® Make Corrections
Noted
Revise and Resubmit � Rejected
Checking is only for general conformance with the
design concept of the project and general
compliance with the information given in the
contract documents. Any action shown is subject
to the requirements of the plans and
specifications. Contractor is responsible for:
dimensions which shall be confirmed and
correlated at the job site; fabrication processes
and techniques of construction; coordination of his
work with that of all other trades; and the
satisfactory performance of his work.
BIGGS CARDOSA ASSOCIATES, INC.
Date 0(i/04/2020 By BCA
�Q o �
� � ��
SAFETY CO_. �IVC .
7821 W. SUNNYVIEW AVE
VISALIA, CA 93291
559 - 732 - 0393
TRAFFIC CONTROL PLANS
LICENSE # 507950 (A,C31)
IF KRC SAFETY CO INC IS NOT
PERFORM ING THE ACTUAL TRAFFIC
CONTROL, THEN IT IS
THE RESPONSIBILITY OF THE
CONTRACTOR OR SUBCONTRACTOR
TO ENSURE THAT PROPERLY TRAINED
PERSONNEL MAINTAIN AND MAKE
NEEDED FIELD ADJUSTMENTS
FOR UTMOST VEHICULAR AND
PEDESTRIAN SAFETY. IFATRAFFIC
CONTROL SET UP VARIES FROM,
AND OR CHANGES ARE MADE TO THE
APPROVED TRAFFIC CONTROL PLAN,
THE CONTRACTOR SHALLASSUME
ALL RESPONSIBILITYAND RISK
ASSOCIATED WITH IMPLEMENTATION,
MAINTENANCE AND REMOVAL
OF THE TRAFFIC CONTROL.
�v Y N �< �
c� � � —t i
a � _
No. 80702
EXP. 03/31 /21 Q.
9TF OF CAS\F0�
—(-Zv2o
CONTRACTOR:
AMERICAN CIVIL
CONSTRUCTORS
CONTACT:
DOUG VANNOTE
707-249-0845
AGENCY/ LOCATION:
-GILROY-
FOREST ST
PROJECT
BRIDGE PREVENTATIVE
MAINTENANCE PROGRAM
START DATE:
PER PERMIT
WORK HOURS:
PER PERMIT
DURATION:
PER PERMIT
SUBMITTAL:
05.29.20 -SUBMITTED
TCP DRAWN BY:
Hannah L {HannahL@kresafety.com)
N
TCP 10
SHEET:
180F22
DocuSign Envelope ID: OBOOE308-F2CB-4708-8BOC-B9F3BOA19A06
��6
GN ��N � �
MAT sNEE�` *=
SE�� .
� �
�`C S�
3a MpNI
G20 2
// �_
100'�
W2
�20-1
100 �.
250'
1
W20-1
Reviewed ® Make Corrections
Noted
Revise and Resubmit � Rejected
Checking is only for general conformance with the
design concept of the project and general
compliance with the information given in the
contract documents. Any action shown is subject
to the requirements of the plans and
specifications. Contractor is responsible for:
dimensions which shall be confirmed and
correlated at the job site; fabrication processes
and techniques of construction; coordination of his
work with that of all other trades; and the
satisfactory performance of his work.
BIGGS CARDOSA ASSOCIATES, INC.
Date 06/04/2020 By BCA
��Q o
S� -�
SAFETY CO_, �IVC .
7821 W. SUNNYVIEW AVE
VISALIA, CA 93291
559 - 732 - 0393
TRAFFIC CONTROL PLANS
LICENSE # 507950 (A,C31)
IF KRC SAFETY CO INC IS NOT
PERFORMING THE ACTUAL TRAFFIC
CONTROL, THEN IT IS
THE RESPONSIBILITY OF THE
CONTRACTOR OR SUBCONTRACTOR
TO ENSURE THAT PROPERLY TRAINED
PERSONNEL MAINTAIN AND MAKE
NEEDED FIELD ADJUSTMENTS
FOR UTMOST VEHICULARAND
PEDESTRIAN SAFETY. IFATRAFFIC
CONTROL SET UP VARIES FROM,
AND OR CHANGES ARE MADE TO THE
APPROVED TRAFFIC CONTROL PLAN,
THE CONTRACTOR SHALLASSUME
ALL RESPONSIBILITY AND RISK
ASSOCIATED WITH IMPLEMENTATION,
MAINTENANCE AND REMOVAL
OF THE TRAFFIC CONTROL.
����G��Y N S r`�\
� � �
� � a �
w c9 2
n= No. 80702 a
EXP. 03/31/21
S�j. CIVIL t'�
9TF OF OAL�F��
- I -2oZU
CONTRACTOR:
AMERICAN CIVIL
CONSTRUCTORS
CONTACT:
DOUG VANNOTE
707-249-0845
AGENCY/ LOCATION:
-GILROY-
FOREST ST
PROJECT:
BRIDGE PREVENTATIVE
MAINTENANCE PROGRAM
START DATE:
PER PERMIT
WORK HOURS:
PER PERMIT
DURATION:
PER PERMIT
SUBMITTAL:
05.29.20 -SUBMITTED
TCP DRAWN BY:
Hannah L (HannahL@kresafety.com)
N -
TCP 10
SHEET:
190F22
DocuSign Envelope ID: OBOOE308-F2CB-4708-8BOC-B9F3BOA19A06
W20� � 1
250' � �
G20_ 2 �
W20-1
�1
100'
20-2
s
N
2
G�
(:A N%1
'��
TEMPORARY NO PARKING SIGNS TO BE
PLACED ON BOTH SIDES OF THE STREET
FOR THIS STRETCH A MINIMUM 100' W3 y
OF 72 HOUR PRIOR TO THE START OF
.2 CONSTRUCTION.
_ 50'�
00' �/
'n WORK
��� ,./ZONE .'
1 s `�'� , 2' ��V `�
100�
W20-1
100' W20-4
100' `' G20-2
C9A(CA)
� ,/c... ��'- I
��
` � Reviewed ® Make Corrections
Noted
�� � Revise and Resubmit � Rejected
�� �
G2o'-i
3-� ENSURE ACCESS TO THE EXISTING
RESIDENTIAL DRIVEWAY (LESS
10o THAN 50' FROM BRIDGE) IS
PROVIDED FOR THE DURATION OF
CONSTRUCTION
250'
�zo-t
Checking is only for general conformance with the
design concept of the project and general
compliance with the information given in the
contract documents. Any action shown is subject
to the requirements of the plans and
specifications. Contractor is responsible for:
dimensions which shall be confirmed and
correlated at [he job site; fabrication processes
and techniques of construction; coordination of his
work with that of all other trades; and the
satisfactory performance of his work.
BIGGS CARDOSA ASSOCIATES, INC.
Date 06/04/2020 By BCA
■v Q o �--
� � �►a..
SAFETY CO—� �IVC .
7821 W. SUNNYVIEW AVE
VISALIA, CA 93291
559 - 732 - 0393
TRAFFIC CONTROL PLANS
LICENSE # 507950 (A,C3l)
IF KRC SAFETY CO INC IS NOT
PERFORMING THE ACTUAL TRAFFIC
CONTROL, THEN IT IS
THE RESPONSIBILITY OF THE
CONTRACTOR OR SUBCONTRACTOR
TO ENSURE THAT PROPERLY TRAINED
PERSONNEL MAINTAIN AND MAKE
NEEDED FIELD ADJUSTMENTS
FOR UTMOST VEHICULAR AND
PEDESTRIAN SAFETY. IFATRAFFIC
CONTROL SET UP VARIES FROM,
AND OR CHANGES ARE MADE TO THE
APPROVED TRAFFIC CONTROL PLAN,
THE CONTRACTOR SHALLASSUME
ALL RESPONSIBILITY AND RISK
ASSOCIATED WITH IMPLEMENTATION,
MAINTENANCE AND REMOVAL
OF THE TRAFFIC CONTROL.
�Y Y IV '�
�;���� s��yc�
� /(/� —i r
a � ' 'V- = r
No. 80702
EXP. 03/31 /21 �
F OF CA�-
�o-1-2p2o
CONTRACTOR:
AMERICAN CIVIL
CONSTRUCTORS
CONTACT:
DOUG VANNOTE
707-249-0845
AGENCY/ LOCATION:
-GILROY-
LEWIS ST
PROJECT:
BRIDGE PREVENTATIVE
MAINTENANCE PROGRAM
START DATE:
PER PERMIT
WORK HOURS:
PER PERMIT
DURATION:
PER PERMIT
SUBMITTAL:
05.29.20 -SUBMITTED
TCP DRAWN BY:
Hannah L (HannahL@kresafety.com)
N
TCP 11
SHEET:
20 OF 22
DocuSign Envelope ID: OBOOE308-F2CB-4708-8BOC-B9F3BOA19A06
G2o
W20-1
�1
G2o'-2
20-2
TEMPORARY NO PARKING SIGNS TO BE
PLACED ON BOTH SIDES OF THE STREET
FOR THIS STRETCHA MINIMUM
OF 72 HOUR PRIOR TO THE START OF
CONSTRUCTION.
,100�
W20-1'
100 W20-4
G20-2
Reviewed ® Make Corrections
Noted
Revise and Resubmit � Rejected
Checking is only for general conformance with the
design concept of the project and general
compliance with the information given in the
contract documents. Any action shown is subject
to the requirements of the plans and
specifications. Contractor is responsible for:
dimensions which shall be confirmed and
correlated at the job site; fabrication processes
and techniques of construction; coordination of his
work with that of all other trades; and the
satisfactory performance of his work.
BIGGS CARDOSA ASSOCIATES, INC.
., 06/04/2020 ., BCA
■rvQo�
� r �►a.�
SAFETY CO_, ANC .
7921 W.SUNNYVIEWAVE
VISALIA, CA93291
559 - 732 - 0393
TRAFFIC CONTROL PLANS
LICENSE # 507950 (A,C31)
IF KRC SAFETY CO INC IS NOT
PERFORMING THE ACTUAL TRAFFIC
CONTROL, THEN IT IS
THE RESPONSIBILITY OF THE
CONTRACTOR OR SUBCONTRACTOR
TO ENSURE THAT PROPERLY TRAINED
PERSONNEL MAINTAIN AND MAKE
NEEDED FIELD ADJUSTMENTS
FOR UTMOST VEHICULARAND
PEDESTRIAN SAFETY. IF A TRAFFIC
CONTROL SET UP VARIES FROM,
AND OR CHANGES ARE MADE TO THE
APPROVED TRAFFIC CONTROL PLAN,
THE CONTRACTOR SHALLASSUME
ALL RESPONSIBILITYAND RISK
ASSOCIATED WITH IMPLEMENTATION,
MAINTENANCE AND REMOVAL
OF THE TRAFFIC CONTROL.
G�
v� t�
�
� i
w (�
2 !
� No. 80702
EXP. 03/31 /21 Q,
s�qT C1V1�- °/
F OF CA►-�F
%—(-2o2G
CONTRACTOR:
AMERICAN CIVIL
CONSTRUCTORS
CONTACT:
DOUG VANNOTE
707-249-0845
AGENCY/ LOCATION:
-GILROY-
LEWIS ST
PROJECT:
BRIDGE PREVENTATIVE
MAINTENANCE PROGRAM
START DATE:
PER PERMIT
WORK HOURS:
PER PERMIT
DURATION:
PER PERMIT
SUBMITTAL:
05.29.20 -SUBMITTED
TCP DRAWN BY:
Hannah L (HannahL@kresafety.com)
N -
TCP 12
SHEET:
21 OF 22
DocuSign Envelope ID: OBOOE308-F2CB-4708-8BOC-B9F3BOA19A06
PCMSSET OUT 10 DAYS PRIOR TO TH START OF WORK.
PCMS TO READ:
SLIDE 1: SLIDE 2: SLIDE 3:
ROAD XX-XX-XX EXPECT
WORK TO DELAYS
AHEAD XX-XX-XX
'`POSSIBLE SUBSTITUTION FOR PCMS SEE BELOW:
MOUNTED ON TYPE II BARRICADE
2'X3' SIGN
ORANGE BACKGROUND WITH BLACK LETTERING
BCA:
Hard signs accept
per response to Rf
WOODWORTH WAY
Checking is only for general conformance with the
design concept of the project and general
compliance with the information given in the
contract documents. Any action shown is subject
to the requirements of the plans and
specifications. Contractor is responsible for:
dimensions which shall be confirmed and
correlated at the job site; fabrication processes
and techniques of construction; coordination of his
work with that of all other trades; and the
satisfactory performance of his work.
BIGGS CARDOSA ASSOCIATES, INC.
., 06/04/2020 ., BCA
CONTRACTOR TO USE FIGURE 6F-104(CA) FROM CA MUTCD
TO CLOSE SHOULDER FOR PCMS BOARDS LOCATED AT lOOFAVE
& FOREST STAND LEW1S ST.
CONTRACTOR TO USE FIGURE 6F-104(CA) FROM CA MUTCD AND
INCLUDEA W11-1 & W16-1 SIGN TO CLOSE PARKING AND BIKE
LANE FOR PCMS LOCATED ON FOREST ST, FARRELL AVE, CHURCH
ST, AND MURRAYAVE
2'x3' signs mounted on Type II Barricades shall be placed
outside the travel lane, located per approval of Project Inspector
and Project Engineer, and shall not block pedestrian or bicycle
facilities.
��
SAFETY CO-. [IVC .
7821 W. SUNNWIEWAVE
VISALIA, CA 33291
559 - 732 - 0393
TRAFFIC CONTROL PLANS
LICENSE # 507950 (A,C31)
IF KRC SAFETY CO INC IS NOT
PERFORMING THE ACTUAL TRAFFIC
CONTROL, THEN IT IS
THE RESPONSI81LiTY OF THE
CONTRACTOR OR SUBCONTRACTOR
TO ENSURE THAT PROPERLY TRAINED
PERSONNEL MAINTAIN AND MAKE
NEEDED FIELD ADJUSTMENTS
FOR UTMOST VEHICULARAND
PEDESTRIAN SAFETY. IFATRAFFIC
CONTROL SET UP VARIES FROM,
AND OR CHANGES ARE MADE TO THE
APPROVED TRAFFIC CONTROL PLAN,
THE CONTRACTOR SHALLASSUME
ALL RESPONSIBILITYAND RISK
ASSOCIATED WITH IMPLEMENTATION,
MAINTENANCE AND REMOVAL
OF THE TRAFFIC CONTROL.
�4�� N s��c
� /,,/` �
c� �'j� r
N o. 80702
• EXP. 03/31 /21 �
sT C I V 1 �- �'�
\CF CAL�FC/
�-1 -ZoZe
CONTRACTOR:
AMERICAN CIVIL
CONSTRUCTORS
CONTACT:
DOUG VANNOTE
707-249-0845
AGENCY/ LOCATION:
-GILROY-
VARIOUS LOCATIONS
PROJECT:
BRIDGE PREVENTATIVE
MAINTENANCE PROGRAM
START DATE:
PER PERMIT
WORK HOURS:
PER PERMIT
DURATION:
PER PERMIT
SUBMITTAL:
05.29.20 -SUBMITTED
TCP DRAWN BY:
Hannah L (HannahL@kresafety.com)
PCMS LAYOUT
SHEET:
220F22