Wood Environment and Infrastructure Solutions Inc Amendment 2DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
12/11/2020
Hourly Labor Rates
Original Agreement Amendment #1(Note 1)Amendment #2(Note 2)
Principal $247 $259 $259
Senior Associate $218 $229 $229
Associate $195 $205 $205
Senior 2 $183 $192 $192
Senior 1 $167 $175 $175
Technical Professional 3 $149 $156 $156
Technical Professional 2 $128 $134 $134
Technical Professional 1 $120 $126 $126
Senior Technician $97 $102 $102
Technician $92 $97 $97
Project Controls Analyst $135 $142 $142
Technical Editor $114 $120 $120
Project Administrator $90 $95 $95
Notes:
Contract Role
2. Amendment #2 locks in the hourly rates through December 31, 2022.
1. Amendment #1 increased the hourly rates in the original agreement by 5%.
Attachment A
Corp Yard Storm Water Compliance Improvement Project
Project No. 18‐RFP‐PW‐405
Amendment #2
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
AMENDMENT TO THE AGREEMENT FOR SERVICES BETWEEN
CITY OF GILROY AND WOOD ENVIRONMENT & INFRASTRUCTURE SOLUTIONS, INC.
FOR THE DESIGN OF THE
CORP YARD STORM WATER COMPLIANCE IMPROVEMENT PROJECT
PROJECT NO. 18-RFP-PW-405
PURCHASE ORDER NO. 190394 DATED 11/28/2018
AMENDMENT NO. 1
This Amendment shall become effective when it has been signed by the City Administrator, Project Manager,
and Consultant. All copies forwarded to Consultant for signature shall be returned to the City of Gilroy
properly filled out. Upon acceptance by the City, the Consultant's copy will be returned to him as his authority
to aroceed with the work.
This Amendment extends the term of the Agreement for Services between the City of Gilroy and Wood
Environment & Infrastructure Solutions, Inc. (formerly known as Amec Foster Wheeler Environment &
Infrastructure, Inc.). This Amendment shall be effective on June 1; 2019 and will continue in effect
through December 31, 2020. This Amendment also adds the firm Automated Engineering Technologies
Ltd. as a subconsultant under this contract. Wood Environment & Infrastructure Solutions, Inc. hourly
labor rates are included as Attachment A. The hourly labor rates in Attachment A shall increase by 5%
annually, upon the effective date of this Amendment. However, no increase in the amount of total
compensation is allowed. The original agreement's cost estimate summary is included as Attachment B.
All requirements of the original Agreement Documents shall apply to the above work except as specifically
modified by this Amendment. The contract time shall not extend unless expressly provided for in this
Amendment.
Wood Environment & Infrastructure Solutions, Inc. hereby agrees to perform the above work subject to the
terms of this Amendment for additional services as described above.
Consultant: Wood EnX,11r
By .
Martin Spongbeejr
Date / F// -(
Solutions, Inc.
ACCEPTED: --
li:tes, Project Maifger
irum Awoke, Pu lic Works Department Director
Gabriel A. Gonzalez, City Ad r
ATTESTP
4(-3bhel
Dy e
ate
Date
Amendment #1
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Attachment A
Wood Environment & infrastructure Solutions, Inc.
Hourly Rate Schedule
CONTRACT ROLE
Principal
Senior Associate
Associate
Senior 2
Senior 1
Technical Professional 3
Technical Professional 2
Technical Professional 1
Senior Technician
Technician
Project Controls Analyst
Technical Editor
Project Administrator
RATE/HOUR
247
218
195
183
167
149
128
12b
97
92
135
114
90
Amendment #1
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Attachment B
Wood Environment & Infrastructure Solutions, Inc.
Cost Estimate Summary
Amendment #1
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Attachment B
COST ESTIMATE SUMMARY
Consultant:
Contract:
Amec Foster Wheeler Environment & Infrastructure, Inc
RFQ for Corp Yard Storm Water Compliance Improvement Project No. 18-RFP-PW-405
Task/Description
Task 1 - Project Management
Task 2 - Site Assessment
Task 3 - Preliminary Design
Task 4 - Design Development
Task 5 - Update SWPPP
Task 6 - Post -Construction Stormwater Control Plan
Task 7 - Final Bid Package
Task 8 - Bid Support
Task 9 - Construction Support Services
Task 10 - Prepare O&M Plan
Total
Total with contingency (10%)
Budqet
16,833
5,864
13,388
49,759
4,067
6,023
4,894
3,876
7,734
5,747
118, 200
130, 000
Amendment #1
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
COST ESTIMATE SUMMARY
Consultant:
Contract:
Summary of Direct Labor Costs
Discipline
Principal
Associate
Senior 2
Technical Professional 3
Technical Professional 2
Project Controls Analysts
Technical Editor
Project Administrator
Subtotal Labor Costs
Total Labor Costs
Other Direct Costs
Automated Engineering Technologies Ltd.
Vehicle (daily)
Airfare
Subtotal Other Direct Costs
Other Direct Costs - 7% markup
Total Other Direct Costs
TOTAL PROPOSED FEE
Attachment B
AM EC Foster Wheeler Environment & Infrastructure, Inc.
RFQ for Corp Yard Storm Water Compliance
Improvement Project No. 18-RFP-PW-405
Hours
55. 00
192.00
60.00
196.00
100.00
8.00
12.00
34.00
657.00
12.00
1.00
Rate
247
195
183
149
128
135
114
90.00
Fixed Price
50. 00
300.00
C:\Users\courtney.slmpsonWppDala\Local\Mlcrosoft\ Windows\Temporary Inlemet Files\Content.Outlook\ZO80MNZD\Copy.of Gilroy COST SHEET_041716 mesJhh
Total
13,585.00
37,440.00
10,980.00
29,204.00
12,800.00
1,080.00
1,368.00
3,060.00
109,517.00
109,517.00
7,200.00
600.00
300.00
8,100.00
567.00
8,667.00
118,184.00
Amec Foster Wheeler
Page 1 of 11
Amendment #1
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Attachment B
Task 1 - Project Management
Assumptions: This task includes invoicing, scheduling, and participation ina' kickoff meeting and three status
meetings. Project manager will attend kickoff meeting and three status meetings in person. Contract manager
and design team will attend kickoff meeting in person, and participate in status meetings via phone.
Consultant will prepare meeting minutes. The project schedule will be managed with a Gantt chart schedule
that will be provided at the kickoff meeting. QA/QC is included in each task and is not included separately
in the Project Management task. Summary
of Direct Labor Costs Discipline
Hours Rate Total Principal
16.00 247.00 3,952.00 Associate
56.00 195.00 10,920.00 Senior
2 0.00 183.00 0.00 Technical
Professional 3 0.00 149.00 0.00 Technical
Professional 2 0.00 128.00 0.00 Project
Controls Analysts 8.00 135.00 1,080.00 Technical
Editor 0.00 114.00 0.00 Project
Administrator 8.00 90.00 720.00 Subtotal
Labor Costs 16,672.00 Total
Labor Costs $16,672.00 Other
Direct Costs Automated
Engineering Technologies Ltd. 0.00 Fixed Price $0.00 Vehicle (
daily) 3.00 $50.00 $150.00 Airfare
0.00 $300.00 $0.00 Subtotal
Other Direct Costs $150.00 Other
Direct Costs - 7% markup $10.50 Total
Other Direct Costs $160.50 TOTAL
PROPOSED FEE $16,832.50 Amec
Foster Wheeler Page
2 of 11 C:\Users\counney.simpsonWppData\Local\Microsoft\Windows\Temporary Intemet Files\Content.Outlook\Z880MNZD\Copy of Gilroy COST SHEET_041718 mesJhh
Amendment #1
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Attachment B
Task 2 - Site Assessment
Assumptions: Includes .document review and field investigation including site/structure evaluation. Because
of Amec Foster Wheeler's previous work at the Corporation Yard, a detailed field investigation is not
required. An abbreviated field investigation will take place during the same trip as the kickoff meeting.
Travel costs for the kickoff meeting/field investigation are included in this task.
Summary of Direct Labor Costs
Discipline Hours Rate Total
Principal 6.00 247.00 1,482.00
Associate 20. 00 195.00 3,900.00
Senior 2 0.00 183.00 0.00
Technical Professional 3 0.00 149.00 0.00
Technical Professional 2 0.00 128.00 0.00
Project Controls Analysts 0.00 135.00 0.00
Technical Editor 0.00 114.00 0.00
Project Administrator 0.00 90. 00 0.00
Subtotal Labor Costs 5,382.00
Total Labor Costs $5,382.00
Other Direct Costs
Automated Engineering Technologies Ltd. 0.00 Fixed Price $0.00
Vehicle (daily) 3.00 $50.00 . $150.00
Airfare 1.00 $300.00 $300.00
Subtotal Other Direct Costs $450.00
Other Direct Costs - 7% markup $31.50
Total Other Direct Costs $481.50
TOTAL PROPOSED FEE $5,863.50
Amec Foster Wheeler
C:\Users\courtney.simpsonWppData\Local\Microsoft\ Wlndows\Tempomry Internet Files\Content.Outlook\ZOOOMNZD\Copy of Gilroy COST SHEET_041718 mesJhh Page 3 of 11
Amendment #1
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Attachment B
Task 3 - Preliminary Design
Assumptions: Includes preparation of a Corporation Yard Stormwater Management Master Plan that will
include: summary of findings; identification/prioritization of alternative; basis for design; preliminary cost
estimates; and proposed timeline for design, construction and training. Prioritized ranking will include
consideration of capital cost, water quality benefit, employee/highway safety, and O&M cost.
Summary of Direct Labor Costs
Discipline Flours Rate Total
Principal 8.00 247.00 1,976.00
Associate 12.00 195.00 2,340.00
Senior 2 20. 00 183.00 3,660.00
Technical Professional 3 20. 00 149.00 2,980.00
Technical Professional 2 0.00 128.00 0.00
Project Controls Analysts 0.00 135.00 0.00
Technical Editor 0.00 114.00 0.00
Project Administrator 8.00 90. 00 720.00
Subtotal Labor Costs 11,676.00
Total Labor Costs $11,676.00
Other Direct Costs
Automated Engineering Technologies Ltd. 20. 00 Fixed Price $1,600.00
Vehicle (daily) 0.00 $50. 00 $0.00
Airfare 0.00 $300.00 $0.00
Subtotal Other Direct Costs $1,600.00
Other Direct Costs - 7% markup $112.00
Total Other Direct Costs $1,712.00
TOTAL PROPOSED FEE $13,388.00
Amec Foster Wheeler
Page 4 of 11 C:\Users\courtney.slmpsonWppData\local\Microsoft\WlndowslTemporary Internet Flles\0ontent.Outlook1Z08OMNZD\Copy of Gliroy COST SHEET_041718 mesJhh
Amendment #1
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Attachment B
Task 4 - Design Development
Assumptions: Includes preparation of 30, 75, and 100% plans, specifications, and cost estimates. Each
successive level will incorporate all comments received from the City. This task includes Principal level review
of all plan sets. For this cost estimate we have assumed that infiltration trenches will be selected as a BMP,
which'will require preparation of a Preliminary Post -Construction Stormwater Quality Report per City Planning
Permit Applications. Includes costs to meet on site up to two times with vendors or sub -consultants to develop
construction cost estimates. This cost estimate assumes electronic submittals only.
Summary of Direct Labor Costs
Discipline Hours Rate Total
Principal 20. 00 247.00 4,940.00
Associate 40.00 195.00 7,800.Q0
Senior 2 40.00 183.00 7,320.00
Technical Professional 3 80.00 149.00 11,920.00
Technical Professional 2 80.00 128.00 10,240.00
Project Controls Analysts 0.00 135.00 0.00
Technical Editor 0.00 114.00 0.00
Project Administrator 16.00 90.00 1,440.00
Subtotal Labor Costs 43,660.00
Total Labor Costs $43,660.00
Other Direct Costs
Automated Engineering Technologies Ltd. 70.00 Fixed Price_ $5,600.00
Vehicle (daily) 2.00 $50.00 $100.00
Airfare 0.00 $300.00 $0.00
Subtotal Other Direct Costs $5, 700.00
Other Direct Costs - 7% markup $399.00
Total Other Direct Costs $6,099.00
TOTAL PROPOSED FEE $49,759.00
Amec Foster Wheeler
C:\Users\courtney.simpson\AppDala\Local\Microsoft\Windows\Temporary Intemet Flles\Content.0ullook\Z080MNZD\Copy of Gilroy COST SHEET_041718 mesJhh Page 5 of 11
Amendment #1
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Attachment B
Task 5 - Update SWPPP
Assumptions: We are very familiar with the Corporation Yard SWPPP, have possession of all digital files, and
will update as necessary. Updates will include new BMPs implemented at the Corporation Yard, internal
QA/QC, and one draft review from City before final copy is produced. We will send original electronic copies to
the City for future updates to the SWPPP.
Summary of Direct Labor Costs
Discipline Hours Rate Total
Principal 1.00 247.00 247.00
Associate 12.00 195.00 2,340.00
Senior 2 0.00 183.00 0.00
Technical Professional 3 0.00 149.00 0.00
Technical Professional'2 8.00 128.00 1,024.00
Project Controls Analysts 0.00 135.00 0.00
Technical Editor 4'00 114.00 456.00
Project Administrator 0.00 90.00 0.00
Subtotal Labor Costs 4,067.00
Total Labor Costs $4,067.00
Other Direct Costs
Automated Engineering Technologies Ltd. 0.00 Fixed Price $0.00
Vehicle (daily) 0.00 $50. 00 $0.00
Airfare 0.00 $300.00 $0.00
Subtotal Other Direct Costs $0.00
Other Direct Costs - 7% markup $0.00
Total Other Direct Costs $0.00
TOTAL PROPOSED FEE $4,067.00
Amec Foster Wheeler
Page 6 of 11 C:\Users\courtney.simpson\AppData\Local\Mlcrosofl\Wlndows\Temporary Internet Files\Content.Outlook\Z080MNZD\Copy of Gilroy COST SHEET_00718 mesJhh
Amendment #1
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Attachment B
Task 6 - Post -Construction Stormwater Control Plan
Assumptions: A Post -Construction Stormwater Control Plan (PCSCP) will be developed if
LID/Greenfrastracture BMPs to promote infiltration are implemented at the Corporation Yard. The PCSCP
will follow the City's guidance for Planning and Permit Applications. It will include a narrative describing
proposed post -construction Best Management Practices (BMPs) for the project
and preliminary calculations demonstrating that sufficient space is available to implement the proposal. The
report will be compliant with the City's NPDES permit and will only discuss post -construction BMPs, and .
may be combined with a preliminary drainage report. BMPs and associated calculations (use calculation
sheets provided in manual) shall conform to the requirements of the Storm Water Management Guidance
Manual for Low Impact Development and Post -Construction Requirements and be designed to promote
infiltration as well as provide stormwater treatment. The final PCSCP and will include internal QA/QC and
one draft copy for review for the City before final copy is produced. We will send original electronic copies
to the City for future updates to the PCSCP. We will discuss with the City if they would like to incorporated
the PCSCP into the SWPPP so that all pertinent information is in one document.
Summary of Direct Labor Costs
Discipline Hours Rate Total
Principal 1.00 247.00 247.00
Associate 12.00 195.00 2,340.00
Senior 2 0.00 183.00 0.00
Technical Professional 3 20.00 149.00 2,980,00
Technical Professional 2 0.00 128.00 0.00
Project Controls Analysts 0.00 135.00 0.00
Technical Editor 4.00 114.00 456.00
Project Administrator 0.00 90. 00 0.00
Subtotal Labor Costs 6,023.00
Total Labor Costs $6,023.00
Other Direct Costs
Automated Engineering Technologies Ltd. 0.00 Fixed Price 0.00
Vehicle (daily) 0.00 $50.00 0.00
Airfare 0.00 $300.00 0.00
Subtotal Other Direct Costs 0.00
Other Direct Costs - 7% markup 0.00
Total Other Direct Costs 0.00
TOTAL PROPOSED FEE 6,023.00
Amec Foster Wheeler
C:\Users\courtney.simpson\AppData\Local\Mlcrosoft\ Windows\Temporary Intemet Flles\ContenLOutlook\Z080MNZD\Copy of Gilroy COST SHEET_041718 mesJhh Page 7 of 11
Amendment #1
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Attachment B
Task 7 - Final Bid Package
Assumptions: Amec Foster Wheeler will respond to City comments on the 100% plans, specifications, and
estimates package (produced as part of Task 4) and produce a Final Bid Package for inclusion in the City's
Request for Proposal for the Construction Phase. This cost estimate assumes electronic submittals only and
phone calls in order to review any final City comments or questions that require clarification.
Summary of Direct Labor Costs
Discipline Hours Rate Total
Principal 2.00 247.00 494.00
Associate 8.00 195.00 1,560.00
Senior 2 0.00 183,00 0.00
Technical Professional 3 16.00 149.00 2,384.00
Technical Professional 2 0.00 128.00 0.00
Project Controls Analysts 0.00 135.00 0.00
Technical Editor 4.00 114.00 456.00
Project Administrator 0.00 90. 00 0.00
Subtotal Labor Costs 4,894.00
Total Labor Costs $4,894.00
Other Direct Costs
Automated Engineering Technologies Ltd. 0,00 Fixed Price $0.00
Vehicle (daily) 0.00 $50.00 $0.00
Airfare 0.00 $300.00 $0.00
Subtotal Other Direct Costs $0.00
Other Direct Costs - 7% markup $0.00
Total Other Direct Costs $0.00
TOTAL PROPOSED FEE $4,894.00
Amec Foster Wheeler
Page 8 of 11 C.\Users\courtney.simpson\AppData\Local\Mlcrosoft\Windows\Temporary Intemet Flles\Content.Outlook\Z060MNZD\Copy of Gilroy COST SHEET_041718 mes Jhh
Amendment #1
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Attachment B
Task 8 - Bid Support
Assumptions: Amec Foster Wheeler will provide assistance with bids and submittal reviews and related
questions from contractors for up to 5 Requests for Information (RFls). This cost estimate assumes up to 4
hours for submittal review and no more than 2 hours will be required for each RFI.
Summary of Direct Labor Costs
Discipline
Principal
Associate
Senior 2
Technical Professional 3
Technical Professional 2
Project Controls Analysts
Technical Editor
Project Administrator
Subtotal Labor Costs
Total Labor Costs
Other Direct Costs
Automated Engineering Technologies Ltd.
Vehicle (daily)
Airfare
Subtotal Other Direct Costs
Other Direct Costs - 7% markup
Total Other Direct Costs
TOTAL PROPOSED FEE
Hours Rate Total
0.00 247.00 0.00
12.00 195.00 2,340.00
0.00 183.00 0.00
0.00 149.00 0.00
12.00 128.00 1, 536.00
0.00 135.00 0.00
0.00 114.00 0.00
0.00 90.00 0.00
3,876. 00
3,876.00
0.00 Fixed Price 0.00
0.00 50.00 0.00
0.00 300.00 0.00
0.00
0.00
0.00
3,876.00
d
Amec Foster Wheeler
C;\Users\courtney.simpson\AppData\Local\Microsoft\Windows\Temporary Intemet Flles\Content.Outlook\ZOBOMNZD\Copy of Gilroy COST SHEET_041M me Jhh Page 9 of 11
Amendment #1
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Attachment B
Task 9 - Construction Support Services
Assumptions: Amec Foster Wheeler will provide construction support for up to 4 weeks of construction.
This cost estimate assumes up to 4 site visits to confirm proper installations as well as phone call
coordination throughout construction. This Task also assumes up to 2 Redline Reviews, with the
Contractor preparing redline mark-ups ("as-builts"). Amec Foster Wheeler will review the redlines and
incorporate the mark-ups on the 100% design drawings (record drawings). This cost estimate assumes
electronic submittals only. These services will be provided in accordance with the City's Erosion and
Sediment Control Plan and the California Construction General Permit. It's unlikely that construction of
SCMs will trigger coverage under the CGP. However, coverage under the CGP might be triggered for
asphalt replacement activities.
Summary of Direct Labor Costs
Discipline Hours Rate Total
Principal 0.00 247.00 0.00
Associate 8.00 195.00 1, 560.00
Senior 2 0.00 183.00 0.00
Technical Professional 3 40. 00 149.00 5,960.00
Technical Professional 2 0.00 128.00 0.00
Project Controls Analysts 0.00 135.00 0.00
Technical Editor 0.00 114.00 0.00
Project Administrator 0.00 90.00 0.00
Subtotal Labor Costs 7,520.00
Total Labor Costs $7,520.00
Other Direct Costs
Automated Engineering Technologies Ltd. 4.00 Fixed Price $0.00
Vehicle (daily) 4.00 $50. 00 $200.00
Airfare 0.00 $300.00 $0.00
Subtotal Other Direct Costs $200.00
Other Direct Costs - 7% markup $14.00
Total Other Direct Costs $214.00
TOTAL PROPOSED FEE $7,734.00
Amec Foster Wheeler
Page 10 of 11 C:\Users\courtney.slmpson\AppDala\Local\Microsoft\ Windows\Temporary Internet Files\Content.Outlook\Z080MNZD\Copy of Gilroy COST SHEET_041718 mes.Jhh
Amendment #1
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Attachment B
Task 10 - Prepare O&M Plan
Assumptions: Amec Foster Wheeler will prepare an O&M Plan with operation and maintenance
requirements, recommended staff training, and minimum qualifications for contractors performing O&M
services, based on the BMPs that may need O&M. We will perform internal QA/QC and submit one draft
copy to the City for review before final copy is prepared. We sill send original electronic copies to the City
for future updates to the O&M Plan. We will discuss with the City if they would like to incorporated the
O&M Plan into the SWPPP so that all pertinent information is in one document.
Summary of Direct Labor Costs
Discipline Hours Rate Total
Principal 1.00 247.00 247.00
Associate 12.00 195.00 2,340.00
Senior 2 0.00 183.00 0.00
Technical Professional 3 20.00 149.00 2,980.00
Technical Professional 2 0.00 128.00 0.00
Project Controls Analysts 0.00 135.00 0.00
Technical Editor 0.00 114.00 0.00
Project Administrator 2.00 90.00 180.00
Subtotal Labor Costs 5,747.00
Total Labor Costs $5,747.00
Other Direct Costs
Automated Engineering Technologies Ltd. 0.00 Fixed Price 0.00
Vehicle (daily) 0.00 $50.00 0.00
Airfare 0.00 $300.00 0.00
Subtotal Other Direct Costs 0.00
Other Direct Costs - 7% markup 0.00
Total Other Direct Costs 0.00
TOTAL PROPOSED FEE 5,747.00
Amec Foster Wheeler
C.\Users\courtney.simpson\AppData\Local\Microsofl\Windows\Tempomry Intemel FIIes\Conlent.OutlooklZOBOMNZD\Copy of Gliroy COST SHEET_041718 mesJhh Page 11 of 11
Amendment #1
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Original Agreement
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Original Agreement
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Original Agreement
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Original Agreement
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Original Agreement
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Original Agreement
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Original Agreement
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Original Agreement
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Original Agreement
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Original Agreement
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Original Agreement
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Original Agreement
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Original Agreement
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Original Agreement
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Original Agreement
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Original Agreement
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Original Agreement
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Original Agreement
DocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53
Original AgreementDocuSign Envelope ID: 5D0BE38C-ADFF-4FE0-BFE0-9D9B846ADF53