Loading...
10/06/2022 Planning Commission Regular Agenda Packet Regular Planning Commission Meeting Agenda October 6, 2022 6:00 P.M. City Council Chambers, City Hall 7351 Rosanna Street, Gilroy CA PLANNING COMMISSION MEMBERS Chair: Manny Bhandal: manny.bhandal@cityofgilroy.org Vice Chair: Annedore Kushner: annedore.kushner@cityofgilroy.org Commissioners: ▪ John Doyle: john.doyle@cityofgilroy.org ▪ Adilene Jezabel Moreno: adilene.moreno@cityofgilroy.org ▪ Stefanie Elle: stefanie.elle@cityofgilroy.org ▪ Adriana Leongardt: adriana.leongardt@cityofgilroy.org ▪ Joan Lewis: joan.lewis@cityofgilroy.org THIS MEETING WILL BE CONDUCTED PURSUANT TO THE PROVISIONS OF ASSEMBLY BILL 361. MEETING MATERIAL IS AVAILABLE ON THE CITY WEBSITE www.cityofgilroy.org. Pursuant to California Assembly Bill 361, a local legislative bode is authorized to hold public meetings remotely and to make those meetings accessible to all members of the public seeking to observe and to address the local legislative body by remote means only via a technology solution. As such, the City will provide various options for the public to participate in the conduct of the meeting, as indicated in detail below on this coversheet. Written comments can be submitted by email to planningdivision@cityofgilroy.org Please note that written comments will not be read out loud, but will be part of the written record. Comments by the public will be taken on any agenda item before action is taken by the Planning Commission. Persons speaking on any matter are asked to state their name and address for the record. Public testimony is subject to reasonable regulations, including but not limited to time restrictions on particular issues and for each individual speaker. A minimum of 12 copies of materials should be provided to the Clerk for distribution to the Commission and Staff. Public comments are limited to no more than three-minutes, at the Chair’s discretion. Comments on any agenda item may be emailed to the Planning Division at planningdivision@cityofgilroy.org or mailed to the City of Gilroy, Community Development Department at City Hall, 7351 Rosanna Street, Gilroy, CA 95020. Comments received by the Planning Division by 1:00pm on the day of a Planning Commission meeting will be distributed to the Planning Commissioners prior to or at the meeting and are available for public inspection at the Planning Division counter at City Hall, 7351 Rosanna Street. Any correspondence received will be incorporated into the meeting record. Items received after the 1:00pm deadline will be provided to the Planning Commission as soon as practicable. In compliance with the American Disabilities Act (ADA), the City will make reasonable arrangements to ensure accessibility to this meeting. If you need special assistance to participate in this meeting, please contact the City Clerk 72 hours prior to the meeting at (408) 846-0491. A sound enhancement system is available in the City Council Chambers. If you challenge any planning or land use decision made at this meeting in court, you may be limited to raising only those issues you or someone else raised at the public hearing held at this meeting, or in written correspondence delivered to the Planning Commission at, or prior to, the public hearing. Please take notice that the time within which to seek judicial review of any final administrative determination reached at this meeting is governed by Section 1094.6 of the California Code of Civil Procedure. Persons who wish to speak on matters set for Public Hearing will be heard when the presiding officer calls for comments from those persons who are in support of or in opposition thereto. After persons have spoken, the hearing is closed and brought to the Planning Commission level for discussion and action. There is no further comment permitted from the audience unless requested by the Planning Commission. A Closed Session may be called during this meeting pursuant to Government Code Section 54956.9(b)(1) if a point has been reached where, in the opinion of the legislative body of the City on the advice of its legal counsel, based on existing facts and circumstances, there is a significant exposure to litigation against the City. Materials related to an item on this agenda submitted to the Planning Commission after distribution of the agenda packet are available for public inspection with the agenda packet in the lobby of Administration at City Hall, 7351 Rosanna Street during normal business hours. These materials are also available with the agenda packet on the City website at www.cityofgilroy.org I. OPENING II. PLEDGE OF ALLEGIANCE III. REPORT ON POSTING THE AGENDA AND ROLL CALL IV. PUBLIC COMMENTS: (Three-minute time limit). This portion of the meeting is reserved for persons desiring to address the Planning Commission on m atters not on the agenda. The law does not permit the Planning Commission action or extended discussion of any item not on the agenda except under special circumstances. If Planning Commission action is requested, the Planning Commission may place the matter on a future agenda. Comments on any agenda item may be emailed to the Planning Division at planningdivision@cityofgilroy.org or mailed to Community Development Department at City Hall, 7351 Rosanna Street, Gilroy, CA 95020. Comments received by the Planning Division by 1:00pm on the day of a Planning Commission meeting will be distributed to the Planning Commission prior to or at the meeting and available for public inspection with the agenda packet located in the lobby of Planning Division at City Hall, 7351 Rosanna Street prior to the meeting. Any correspondences received will be incorporated into the meeting record. Items received after 1:00pm deadline will be provided to the Planning Commission as soon as practicable. All statements that require a response will be referred to staff for reply in writing. PUBLIC HEARINGS FOR RELATED PROJECT APPLICATIONS WILL BE HEARD CONCURRENTLY AND ACTION WILL BE TAKEN INDIVIDUALLY. COMPANION PROJECTS UNDER NEW BUSINESS WILL BE TAKEN UP FOR ACTION PRIOR TO, OR IMMEDIATELY FOLLOWING THE RELATED PUBLIC HEARING. THIS REQUIRES DEVIATION IN THE ORDER OF BUSINESS AS NOTED WITHIN THE AGENDA. V. CONSENT AGENDA 1. Planning Commission - Regular Meeting - Sep 1, 2022 6:00 PM VI. SANTA CLARA VALLEY TRANSPORTATION AUTHORITY BICYCLE AND PEDESTRIAN ADVISORY COMMITTEE UPDATE VII. CONTINUED PUBLIC HEARINGS No Items. VIII. PUBLIC HEARINGS A. Royal Way Townhomes, Located at 6680-6687 Royal Way, APN 799-44-93, 94, 95, 96, 97, 98, 101, 109 & 110, Z 21-05; TM 21-04 and AS 21-17 (# 21090001, 21090002 & 20190003). 1. Staff Report: Kraig Tambornini, Senior Planner 2. Open Public Hearing 3. Close Public Hearing 4. Planning Commission Disclosure of Ex-Parte Communications 5. Possible Action: Staff has analyzed the proposed project, and recommends that the Planning Commission: a) Adopt a resolution recommending that the City Council approve the Zone Change request Z 21-05; and b) Adopt a resolution recommending that the City Council approve the Vesting Tentative Map request TM 21-04; and c) Adopt a resolution recommending that the City Council approve the Architectural and Site Review Permit AS 21-17. B. Proposed Tentative Map to divide 778 First Street into two parcels, Application No. TM 22-04 1. Staff Report: Jon Biggs, Special Assistant to City Administration 2. Open Public Hearing 3. Close Public Hearing 4. Planning Commission Disclosure of Ex-Parte Communications 5. Possible Action: Staff has analyzed the proposed project, and recommends that the Planning Commission adopt a resolution, included with this agenda report, recommending that the City Council approve the proposed tentative map to divide 778 First Street into two parcels. IX. NEW BUSINESS A. Annual Presentation to Council 1. Staff Report: Cindy McCormick, Customer Service Manager 2. Public Comment 3. Possible Action: Accept report and provide feedback on any final edits to the presentation. X. INFORMATIONAL ITEMS A. Planning Current Project Log XI. PRESENTATION BY MEMBERS OF THE PLANNING COMMISSION XII. REPORTS BY COMMISSION MEMBERS Chair Bhandal - South County Joint Planning Advisory Committee Vice Chair Kushner - Gilroy Downtown Business Association XIII. PLANNING DIVISION REPORT XIV. ASSISTANT CITY ATTORNEY REPORT XV. ADJOURNMENT to the Next Meeting of November 3, 2022 at 6:00 P.M. Planning Commission Regular Meeting of SEPTEMBER 1, 2022 Tonight's meeting was called to order by Chair Bhandal at 6:00pm. I. PLEDGE OF ALLEGIANCE Chair Bhandal led the pledge of allegiance. II. REPORT ON POSTING THE AGENDA AND ROLL CALL Tonight's agenda was posted on Friday, August 26th at 3:43 pm. Attendee Name Title Status Arrived Manny Bhandal Chairperson Present 5:48 PM Annedore Kushner Vice Chair Present 5:50 PM John Doyle Planning Commissioner Absent Stefanie Elle Planning Commissioner Present 5:49 PM Adriana Leongardt Planning Commissioner Present 5:46 PM Joan Lewis Planning Commissioner Absent Adilene Jezabel Moreno Planning Commissioner Present 5:48 PM III. PRESENTATIONS 1. Mayor's Presentation to the Planning Commission Mayor Blankley provided the annual presentation to the Planning Commission. Mayor Blankley recognized commissioners for their service on the Planning Commission. Community Development Director Goei shared future training opportunities and stated she will follow up with an email. IV. PUBLIC COMMENTS There were no public comments for items not on the agenda. V. CONSENT AGENDA Motion made by Chair Bhandal; seconded by Commissioner Elle to approve the consent agenda. 5-0-0-2 5.1 Packet Pg. 5 Minutes Acceptance: Minutes of Sep 1, 2022 6:00 PM (CONSENT AGENDA) RESULT: APPROVE [UNANIMOUS] MOVER: Manny Bhandal, Chairperson SECONDER: Stefanie Elle, Planning Commissioner AYES: Bhandal, Kushner, Elle, Leongardt, Moreno ABSENT: Doyle, Lewis VI. SANTA CLARA VALLEY TRANSPORTATION AUTHORITY BICYCLE AND PEDESTRIAN ADVISORY COMMITTEE UPDATE No report. VII. CONTINUED PUBLIC HEARINGS No Items. VIII. PUBLIC HEARINGS No Items. IX. NEW BUSINESS A. Attendance Policy for City Boards, Commissions and Committees 1. Staff Report: Cindy McCormick, Customer Service Manager 2. Public Comment 3. Possible Action: Accept the Report Customer Service Manager McCormick presented the staff report. Several Commissioners asked for clarification regarding the attendance policy. Chair Bhandal opened the item to public comments, seeing none, Chair Bhandal closed the item to public comment. Motion made by Chair Bhandal; seconded by Commissioner Moreno to accept the report. 5-0-0-2 RESULT: APPROVE [UNANIMOUS] MOVER: Manny Bhandal, Chairperson SECONDER: Adilene Jezabel Moreno, Planning Commissioner AYES: Bhandal, Kushner, Elle, Leongardt, Moreno ABSENT: Doyle, Lewis B. Annual Presentation to Council 1. Staff Report: Cindy McCormick, Customer Service Manager 2. Public Comment 3. Possible Action: Accept report and provide feedback on any additional items for the presentation. 5.1 Packet Pg. 6 Minutes Acceptance: Minutes of Sep 1, 2022 6:00 PM (CONSENT AGENDA) Customer Service Manager McCormick presented the staff report and asked the Commissioners if they would like additional items added to the presentation. The Commissioners would like the following four projects included in the presentation: Covale Taproom, Cold Storage, Chestnut & 10 Street, and Gurries project. McCormick will update the presentation slides and bring the item back to the October meeting for the Commission’s review. Chair Bhandal opened the item to public comments, seeing none, Chair Bhandal closed the item to public comment. Motion made by Commissioner Moreno; seconded by Chair Bhandal to accept the report. 5-0-0-2 RESULT: APPROVE [UNANIMOUS] MOVER: Adilene Jezabel Moreno, Planning Commissioner SECONDER: Manny Bhandal, Chairperson AYES: Bhandal, Kushner, Elle, Leongardt, Moreno ABSENT: Doyle, Lewis X. INFORMATIONAL ITEMS A. Planning Current Project Log There were no comments or questions from the Planning Commission regarding the project log. XI. PRESENTATION BY MEMBERS OF THE PLANNING COMMISSION None. XII. REPORTS BY COMMISSION MEMBERS Chair Bhandal (South County Joint Planning Advisory Committee) stated he has not received contacts for the South County Joint Planning Advisory Committee. Senior Planner Tambornini will look into this and report back. Vice Chair Kushner (Gilroy Downtown Business Association) stated the next meeting will be held the week of 9/6/22. XIII. PLANNING DIVISION REPORT Community Development Director Goei stated there are three open recruitments in the planning division. Community Development Director Goei thanked everyone for the input at the Housing Element study session held in collaboration with the City Council. XIV. ASSISTANT CITY ATTORNEY REPORT Nothing to report. 5.1 Packet Pg. 7 Minutes Acceptance: Minutes of Sep 1, 2022 6:00 PM (CONSENT AGENDA) XV. ADJOURNMENT to the Next Meeting of October 6, 2022 at 6:00 P.M. Chair Bhandal adjourned the meeting at 6:37 pm. Zinnia Navarro, Management Assistant 5.1 Packet Pg. 8 Minutes Acceptance: Minutes of Sep 1, 2022 6:00 PM (CONSENT AGENDA) Community Development Department 7351 Rosanna Street, Gilroy, California 95020-61197 Telephone: (408) 846-0451 Fax (408) 846-0429 http://www.cityofgilroy.org DATE: October 6, 2022 TO: Planning Commission FROM: Kraig Tambornini, Senior Planner SUBJECT: Royal Way Townhomes, Located at 6680-6687 Royal Way, APN 799-44-93, 94, 95, 96, 97, 98, 101, 109 & 110, Z 21-05; TM 21-04 and AS 21-17 (# 21090001, 21090002 & 20190003). RECOMMENDATION: Staff has analyzed the proposed project, and recommends that the Planning Commission: a) Adopt a resolution recommending that the City Council approve the Zone Change request Z 21-05; and b) Adopt a resolution recommending that the City Council approve the Vesting Tentative Map request TM 21-04; and c) Adopt a resolution recommending that the City Council approve the Architectural and Site Review Permit AS 21-17. PROJECT DESCRIPTION: The project proposes to develop 3.37 total acres of vacant land, between Royal Way and Uvas Creek levee and trail, with 45 two-story townhomes in 11 buildings. The units would be for sale, market rate housing and consist of six (6) 3-bedroom units and 39 2- bedroom units. The 3-bedroom units average 1,300 square feet in size and 2-bedroom units average 1,200 square feet in size. Each townhome includes a two car garage, front yard and private patio area. Project features and amenities include an onsite recreational playground, 12 guest parking spaces, on-site and offsite landscaping, perimeter pathway, fencing and outdoor courtyard area. The project also includes landscaping on the Gilroy Unified School District property to the west, and in the parkstrip on Royal Way. The site is relatively level and would result in approximately 3,000 cubic yards of soils removal to accommodate site development. The property is permitted for medium density residential development and zoned R3 multi-family residential. The Planned Unit Development (PUD) overlay is proposed to 7.A Packet Pg. 9 2 permit individual townhome lots with deviations to side and front setback standards along the exterior boundary. The tentative map is required to create individual lots for each unit. The architectural and site review permit is required to approve all site and building design details, consistent with the PUD overlay. The site could otherwise develop as an apartment complex, subject to administrative review, without the PUD rezoning and Tentative Map. BACKGROUND: Subject Property and Surrounding Land Uses: The site and surrounding land uses are as follows: LOCATION EXISTING LAND USE GENERAL PLAN ZONING Project Site Vacant Medium Density R3 North Multi-family Medium Density R1&R3 South Levee trail Park and Recreation OS East Single-family Low Density R1 West Gilroy High School Public/Quasi Public PF Background Information: This site was rezoned from R2 to R3 zoning in 1983. Prior applications for development were reviewed in 2007 and again in 2015. The applicant submitted the subject project for preliminary review in 2021. This application responds to preliminary review comments provided on 3/19/21. The formal submittal was made on 10/4/21 and complete for processing on 7/29/22. Environmental Determination: Pursuant to Section 15183 of the California Environmental Quality Act, projects that are consistent with the general plan do not require additional environmental review except as might be necessary to examine whether there are particular project-specific significant effects. Staff has investigated the site and concludes that project qualifies for an infill exemption pursuant to section 15332 of the CEQA Guidelines, and no further environmental analysis is required, as follows: a) The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations. b) The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses. c) The project site has no value as habitat for endangered, rare or threatened species. d) Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality. e) The site can be adequately served by all required utilities and public services. f) There are no significant effects peculiar to this site. Filing of a Notice of Exemption (NOE) is not mandated. However, this would reduce the statute of limitations for legal challenges under CEQA, from 180 days to 35 days. No further assessment is necessary for this proposal. It is anticipated that a Notice of Exemption will be filed for the project. 7.A Packet Pg. 10 3 DISCUSSION AND ANALYSIS: General Plan Consistency: The 2040 General Plan requires development of the site to be completed with the density range of 8 to 20 units per net acre. The site is 3.37 net acres, and has no public rights of way or dedications required. Based on this site area, the property has a permitted density range of 30 to 68 units. Therefore, the 45 unit project size is within the required density range. Specific goals and policies relevant to this site are further discussed as follows: General Plan Policy/Goal Consistency Analysis LU 1.1 Pattern of Development. Ensure an orderly, contiguous pattern … that prioritizes infill… Complies. The project integrates with the neighborhood. LU 3.1 Existing Neighborhoods. Maintain and enhance the quality of existing residential neighborhoods, … Complies. The project enhances the neighborhood quality. LU 3.2 Connectivity. Encourage new residential development to promote walking and connectivity between blocks Complies. The site provides connectivity to public sidewalks. LU 3.3 Building Orientation. Encourage new residential development to orient buildings toward streets or public spaces to actively engage the community and provide complete neighborhoods. Complies. Buildings orient to common paths and streets. LU 3.5 Neighborhood Infill. Encourage infill developments that enhance neighborhood quality and respond to community input in the planning and design of infill projects … Complies. Buildings facing Royal Way are designed smaller with driveways to relate well with the neighborhood. LU 3.6 Attached housing. Require new development projects located within the Medium Density … land use designations to provide attached dwelling units. Complies. The project proposes attached units. LU 3.8 Multi-family design policy. Encourage new multi-family development to incorporate distinctive site and architectural design that also respects existing and surrounding uses. Complies. Objective Design Standards are addressed and the project is designed to respect the predominant development pattern and adjacent property setbacks. H 1-1 Encourage provision of a variety of housing options for residents. Substantially Complies. Housing Element Table 13-17 single family attached represented 6.9% of the housing stock with the majority detached single-family, and market rate townhomes provide another home ownership option. H 4-1 Promote homeownership opportunities. Substantially Complies. Attached townhomes provide additional opportunity for entry into homeownership. H 4-2 Encourage provision of new affordable housing. Not Applicable. The developer has elected to proceed with by right market rate housing conforming to the site density allowance, thus no affordable housing is required. 7.A Packet Pg. 11 4 M 1.8 Street landscaping. Require landscaping as a part of all new street design, including street trees, landscaped medians and buffers, and high-quality street furniture. Complies. Street trees are provided as required by policies M 1.8 and PFS 7.5. M 4.2 Transit and development. Require new development to fully accommodate, enhance, and facilitate public transit, including pedestrian and bicycle access Not Applicable. The project does not affect bus service or routes. A VTA Route 86 bus stop is within 0.25 miles, at Princevalle St & Johnson Way. PFS 3.6 Water infrastructure. Ensure that water infrastructure is in place or required in conditions prior to approving. Complies. Water lines are located at the Royal Way frontage. Capacity for General Plan buildout remains sufficient. Service would be extended to the site by the developer. PFS 4.3 Timing of development. Require adequate wastewater treatment capacity is … in place Complies. Sewer lines exist along the site frontage. Capacity for General Plan buildout is sufficient. Service would be extended into the stie by the developer. PFS 8.5 Undergrounding. Require the undergrounding of utilities in areas of the City undergoing redevelopment or significant construction. Complies. There are no existing or new above ground power or telephone lines with this project. PFS 9.3 Development review. Include Police Department in development review to ensure crime and safety issues are addressed Complies. The project has been reviewed by all departments and agencies that would serve the development, including Police, and requirements are met. PFS 10.8 Fire access design and building. Require new development to include fire- resistant landscaping & building materials and adequate fire equipment access Complies. Building materials and landscaping as proposed and conditioned comply with all fire code requirement. PR 1.4 Parkland standard. Maintain the City’s established standard of five acres of developed park land per thousand population. Complies. The project is not suitable for public parkland use. The City has planned for its park needs in the Parks Master Plan and will collect Facilities impact fee per unit to fund improvements. NCR 1.8 Native nesting birds. Protect native nesting birds, protected by Migratory Bird Treaty Act and Fish and Game Code Complies (as conditioned). Standard conditions require surveys to be conducted prior to start of construction during the nesting season NCR 1.10 Light pollution. Encourage measures to limit light pollution from outdoor sources, and direct outdoor lighting downward and away from wildlife habitat areas Complies. A photometric plan has been provided that shows residential level lighting sufficient for safety and security, with an average 0.44-footcandle on the private streets; with lighting required to be shielded downward to avoid spillover or glare. NCR 3.3 Shade tree program. Increase community-wide use of shade trees to decrease energy use associated with building cooling Substantially Complies. The project includes significant tree planting which will contribute to site and building cooling. NCR 5.3 Archaeological resources. Ensure all ground-disturbing activities protect archaeological resources if discovered during excavation. Complies (as conditioned). Though the site has a low risk for discovery, standard conditions of approval require work to halt if remains or artifacts are uncovered, in compliance with state law. Notes: The City is in the process of updating its Housing Element which will address new state housing allocation numbers. This site is included as site M-4 on the 12-7-21 Vacant Land Survey. Some useful links relevant to the information in this table are as follows: 7.A Packet Pg. 12 5 www.cityofgilroy.org/274/2040-General-Plan www.cityofgilroy.org/DocumentCenter/View/9058/2015--2023-Housing-Element?bidId= www.cityofgilroy.org/DocumentCenter/View/12571/Vacant-Land-Survey-12-07- 2021?bidId= www.cityofgilroy.org/DocumentCenter/View/11630/2020-Annual-Housing-Element- Progress-Report- Zoning Code Conformance: Review of the project requests for planned development zone change, tentative map and architectural and site plan permit is provided as follows: Zoning and PUD Standards Analysis Pursuant to zoning code chapter 30.26, the PUD planned unit development combining district allows diversification in development standards that promote unified plann ing and development, economical and efficient land use, a higher standard of amenities, creative design, and upgrading of the urban environment. Development standards are established through issuance of a PUD permit per chapter 30.50.50. The project proposes the following deviations from the base R3 medium density residential zoning (with setbacks measured from nearest building edge to exterior site boundary, and shown on plan Sheet A 1.1): Standard Required Proposed Lot Size 8,880 square feet N/A to townhome lots Front Setback (*) 26’ from face of curb 24’ min to 30’ max Cul de Sac Setback (*) 21 feet from face of curb 20’4” min Street Side Setback 12 feet 14’1” min Interior Side (*) 12’ 6’ min (19’ typ.) west side adjacent to Gilroy HS 10’3” min (17’ typ.) east side backing to SFR Rear Setback 15 feet 16’5” min. Building Height 45 feet/3 stories 26’+/- and 2 stories typ. Parking (Ch 30.31) Two (2) 10’x20’ spaces; one of which is covered, plus 1 foot for obstructions (e.g., min 22’ wide by 20’ deep 2 car garage) Units propose two car garages with typically one standard 10’x20’ and one compact 8’x17’ space, plus space for 2 cars in the private driveway. Guest Parking 12 spaces (1 per 4 units) 12 spaces, including one accessible space Landscaping (Ch 30.38) All yard areas must be landscaped with no more than 50% paving in the front yard. The project complies. See Architectural and Site Review Permit discussion below Multifamily Design Compliance with Objective Design Standards (ODS) The project complies. See Architectural and Site Review Permit discussion below R3 Site and Design Standard (Sec 30.7.50) Provide 6 foot building separation, and 80% of ground floor units with 150sf private yard area All buildings and units meet or exceed this standard. Note: The asterisk (*) in the Standards column indicates a PUD deviation from base R3 zoning is proposed. This applies to the Front, Cul-de-sac and Interior setbacks (as 7.A Packet Pg. 13 6 measured from building to perimeter boundary). Staff recommends support of the PUD overlay and development standards as consistent with Chapter 30.26 and Section 30.50.50 for the following reasons: 1) The single-family attached development is consistent with the general plan density, policies, and land use designations as it provides additional home ownership possibilities in the community. 2) The deviations to R3 standards would provide compliant parking and be harmonious with the existing neighborhood development pattern. 3) The project proposes high quality design details and building materials. 4) The project includes a higher standard of amenities which includes: • The project proposes to install and maintain landscaping between the site and Gilroy High School tennis courts, to enhance and maintain visibility of this area from the development. • Visible and attractive community walkways and gathering areas placed throughout the site that meet or exceed the City Objective Design Standards, with orientation of units to these active outdoor areas. • High quality open view fencing along the perimeter, attractive low front yard fencing and consistent fencing for private yard areas. • Quality building materials and details that meet or exceed the City Objective Design Standards. And, • Proposed placement of public art at the community open space/gazebo . Architectural and Site Review Analysis In addition to the PUD requirements above, the building designs and site plan must comply with the criteria listed in Section 30.50.40. The project addresses this review criteria, as follows: a) Traffic Safety and efficiency. The project has been evaluated by police, fire, and public works to ensure the street circulation, driveways, and access meet city standards. The proposed internal private street design is considered efficient and acceptable for emergency access and the volume of traffic anticipated for the small infill development. b) Signage. The project does not currently include specific building identification signage details. If a monument or wall identification sign is requested, a separate sign permit would be required. Such signage must match the complex design, not exceed 24 square feet in area, height of 6 feet, indirectly illuminated and setback at least 10 feet from the property line. Addressing for the building would be provided in compliance with City fire code requirements. c) Site Development. The project is broken into a series of buildings, with smaller building groups along Royal Way, and accent concrete paving at the intersections which would enhance the aesthetic appeal of the drive aisles. d) Landscaping. The project includes a detailed landscape plan for all yard areas that includes a variety of plants and trees, native and compatible species, water efficient planting and irrigation. Landscape area totals approximately 0.88 acres. More than 35 percent of landscape areas would be usable outdoor space with private patio areas, front yard space, outdoor gathering and recreation areas, and pedestrian walkways throughout the project. Comments from Valley Water agency have been included as conditions regarding removal of trees that could conflict with an easement along the rear of the site, and with recommendation 7.A Packet Pg. 14 7 regarding certain tree species. e) Stormdrainage. The project has been designed to incorporate stormdrainage facilities in compliance with state and local regulations. The plan would not result in any loss of ornamental landscaping to accommodate stormdrainage features/ f) Fire Protection. The site has been designed and conditioned to ensure fire safety and access would be accommodated. g) Environmental Impacts. The vacant urban infill site has no environmental characteristics or concerns on the property. Further, the project is subject to review for compliance with the Santa Clara Valley Habitat Plan, pursuant to the City Code. A Habitat Permit application has been filed and the project will be required to pay its share of habitat mitigation fees as required by the plan. Completion of the application process is required as a standard condition of approval. The project also must conform to the City Objective Design Standards. The project is considered to be in substantial conformance with these additional standards as summarized below: Standard Discussion Entryways Front entries are oriented to common areas and active landscape areas, with covered porch areas. Garage Doors Garages do not face the street and are appropriately detailed as shown on detail 1 of sheet A4.4 Massing Breaks Massing breaks are provided exceeding parameters as set forth in the Objective Design Standards as shown in detail 2 and 6 of plan sheet A4.4 Roofline Rooflines provide differentiations in pitch and steps exceeding 4 ft. between porch roof forms and upper roofs. See sheet A5.3 images and elevations A3.7, A3.8, A3.9 End Units Design employs mass break and articulation as shown on sheet A3.1a Balconies, Patios, Porches Ground floor residential units and upper floor residential units include a balcony, patio, porch, or stoop, with 48 square feet of area. The project consists of two story townhomes which provide individual yards with patio areas, covered entry porch areas and balconies for all units that would exceed the 48 square feet area. The units along the exterior boundary have large yard areas that would face a common pathway encircling the complex. The units on Royal Way would have larger private yard areas. Windows, Doors Windows and Doors are recessed per details 2 and 6 of sheet A4.4 Storage Every Unit has personal outdoor storage space identified in the garage area. Materials, Colors The primary wall finish consists of quality materials and at least two materials on each elevation. A universal color system is proposed as shown on elevations and material board. Pedestrian Circulation The project is internally connected with pedestrian pathways. Parking Parking is provided for each unit, guest parking is dispersed throughout the complex, and landscape islands are provided for plants and trees. Bicycle Parking Bicycle parking pads and racks are adequately provided throughout the community, per detail 2 sheet A4.5 Public Art Public Art area is allocated at north of Gazebo/Community space identified on site plan. A standard condition of approval requires the details to be reviewed and recommended by the Arts and Culture Commission. 7.A Packet Pg. 15 8 Outdoor Amenities Two active areas of 800 sf total and two passive areas of 400 sf total area required amenities. The project includes a 2400 sf play area with two play modules, a 1500 sf gazebo, 4,000 sf picnic area in visible and accessible locations along with benches and picnic tables in open space areas. Lighting All structures, entries, parking areas, refuse enclosures, active outdoor/landscape areas, and pedestrian pathways include dusk to dawn lighting for safety and security. Refuse Areas Each building has a pad adjacent to the street for trash pickup service and would otherwise be stored in dedicated space in the garage. The full list and text of the ODS are available at the following city webpage/link: https://www.cityofgilroy.org/DocumentCenter/View/12377/Objective-Design- Standards?bidId= Zoning Review Summary: Based on the analysis above, staff recommends approval of the project with conditions . This includes Valley Water Districts requested changes to the landscape plan as follows: • Olive tree species shall be replaced with a less invasive tree, to avoid seedlings entering the creek channel (as recommended by Valley Water). • Trees shall be removed from the Valley Water pipeline easement. This potentially impacts three trees located behind Building D and the recreation lot (as recommended by Valley Water). Tentative Map Analysis: Consistent with Section 21.41(a) of the City Code, tentative maps must be recommended by the Planning Commission and approved by the City Council. The tentative map was distributed to the various departments and utility agencies that would review and serve the project. As proposed and conditioned it has been concluded that the project layout, design and circulation comply with applicable standards, would not conflict with existing easements, results in an orderly pattern of development, and is consistent with the medium density land use designation . Criteria considered to reach this conclusion include the following: a) Flood Zone: The site is located in Flood Zone X, which is not a Special Flood Hazard Area. b) Site Layout: The site proposes an orderly pattern of development of roads and buildings in compliance with City standards. c) Design and Size of Lots: The townhome lots are appropriate and of sufficient size and geometry to accommodate their buildings and other improvements. d) Density: The project facilities the multi-family development within the required 8- 20 unit per acre density range. e) Circulation: Each resulting parcel will have access from interior private streets. f) Open Space: There are adequate open space areas and setbacks provided in compliance with City requirements. g) Improvements: Utilities will be extended into the site from Royal Way to serve the development in compliance with City codes and standards. h) Property Dedications and Easements: The tentative map identifies all required easements and dedications and as proposed and conditioned will not result in any conflicts with easements. i) Transportation: The project provides connections with existing public sidewalks and will incorporate bicycle parking throughout the complex in compliance with 7.A Packet Pg. 16 9 City requirements. Findings of approval are required pursuant to Gilroy City Code Section 21.41 and the Subdivision Map Act section 66474. Based on the discussion herein, staff supports a recommendation of approval by the Planning Commission subject to the findings and conditions of approval included in the Resolution attached to this report. A tentative map is valid for twenty-four (24) months and may be extended for up to three additional years. INTER-DEPARTMENTAL/AGENCY REVIEW: Project plans were routed to Engineering, Building, Police, Fire representatives, the Gilroy Unified School District, Santa Clara Valley Water, Valley Transit Authority and other service agencies for review and comment. Recommendations received have been incorporated into the project plans or included as conditions in attached resolution(s). PUBLIC NOTICING: Property owner information (i.e. list, labels, and map) within 500 feet of the subject site were generated by the application using Data Pro which is based on current ownership data. By September 23rd, notices of this Planning Commission meeting were mailed to the property owners along within other interested parties, published in the Gilroy Dispatch, and posted on-site. In addition, the Planning Commission public hearing packets are available through the City's webpage. APPEAL PROCEDURE: The Planning Commission's action is not final, but rather a recommendation. As such, the matter will be considered by the City Council at a later date. Attachments: 1. Vicinity Map Royal Way 2. Architectural Plans 3. Civil and Landscape Plans 4. Vesting Tentative Map Sheet 5. Street Name Exhibit 6. Z 21-05 PC Resolution 7. AS 21-17 PC Resolution 8. TM 21-04 PC Resolution 7.A Packet Pg. 17 Note: Map is for reference purposes only. City of Gilroy 4,427 City of Gilroy, GIS Services 737.8 1:NAD_1983_StatePlane_California_III_FIPS_0403_Feet 368.89 Feet737.80 Vicinity Map - Royal Way Townhomes 7.A.a Packet Pg. 18 Attachment: Vicinity Map Royal Way (3981 : Royal Way Townhomes) 1.ALL CONSTRUCTION, FABRICATION AND INSTALLATIONS SHALL CONFORM TO THE REQUIREMENTS OF THE APPLICABLE EDITIONS OF THE CALIFORNIA BUILDING CODE, CALIFORNIA MECHANICAL CODE, CALIFORNIA PLUMBING CODE, NATIONAL ELECTRICAL CODE, TITLE 24, AND ANY OTHER FEDERAL, STATE, AND LOCAL CODE, REGULATIONS, ORDINANCES OF THE GOVERNING JURISDICTION. SUCH APPLICABLE CODES, ETC. ARE THOSE IN EFFECT AT THE TIME PERMIT APPLICATION IS FILED FOR THE PROJECT.2.THE ARCHITECT SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES BETWEEN THESE DOCUMENTS AND ANY APPLICABLE CODES BY THE AGENT INVOLVED WITH THE GOVERNING AGENCY HAVING JURISDICTION. IT IS UNDERSTOOD THAT THE "FIELD INSPECTOR" FOR SUCH AGENCY HAS FINAL AUTHORITY TO APPROVE/DISAPPROVE PROJECT CONSTRUCTION AND CORRECTNESS OF ALL CODE RELATED ITEMS3.EACH SUBCONTRACTOR IS CONSIDERED A SPECIALIST IN THEIR RESPECTIVE FIELD OR TRADE AND SHALL NOTIFY, PRIOR TO PERFORMANCE OF THE WORK AND PRIOR TO THE TENDERING A PRICE FOR THE WORK, THE GENERAL CONTRACTOR AND THE ARCHITECT OF ANY WORK CALLED OUT IN THE DRAWINGS WHICH CANNOT BE FULLY GUARANTEED OR CONSTRUCTED AS DESIGNED OR DETAILED AND WHICH WOULD NOT BE SUITABLE FOR THIS TYPE OF FACILITY.4.THE CONTRACTOR SHALL VERIFY ALL SITE CONDITIONS AND DIMENSIONS PRIOR TO COMMENCING THE WORK AND IMMEDIATELY NOTIFY THE ARCHITECT IN WRITING OF ANY DISCREPANCIES.5.THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND LOCATIONS OF ALL OPENINGS, CHASES AND SPECIAL PROVISIONS REQUIRED FOR EQUIPMENT, DUCTS, PIPING, CONDUITS, FINISH HARDWARE, ETC. AND IMMEDIATELY NOTIFY THE ARCHITECT IN WRITING OF ANY DISCREPANCIES.6.DO NOT SCALE DRAWINGS. ALL DIMENSIONS SPECIFIED SHALL GOVERN. DIMENSIONS ARE TYPICALLY TO THE FACE OF FRAMING UNLESS OTHERWISE NOTED.7.ALL DECORATIVE MATERIALS, INTERIOR FURNISHINGS, ETC., WILL MEET SMOKE DENSITY AND FLAME SPREAD RATINGS AS PER CODE. CERTIFICATIONS SHALL BE PROVIDED PRIOR TO FINAL OCCUPANCY.8.ALL ITEMS OF THE WORK DESIGNATED FOR THE USE BY HANDICAPPED SHALL FULLY COMPLY WITH CURRENT REQUIREMENTS OF APPLICABLE GOVERNING HANDICAP/ACCESSIBILITY CODES AND REGULATIONS.9.WHERE CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF THE WORK, DETAILING SHALL BE THE SAME AS FOR OTHER SIMILAR FIRST CLASS WORK FOR THE TRADE INVOLVED. THE ARCHITECT SHALL BE NOTIFIED IMMEDIATELY OF ANY ALTERNATE NON-STANDARD OR UNTESTED METHOD(S) PROPOSED10.GENERAL CONTRACTOR TO COORDINATE ARCHITECTURAL AND STRUCTURAL DRAWINGS WITH MECHANICAL, ELECTRICAL, PLUMBING, AND CIVIL DRAWINGS, AND SHALL NOTIFY THE ARCHITECT OF ANY REQUIREMENTS (CODE-RELATED OR OTHERWISE) FOR ENCLOSURES, SHAFTS, AND ACCESS PANELS THAT ARE NOT OTHERWISE DESCRIBED ON THE DOCUMENTS PRIOR TO TENDERING ANY PRICE FOR THE WORK.11.PLANS FOR AUTOMATIC FIRE SPRINKLER SYSTEM WILL BE SUBMITTED TO AND APPROVED BY THE AUTHORITY HAVING JURISDICTION PRIOR TO INSTALLATION.12.SUBMITTAL DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE ARCHITECT OR ENGINEER OF RECORD, WHO SHALL REVIEW THEM AND FORWARD THEM TO THE BUILDING OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND THAT THEY HAVE BEEN FOUND TO BE IN GENERAL CONFORMANCE WITH THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THEIR DESIGN AND SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING OFFICIAL.13.PENETRATIONS AND MEMBRANE PENETRATIONS OF HORIZONTAL ASSEMBLIES (FLOOR-CEILINGS AND ROOF-CEILINGS) AND FIRE-RESISTIVE WALL ASSEMBLIES SHALL BE PROTECTED PER CBC SECTION 712.14.ALL INTERIOR WALL AND CEILING FINISHES SHALL COMPLY WITH CBC CHAPTER 815.PER REQUIREMENTS OF CBC SECTION 903.3, THE BUILDING SHALL BE PROTECTED THROUGHOUT BY AN APPROVED "AUTOMATIC SMOKE DETECTION SYSTEM" AND AN APPROVED "AUTOMATIC SPRINKLER SYSTEM" IN COMPLIANCE WITH STANDARDS OF NFPA 13 16.PER REQUIREMENTS OF CBC SECTION 903.3, THE BUILDING SHALL BE EQUIPPED WITH AN AUTOMATIC FIRE ALARM SYSTEM COMPLYING WITH THE REQUIREMENTS OF NFPA 72.17. THIS PROJECT REQUIRES STRUCTURAL OBSERVATION PURSUANT TO CBC 171018. ELEVATOR SHALL MEET ALL PROVISIONS OF CBC CHAPTER 30 AND CBC CHAPTER 7. AN ELEVATOR PERMIT IS TO BE OBTAINED FROM DOSHPRIOR TO FINAL OCCUPANCY19. ACCESSIBILITY FOR DISABLED PERSONS IN WHEEL CHAIRS WILL BE PROVIDED AS REQUIRED BY THE 2019 CBC122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A0.1COVER SHEET9967RESIDENTIAL DEVELOPMENTROYAL WAYGilroy, CaliforniaSHEET INDEXVICINITY MAPPROJECT DIRECTORYSCOPE OF WORKPROJECT TYPEPROJECT DATA45 UNIT RESIDENTIAL TOWNHOMES PROJECT, RESIDENTIAL AMENETIES AND OPEN SPACE,87 ON GRADE PARKING SPACESURVEYCIVILMID COAST ENGINEERIS70 PENNY LANE, SUITE AWATSONVILLE CA, 95076TEL. 831.724.2580R3 ZONE ALOWS DENSITY OF 52.69 UNITS @ SITE AREA OF 2,722 SF PER UNITDENSITY CALCULATIONS:CIVIL DESIGN STUDIO, Inc.ROBERT WINSLOW, P.E., QSDP.O. BOX 199CAMBRIA, CA 93428TEL. 805.706.0401OWNERTMP ROYAL WAY, LLCATTN: MICHAEL CADYSANTA TERESA BLVD. #200SAN JOSE, CA 95123T: 408.960-8010F: 408.393-9769LANDSCAPEBFS LANDSCAPE ARCHITECTS425 Pacific Street, Suite 201,Monterey CA 93940 www.bfsla.comTEL: 831.646-1383SITEA0.1COVER SHEETC1 SURVEY C2 SURVEYROYAL WAY TOWNHOMES PROJECTPROPOSED DENSITY: 45 UNITSOWNER/APPLICANT:PROJECT ADDRESS:ZONE:PARCEL NUMBERS:OCCUPANCY TYPE:PROJECT INFORMATIONLOT AREANO. OF STORIES:BUILDING HEIGHT:MAX ALLOWED 47'PROPOSED -26.5'23.29 NET ACRESTMP ROYAL WAY, LLCGILROY, CA790 -44-93, -94, -95, -96, -97, -98, -101, -109, -110CALIF. BLDG CODE, R2, S-2R3 (MEDIUM DENSITY RESIDENTIAL DISTRICT)ARCHITECTJAN R. HOCHHAUSER, AIAHOCHHAUSER BLATTERARCHITECTURE + PLANNING122 E. ARRELLAGA STREETSANTA BARBARA, CA 93101T: 805.962.2746 X 102F: 805.962.4984TOTAL BUILDING COVERAGE53.946 SF (1.23 AC) ~36.7%LANDSCAPE COVARAGE36,305 SF (0.83 AC) ~24.8%HARDSCAPE COVARAGE53,458 SF (1.22 AC) ~ 38.5%TOTAL 45 UNIT RESIDENTIAL TOWNHOMES SITE CONTAINS:6 -TWO STORIES TOWNHOMES ARE 3 BDRMS (WITH AVARAGE OF ~1,300 SF PER UNIT)39 -TWO STORIES TOWNHOMES ARE 2 BDRMS (WITH AVARAGE OF ~1,200 SF PER UNIT)1HR TYPE V, WOODEN FRAMEARCHITECTURAL:APPLICABLE CODES2021 GILROY CITY CODE IS CURRENT ORDINANCE 20212019 CALIFORNIA BUILDING CODE2 GARAGE PARKING PER UNIT PARKINGGENERAL NOTESLANDSCAPEC1.0PRELIMINARY GRADING PLANCIVILC2.0PRELLIMINARY UTILITY PLANL2.2PLANT IMAGESL2.1CONSTRUCTION & PLANTING ENLARGEMENT PLANL2.0LANDSCAPE SITE PLANL1.0TREE REMOVAL & PROTECTION PLAN45 TOWNHOUSE UNITS2/ GARAGED CAR SPACES PER UNIT = 90 GARAGED CARS PROVIDED25 UNITS OF 45 TOTAL HAVE GARAGES THAT HAVE REDUCED SIZINGFACILIATING PARKING OF ONE COMPACT ANDONE FULL SIZE AUTOMOBILE.ALL OTHER UNITS GARAGE 2 FULL SIZE VEHICLES. 12 GUEST SPACES PROVIDED OFF STREET ON SITE@ 1 SPACE PER 4 UNITS11.25 REQUIREDA1.1 SITE PLANA2.1 OVERALL FLOOR PLANSA2.3 ROOF PLANA3.1 BUILDING A LAYOUTSA3.1a ELEVATIONS - AA3.2 BUILDING B AND TYP. UNITS LAYOUTA3.2a BUILDING B AND TYP. UNITSELEVATIONA3.3 BUILDING C -TYP. LAYOUTA3.3a TYP. ELEVATIONS - CA3.4 TOWNHOME D - LAYOUTSA3.4a ELEVATIONS - DA3.5 BUILDING E LAYOUTSA3.5a ELEVATIONS - EA3.6 LAYOUT - FA3.7 TOWNHOME G - LAYOUTSA3.8 TOWNHOME H - LAYOUTSC1.1PRELIMINARY SECTIONSC3.0PRELIMINARY HORIZONTALCONTROL PLANC4.0PRELIMINARY FIRE CIRCULATION PLAN -CLOCKWISEC4.1PRELIMINARY FIRE CIRCULATION PLAN -COUNTER CLOCKWISEELECTRICAL1PHOTOMETRIC PLANL3.0IRRIGATIONPLANL2.3PLANT IMAGESA3.9 TOWNHOME K - LAYOUTSA3.10 BUILDING L LAYOUTSA3.10a ELEVATIONS - LA3.11 BUILDING M LAYOUTSA3.11a ELEVATIONS - MA4.0 SITE GAZEBOA4.1 SECTIONSA4.2 SECTIONSA4.4 DETAILSA4.5 DETAILSA5.1 ILLUSTRATIONSA5.2 ILLUSTRATIONSA5.3 OFF FRONT STREET ILLUSTRATIONSA5.4 SITE IMAGESA-M-1 Material BoardA-M-3 Material Board7.A.bPacket Pg. 19Attachment: Architectural Plans (3981 : Royal Way Townhomes) 7.A.b Packet Pg. 20 Attachment: Architectural Plans (3981 : Royal Way Townhomes) 7.A.b Packet Pg. 21 Attachment: Architectural Plans (3981 : Royal Way Townhomes) 3 6 "0 ,9 2 MOVERALL SITE 3.29 NET ACRESEQEQ12' - 0"2 4 ' - 0 "24' - 0"TYPICALTOWNHOUSEPLAYAMENETIESPICNICBENCH, SEE 1/A4.5TYPICAL PRIVATE GARDEN COURTPUBLIC / COMMONPEDESTRIAN PATHGAZEBOFEATURE,SEE A3.13ROYAL WAYDUPLEXTOWNHOMESPUBLIC / COMMONPEDESTRIAN PATHNORTH010' 30' 60'1A4.12A4.1ABCDEFMLKHG39 ROWHOUSE TOWNHOMES ~ 1,200 SF WITH 2 CAR GARAGE6 DUPLEX TOWNHOMES ~ 1,300 SFWITH 2 CAR GARAGEDRIVEWAY - 40,665 SFCOMMON AREAS - 1,934 SF87 PARKING ON SITE (INCL. 12 GUEST)WALKING PATH - 15,605 SF13.67 (~14) Units per Acretotal 45 unitsCLTREE REMOVALPER PERMIT ONLY12103TOTAL LANDSCAPE -34,622 SF FIREHYDRANTEXISTING TREES(per landscape)PROPERTYLINEEXISTING TREES(per landscape)PROPERTYLINEPROPERTYLINEPROPERTYLINEGREEN BELTNATURALWALKWAY8 PARKING ON ALONG ROYAL WAY ST.17' - 0"10' - 3"18' - 3"F I R E H Y D R A N T H O S E R E A C H 1 5 0 'FIREHYDRANTHOSE REACH 150'20' - 0"FIREHYDRANT2A4.0PAVED PAD FORTRASH/REFUSE, TYP.1456789FIREHYDRANTF I R E H Y D R A N T H O S E R E A C H 1 5 0 '1A4.22116' - 11"LOCATION FORPUBLIC ARTPAVED PAD FORTRASH/REFUSE, TYP.1 1 5 ' M IN . F .H .F .T . B A C K U P150' M IN PAVED PAD FORTRASH/REFUSE, TYP.25' - 2"24' - 6"3 2 ' - 4 1 /2 "SEE 1/A4.4FACE OF BUILDING19' FROM PROP. LN. TO13' - 5"SITE STATS:FRONT: 26 FEET FROMCURB FACECUL DE SAC: 22 FEETFROM CURB FACESTREET SIDE: 12 FEETREAR: 15 FEET- 24' MIN.TO 30' MAX.-20' 4"-14' 1"- 16.5'PROVIDEDMIN. STANDARD R3 SETBACKS ARE AS FOLLOWS:21' - 5"TO PROP. LINE14' - 1"5A4.412' - 8 1/2"5' - 0"18' - 6 1/2"8' - 11 1/2"R 31' - 0"9' - 8"18' - 0"20' - 0"7' - 1 1/2"17' - 7 1/2"6' - 1 1/2"10' - 5 1/2"4 9 ' - 3 "18' - 0 1/2"11' - 9 1/2"24' - 9 1/2"23' - 11"24' - 0 1/2"FACE OF THE CURB24' - 1 1/2"BIKE PADTYP. 2/A4.5SHEET A3.1SHEET A3.2SHEET A3.3SHEET A3.4SHEET A3.11SHEET A3.10SHEET A3.9SHEET A3.8SHEET A3.7SHEET A3.6SHEET A3.54A4.4FACE OF THE CURB25' - 2"29' - 9"FACE OF THE CURB30' - 2 1/2"CUL DE SAC20' - 4 1/2"FROM PROP. LINETO FACE OF THE BUILDING5' - 3 1/2"7' - 11 1/2"5' - 1"4' - 8 1/2"4' - 3 1/2"7' - 10"4' - 6 1/2"5' - 4"BIKE PADTYP. 2/A4.5BIKE PADTYP. 2/A4.5BIKE PADTYP. 2/A4.5BIKE PADTYP. 2/A4.5BIKE PADTYP. 2/A4.58' - 8"1 6 ' - 5 1 /2 "6'-HIGH WROUGHTIRON FENCE, SEE 4/A4.5NEW NON-SCALABLE6' VERTICAL BOARDFENCE AT PROP. LINEREPPLACE (E) FENCEWITH NON-SCALABLEVERTICAL BOARDFENCE AT PROP. LINE3'-6" HIGH YARD FENCESEE 3/A4.56'-HIGHWROUGHTIRON FENCENO FENCING PROPOSEDFACING ROYAL WAY18' - 0"1 8 ' - 7 "EXIST WATERPIPELINE EASEMENTEXIST FLOOD ANDDRAINAGE EASEMENTEXIST TEMPCONSTRUCTIONEASEMENT16' - 0"PUEPUEPUEPUE16' - 0"PUE122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A1.1SITE PLAN9967RESIDENTIAL DEVELOPMENTROYAL WAY3/64" = 1'-0"1SiteE A S M E N T L IN E06/23/20227.A.bPacket Pg. 22Attachment: Architectural Plans (3981 : Royal Way Townhomes) DW UP3 6 " 0 ,9 2 M AMENITIES6'-HIGH WROUGHTIRON FENCE, SEE 4/A4.5NEW NON-SCALABLE6' VERTICAL BOARDFENCE AT PROP. LINE9' - 0"1A4.12A4.1OUTDOORCOURTYARDA3.2a3A3.2a4A3.2a5A3.2a6A3.9A3.92A3.931A3.94A3.82A3.81A3.83A3.84A3.71A3.72A3.73A3.74A3.10a1A3.10a3UNITK102UNITK101UNITH102UNITF103UNITF102UNITF101UNITE108UNITE107UNITE106UNITE105UNITE104UNITE103UNITE102UNITE101UNITD104UNITD103UNITD102UNITD101UNITD105UNITL106UNITM101UNITM102UNITL105UNITL104UNITL103UNITL102UNITL101UNITM103UNITC103UNITC102UNITC101UNITC104UNITB103UNITB102UNITB101UNITB104UNITA105UNITA104UNITA103UNITA102UNITA101UNITA106UNITH101UNITG102UNITG101PATIOPATIOPATIOPATIOPATIOPATIOPATIOPATIOPATIO PATIO PATIO PATIOPATIO PATIOPATIOPATIOPATIOPATIOPATIOPATIOPATIOPATIOPATIOPATIOPATIOPATIOPATIOPATIOPATIOPATIOPATIOPATIOPATIOPATIOPATIOPATIO PATIOPATIO PATIOPATIOPATIOPATIOPATIOPATIO379 SF 1ST FLOOR858 SF 1ST FLOOR411 SF 1ST FLOOR410 SF 1ST FLOOR644 SF 1ST FLOOR410 SF 1ST FLOOR12' - 5" 2' - 0"44' - 0" TYP. 46' - 0"TYP.30' - 0 1/2"TYP.25' - 11 1/2"A3.1a1A3.1a2A3.1a3A3.1a4A3.11a2A3.11a3A3.11a4A3.11a1A3.65A3.66A3.68A3.5a1A3.5a2A3.5a3A3.5a4A3.10a2A3.10a410' - 2 1/2"17' - 0"ROYAL WAYA3.4a1A3.4a2A3.4a3A3.4a4PLAYGROUNDTYP.TYP.TYP.TYP.A3.638' - 3 1/2"14' - 9"26' - 0"24' - 0"24' - 8 1/2"16' - 11"21' - 0"24 ' - 0"8' - 11 1/2"13' - 0"10' - 11 1/2"6' - 1 1/2"11' - 1 1/2"2A4.010' from PL21' - 7"-A2.425' - 0 1/2"1A4.2A3.3a4A3.3a3A3.3a2A3.3a125' - 2"NORTH010' 30' 60'20' - 8"20' - 2 1/2"REPPLACE (E) FENCEWITH NON-SCALABLEVERTICAL BOARDFENCE AT PROP. LINE3'-6" HIGH YARD FENCESEE 3/A4.56'-HIGHWROUGHTIRON FENCENO FENCING PROPOSED FACING ROYAL WAYE107E102E101168516851782ETOTAL(D):E1061674E1081782E104E10316741674E1051674860813630C103 1782D1011782TOTAL (C):DD102D103168516746934B102B103B101168516851782BTOTAL (A):B1041782C102C10116851782CTOTAL (B):693410177AUNIT #A102A103A101BUILDINGTYPE 2 story middle attachedtownhomes w/ underparking (M)SQ FT167416741680A105A106A104C103D104D105TOTAL (E):UNIT #BUILDINGTYPE SQ FTM102M103M101167417751680ML105L106F102F103F101157717711777L1011782L10216851688169310202TOTAL (E):FLTOTAL (E):L103L104TOTAL (L):K1021963TOTAL (K):H101H102K10119943957200320034006KHTOTAL (H):GRANDTOTAL :4566331G101G102grandtownhouse198119143895GTOTAL (H):168016741782168516851782168216852 story end unit townhome w/underparking (E)MEEMEEEEMEEMMMMEEEEEgrandtownhousegrandtownhouse51295129122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A2.1OVERALL FLOOR PLANS9967RESIDENTIAL DEVELOPMENTROYAL WAY3/64" = 1'-0"11ST FLOOR06/23/20227.A.bPacket Pg. 23Attachment: Architectural Plans (3981 : Royal Way Townhomes) 1A4.12A4.12A4.01A4.2NORTH010' 30' 60'5"/12" ROOF PITCH USEDUNLESS OTHER NOTED5"/12" ROOF PITCH USEDUNLESS OTHER NOTED5"/12" PITCH TYP.2.5"/12" ROOF PITCH USEDUNLESS OTHER NOTEDFLAT ROOFUNLESS OTHER NOTED5" / 1'-0"5" / 1'-0"5" / 1'-0"5" / 1'-0"5" / 1'-0"5" / 1'-0"5" / 1'-0"5" / 1'-0"5" / 1'-0" 5" / 1'-0"5" / 1'-0"5" / 1'-0"5" / 1'-0"5 " / 1 '-0 " 5 " / 1 '-0 " 5 " / 1 '-0 "5" / 1'-0"5 " / 1 '-0 "5" / 1'-0"5 " / 1 '-0 "5" / 1'-0"5" / 1'-0"5 " / 1 '-0 "5" / 1'-0"5" / 1'-0"5" / 1'-0"5" / 1'-0"5" / 1'-0"5" / 1'-0"5" / 1'-0" 2 1/2" / 1'-0" 2 1/2" / 1'-0" 2 1/2" / 1'-0" 2 1/2" / 1'-0" 2 1/2" / 1'-0" 2 1/2" / 1'-0" 2 1/2" / 1'-0" 5" / 1'-0"5" / 1'-0"5" / 1'-0"5" / 1'-0"5" / 1'-0"5" / 1'-0"2 1/2" / 1'-0"5" / 1'-0" 5" / 1'-0"5" / 1'-0"5" / 1'-0" 2 1/2" / 1'-0"122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A2.3ROOF PLAN9967RESIDENTIAL DEVELOPMENTROYAL WAY1" = 30'-0"1Roof Plan7.A.bPacket Pg. 24Attachment: Architectural Plans (3981 : Royal Way Townhomes) A3.1a33' x 8' BALCONYTYP.26' - 4"25' - 11"25' - 10 1/2"26' - 1 1/2"53' - 0"3' - 11 1/2"42' - 0"160' - 3 1/2"BRM BATHROOMBTRMBRLNDRYBRBATHM BATHROOMBRBTRMLNDRYBRBTRMM BATHROOMBRBTRMLNDRYBRBTRMM BATHROOMBRBTRMLNDRYBRBTRMM BATHROOMBRBTRMLNDRYBRBTRMM BATHROOMBRBTRMLNDRYBR0141043' - 0"4' x 8' BALCONYTYP.3' x 8' BALCONYTYP.4' x 8' BALCONYTYP.BRACKETSUPPORTSEE 5/A4.4 FORTYP BALCONY SYSTEM12' x 8'PATIO.5.5' x 6' ENTRYPORCHGARAGELRKTDININGGARAGELRKTDININGGARAGELRKTDININGGARAGELRKTDININGGARAGELRKTDININGGARAGELRKTDINING159' - 3"26' - 0"30' - 9 1/2"26' - 0 1/2"25' - 11 1/2"25' - 10 1/2"26' - 1 1/2"5.5' x 6' ENTRYPORCH 51SF ENTRYPORCH TYP.5.5' x 6' ENTRYPORCH5.5' x 6' ENTRYPORCH5.5' x 6' ENTRYPORCH7' - 11"6' - 0"BALCONYABOVEROOFABOVE FULL CAR SPACE20' - 2 1/2"FULL CAR SAPCE20' - 8"A4.41SimTRASHTRASHTRASH, STOSTORAGE10 sfCOMPACT CAR SPACE17' - 2 1/2"10 sf STORAGEABOVE, TYP.10 sf STORAGEABOVE,TYP.6' - 3 1/2"1' - 8 1/2"6" TYP.PRIVACYENTRY SEPERATION TYP.6" TYP.ROOF OVERENTRY PORCHPICKETPATIO FENCE3/A4.5 TYP.ROOF LINE ABOVE122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A3.1BUILDING A LAYOUTS9967RESIDENTIAL DEVELOPMENTROYAL WAY1/8" = 1'-0"12nd FLOOR LAYOUT - TOWNHOME A1/8" = 1'-0"21ST FLOOR LAYOUT - TOWNHOME AFRONT PORCH -216 SFPATIO -576 SF2ND FLOOR BALCONIES -248 SFTOTAL -1040 SFROOF PLAN A7.A.bPacket Pg. 25Attachment: Architectural Plans (3981 : Royal Way Townhomes) 1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"52BEP537P7EP5P526' - 0 1/2"1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"EP2P7P7EP5EP226' - 0 1/2"1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"P7EP5EP126' - 0 1/2"1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"P7EP5EP1122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A3.1aELEVATIONS -A9967RESIDENTIAL DEVELOPMENTROYAL WAY1/8" = 1'-0"1OVERALL ELEVATION BUILDING A -EAST1/8" = 1'-0"2OVERALL ELEVATION BUILDING A -SOUTH1/8" = 1'-0"3OVERALL ELEVATION BUILDING A -WEST1/8" = 1'-0"4OVERALL ELEVATION BUILDING A -NORTHKeynote LegendKeyValueKeynote Text37 PORCH COLUMN, PAINTED STUCCO FINISH OVER WOOD FRAMING52BEP1 2.5"/12" SLOPED WOODEN FRAMED BALCONY AWNING WITH CURRAGATEDMETAL PANEL ON TOPEP2 ASPHALT SHINGLE ROOFINGEP5 FIBER CEMENT BOARD AND BATTEN DESIGN -SHERWIN WILLIAMSSW6673 BANANA CREAMP5 STUCCO FINISH PER STRUCTURAL AND ARCHITECTURAL DRAWINGS,SHERWIN WILLIAMS SW9163 "TIN LIZZIE"P7 EXTERIOR WALL TO RECEIVE STUCCO FINISH PER STRUCTURAL ANDARCHITECTURAL DRAWINGS, SHERWIN WILLIAMS SW7064 "PASSIVE"7.A.bPacket Pg. 26Attachment: Architectural Plans (3981 : Royal Way Townhomes) 1. NOTEOVERALL FLOOR PLAN FOR BUILDINGS B, C UNIT PLANS ARE TYPICAL FOR THE BUILDINGS A, B, C, D, E, F, M, LSEE A3.0 FOR ELEVATIONS OF BUILDING B & CAACC2244UUUUE1E1E2E2LIV.DIN.LIV.DIN.KTLIV.DIN.LIV.DIN.GARAGEGARAGEGARAGEGARAGEKTKTKT115521' - 0"3325' - 0"29' - 0"26' - 0"26' - 0"29' - 0"110' - 0"20' - 10"4' - 0"20' - 8 1/2"5.5' x 6' ENTRYPORCH PER UNIT51SF ENTRYSTOOP12' x 8' PATIO TYP.12' x 8' PATIO TYP.51SF ENTRYSTOOPTRASH, STOROOFABOVEA4.41SimTYP6" TYP.PRIVACY ENTRYSEPARATION10 SF TRASHBALCONYABOVE51SF ENTRYSTOOPA3.2a3A3.2a4A3.2a5A3.2a6AACC24UUUUE1E1E2E21532' - 0"13' - 8 1/2"13' - 3 1/2"13' - 3"12' - 9"12' - 9"13' - 3"13' - 3 1/2"13' - 8 1/2"2' - 0"2' - 0"6' - 10"14' - 0"2' - 0"14' - 0"4' - 5"MBRBRMBRMBCBBRCBRMBRBRMBRMBCBBRCBRBRBRMBMBMCMC29' - 0"26' - 0"26' - 0"29' - 0"2' - 0"4' x 8' BALCONY TYP.A3.3a4A3.3a3A3.3a2A3.3a101410SEE 5/A4.4 FOR TYPBALCONY SYSTEM122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A3.2BUILDING B AND TYP.UNITS LAYOUT9967RESIDENTIAL DEVELOPMENTROYAL WAYGENERAL NOTES1/8" = 1'-0"11ST FLOOR UNIT LAYOUT1/8" = 1'-0"22nd FLOOR UNIT LAYOUTFRONT PORCH -168 SFPATIO -384 SF2ND FLOOR BALCONIES -64 SFTOTAL -616 SFROOF PLAN B7.A.bPacket Pg. 27Attachment: Architectural Plans (3981 : Royal Way Townhomes) 1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"BACUUE1E2EP2P7EP2P7P7EP6EP5step1' -0"EP11ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"EP2EP5P71531ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"BACUUE1E2EP2P7EP5EP2P726' - 0 1/2"EP5EP6P7P8step1' -0"371ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"24EP2EP5P726' - 0 1/2"153step1' -0"122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A3.2aBUILDING B AND TYP.UNITS ELEVATION9967RESIDENTIAL DEVELOPMENTROYAL WAYTYP. UNITS ELEVATION -SOUTHTYP. UNITS ELEVATION -EASTTYP. UNITS ELEVATION -NORTHTYP. UNITS ELEVATION -WESTKeynote LegendKeyValueKeynote Text37 PORCH COLUMN, PAINTED STUCCO FINISH OVER WOOD FRAMINGEP1 2.5"/12" SLOPED WOODEN FRAMED BALCONY AWNING WITH CURRAGATEDMETAL PANEL ON TOPEP2 ASPHALT SHINGLE ROOFINGEP5 FIBER CEMENT BOARD AND BATTEN DESIGN -SHERWIN WILLIAMSSW6673 BANANA CREAMEP6 FIBER CEMENT PER STRUCTURAL AND ARCHITECTURAL DRAWINGS,SHERWIN WILLIAMS SW6226 "LANGUID BLUE"P7 EXTERIOR WALL TO RECEIVE STUCCO FINISH PER STRUCTURAL ANDARCHITECTURAL DRAWINGS, SHERWIN WILLIAMS SW7064 "PASSIVE"P8 STUCCO FINISH PER STRUCTURAL AND ARCHITECTURAL DRAWINGS,SHERWIN WILLIAMS SW7066 "GRAY MATTERS"7.A.bPacket Pg. 28Attachment: Architectural Plans (3981 : Royal Way Townhomes) AACC2244UUUUE1E1E2E2LIV.DIN.LIV.DIN.KTLIV.DIN.LIV.DIN.GARAGEGARAGEGARAGEGARAGEKTKTKT115521' - 0"3325' - 0"29' - 0"26' - 0"26' - 0"29' - 0"110' - 0"20' - 10"4' - 0"20' - 8 1/2"5.5' x 6' ENTRYPORCH PER UNIT51SF ENTRYSTOOP12' x 8' PATIO TYP.12' x 8' PATIO TYP.TRASH, STOROOFABOVEA4.41SimTYP6" TYP.PRIVACY ENTRYSEPARATION10 SF TRASHBALCONYABOVE51SF ENTRYSTOOPA3.2a3A3.2a4A3.2a5A3.2a6AACC24UUUUE1E1E2E21532' - 0"13' - 8 1/2"13' - 3 1/2"13' - 3"12' - 9"12' - 9"13' - 3"13' - 3 1/2"13' - 8 1/2"2' - 0"2' - 0"6' - 10"14' - 0"2' - 0"14' - 0"4' - 5"MBRBRMBRMBCBBRCBRMBRBRMBRMBCBBRCBRBRBRMBMBMCMC29' - 0"26' - 0"26' - 0"29' - 0"2' - 0"4' x 8' BALCONY TYP.A3.3a4A3.3a3A3.3a2A3.3a101410SEE 5/A4.4 FOR TYPBALCONY SYSTEM122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A3.3BUILDING C -TYP. LAYOUT9967RESIDENTIAL DEVELOPMENTROYAL WAY1/8" = 1'-0"11ST FLOOR UNIT LAYOUT -BUILDING C1/8" = 1'-0"22nd FLOOR UNIT LAYOUT -BUILDING CFRONT PORCH -152 SFPATIO -384 SF2ND FLOOR BALCONIES -64 SFTOTAL -600 SFROOF PLAN C7.A.bPacket Pg. 29Attachment: Architectural Plans (3981 : Royal Way Townhomes) 1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"24EP2EP5P726' - 0 1/2"153step1' -0"1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"BACUUE1E2EP2P7EP2P7P7EP6EP5step1' -0"EP11ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"BACUUE1E2EP2P7EP5EP2P726' - 0 1/2"EP5EP6P7P8step1' -0"371ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"EP2EP5P7153step1' -0"122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A3.3aTYP. ELEVATIONS -C9967RESIDENTIAL DEVELOPMENTROYAL WAYTYP. UNITS ELEVATION -WEST -CTYP. UNITS ELEVATION -SOUTH -CTYP. UNITS ELEVATION -NORTH -CTYP. UNITS ELEVATION -EAST -CKeynote LegendKeyValueKeynote Text37 PORCH COLUMN, PAINTED STUCCO FINISH OVER WOOD FRAMINGEP1 2.5"/12" SLOPED WOODEN FRAMED BALCONY AWNING WITH CURRAGATEDMETAL PANEL ON TOPEP2 ASPHALT SHINGLE ROOFINGEP5 FIBER CEMENT BOARD AND BATTEN DESIGN -SHERWIN WILLIAMSSW6673 BANANA CREAMEP6 FIBER CEMENT PER STRUCTURAL AND ARCHITECTURAL DRAWINGS,SHERWIN WILLIAMS SW6226 "LANGUID BLUE"P7 EXTERIOR WALL TO RECEIVE STUCCO FINISH PER STRUCTURAL ANDARCHITECTURAL DRAWINGS, SHERWIN WILLIAMS SW7064 "PASSIVE"P8 STUCCO FINISH PER STRUCTURAL AND ARCHITECTURAL DRAWINGS,SHERWIN WILLIAMS SW7066 "GRAY MATTERS"7.A.bPacket Pg. 30Attachment: Architectural Plans (3981 : Royal Way Townhomes) A3.4a21COURTYARD8'X8' PATIOTYP.COURTYARDCOURTYARDCOURTYARDCOURTYARDGARAGEKTDININGLRGARAGEKTDININGLRGARAGEKTDININGLRGARAGEKTDININGLRGARAGEKTDININGLR19' - 0"9' - 11 1/2"17' - 0 1/2"19' - 3 1/2"TRASHTRASHTRASHTRASHTRASHSTOSTOSTO10SF STOTYP.135' - 11 1/2"46' - 0"5.5'X6' ENTRYPORCH51 SFENTRYPORCHSTEPBALCONY ABOVE20' - 2 1/2"COMPACT CAR SPACE17' - 2 1/2" TYP.20' - 2"6" TYP.PRIVACYSEPERATIONROOF LINE ABOVE PORCHROOF LINE ABOVE PORCHPICKETPATIO FENCE3/A4.5 TYP.10SF STOTYP.A3.4a1A3.4a2A3.4a40141043' - 0"138' - 0"M BATHROOMM BEDROOMSTUDYBRBTRMLNDRYM BATHROOMM BEDROOMSTUDYBRBTHRMLNDRYM BATHROOMM BEDROOMBRM BATHROOMM BEDROOMSTUDYBRLNDRYBTHRMBTHRMM BATHROOMM BEDROOMSTUDYBRLNDRYBTHRMSTUDYLNDRY27' - 0 1/2"26' - 0"52' - 0"27' - 0 1/2"122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A3.4TOWNHOME D -LAYOUTS9967RESIDENTIAL DEVELOPMENTROYAL WAY1/8" = 1'-0"11ST FLOOR LAYOUT -TOWNHOME D1/8" = 1'-0"22ND FLOOR LAYOUT -TOWNHOME DFRONT PORCH -147 SFPATIO -320 SF2ND FLOOR BALCONIES -176 SFTOTAL -643 SF3'X8 BALCONIESTYP.4'X8'BALCONIESROOF PLAN D7.A.bPacket Pg. 31Attachment: Architectural Plans (3981 : Royal Way Townhomes) 1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"EP2EP5P7EP5EP126' - 0 1/2"P7P7EP5EP1P7step1' -0"1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"EP2EP5P7P5step1' -0"1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"P7EP1P7EP2P7P7P726' - 0 1/2"EP1step1' -0"1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"EP2EP5P7EP5EP2step1' -0"122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A3.4aELEVATIONS -D9967RESIDENTIAL DEVELOPMENTROYAL WAY1/8" = 1'-0"1OVERALL ELEVATION D -SOUTH1/8" = 1'-0"2OVERALL ELEVATION D -WEST1/8" = 1'-0"3OVERALL ELEVATION D -NORTH1/8" = 1'-0"4OVERALL ELEVATION D -EASTKeynote LegendKeyValueKeynote TextEP1 2.5"/12" SLOPED WOODEN FRAMED BALCONY AWNING WITH CURRAGATEDMETAL PANEL ON TOPEP2 ASPHALT SHINGLE ROOFINGEP5 FIBER CEMENT BOARD AND BATTEN DESIGN -SHERWIN WILLIAMSSW6673 BANANA CREAMP5 STUCCO FINISH PER STRUCTURAL AND ARCHITECTURAL DRAWINGS,SHERWIN WILLIAMS SW9163 "TIN LIZZIE"P7 EXTERIOR WALL TO RECEIVE STUCCO FINISH PER STRUCTURAL ANDARCHITECTURAL DRAWINGS, SHERWIN WILLIAMS SW7064 "PASSIVE"7.A.bPacket Pg. 32Attachment: Architectural Plans (3981 : Royal Way Townhomes) A3.5a312'X8' PATIOSGARAGETRASH, STOLRKTDININGENTRYENTRYENTRYGARAGETRASH, STOLRKTDININGGARAGETRASH, STOLRKTDININGGARAGETRASH, STOLRKTDININGGARAGETRASH, STOLRKTDININGGARAGETRASH, STOLRKTDINING30' - 0 1/2"26' - 0"30' - 0"26' - 0"26' - 0"26' - 0"44' - 0"2' - 0"12'X8' PATIOS51SFPORCH48SFLRLRKTKTGARAGEGARAGETRASH, STOTRASH, STO20' - 2 1/2"26' - 0"20' - 2 1/2"6" TYP.6" TYP.A3.5a301410M BEDROOMM BEDROOMM BEDROOMM BEDROOMLNDRYM BEDROOMM BEDROOMM BTHRMM BTHRMM BTHRMM BTHRMM BTHRMM BTHRMM BTHRMM BTHRMBTHRMBTHRMBTHRMBTHRMBTHRMBTHRMBTHRMBTHRMBRLNDRYLNDRYLNDRYLNDRYLNDRYLNDRYLNDRYSTUDYSTUDYSTUDYSTUDYSTUDYSTUDYSTUDYBRBRBRBRBRSTUDYM BEDROOMM BEDROOMSTUDY215' - 11 1/2"46' - 0"4' X 8' BALCONIES3'X8' BALCONIESSEE 5/A4.4 FOR TYPBALCONY SYSTEMSEE 5/A4.4 FOR TYPBALCONY SYSTEM122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A3.5BUILDING E LAYOUTS9967RESIDENTIAL DEVELOPMENTROYAL WAY1/8" = 1'-0"11ST FLOOR LAYOUT -TOWNHOME E1/8" = 1'-0"22ND FLOOR LAYOUT -TOWNHOME EROOF PLAN EFRONT PORCH -416 SFPATIO -768 SF2ND FLOOR BALCONIES -272 SFTOTAL -1456 SF5.5' X 6' PORCH51SFPORCHPRIVACYSCREEN, TYP.5.5' X 6' PORCHBALCONYABOVE, TYP.BALCONYABOVE, TYP.7.A.bPacket Pg. 33Attachment: Architectural Plans (3981 : Royal Way Townhomes) 1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"EP526' - 0 1/2"EP6P7EP5P51ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"EP2EP2EP5P726' - 0 1/2"P51ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"EP5EP2EP162P7P7EP2P7P726' - 0 1/2"P5EP6step1' -0"1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"EP2P7EP2EP5step1' -0"122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A3.5aELEVATIONS -E9967RESIDENTIAL DEVELOPMENTROYAL WAY1/8" = 1'-0"1OVERALL ELEVATION E -WEST1/8" = 1'-0"2OVERALL ELEVATION E -NORTH1/8" = 1'-0"3OVERALL ELEVATION E -EAST1/8" = 1'-0"4OVERALL ELEVATION E -SOUTHKeynote LegendKeyValueKeynote Text62 DECORATIVE TRELLIS STRUCTURE: ARCHITECTURAL GRADE WOODMEMBERS, REFER TO DETAILS. PRIME AND PAINT PER EXTERIOR FINISHSCHEDULE.EP1 2.5"/12" SLOPED WOODEN FRAMED BALCONY AWNING WITH CURRAGATEDMETAL PANEL ON TOPEP2 ASPHALT SHINGLE ROOFINGEP5 FIBER CEMENT BOARD AND BATTEN DESIGN -SHERWIN WILLIAMSSW6673 BANANA CREAMEP6 FIBER CEMENT PER STRUCTURAL AND ARCHITECTURAL DRAWINGS,SHERWIN WILLIAMS SW6226 "LANGUID BLUE"P5 STUCCO FINISH PER STRUCTURAL AND ARCHITECTURAL DRAWINGS,SHERWIN WILLIAMS SW9163 "TIN LIZZIE"P7 EXTERIOR WALL TO RECEIVE STUCCO FINISH PER STRUCTURAL ANDARCHITECTURAL DRAWINGS, SHERWIN WILLIAMS SW7064 "PASSIVE"7.A.bPacket Pg. 34Attachment: Architectural Plans (3981 : Royal Way Townhomes) 1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"EP4EP5EP2EP6step1' -0"EP11ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"step1' -0"1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"EP5EP523' - 5"EP6P4step1' -0"A3.66A3.68A3.6386' - 0"45' - 0"BRM BEDROOMM BATHROOMLNDRSTUDYBTHRBTHRBTHRBRBRBRLNDRLNDRM BEDROOMM BEDROOMSTUDY3' X 8'BALCONYA3.65A3.66A3.68A3.638' X 8' PATIOTYP.KTLRDININGGARAGETRASH, STOTRASH, STOTRASH, STOGARAGEGARAGEKTLRKTLRDININGDININGPORCHENTRY, 63 SF20' - 2 1/2"20' - 3"BALCONYABOVEROOFABOVE20' - 2 1/2"11' - 7 1/2"2' - 3"2' - 3"8' - 2"7' - 5 1/2"PATIO PICKETTFENCE TYP.1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"26' - 0 1/2"EP4EP2EP5EP2step1' -0"122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A3.6LAYOUT -F9967RESIDENTIAL DEVELOPMENTROYAL WAY1/8" = 1'-0"5OVERALL ELEVATION F -WEST1/8" = 1'-0"6OVERALL ELEVATION F -NORTH1/8" = 1'-0"8OVERALL ELEVATION F -SOUTHKeynote LegendKeyValueKeynote TextEP1 2.5"/12" SLOPED WOODEN FRAMED BALCONY AWNING WITH CURRAGATEDMETAL PANEL ON TOPEP2 ASPHALT SHINGLE ROOFINGEP4 STUCCO FINISH PER STRUCTURAL AND ARCHITECTURAL SHERWINWILLIAMS SW6177 SOFTENED GREENEP5 FIBER CEMENT BOARD AND BATTEN DESIGN -SHERWIN WILLIAMSSW6673 BANANA CREAMEP6 FIBER CEMENT PER STRUCTURAL AND ARCHITECTURAL DRAWINGS,SHERWIN WILLIAMS SW6226 "LANGUID BLUE"P4 STUCCO FINISH PER STRUCTURAL AND ARCHITECTURAL DRAWINGS,SW9128 GREEN ONYX1/8" = 1'-0"12ND FLOOR LAYOUT -TOWNHOME F1/8" = 1'-0"21ST FLOOR LAYOUT -TOWNHOME F1/8" = 1'-0"3OVERALL ELEVATION F -EASTROOF PLAN FFRONT PORCH -93 SFPATIO -72 SF2ND FLOOR BALCONIES -24 SFTOTAL -189 SF7.A.bPacket Pg. 35Attachment: Architectural Plans (3981 : Royal Way Townhomes) UPDWDNDW1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"24' - 10"EP2EP4EP5step1' -0"1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"EP2EP4EP5step1' -0"1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"EP5P4step1' -0"1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"step1' -0"EP4EP2EP5P7111PCOURTYARDCOURTYARDA3.71A3.72A3.73A3.74TWO CARGARAGEKTLIVINGDININGTWO CARGARAGEKTLIVINGDINING20' - 5 1/2"11' - 10 1/2"11' - 10 1/2"20' - 7"10' - 8"10' - 10"7' - 0"12' - 8 1/2"6' - 0"12' x 6' FRONTPORCH 72 SF8' X 8' PATIO TYP.16' x 6' FRONTPORCH 96 SFTRASH, STOTRASH, STO20' - 9"BALCONYABOVEBALCONYABOVEBALCONYABOVEA4.41SimTYP.19' - 8"TYP, GARAGEJAMB8"X8" ENTRY POSTSPATIO PICKETTFENCE TYP.A3.71A3.72A3.11a4BRMBRBRMBRBRBR32' - 3 1/2"11' - 10 1/2"18' - 0"2' - 7"47' - 2"LOFTLOFT4' x 8' BALCONYTYP, 32 SF3' x 8' BALCONYTYP, 24 SF6' - 1 1/2"7' - 0"122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A3.7TOWNHOME G -LAYOUTS9967RESIDENTIAL DEVELOPMENTROYAL WAY1/8" = 1'-0"1TOWNHOME G ELEVATION -SOUTH1/8" = 1'-0"2TOWNHOME G ELEVATION -WEST1/8" = 1'-0"3TOWNHOME G ELEVATION -NORTH1/8" = 1'-0"4TOWNHOME G ELEVATION -EAST1/8" = 1'-0"51ST FLOOR LAYOUT -TOWNHOME G1/8" = 1'-0"62ND FLOOR LAYOUT -TOWNHOME GKeynote LegendKeyValueKeynote Text111P 8"X 8" ENTRY POST WITH STUCCO FINISH, COLOR TO MATCH. OVERWOODEN 2 X FRAMEEP2 ASPHALT SHINGLE ROOFINGEP4 STUCCO FINISH PER STRUCTURAL AND ARCHITECTURAL SHERWINWILLIAMS SW6177 SOFTENED GREENEP5 FIBER CEMENT BOARD AND BATTEN DESIGN -SHERWIN WILLIAMSSW6673 BANANA CREAMP4 STUCCO FINISH PER STRUCTURAL AND ARCHITECTURAL DRAWINGS,SW9128 GREEN ONYXP7 EXTERIOR WALL TO RECEIVE STUCCO FINISH PER STRUCTURAL ANDARCHITECTURAL DRAWINGS, SHERWIN WILLIAMS SW7064 "PASSIVE"FRONT PORCH -168 SFPATIO -128 SF2ND FLOOR BALCONIES -112 SFTOTAL -408 SFROOF PLAN GROOFABOVE7.A.bPacket Pg. 36Attachment: Architectural Plans (3981 : Royal Way Townhomes) 1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"EP2EP4EP1step1' -0"621ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"EP2EP5EP5P2P5step1' -0"4' - 1 1/2"3' - 2"1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"EP2EP5EP5EP46224' - 10"P5step1' -0"EP1111P1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"EP2EP5P2step1' -0"A3.82A3.81A3.83A3.8421' - 6"7' - 0"12' - 8"6' - 0"11' - 7"7' - 0"14' - 7 1/2"M.BATHROOMBRMBRBRMBRM.BATHROOMBRBR65' - 0"47' - 2"LOFTLOFT4' x 8' BALCONYTYP, 32 SF3' x 8' BALCONYTYP, 24 SFLNDRLNDRCOURTYARDCOURTYARD32' - 6"32' - 6"TWO CARGARAGETWO CARGARAGEDININGKTLRDININGKTLR21' - 0 1/2"19' - 8"6' - 0"47' - 2"2' - 7"18' - 0"11' - 11"11' - 11"17' - 11 1/2"2' - 7 1/2"32' - 6"32' - 6"8' X 8' PATIOTYP. 64SF12' X 7'ENTRYPORCH84SFTRASHSTO20' - 9"20' - 8"TRASHSTOBALCONY ABOVE12' X 7' ENTRYPORCH 84SFprivacyseparation122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A3.8TOWNHOME H -LAYOUTS9967RESIDENTIAL DEVELOPMENTROYAL WAY1/8" = 1'-0"1TOWNHOME H ELEVATION -SOUTH1/8" = 1'-0"2TOWNHOME H ELEVATION -WEST1/8" = 1'-0"3TOWNHOME H ELEVATION -NORTH1/8" = 1'-0"4TOWNHOME H ELEVATION -EAST1/8" = 1'-0"62nd FLOOR LAYOUT -TOWNHOME H1/8" = 1'-0"51ST FLOOR LAYOUT -TOWNHOME HKeynote LegendKeyValueKeynote Text62 DECORATIVE TRELLIS STRUCTURE: ARCHITECTURAL GRADE WOODMEMBERS, REFER TO DETAILS. PRIME AND PAINT PER EXTERIOR FINISHSCHEDULE.111P 8"X 8" ENTRY POST WITH STUCCO FINISH, COLOR TO MATCH. OVERWOODEN 2 X FRAMEEP1 2.5"/12" SLOPED WOODEN FRAMED BALCONY AWNING WITH CURRAGATEDMETAL PANEL ON TOPEP2 ASPHALT SHINGLE ROOFINGEP4 STUCCO FINISH PER STRUCTURAL AND ARCHITECTURAL SHERWINWILLIAMS SW6177 SOFTENED GREENEP5 FIBER CEMENT BOARD AND BATTEN DESIGN -SHERWIN WILLIAMSSW6673 BANANA CREAMP2 FIBER CEMENT PER STRUCTURAL AND ARCHITECTURAL DRAWINGS,SHERWIN WILLIAMS SW7065 "ARGOS"P5 STUCCO FINISH PER STRUCTURAL AND ARCHITECTURAL DRAWINGS,SHERWIN WILLIAMS SW9163 "TIN LIZZIE"FRONT PORCH -168 SFPATIO -128 SF2ND FLOOR BALCONIES -112 SFTOTAL -408 SFROOF PLAN H7.A.bPacket Pg. 37Attachment: Architectural Plans (3981 : Royal Way Townhomes) DNDNDNUPUPUP6891011step1' -0"EP5P7EP460EP11ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"GHIJKLMEP5EP41ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"689EP4EP5step1' -0"EP14' - 1 1/2"3' - 1 1/2"1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"GHIJKLMEP4EP5step1' -0"6891011GHIJKLMA3.9A3.92A3.931BRMBRBRMBTHRMBTHRBRMBR32' - 3 1/2"33' - 11"32' - 3"6' - 11 1/2"21' - 6"2' - 0"2' - 0"BTHRBRBRC12' - 0"0' - 4"1' - 8 1/2"4' - 2"0' - 4"18' - 0"-4' x 8' BALCONYTYP3' x 8' BALCONYTYP6' x 8' BALCONY48 SF014101' - 9"3' - 10"6891011GIJKLMLRKTGARAGEDININGDININGGARAGECOURTYARDCOURTYARD32' - 3 1/2"33' - 11"KT8' - 3 1/2"9' - 0"6' x 12' ENTRYPORCH 72 SF7' x 5' FRONTSTOOP8' X 8' PATIOTYP.14' - 4 1/2"7' - 0"1' - 9"18' - 0"1' - 9 1/2"STO AND TRASHSTO AND TRASHBALCONYABOVE1' - 0"20' - 8"20' - 8"1' - 6"18' - 0"16' - 7"2' - 1"6" TYP.10' FROM PROP. LN122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A3.9TOWNHOME K -LAYOUTS9967RESIDENTIAL DEVELOPMENTROYAL WAY1/8" = 1'-0"1TOWNHOME K ELEVATION -NORTH1/8" = 1'-0"2TOWNHOME K ELEVATION -WEST1/8" = 1'-0"3TOWNHOME K ELEVATION -SOUTH1/8" = 1'-0"4TOWNHOME K ELEVATION -EAST1/8" = 1'-0"52nd FLOOR LAYOUT - TOWNHOME K1/8" = 1'-0"61ST FLOOR LAYOUT - TOWNHOME KKeynote LegendKeyValueKeynote Text60 DECORATIVE IRON GRILL FOR THE PLANTS AND VINESEP1 2.5"/12" SLOPED WOODEN FRAMED BALCONY AWNING WITH CURRAGATEDMETAL PANEL ON TOPEP4 STUCCO FINISH PER STRUCTURAL AND ARCHITECTURAL SHERWINWILLIAMS SW6177 SOFTENED GREENEP5 FIBER CEMENT BOARD AND BATTEN DESIGN -SHERWIN WILLIAMSSW6673 BANANA CREAMP7 EXTERIOR WALL TO RECEIVE STUCCO FINISH PER STRUCTURAL ANDARCHITECTURAL DRAWINGS, SHERWIN WILLIAMS SW7064 "PASSIVE"FRONT PORCH -107 SFPATIO -128 SF2ND FLOOR BALCONIES -104 SFTOTAL -339 SFROOF PLAN K7.A.bPacket Pg. 38Attachment: Architectural Plans (3981 : Royal Way Townhomes) 20' - 5 1/2"8'X8' PATIOSTYP.KTDININGLRGARAGEGARAGEGARAGEGARAGEGARAGEKTDININGLRKTDININGLRKTDININGLRKTDININGLRKTDININGLRGARAGE26' - 0"26' - 0"29' - 0"26' - 4 1/2"26' - 0"26' - 0"ENTRYTYP.8'X8' PATIO8'X12' PATIO5.5'X6'ENTRIES51 SFENTRY19' - 9 1/2"ROOF LINEABOVEBALCONYABOVEBALCONYABOVETRASHSTOTRASHTRASHTRASHTRASHENTRYTYP.ENTRYPORCH5.5'X6'ENTRIES12' - 0"4' - 0"STORAGE ABOVETYP.17' - 2"20' - 2 1/2"20' - 3 1/2"6" TYP.PRIVACYSCREEN, TYPA4.41SimA3.10a1A3.10a3A3.10a2A3.10a4160' - 4 1/2"46' - 0"4' X 8' BALCONIESM BEDROOMM BTHRCLOSETBTHRSTUDYBRLNDRM BEDROOMM BTHRCLOSETSTUDYBRLNDRM BEDROOMM BTHRCLOSETSTUDYBRLNDRM BEDROOMM BTHRCLOSETSTUDYBRLNDRM BEDROOMM BTHRCLOSETSTUDYBRLNDRM BEDROOMSTUDYM BTHRCLOSETBRBTHRBTHRBTHRBTHRBTHR014103' X 8' BALCONIES4' X 8' BALCONIES122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A3.10BUILDING L LAYOUTS9967RESIDENTIAL DEVELOPMENTROYAL WAY1/8" = 1'-0"11ST FLOOR LAYOUT - TOWNHOME L1/8" = 1'-0"22nd FLOOR LAYOUT - TOWNHOME LFRONT PORCH -216SFPATIO -416 SF2ND FLOOR BALCONIES -248 SFTOTAL -880 SFROOF PLAN L7.A.bPacket Pg. 39Attachment: Architectural Plans (3981 : Royal Way Townhomes) 1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"EP262EP2EP1P7EP2step1' -0"371ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"EP2P7step1' -0"1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"EP2EP5P7EP26226' - 0 1/2"P5step1' -0"1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"step1' -0"122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A3.10aELEVATIONS -L9967RESIDENTIAL DEVELOPMENTROYAL WAY1/8" = 1'-0"1OVERALL ELEVATION L -SOUTH1/8" = 1'-0"3OVERALL ELEVATION L -NORTH1/8" = 1'-0"2OVERALL ELEVATION L -WEST1/8" = 1'-0"4OVERALL ELEVATION L -EASTKeynote LegendKeyValueKeynote Text37 PORCH COLUMN, PAINTED STUCCO FINISH OVER WOOD FRAMING62 DECORATIVE TRELLIS STRUCTURE: ARCHITECTURAL GRADE WOODMEMBERS, REFER TO DETAILS. PRIME AND PAINT PER EXTERIOR FINISHSCHEDULE.EP1 2.5"/12" SLOPED WOODEN FRAMED BALCONY AWNING WITH CURRAGATEDMETAL PANEL ON TOPEP2 ASPHALT SHINGLE ROOFINGEP5 FIBER CEMENT BOARD AND BATTEN DESIGN -SHERWIN WILLIAMSSW6673 BANANA CREAMP5 STUCCO FINISH PER STRUCTURAL AND ARCHITECTURAL DRAWINGS,SHERWIN WILLIAMS SW9163 "TIN LIZZIE"P7 EXTERIOR WALL TO RECEIVE STUCCO FINISH PER STRUCTURAL ANDARCHITECTURAL DRAWINGS, SHERWIN WILLIAMS SW7064 "PASSIVE"7.A.bPacket Pg. 40Attachment: Architectural Plans (3981 : Royal Way Townhomes) A3.11a2A3.11a18' x 8'PATIOBIKERACKBIKERACKTRASH, STOTRASH, STOTRASH, STOGARAGELRKTDININGLRKTDININGLRKTDININGGARAGEGARAGE20' - 2 1/2"20' - 2"50 SF ENTRYPORCH50 SF ENTRYPORCH37 SF ENTRY45' - 0"20' - 5 1/2"5' - 10"5' - 9 1/2"19' - 9 1/2"9' - 0"1' - 0"1' - 3"FIRE HYDRANTPER SITETRASHPADTRASHPADBALCONYABOVEBALCONYABOVE8' x 8'PATIO8' x 8'PATIOBALCONYABOVE26' - 0 1/2"26' - 2 1/2"22' - 1"ROOFABOVE5' - 0"4' - 9"15' - 8"6' - 8 1/2"6" TYP.A3.11a4A3.11a14' x 8' BALCONYTYP. 32 SF3' x 8' BALCONYTYP. 24 SFM BEDROOMM BATHBRBRBATHLNDRM BEDROOMM BEDROOMLNDRLNDRM BATHM BATHBATHBATHBRBRCLOSETCLOSETCLOSET26' - 2 1/2"25' - 11"3' - 0"26' - 9 1/2"45' - 11 1/2"83' - 3"70' - 4"EQEQ122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A3.11BUILDING M LAYOUTS9967RESIDENTIAL DEVELOPMENTROYAL WAY1/8" = 1'-0"11ST FLOOR LAYOUT -TOWNHOME M1/8" = 1'-0"22ND FLOOR LAYOUT -TOWNHOME MFRONT PORCH -137 SFPATIO -192 SF2ND FLOOR BALCONIES -112 SFTOTAL -441 SFROOF PLAN M7.A.bPacket Pg. 41Attachment: Architectural Plans (3981 : Royal Way Townhomes) 1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"EP2EP4EP2EP5EP462step1' -0"1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"EP2EP4EP1EP5EP1step1' -0"3' - 0"1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"EP4EP2EP5EP4step1' -0"1114' - 0"3' - 0"1' - 8"1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"EP2EP4122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A3.11aELEVATIONS - M9967RESIDENTIAL DEVELOPMENTROYAL WAY1/8" = 1'-0"3OVERALL ELEVATION M -EAST1/8" = 1'-0"4OVERALL ELEVATION M -NORTH1/8" = 1'-0"2OVERALL ELEVATION M -SOUTH1/8" = 1'-0"1OVERALL ELEVATION M -WESTKeynote LegendKeyValueKeynote Text62 DECORATIVE TRELLIS STRUCTURE: ARCHITECTURAL GRADE WOODMEMBERS, REFER TO DETAILS. PRIME AND PAINT PER EXTERIOR FINISHSCHEDULE.111 BIKE RACK, SEE 2/A4.5EP1 2.5"/12" SLOPED WOODEN FRAMED BALCONY AWNING WITH CURRAGATEDMETAL PANEL ON TOPEP2 ASPHALT SHINGLE ROOFINGEP4 STUCCO FINISH PER STRUCTURAL AND ARCHITECTURAL SHERWINWILLIAMS SW6177 SOFTENED GREENEP5 FIBER CEMENT BOARD AND BATTEN DESIGN -SHERWIN WILLIAMSSW6673 BANANA CREAM7.A.bPacket Pg. 42Attachment: Architectural Plans (3981 : Royal Way Townhomes) 1' - 4"1' - 4"17' - 0"17' - 0"15' - 3"15' - 3"CONCRETEBENCHGAZEBO DEDICATED AREA154 SF1ST FLOOR0' -0"ROOF SYSTEMASPHALT SHINGLEDECORATIVEWOODEN BEAMTWO TONECOLUMNSTUCCO FINISH15' - 3"9' - 6"14' - 0"122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A4.0SITE GAZEBO9967RESIDENTIAL DEVELOPMENTROYAL WAY1/4" = 1'-0"1GAZEBO1/4" = 1'-0"2GAZEBO ELEVATION3GAZEBO 3D VIEWINTEGRALCOLOR CONCRETETWO TONECOLUMNSTUCCO FINISH7.A.bPacket Pg. 43Attachment: Architectural Plans (3981 : Royal Way Townhomes) 1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"PROPERTYLINETWO STORYTOWNHOUSE6' HIGH OPEN WROUGHT IRON FENCESEE 4/A4.5ROYAL WAYMAX. ALLOWED HEIGHT45' - 0"step1' -0"PRIVATE YARD/COURTYARDFENCING, PICKETT3'-6" HIGHSEE 3/A4.51ST FLOOR0' -0"PROPERTYLINE(E) HIGH SCHOOLTENNIS COURTSROYAL WAYHIGH SCHOOL PROPERTYSIDEWALKTYP. 5' WIDEVERTICALWROUGHT IRONPROPERTY LINE FENCESEE 4/A4.5TWO STORYTOWNHOUSEMAX. ALLOWED HEIGHT45' - 0"step1' -0"PROPERTYPATIO PICKETTFENCING SEE 3/A4.521' - 3 3/8"122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A4.1SECTIONS9967RESIDENTIAL DEVELOPMENTROYAL WAY1/8" = 1'-0"1SOUTH SECTION1/8" = 1'-0"2WEST SECTION7.A.bPacket Pg. 44Attachment: Architectural Plans (3981 : Royal Way Townhomes) 1ST FLOOR0' -0"2nd FLOOR10' -6"Roof Plan19' -0"PROPERTYLINE THEN ADJ. OPEN CARPORT~10'-0" HIGHER(E) 2 STORYRESIDENTIALBUILDING~ 53'26' - 0"122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A4.2SECTIONS9967RESIDENTIAL DEVELOPMENTROYAL WAYROYAL WAY' APARTMENTS TO ADJACENT STRUCTURE HEIGHT RELATION7.A.bPacket Pg. 45Attachment: Architectural Plans (3981 : Royal Way Townhomes) INTERIOREXTERIORPLYWOOD WHERE REQUIRED BY STRUCTURAL.NON-SHEAR WALLS THAT ARE CONTINUOUS WITHWALLS DESCRIBED ON THE STRUCTURALDRAWINGS TO REQUIRE SHEATHING SHALL ALSOBE PROVIDED WITH A LAYER OF SHEATHING TOENSURE AN UNINTERRUPTED FINISH.EXTERIOR WALL ASSEMBLY PER PLANSELF ADHERING/ SEALING MEMBRANE FLASHINGWINDOW UNIT PER WINDOW SCHEDULE SHEET,SET FIN IN SEALANT7/8" "3 COATS PORTLANDCEMENT PLASTER O/ METALLATH/O/2 LAYERS OF GRADE D,60 MIN. BUILDING PAPER "WOOD FRAMING PER STRUCTURALSHIM AS REQUIREDWOOD EXTERIORTRIMINTERIOREXTERIORPLYWOOD WHERE REQUIRED BY STRUCTURAL.NON-SHEAR WALLS THAT ARE CONTINUOUS WITHWALLS DESCRIBED ON THE STRUCTURALDRAWINGS TO REQUIRE SHEATHING SHALL ALSOBE PROVIDED WITH A LAYER OF SHEATHING TOENSURE AN UNINTERRUPTED FINISH.EXTERIOR WALL ASSEMBLY PER PLAN0' - 6"BOARDWOOD FRAMING PER STRUCTURAL2x AS REQUIREDWOOD EXTERIORTRIMBATTEN OVERLAP 1/2" MINAT BOARD AND BATTENAT STUCCO FINISHWINDOW UNITSET FIN IN SEALANT0' - 5"2nd FLOOR10' -6"WOODEN SUPPORTBRACKETMETAL GUARD RAILINING SYSTEM2.5"/12" SLOPED WOODEN FRAMEDBALCONY AWNINGWITH CURRAGATED METAL PANEL ON TOPA4.44SimA4.43SimGARAGE DOOR TRACK5/8" GYP. BOARDDOUBLE 2 X 8 PRESSURE TREATED DOUGLAS FIR DOOR TRIMMERS7/8" "3 COATS PORTLAND CEMENT PLASTER O/ METAL LATH/O/2 LAYERS OF GRADE D, 60 MIN. BUILDING PAPER "PLYWOOD WHERE REQUIRED BY STRUCTURAL. NON-SHEAR WALLS THAT ARE CONTINUOUS WITH WALLS DESCRIBED ON THE STRUCTURAL DRAWINGS TO REQUIRE SHEATHING SHALL ALSO BE PROVIDED WITH A LAYER OF SHEATHING TO ENSURE AN UNINTERRUPTED FINISH.STRUCTURAL TIE OR HOLDOWN PER STRUCTURAL PLANSTHRESHOLD TRANSITION / RECESSGARAGESTUCCO STOPWOOD APPEARANCE METAL GARAGE DOOR PER ELEVATION / SCHEDULE0' - 8"0' - 5 1/2"2 x 4WOOD T&G SIDINGCORRUGATED METAL ROOFINGWATERPROOF MEMBRANEGALV. METAL FASCIA5" HALFROUND METAL GUTTERW/ SCREEN5/8" PLYFLASHING RECIEVINGPLASTER GROUNDCOUNTER FLASHINGCORRUGATED METAL ROOFING1/2" PLYWOODINTERIOREXTERIORPLYWOOD WHERE REQUIRED BY STRUCTURAL.NON-SHEAR WALLS THAT ARE CONTINUOUS WITHWALLS DESCRIBED ON THE STRUCTURALDRAWINGS TO REQUIRE SHEATHING SHALL ALSOBE PROVIDED WITH A LAYER OF SHEATHING TOENSURE AN UNINTERRUPTED FINISH.EXTERIOR WALL ASSEMBLY PER PLANSELF ADHERING/ SEALING MEMBRANE FLASHING7/8" "3 COATS PORTLANDCEMENT PLASTER O/ METALLATH/O/2 LAYERS OF GRADE D,60 MIN. BUILDING PAPER "WOOD FRAMING PER STRUCTURALSHIM AS REQUIRED2X FRAMINGINTERIOREXTERIORPLYWOOD WHERE REQUIRED BY STRUCTURAL.NON-SHEAR WALLS THAT ARE CONTINUOUS WITHWALLS DESCRIBED ON THE STRUCTURALDRAWINGS TO REQUIRE SHEATHING SHALL ALSOBE PROVIDED WITH A LAYER OF SHEATHING TOENSURE AN UNINTERRUPTED FINISH.EXTERIOR WALL ASSEMBLY PER PLANBOARDWOOD FRAMING PER STRUCTURALSHIM AS REQUIREDBATTEN OVERLAP 1/2" MINAT BOARD AND BATTENAT STUCCO FINISHDOOR UNITSET FIN IN SEALANTCONT. CAULK CONT. CAULK DRIP EDGE DRIP EDGE2X FRAMING122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A4.4DETAILS9967RESIDENTIAL DEVELOPMENTROYAL WAY3" = 1'-0"2RECESSED WINDOW3/4" = 1'-0"5TYP. BALCONY3" = 1'-0"1RECESSED GARAGE3" = 1'-0"3BALCONY EVE DETAIL3" = 1'-0"4EVE CONNECTION3" = 1'-0"6RECESSED DOOR, TYP.7.A.bPacket Pg. 46Attachment: Architectural Plans (3981 : Royal Way Townhomes) 4' - 11"1' - 5"2' - 5"5' - 11"2' - 7 1/2"2' - 7 1/2"0' - 8"2' - 9 1/2"DUO-GARDInverted U Architectural RoundedFixed BR85F/SBR85Fsee specs.3' - 6"2"X 6" WOOD RAIL1.5" X 1.5" DIA GALVANIZEDPOST, SET INCONCRETE FOOTING2"X4" WOOD NAILERFASTENED TO STEEL POSTCONCRETE FOOTING SET ATEA POST (6' TO' ON CENTER)1" X 2", 1"X4", 1"X6"VERTICAL WOOD PICKETTS3' - 0"1.5" X 1" STEEL CAP RAIL5/8" SQ STEEL PICKET @4" O.C.1.5" X 1.5" STEEL POST@ 6'-0" O.C.12" X 36" CONCRETEFOOTING SET ATEA POST (6' TO' ON CENTER)1.5" W X 3/4"BOTTOM RAIL3' - 0"6' - 0"122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A4.5DETAILS9967RESIDENTIAL DEVELOPMENTROYAL WAY1" = 1'-0"1PICNIC TABLE1" = 1'-0"2BIKE RACK3/4" = 1'-0"3TYP. UNIT YARD FENCE3/4" = 1'-0"4NONE SCALABLE FENCE PROPERTY7.A.bPacket Pg. 47Attachment: Architectural Plans (3981 : Royal Way Townhomes) 122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A5.1ILLUSTRATIONS9967RESIDENTIAL DEVELOPMENTROYAL WAYOVERALL SOUTH EAST VIEWLOW-LEVEL VIEW (NORTH EAST7.A.bPacket Pg. 48Attachment: Architectural Plans (3981 : Royal Way Townhomes) 122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A5.2ILLUSTRATIONS9967RESIDENTIAL DEVELOPMENTROYAL WAY7.A.bPacket Pg. 49Attachment: Architectural Plans (3981 : Royal Way Townhomes) 122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A5.3OFF FRONT STREETILLUSTRATIONS9967RESIDENTIAL DEVELOPMENTROYAL WAY3D ENTRY VIEW -H3D ENTRY VIEW G3D ENTRY VIEW -K7.A.bPacket Pg. 50Attachment: Architectural Plans (3981 : Royal Way Townhomes) 122 E. ARRELLAGASANTA BARBARA805 962 2746CALIFORNIA 93101BlatterHochhauserARCHITECTUREAND PLANNINGSHEETPROJECT NO:THIS DRAWING IS COPYRIGHTEDMATERIAL UNDER THE SOLE OWNERSHIPOF HOCHHAUSER BLATTER ARCHITECTURE& PLANNING. ANY USE WITHOUTEXPRESSED WRITTEN CONSENT OFHOCHHAUSER BLATTER IS PROHIBITED.SHEET CONTENTSISSUANCE OR REVISIONDATE:PLANNING SUBMITTAL08/13/20212ND PLNG. SBMTL.01/06/20223RD PLNG. SBMTL.04/26/2022ROYAL WAY TOWNHOMESSCHEMATIC DESIGNGILROY CA 95020A5.4SITE IMAGES9967RESIDENTIAL DEVELOPMENTROYAL WAY12456789310131211141516171234567891011121314151617NORTH7.A.bPacket Pg. 51Attachment: Architectural Plans (3981 : Royal Way Townhomes) ROYAL WAY TOWNHOMES, Gilroy CA- Material BoardEP1 -CURRAGATED METAL PANELROOFING, SLOPPED,ZINCALUME (BARE METAL)P5 -SHERWIN WILLIAMSSTUCCOSW9163 TIN LIZZIEEXTERIOR WALLS COLOR SCHEMEP8 -SHERWIN WILLIAMSSTUCCOSW7066 GRAY MATTERSP2 -SHERWIN WILLIAMSFIBER CEMENTSW7065 ARGOSP7 -SHERWIN WILLIAMSSTUCCOSW7064 PASSIVEEP6 -SHERWIN WILLIAMSFIBER CEMENTSW6226 LANGUID BLUEP4 -SHERWIN WILLIAMSSTUCCOSW9128 GREEN ONYXEP4 -SHERWIN WILLIAMSSTUCCOSW6177 SOFTENED GREENEP5 -SHERWIN WILLIAMSFIBER CEMENTSW6673 BANANA CREAMP9 -SHERWIN WILLIAMSSTUCCOSW6077 EVERYDAY WHITEP1-SHERWIN WILLIAMSSTUCCOSW7000 IBIS WHITEBASIS OF DESIGNBUILDING ELEMENTS COLORSEP2ROOF SHINGLES"TIMBERTEXENGLISH GREY"WINDOWS:Milgard: Montecito Line (Vinyl)brownDOORS:Milgard: Montecito Line (Vinyl)Brown7.A.bPacket Pg. 52Attachment: Architectural Plans (3981 : Royal Way Townhomes) ROYAL WAY TOWNHOMES, Gilroy CA- Material BoardBASIS FOR DESIGNSMOOTH STUCCOEXAMPLE -GREENSMOOTH STUCCO EXAMPLE -GRAYEXTERIOR HORIZONTAL SHIP LAP SIDINGEXTERIOR BOARD AND BATTENSIDINGTYP. MILGARD WINDOW7.A.bPacket Pg. 53Attachment: Architectural Plans (3981 : Royal Way Townhomes) UNIT K102 UNIT K101 UNIT H102 UNIT F103 UNIT F102 UNIT F101 UNIT E108 UNIT E107 UNIT E106 UNIT E105 UNIT E104 UNIT E103 UNIT E102 UNIT E101 UNI T D1 0 4 UNI T D1 0 3 UNI T D1 0 2 UNI T D1 0 1 UNI T D1 0 5 UNIT L106 UNIT M101 UNIT M102 UNIT L105 UNIT L104 UNIT L103UNIT L102 UNIT L101 UNIT M103 UNIT C103 UNIT C102 UNIT C101 UNIT C104 UNIT B103UNIT B102 UNIT B101 UNIT B104 UNIT A105 UNIT A104 UNIT A103 UNIT A102 UNIT A101 UNIT A106 UNIT H101 UNIT G102 UNIT G101 SD SD SD BUILDING H (2 UNITS) (E) PROPERTY LINE BUILDING A (6 UNITS) BUILDING G (2 UNITS) BUILDING F (3 UNITS) BUILDING L (6 UNITS) BUILDING E (8 UNITS) BUILDING B (4 UNITS) BUILDING D (5 UNITS) (E) PROPERTY LINE (E) PROPERTY LINE (E) PROPERTY LINE (E) PROPERTY LINE (E) RIGHT OF WAY R O Y A L W A Y (PUBLIC)I M P E R I A LD R I V E (PUBLIC)F I L B R OD R I V E (PUBLIC)BUILDING C (4 UNITS) BUILDING K (2 UNITS) BUILDING M (3 UNITS) (E) PROPERTY LINE (E) PROPERTY LINE (E) PROPERTY LINE (E) PROPERTY LINE (E) PROPERTY LINE (E) PROPERTY LINE (E) PROPERTY LINE 205.8 FF 206.8 FF 206.8 FF 207.20 FF 207.20 FF 207.5 FF 209.0 FF 209.0 FF 209.0 FF 209.0 FF 208.1 FF 208.1 FF 208.1 FF 208.1 FF 207.6 FF 207.6 FF 207.6 FF 207.6 FF 207.6 FF 207.3 FF 207.3 FF 207.3 FF 207.0 FF 207.0 FF 206.7 FF 205.8 FF 205.8 FF 205.8 FF 206.5 FF 206.5 FF 206.5 FF207.1 FF 207.1 FF 207.1 FF207.1 FF 207.1 FF 207.1 FF 206.0 FF 206.0 FF 206.3 FF 206.3 FF 206.6 FF206.6 FF 206.7 FF 206.7 FF (204.7 TC) (204.2 FL) (204.6 TC) (204.1 FL) (203.5 TC) (203.0 FL) (203.7 TC) (203.2 FL) (203.8 TC) (203.3 FL) (204.4 TC) (203.9 FL)(204.0 TC) (203.5 FL) (204.5 TC) (204.0 FL) 11 13 16 209.4 TC 208.9 FS 209.5 TC 209.0 FS 209.5 TC 209.0 FS 208.6 TC 208.1 FS 208.1 TC 207.6 FS 208.1 TC 207.6 FS 207.9 TC 207.4 FS 207.7 TC 207.2 FS208.6 TC 208.1 FS 208.6 TC 208.1 FS 206.9 FS 206.3 FS 206.0 FS 206.4 TC 205.9 FS 207.3 TC 206.8 FS 208.2 TC 207.7 FS 207.8 TC 207.3 FS 207.8 TC 207.3 FS 207.5 TC 207.0 FS 206.7 TC 206.2 FS 206.3 TC 205.8 FS 208.0 TC 207.5 FS 207.3 TC 206.8 FS 207.3 TC 206.8 FS 207.7 TC 207.2 FS 206.6 TC 206.1 FS 206.7 TC 206.2 FS 207.8 TC 207.3 FS 207.5 TC 207.0 FS 207.2 TC 206.7 FS 207.2 TC 206.7 FS 207.5 TC 207.0 FS 207.8 TC 207.3 FS 207.8 TC 207.3 FS 208.2 TC 207.7 FS 207.5 TC 207.0 FS 207.4 TC 206.9 FS 207.3 TC 206.8 FS 205.8 TC 205.3 FS 206.3 TC 205.8 FS 206.3 TC 205.8 FS 204.4 TC 203.9 FS 204.9 FS 205.3 TC 204.8 FS 205.5 TC 205.0 FS 4.4%3.5%2.2%3.3%3.9%4.4%1.3% 2.0% 1.6%5.1%(210) (212) (214) (216) (218) (2 0 4 ) (206) (20 6 ) ( 2 0 6 ) (2 0 8 ) (20 8 ) (2 1 0 ) (2 1 2 ) (2 1 4 ) (2 1 6 ) 208 207 207 207 206 20 5 2 0 4 206 206 206 2072 0 5 16 16 16 16 1616 16 16 16 16 11 11 11 11 11 11 1111 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 121212121212 12 12 12 12 12 12 12 13 13 13 13 13 13 14 14 14 14 15 15 15 15 15 13 208.6 TC 208.1 FS 206.5 TC 206.0 FS 206.5 TC 206.0 FS 206.0 TC 205.5 FS 206.1 TC 205.6 FS 207.7 TC 207.2 FS 208.2 TC 207.7 FS 209.1 TC 208.6 FS 208.0 TC 207.5 FS 207.7 TC 207.2 FS 206.3 TC 205.8 FS (20 6 ) (205.0) FS (204.8) FS (204.4) FS (204.1) FS THREE 6" STEPS THREE 6" STEPS THREE 6" STEPS THREE 6" STEPS THREE 6" STEPS THREE 6" STEPS 207206.4 FS 204.8 TG 205.8 TG 205.8 TG 206.2 TG 206.2 TG 206.5 TG 207.5 TG 207.5 TG 207.5 TG 207.5 TG 206.6 TG 206.6 TG 206.6 TG 206.6 TG 206.1 TG 206.1 TG 206.1 TG 206.1 TG 206.1 TG 206.1 TG 206.1 TG 206.1 TG 205.8 TG 205.8 TG 205.5 TG 205.5 TG 205.5 TG 204.8 TG 204.8 TG 204.8 TG 205.6 TG 205.6 TG 205.3 TG 205.3 TG 205.0 TG 205.0 TG 205.5 TG 205.5 TG 205.5 TG 206.1 TG 206.1 TG 206.1 TG 206.1 TG 206.1 TG (208.7) EG (208.4) EG (208.2) EG (208.2) EG (207.5) EG (209.2) EG (207.2) EG (206.9) EG (206.8) EG (206.8) EG (206.5) EG (206.0) EG (205.4) EG (210.3) EG (210.2) EG (210.0) EG (210.3) EG (209.8) EG (210.0) EG (208.2) EG (208.1) EG (207.7) EG (207.7) EG (210.7) EG 205.0 TG 207.6 TG 206.1 TG 206.5 TG 203.7 TG 204.8 TG 204.6 TG 0.4% 0.5 %3.1%0.7%0.4%3.1%1.0%0.7% (0.4%)OVERLANDESCAPEOVERL A N D ESCAPE 17 17 17 17 17 17 17 17 17 17 17 17 1717 17 EXIST FLOOD AND DRAINAGE EASEMENT EXIST WATER PIPELINE EASEMENT EXIST TEMPORARY CONSTRUCTION EASEMENT 18 18D R I V E A I S L E(PRIVATE)D R I V E A I S L E(PRIVATE)D R I V E A I S L E(PRIVATE)D R I V E A I S L E(PRIVATE)12 12 12 12 12 12 12 12 12 12 12 1212 12 12 12 1212 D R I V E A I S L E (PRIVATE)D R I V E A I S L E(PRIVATE) 19 207.7 TC 207.2 FS 207.8 TC 207.3 FS 207.9 TC 207.4 FS 206.5 TC 206.0 FS 206.0 TC 205.5 FS 12 17 17 13 13 PUE PUE PUE PUE 17 17 1.5%1.5%1.5%1.5% 1.5% 1.5% 1.5%1.5%1.5%1.5% 1.5% 1.5%1.5%CDS JOB #: SCALE: 20-088 1" = 20' DATE: PREPARED BY:MMM REVIEWED BY:RDW Z:\Shared\CDS Data\Active Jobs\20-088 Royal Way Apartments\_Project\1_Prelim Docs\20-088 Prelim Grading Plan.dwg, June 22, 2022A B C D E F G H I J K L M N O A B C D E F G H I J K L M N O 2 1 3 4 5 6 7 8 9 10 11 12 SHEET XX OF 6 SHEETSROYAL WAY TOWNHOMESPROJECT NAME:PLANS PREPARED FOR:PROJECT LOCATION:HOCHHAUSER BLATTER122 E ARRELLAGASANTA BARBARA, CA 93101ROYAL WAYGILROY, CA 95020APNS: 799-044-093 TO 098& 109CIVIL ENGINEERING PLANNING PERMITTINGCIVIL DESIGN STUDIOP.O. Box 199 | Cambria | Ca 93428805.706.0401 www.civil-studio.comPLAN PREPARED BY:PRELIMINARY PLANS - NOT FOR CONSTRUCTION 6/22/2022 C1.0 PRELIMINARY GRADING PLAN 1 20 10 015 SCALE: 1" = 20' 20 40 SITE PLAN NOTES 11 PROPOSED ASPHALT PAVING 12 PROPOSED CONCRETE 13 PROPOSED CURB AND GUTTER 14 PROPOSED DRIVEWAY 15 PROPOSED V-GUTTER 16 PROPOSED BUILDING PER ARCHITECTURAL AND STRUCTURAL PLANS 17 PROPOSED CURB RAMP 18 PROPOSED DECORATIVE PAVING PER ARCHITECTURAL PLANS 19 PROPOSED RETAINING WALL AREA BREAKDOWN EXISTING CONDITIONS IMPERVIOUS AREA: 11,673 SQUARE FEET (0.27 ACRES) PERVIOUS AREA: 135,034 SQUARE FEET (3.10 ACRES) TOTAL PROJECT: 146,707 SQUARE FEET (3.37 ACRES) PROPOSED PROJECT IMPERVIOUS AREA: 108,180 SQUARE FEET (2.48 ACRES) CONCRETE: 31,095 SQUARE FEET ASPHALT: 23,085 SQUARE FEET BUILDINGS: 54,000 SQUARE FEET PERVIOUS/LANDSCAPE AREA: 38,527 SQUARE FEET (0.88 ACRES) TOTAL PROJECT: 146,707 SQUARE FEET (3.37 ACRES) IMPERVIOUS/PERVIOUS SURFACE AREA TABLE SITE ACREAGE NUMBER OF LOTS TOTAL PROJECT AREA OF DISTURBANCE (SQ FT) EXISTING IMPERVIOUS SURFACE AREA (SQ FT) PROPOSED IMPERVIOUS SURFACE AREA (SQ FT) EXISTING/REPLACED IMPERVIOUS SURFACE AREA (SQ FT) ADJUSTED IMPERVIOUS SURFACE AREA (SQ FT) LIST OF PLANNED STORMWATER CONTROL MEASURES 3.37 7 146,707 11,673 108,180 11,673 102,344 ONSITE UNDERGROUND RETENTION AND WATER QUALITY TREATMENT PIPES PROJECT INFORMATION FLOOD ZONE: ZONE X SITE AREA: 3.36 ACRES DISTURBED AREA:3.43 ACRES GRADING INFORMATION* CUT QUANTITY: 3,300 CUBIC YARDS FILL QUANTITY: 300 CUBIC YARDS NET CUT/FILL: 3,000 CUBIC YARDS EXPORT * EARTHWORK QUANTITIES ARE PROVIDED FOR PERMITTING INFORMATION ONLY. THE QUANTITIES SHOWN ABOVE ARE NOT INTENDED FOR USE BY THE CONTRACTOR WHEN ESTIMATING. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO GENERATE AND/OR VERIFY EARTHWORK QUANTITIES. AC ASPHALTIC CONCRETE BSW BACK OF SIDEWALK BW BOTTOM OF WALL C/L CENTERLINE CB CATCH BASIN CO CLEANOUT CONC CONCRETE DDC DOUBLE DETECTOR CHECK DI DRAINAGE INLET EG EXISTING GRADE EP EDGE OF PAVEMENT ESMT EASEMENT FDC FIRE DEPARTMENT CONNECTION FF FINISHED FLOOR ELEVATION FG FINISHED GROUND ELEVATION FH FIRE HYDRANT FL FLOW LINE FS FINISHED SURFACE ELEVATION GB GRADE BREAK HP HIGH POINT IE SEWER INVERT ELEVATION INV STORM DRAIN INVERT ELEVATION IRR IRRIGATION JP JOINT POLE L/A LANDSCAPE AREA MH MANHOLE NAP NOT A PART P/A PLANTER AREA P/L PROPERTY LINE PCC PORTLAND CEMENT CONCRETE POC POINT OF CONNECTION (UTILITY) PP POWER POLE PUE PUBLIC UTILITY EASEMENT R/W, ROW RIGHT OF WAY SD STORM DRAIN SS SANITARY SEWER TB THRUST BLOCK TC TOP OF CURB TF TOP OF FOOTING TG TOP OF GRATE TW TOP OF WALL WL WATERLINE WM WATER METER WV WATER VALVE ABBREVIATIONS PROPOSED ASPHALT PAVING PROPOSED CONCRETE12 11 7.A.c Packet Pg. 54 Attachment: Civil and Landscape Plans (3981 : Royal Way Townhomes) A-A 204 206 208 210 212 214 204 206 208 210 212 214 B-B 198 200 202 204 206 208 210 198 200 202 204 206 208 210 C-C 200 202 204 206 208 210 212 200 202 204 206 208 210 212 D-D 204 206 208 210 212 214 216 218 220 204 206 208 210 212 214 216 218 220 EXISTING GRADE FINISHED GRADE EXISTING GRADE FINISHED GRADE EXISTING GRADE FINISHED GRADE EXISTING GRADE FINISHED GRADE E-E 202 204 206 208 210 212 202 204 206 208 210 212 BLDG H EXISTING SIDEWALK R O Y A L W A Y PUBLIC C/L ROYAL WAY ROW 30' BLDG A 7' S/W PROPERTY LINE ±20' ±13.5' BLDG F PROPERTY LINE ±15.5' BLDG C PROPERTY LINE ±29' 5' S/W EXISTING GRADE BLDG E PROPERTY LINE (E) HOUSE5' S/W ±19' FINISHED GRADE EXISTING GRADE 5' S/W PUE 10' 19' DRIVEWAY 24' PRIVATE DRIVE AISLE 5' SW 19' DRIVEWAY ROLLED CURB AND GUTTERROLLED CURB PROP BLDG PROP BLDG C/L ROYAL WAY 30'30' 11.5'18.5' ROADWAY 18.5' ROADWAY 11.5' S/W S/W ROWROW PARK PARK PUE 10' PUE 60' ROW CDS JOB #: SCALE: 20-088 1" = 20' DATE: PREPARED BY:MMM REVIEWED BY:RDW Z:\Shared\CDS Data\Active Jobs\20-088 Royal Way Apartments\_Project\1_Prelim Docs\20-088 Prelim Grading Plan.dwg, June 22, 2022A B C D E F G H I J K L M N O A B C D E F G H I J K L M N O 2 1 3 4 5 6 7 8 9 10 11 12 SHEET XX OF 6 SHEETSROYAL WAY TOWNHOMESPROJECT NAME:PLANS PREPARED FOR:PROJECT LOCATION:HOCHHAUSER BLATTER122 E ARRELLAGASANTA BARBARA, CA 93101ROYAL WAYGILROY, CA 95020APNS: 799-044-093 TO 098& 109CIVIL ENGINEERING PLANNING PERMITTINGCIVIL DESIGN STUDIOP.O. Box 199 | Cambria | Ca 93428805.706.0401 www.civil-studio.comPLAN PREPARED BY:PRELIMINARY PLANS - NOT FOR CONSTRUCTION 6/22/2022 C1.1 PRELIMINARY SECTIONS 2 50 25 0 SCALE: 1" = 50' 50 D D CC B B AA E E TYPICAL DRIVE AISLE SECTION (PRIVATE) SCALE: 1" = 10' TYPICAL ROYAL WAY SECTION (PUBLIC) SCALE:1" = 10' SITE CROSS SECTIONS SCALE:HORIZ - 1" = 10' VERT - 1" = 5' 7.A.c Packet Pg. 55 Attachment: Civil and Landscape Plans (3981 : Royal Way Townhomes) SSSS WMWMWMSSSSSSSSSSSSSSSSSSSSSSSSSSSSWMWMSSSSSS SS WLWL WL WL WL WL WL WL WLSS WMWL WLWLSS S S S S WLWLWLUNIT K102 UNIT K101 UNIT H102 UNIT F103 UNIT F102 UNIT F101 UNIT E108 UNIT E107 UNIT E106 UNIT E105 UNIT E104 UNIT E103 UNIT E102 UNIT E101 UNI T D1 0 4 UNI T D1 0 3 UNI T D1 0 2 UNI T D1 0 1 UNI T D1 0 5 UNIT L106 UNIT M101 UNIT M102 UNIT L105 UNIT L104 UNIT L103UNIT L102 UNIT L101 UNIT M103 UNIT C103 UNIT C102 UNIT C101 UNIT C104 UNIT B103UNIT B102 UNIT B101 UNIT B104 UNIT A105 UNIT A104 UNIT A103 UNIT A102 UNIT A101 UNIT A106 UNIT H101 UNIT G102 UNIT G101 SSSSSSSDSDSDSDSDWLWLWLWLWLWLWLWLSSSSSSSSWLWLWLWLWLWL WL WL SDSDSDSDWL WL WL WL WL WL WL WL WL WL WL WL WL WLWLWLWLWLSSSSSSSSSSSS SSSS SSSS SSSD SD SD SD SD SD S D S D WLSS SS SS SS SS SS SS WLSS SS SS SS SS SS SS WM WM WM WM WM WM WM WM WMWMWMWMWMWMWMWMWMWMWMWMWMWM WM WM WM WM WM WM WM WM WM WM WM WM WMWMWMWMWMWMWMWMWMSD SD SD SD SD SD SDSDSDSD SDSD SS SD SDSD SD SD SD SD SD SD SDWL WL PUBLIC 8" VCP SS LINE BUILDING H (2 UNITS) (E) PROPERTY LINE BUILDING A (6 UNITS) BUILDING G (2 UNITS) BUILDING F (3 UNITS) BUILDING L (6 UNITS) BUILDING E (8 UNITS) BUILDING B (4 UNITS) BUILDING D (5 UNITS) (E) PROPERTY LINE (E) PROPERTY LINE (E) PROPERTY LINE (E) PROPERTY LINE (E) RIGHT OF WAY R O Y A L W A Y (PUBLIC)I M P E R I A LD R I V E (PUBLIC)F I L B R OD R I V E (PUBLIC)PUBLIC 8" VCP SS LINE PUBLIC 8" CIP WATER LINE PUBLIC 8" CIP WATER LINE BUILDING C (4 UNITS) BUILDING K (2 UNITS) BUILDING M (3 UNITS) (E) PROPERTY LINE (E) PROPERTY LINE (E) PROPERTY LINE (E) PROPERTY LINE (E) PROPERTY LINE (E) PROPERTY LINE (E) PROPERTY LINE 205.8 FF 206.8 FF 206.8 FF 207.20 FF 207.20 FF 207.5 FF 209.0 FF 209.0 FF 209.0 FF 209.0 FF 208.1 FF 208.1 FF 208.1 FF 208.1 FF 207.6 FF 207.6 FF 207.6 FF 207.6 FF 207.6 FF 207.3 FF 207.3 FF 207.3 FF 207.0 FF 207.0 FF 206.7 FF 205.8 FF 205.8 FF 205.8 FF 206.5 FF 206.5 FF 206.5 FF207.1 FF 207.1 FF 207.1 FF207.1 FF 207.1 FF 207.1 FF 206.0 FF 206.0 FF 206.3 FF 206.3 FF 206.6 FF206.6 FF 206.7 FF 206.7 FF (203.7 RIM) (197.4 IE) (204.9 RIM) (199.2 IE) 204.8 TG 205.8 TG 205.8 TG 206.2 TG 206.2 TG 206.5 TG 207.5 TG 207.5 TG 207.5 TG 207.5 TG 206.6 TG 206.6 TG 206.6 TG 206.6 TG 206.1 TG 206.1 TG 206.1 TG 206.1 TG 206.1 TG 206.1 TG 206.1 TG 206.1 TG 205.8 TG 205.8 TG 205.5 TG 205.5 TG 205.5 TG 204.8 TG 204.8 TG 204.8 TG 205.6 TG 205.6 TG 205.3 TG 205.3 TG 205.0 TG 205.0 TG 205.5 TG 205.5 TG 205.5 TG 206.1 TG 206.1 TG 206.1 TG 206.1 TG 206.1 TG 41 205.0 TG 207.6 TG 206.1 TG 206.5 TG 203.7 TG SS POC 201.8 IE SS POC 202.8 IE SS POC 202.8 IE SS POC 203.2 IE SS POC 203.2 IE SS POC 203.5 IE WATER POC WATER POC WATER POC WATER POC WATER POC WATER POC WATER POC WATER POC WATER POC WATER POC SS POC 201.8 IE WATER POC SS POC 201.8 IE WATER POC SS POC 201.8 IE WATER POC SS POC 202.5 IE WATER POC SS POC 202.5 IE WATER POC SS POC 202.5 IE WATER POC SS POC 202.8 IE WATER POC SS POC 202.8 IE WATER POC SS POC 203.1 IE WATER POC SS POC 203.1 IE WATER POC SS POC 203.1 IE WATER POC SS POC 202.5 IE WATER POC SS POC 202.5 IE WATER POC SS POC 202.5 IE WATER POC SS POC 204.1 IE WATER POC SS POC 204.1 IE WATER POC SS POC 204.1 IE SS POC 204.1 IE WATER POC SS POC 204.1 IE WATER POC SS POC 204.1 IE WATER POC SS POC 204.5 IE WATER POC SS POC 204.5 IE WATER POC SS POC 204.5 IE WATER POC SS POC 204.5 IE WATER POC WATER POC SS POC 203.6 IE WATER POC SS POC 203.6 IE WATER POC SS POC 203.6 IE WATER POC SS POC 203.6 IE SS POC 203.1 IE WATER POC SS POC 203.1 IE WATER POC SS POC 203.1 IE WATER POC SS POC 203.1 IE WATER POC SS POC 203.1 IE WATER POC SS POC 202.3 IE WATER POC SS POC 202.6 IE SS POC 202.6 IE SS POC 202.3 IE SS POC 202.0 IE SS POC 202.0 IE WATER POC 199.7 IE 201.4 IE 198.0 IE 200.0 IE 199.0 INV 200.0 INV 199.0 INV 204.8 TG 204.6 TG 41 41 41 41 41 41 41 41 41 TYP 41 TYP 41 TYP 41 TYP 41 TYP 41 TYP 41 TYP 41 TYP 41 TYP 42 4242 43 43 43 43 43 43 43 43 TYP 43 TYP 43 TYP 43 TYP 43 TYP 43 TYP 43 TYP 43 TYP 43 TYP 43 TYP 43 TYP 44 44 44 51 51 51 51 51 51 51 51 51 51 51 51 TYP 51 TYP 51 TYP 51 TYP 51 TYP 51 TYP 51 TYP 51 TYP 51 TYP 51 TYP 5252 52 52 61 61 61 61 61 61 61 61 61 TYP 61 TYP 61 TYP 61 TYP 61 TYP 61 TYP 61 TYP 61 TYP 61 TYP 62 TYP 62 TYP 62 TYP 62 TYP 62 TYP 62 TYP 62 TYP 62 TYP 63 6310" SS10" SS (PRIVATE)10" SS (PRIVATE)10" SS8" WL (PUBLIC)8" WL (PUBLIC)8" WL (PUBLIC)12" SD (PRIVATE) 12" SD ( P R I V A T E ) 63 REMOVE TO MAIN REMOVE TO MAIN 8" WL (PUBLIC) 8" WL (PUBLIC)8" SS (PR IVATE) 63 63 WATER POC 41 TYP 41 TYP 8" WL (PUBLIC)8" WL (PUBL IC)8" WL (PUBLIC) CDS JOB #: SCALE: 20-088 1" = 20' DATE: PREPARED BY:MMM REVIEWED BY:RDW Z:\Shared\CDS Data\Active Jobs\20-088 Royal Way Apartments\_Project\1_Prelim Docs\20-088 Prelim Grading Plan.dwg, June 22, 2022A B C D E F G H I J K L M N O A B C D E F G H I J K L M N O 2 1 3 4 5 6 7 8 9 10 11 12 SHEET XX OF 6 SHEETSROYAL WAY TOWNHOMESPROJECT NAME:PLANS PREPARED FOR:PROJECT LOCATION:HOCHHAUSER BLATTER122 E ARRELLAGASANTA BARBARA, CA 93101ROYAL WAYGILROY, CA 95020APNS: 799-044-093 TO 098& 109CIVIL ENGINEERING PLANNING PERMITTINGCIVIL DESIGN STUDIOP.O. Box 199 | Cambria | Ca 93428805.706.0401 www.civil-studio.comPLAN PREPARED BY:PRELIMINARY PLANS - NOT FOR CONSTRUCTION 6/22/2022 C2.0 PRELLIMINARY UTILITY PLAN 3 20 10 015 SCALE: 1" = 20' 20 40 UTILITY CONSTRUCTION NOTES 41 PROPOSED STORM DRAIN LINE 42 PROPOSED RETENTION/INFILTRATION SYSTEM 43 PROPOSED CATCH BASIN 44 PROPOSED STORM DRAIN MANHOLE NOTES 45 TO 50 NOT USED 51 PROPOSED SANITARY SEWER LINE 52 PROPOSED SANITARY SEWER MANHOLE NOTES 53 TO 60 NOT USED 61 PROPOSED WATER LINE 62 PROPOSED WATER METER 63 PROPOSED FIRE HYDRANT SS (E) SS/SD MANHOLE (E) UTILITY POLE FIRE DEPARTMENT CONNECTION LEGEND WMCATCH BASIN WATER/IRRIGATION METER BACKFLOW DEVICE SEWER CLEANOUT YARD DRAIN (E) FIRE HYDRANT RETENTION/INFILTRATION SYSTEM SD SS/SD MANHOLE FIRE HYDRANT WM(E) WATER/IRRIGATION METER 7.A.c Packet Pg. 56 Attachment: Civil and Landscape Plans (3981 : Royal Way Townhomes) UNIT K102 UNIT K101 UNIT H102 UNIT F103 UNIT F102 UNIT F101 UNIT E108 UNIT E107 UNIT E106 UNIT E105 UNIT E104 UNIT E103 UNIT E102 UNIT E101 UNI T D1 0 4 UNI T D1 0 3 UNI T D1 0 2 UNI T D1 0 1 UNI T D1 0 5 UNIT L106 UNIT M101 UNIT M102 UNIT L105 UNIT L104 UNIT L103UNIT L102 UNIT L101 UNIT M103 UNIT C103 UNIT C102 UNIT C101 UNIT C104 UNIT B103UNIT B102 UNIT B101 UNIT B104 UNIT A105 UNIT A104 UNIT A103 UNIT A102 UNIT A101 UNIT A106 UNIT H101 UNIT G102 UNIT G101 BUILDING H (2 UNITS) (E) PROPERTY LINE BUILDING A (6 UNITS) BUILDING G (2 UNITS) BUILDING F (3 UNITS) BUILDING L (6 UNITS) BUILDING E (8 UNITS) BUILDING B (4 UNITS) BUILDING D (5 UNITS) (E) PROPERTY LINE (E) PROPERTY LINE (E) PROPERTY LINE (E) PROPERTY LINE (E) RIGHT OF WAY R O Y A L W A Y (PUBLIC)I M P E R I A LD R I V E (PUBLIC)F I L B R OD R I V E (PUBLIC)BUILDING C (4 UNITS) BUILDING K (2 UNITS) BUILDING M (3 UNITS) (E) PROPERTY LINE (E) PROPERTY LINE (E) PROPERTY LINE (E) PROPERTY LINE (E) PROPERTY LINE (E) PROPERTY LINE (E) PROPERTY LINE 205.8 FF 206.8 FF 206.8 FF 207.20 FF 207.20 FF 207.5 FF 209.0 FF 209.0 FF 209.0 FF 209.0 FF 208.1 FF 208.1 FF 208.1 FF 208.1 FF 207.6 FF 207.6 FF 207.6 FF 207.6 FF 207.6 FF 207.3 FF 207.3 FF 207.3 FF 207.0 FF 207.0 FF 206.7 FF 205.8 FF 205.8 FF 205.8 FF 206.5 FF 206.5 FF 206.5 FF207.1 FF 207.1 FF 207.1 FF207.1 FF 207.1 FF 207.1 FF 206.0 FF 206.0 FF 206.3 FF 206.3 FF 206.6 FF206.6 FF 206.7 FF 206.7 FF±R39'±R39'±R35'±R35'D R I V E A I S L E(PRIVATE)D R I V E A I S L E(PRIVATE)D R I V E A I S L E (PRIVATE)D R I V E A I S L E(PRIVATE)S00° 44' 18"W155.14'N82° 18' 14"E 91.05' N90° 00' 00"E 124.78' S66° 0 4 ' 5 6 " E 113. 1 1 'N00° 00' 07"E145.57'S18° 22' 04"E189.72'N82° 18' 14"E 37.03' R2 0 'R20'R112'R88'R 3 1 ' R 1 2 ' R100'R2'L = 35.91' R = 112.00' D = 018° 22' 11" L = 41.74' R = 100.00' D = 023° 55' 04" N71° 37' 5 6 " E 6.70'30'±19'±7'24' DRIVEWAY 2 5 ' D R I V EW A Y 24'DRIVE AISLE24'DRIVE AISLE24'DRIVE AISLE24' DRIVE A I S L E 24' DRIVE AISLE±4'9'18'9'19'9'18'18'15' 5'5'5'5'5'5'5 ' 5' 5' 5' 5'5'5'5'5'4' 5' 5' 5' 5' 5'5'5' 5'5'5' 5'5'5'5'5' 5' 5' 16'16' 25'24'24'24'18'18' 18' 18' 18' 18' 18'18'18'18'17'18'18' 18' 18' 18' 18'19'18'18'18'18'18'18'18'18'19'19'18'9'19'18'18'17'18'18'19'18'18'18'18'18'18'18' 18' 18' 19' 19' 19' 19' 19' 19'19'19'19'19'19'19'19'19'19'19'19'20'20'19' 19' 19' 19' 19' 19' 19' 19' 18' 19' 19' 19' 18'9'13'18'24' DRIVE AISLE 19'19'19'19'19'19'24'22'21'22' DRIVEWAY 22' DRIVEWAY 5' 5' 5'5'5'5'D R I V E A I S L E(PRIVATE)D R I V E A I S L E(PRIVATE)5' C/L ROYAL WAY 30'30' 11.5'18.5' ROADWAY 18.5' ROADWAY 11.5' S/W S/W ROWROW PARK PARK PUE 10' PUE 60' ROW 19' DRIVEWAY 24' PRIVATE DRIVE AISLE 5' SW 19' DRIVEWAY ROLLED CURB AND GUTTERROLLED CURB PROP BLDG PROP BLDG CDS JOB #: SCALE: 20-088 1" = 20' DATE: PREPARED BY:MMM REVIEWED BY:RDW Z:\Shared\CDS Data\Active Jobs\20-088 Royal Way Apartments\_Project\1_Prelim Docs\20-088 Prelim Grading Plan.dwg, June 22, 2022A B C D E F G H I J K L M N O A B C D E F G H I J K L M N O 2 1 3 4 5 6 7 8 9 10 11 12 SHEET XX OF 6 SHEETSROYAL WAY TOWNHOMESPROJECT NAME:PLANS PREPARED FOR:PROJECT LOCATION:HOCHHAUSER BLATTER122 E ARRELLAGASANTA BARBARA, CA 93101ROYAL WAYGILROY, CA 95020APNS: 799-044-093 TO 098& 109CIVIL ENGINEERING PLANNING PERMITTINGCIVIL DESIGN STUDIOP.O. Box 199 | Cambria | Ca 93428805.706.0401 www.civil-studio.comPLAN PREPARED BY:PRELIMINARY PLANS - NOT FOR CONSTRUCTION 6/22/2022 C3.0 PRELIMINARY HORIZONTAL CONTROL PLAN 4 20 10 015 SCALE: 1" = 20' 20 40 TYPICAL ROYAL WAY SECTION (PUBLIC) SCALE:1" = 10' TYPICAL DRIVE AISLE SECTION (PRIVATE) SCALE: 1" = 10' 7.A.c Packet Pg. 57 Attachment: Civil and Landscape Plans (3981 : Royal Way Townhomes) UNIT K102 UNIT K101 UNIT H102 UNIT F103 UNIT F102 UNIT F101 UNIT E108 UNIT E107 UNIT E106 UNIT E105 UNIT E104 UNIT E103 UNIT E102 UNIT E101 UNI T D1 0 4 UNI T D1 0 3 UNI T D1 0 2 UNI T D1 0 1 UNI T D1 0 5 UNIT L106 UNIT M101 UNIT M102 UNIT L105 UNIT L104 UNIT L103UNIT L102 UNIT L101 UNIT M103 UNIT C103 UNIT C102 UNIT C101 UNIT C104 UNIT B103UNIT B102 UNIT B101 UNIT B104 UNIT A105 UNIT A104 UNIT A103 UNIT A102 UNIT A101 UNIT A106 UNIT H101 UNIT G102 UNIT G101 WM WM WM WM WM WM WM WM WMWMWMWMWMWMWMWMWMWMWMWMWMWM WM WM WM WM WM WM WM WM WM WM WM WM WMWMWMWMWMWMWMWMWMBUILDING H (2 UNITS) BUILDING A (6 UNITS) BUILDING G (2 UNITS) BUILDING F (3 UNITS) BUILDING L (6 UNITS) BUILDING E (8 UNITS) BUILDING B (4 UNITS) BUILDING D (5 UNITS) BUILDING C (4 UNITS) BUILDING K (2 UNITS) BUILDING M (3 UNITS) 205.8 FF 206.8 FF 206.8 FF 207.20 FF 207.20 FF 207.5 FF 209.0 FF 209.0 FF 209.0 FF 209.0 FF 208.1 FF 208.1 FF 208.1 FF 208.1 FF 207.6 FF 207.6 FF 207.6 FF 207.6 FF 207.6 FF 207.3 FF 207.3 FF 207.3 FF 207.0 FF 207.0 FF 206.7 FF 205.8 FF 205.8 FF 205.8 FF 206.5 FF 206.5 FF 206.5 FF207.1 FF 207.1 FF 207.1 FF207.1 FF 207.1 FF 207.1 FF 206.0 FF 206.0 FF 206.3 FF 206.3 FF 206.6 FF206.6 FF 206.7 FF 206.7 FF PRIVATE FIRE HYDRANT 150'150' 15 0 ' 150 ' 1 5 0 ' PUBLIC FIRE HYDRANT PUBLIC FIRE HYDRANT PRIVATE FIRE HYDRANT PRIVATE FIRE HYDRANTD R I V E A I S L E(PRIVATE)D R I V E A I S L E(PRIVATE)D R I V E A I S L E(PRIVATE)D R I V E A I S L E(PRIVATE)D R I V E A I S L E (PRIVATE)D R I V E A I S L E(PRIVATE) R O Y A L W A Y (PUBLIC) LEGEND FRONT LEFT TIRE FRONT RIGHT TIRE REAR LEFT TIRE REAR RIGHT TIRE TRUCK BODY 6.2'28.5'5.8' 40.5'8.5'CDS JOB #: SCALE: 20-088 1" = 20' DATE: PREPARED BY:MMM REVIEWED BY:RDW Z:\Shared\CDS Data\Active Jobs\20-088 Royal Way Apartments\_Project\1_Prelim Docs\20-088 Prelim Fire Circulation Plan.dwg, June 22, 2022A B C D E F G H I J K L M N O A B C D E F G H I J K L M N O 2 1 3 4 5 6 7 8 9 10 11 12 SHEET XX OF 6 SHEETSROYAL WAY TOWNHOMESPROJECT NAME:PLANS PREPARED FOR:PROJECT LOCATION:HOCHHAUSER BLATTER122 E ARRELLAGASANTA BARBARA, CA 93101ROYAL WAYGILROY, CA 95020APNS: 799-044-093 TO 098& 109CIVIL ENGINEERING PLANNING PERMITTINGCIVIL DESIGN STUDIOP.O. Box 199 | Cambria | Ca 93428805.706.0401 www.civil-studio.comPLAN PREPARED BY:PRELIMINARY PLANS - NOT FOR CONSTRUCTION 6/22/2022 C4.0 PRELIMINARY FIRE CIRCULATION PLAN - CLOCKWISE 5 20 10 015 SCALE: 1" = 20' 20 40 7.A.c Packet Pg. 58 Attachment: Civil and Landscape Plans (3981 : Royal Way Townhomes) UNIT K102 UNIT K101 UNIT H102 UNIT F103 UNIT F102 UNIT F101 UNIT E108 UNIT E107 UNIT E106 UNIT E105 UNIT E104 UNIT E103 UNIT E102 UNIT E101 UNI T D1 0 4 UNI T D1 0 3 UNI T D1 0 2 UNI T D1 0 1 UNI T D1 0 5 UNIT L106 UNIT M101 UNIT M102 UNIT L105 UNIT L104 UNIT L103UNIT L102 UNIT L101 UNIT M103 UNIT C103 UNIT C102 UNIT C101 UNIT C104 UNIT B103UNIT B102 UNIT B101 UNIT B104 UNIT A105 UNIT A104 UNIT A103 UNIT A102 UNIT A101 UNIT A106 UNIT H101 UNIT G102 UNIT G101 WM WM WM WM WM WM WM WM WMWMWMWMWMWMWMWMWMWMWMWMWMWM WM WM WM WM WM WM WM WM WM WM WM WM WMWMWMWMWMWMWMWMWMBUILDING H (2 UNITS) BUILDING A (6 UNITS) BUILDING G (2 UNITS) BUILDING F (3 UNITS) BUILDING L (6 UNITS) BUILDING E (8 UNITS) BUILDING B (4 UNITS) BUILDING D (5 UNITS) BUILDING C (4 UNITS) BUILDING K (2 UNITS) BUILDING M (3 UNITS) 205.8 FF 206.8 FF 206.8 FF 207.20 FF 207.20 FF 207.5 FF 209.0 FF 209.0 FF 209.0 FF 209.0 FF 208.1 FF 208.1 FF 208.1 FF 208.1 FF 207.6 FF 207.6 FF 207.6 FF 207.6 FF 207.6 FF 207.3 FF 207.3 FF 207.3 FF 207.0 FF 207.0 FF 206.7 FF 205.8 FF 205.8 FF 205.8 FF 206.5 FF 206.5 FF 206.5 FF207.1 FF 207.1 FF 207.1 FF207.1 FF 207.1 FF 207.1 FF 206.0 FF 206.0 FF 206.3 FF 206.3 FF 206.6 FF206.6 FF 206.7 FF 206.7 FF PRIVATE FIRE HYDRANT 150'150' 15 0 ' 150 ' 1 5 0 ' PUBLIC FIRE HYDRANT PUBLIC FIRE HYDRANT PRIVATE FIRE HYDRANT PRIVATE FIRE HYDRANTD R I V E A I S L E(PRIVATE)D R I V E A I S L E(PRIVATE)D R I V E A I S L E(PRIVATE)D R I V E A I S L E(PRIVATE)D R I V E A I S L E (PRIVATE)D R I V E A I S L E(PRIVATE) R O Y A L W A Y (PUBLIC) LEGEND FRONT LEFT TIRE FRONT RIGHT TIRE REAR LEFT TIRE REAR RIGHT TIRE TRUCK BODY 6.2'28.5'5.8' 40.5'8.5'CDS JOB #: SCALE: 20-088 1" = 20' DATE: PREPARED BY:MMM REVIEWED BY:RDW Z:\Shared\CDS Data\Active Jobs\20-088 Royal Way Apartments\_Project\1_Prelim Docs\20-088 Prelim Fire Circulation Plan.dwg, June 22, 2022A B C D E F G H I J K L M N O A B C D E F G H I J K L M N O 2 1 3 4 5 6 7 8 9 10 11 12 SHEET XX OF 6 SHEETSROYAL WAY TOWNHOMESPROJECT NAME:PLANS PREPARED FOR:PROJECT LOCATION:HOCHHAUSER BLATTER122 E ARRELLAGASANTA BARBARA, CA 93101ROYAL WAYGILROY, CA 95020APNS: 799-044-093 TO 098& 109CIVIL ENGINEERING PLANNING PERMITTINGCIVIL DESIGN STUDIOP.O. Box 199 | Cambria | Ca 93428805.706.0401 www.civil-studio.comPLAN PREPARED BY:PRELIMINARY PLANS - NOT FOR CONSTRUCTION 6/22/2022 C4.1 PRELIMINARY FIRE CIRCULATION PLAN - COUNTER CLOCKWISE 6 20 10 015 SCALE: 1" = 20' 20 40 7.A.c Packet Pg. 59 Attachment: Civil and Landscape Plans (3981 : Royal Way Townhomes) WMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWM' WOOD FENCE6 '6A101A102A103A104A105A106K102 K101 H102 H101 G102 G101 L101 L102 L103 L104 L105 L106 M101 M102 M103 F103 F102 F101 E108 E107 E106 E105 E104 E103 E102 E101 B101 B102 B103 B104 C101 C102 C103 C104 D101 D102 D103 D104 D105 ROYAL WAY AA AA AA AA AA AA AA 0.2 0.1 0.1 0.3 0.2 0.1 0.5 0.3 1.0 0.8 0.3 1.1 0.9 0.3 1.0 0.8 1.2 1.1 0.6 0.8 0.7 0.3 0.5 0.4 0.2 0.3 0.2 0.1 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.1 0.3 0.3 0.1 0.3 0.5 0.6 0.1 0.1 0.1 0.1 0.5 1.0 0.2 0.2 0.2 0.1 0.1 0.2 0.7 1.1 0.1 0.1 0.1 0.1 0.5 0.6 0.6 0.4 0.2 0.1 0.1 0.3 0.9 0.9 0.1 0.2 0.3 0.4 0.6 0.7 0.7 0.6 0.4 0.3 0.2 0.1 0.2 0.5 0.8 1.1 1.2 0.9 0.4 0.1 0.4 0.9 1.2 0.2 0.3 0.6 1.0 1.2 1.0 1.1 0.8 0.5 0.3 0.2 0.2 0.2 0.4 0.6 1.0 1.1 1.0 1.1 0.8 0.5 0.3 0.2 0.1 0.1 0.2 0.4 0.8 1.2 0.6 0.3 0.7 0.8 1.1 0.8 0.4 0.3 0.2 0.2 0.2 0.3 0.4 0.5 0.6 0.7 0.6 0.4 0.3 0.2 0.1 0.1 0.2 0.3 0.5 0.3 0.4 0.4 0.3 0.2 0.1 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.1 0.2 0.2 0.2 0.3 0.1 0.3 0.3 0.3 0.5 0.2 0.4 0.6 0.5 0.8 0.2 0.6 1.0 0.6 1.2 0.3 0.9 1.2 0.7 1.0 0.3 1.0 0.7 0.7 1.1 0.3 0.9 1.2 0.5 1.0 0.2 0.7 0.9 0.4 0.6 0.2 0.3 Luminaire Schedule - LED Project: ROYAL WAY TOWNHOMES - GILROY Symbol Qty Label Arrangement LLF LLD UDF Luminaire Lumens Luminaire Watts Description Filename 7 AA Single 0.630 0.900 0.700 2856+/-25+/-LUMEC S55-35W32LED3K-G3-LE2 - 14' POLE (REDUCED 30%)S55-35W32LED3K-G3-LE2.ies Calculation Summary Project: ROYAL WAY TOWNHOMES - GILROY Description CalcType Units Avg Max Min Avg/Min Max/Min PRIVATE STREET Illuminance Fc 0.44 1.2 0.1 4.40 12.00 AGI32 VERSION 20.1 AGI (C) 2021 LIGHTING ANALYSTS, INC. 10268 W. CENTENNIAL ROAD, SUITE 202 LITTLETON, CO 80127 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * SALES REPRESENTATIVE: ALR; JOHN BENSON differences will occur between measured values and calculated values. lighting calculations. If the real environment conditions do not match the input data, dimensions, reflectances, furniture and architectural elements significantly affect the variations. Input data used to generate the attached calculations such as room measurement techniques and field conditions such as voltage and temperature tolerances in calculation methods, testing procedures, component performance, Some differences between measured values and calculated results may occur due to Calculations have been performed according to IES standards and good practice. BY: APPLICATIONS ENGINEERING; RAMON ZAPATA REPORT FOR: GIACALONE DESIGN SERVICES PHONE: (510) 638-0158 - FAX (510) 638-2908 OAKLAND, CA 94621 P.O. BOX 2265 7777 PARDEE LANE ASSOCIATED LIGHTING REPRESENTATIVES, INC ALL VALUES SHOWN ARE MAINTAINED HORIZONTAL FOOTCANDLES AT GRADE LAMP, BALLAST, ELECTRICAL, AND SITE CHARACTERISTICS. LAMP, RATINGS, FIELD PERFORMANCE WILL DEPEND ON ACTUAL IS BASED ON ESTABLISHED IES PROCEDURES AND PUBLISHED PHOTOMETRIC DATA USED AS INPUT FOR THESE CALCULATIONS DATE 09.16.20211" = 30'1 OF 1 X REVSHEETSCALE PROJECT DESCRIPTION DRAWING NO. / INPUT FILE ROYAL WAY TOWNHOMES CITY OF GILROY 19324BEN.DWG / 19324BEN.A32 7.A.c Packet Pg. 60 Attachment: Civil and Landscape Plans (3981 : Royal Way Townhomes) DWUP 36"0,92M 379 SF 1ST FLOOR 858 SF 1ST FLOOR 411 SF 1ST FLOOR 410 SF 1ST FLOOR 644 SF 1ST FLOOR 410 SF 1ST FLOOR 644 SF TOWN HOUSE TYP. A 39 LLLLLLLLLLLLLLLLLLLLLLLL ROYAL WAY GILROY HIGH SCHOOLCARNADERO CREEK 401 402 403 404 15", 13" 25" 28"0 15" 18" 10", 10" 27" 16", 13", 13', 11" 16"16"0 424 425 427 428 430431 16"0 432 16" 426 LEGEND Indicates tree number as referenced in Arborist Report Tree To Remain: Preserve And Protect. See Tree Protection Notes Tree To Be Removed: See Tree Protection Notes Tree To Be Moved or Removed: Heritage Tree or Protected Tree Existing Trees to Remain: Preserve and Protect 8"0 12"0 1 EXISTING TREE SUMMARY Tree #:Tree Name:DBH:Heritage Tree:Protected:Status: 401 Fraxinus uhdei 15", 13"No No Remove 402 Olea europea 25"No No Move or Remove 403 Koelreuteria bipinnata 28"No No Remove 404 Quercus lobata 15"No Yes Offsite Preserve 424 Quercus lobata 18"No Yes Remove 425 Quercus lobata 10",10"No No Remove 426 Quercus agrifolia 16"No Yes Remove 427 Olea europea 27"No No Move or Remove 428 Olea europea 16",13", 13",11"No No Move or Remove 430 Juglans regia 16"No No Remove 431 Fraxinus uhdei 16"No No Remove 432 Juglans regia 30"No No Remove 23"0 F:\PRODUCTION\Projects\2021\21.005\CAD\21005_L-1.0 Tree Removal.dwg 4/26/202230 0 30 60 Tree Removal & Protection Plan L-1.0 ARBORISTS REPORT: TREE PROTECTION NOTES Arborwell Report - March 14, 2022 ROYAL WAY TOWNHOMES GILROY, CA HOCHHAUSER BLATTER ARCHITECTURE AND PLANNING SHEET NO: SHEET NAME: PROJECT NO: DATE: SCALE: DRAWN | CHECKED: REVISIONS: PROJECT: NO.DESCRIPTIONDATE ISSUANCE: PLANNING SUBMITTAL JB/LF AS SHOWN 04/26/2022 21.005 7.A.c Packet Pg. 61 Attachment: Civil and Landscape Plans (3981 : Royal Way Townhomes) DWUP 36 "0,92M ROYAL WAY GILROY HIGH SCHOOLCARNADERO CREEK Cs Cs Cs Cs Cs CsCsCsCs Cs Cs Cs Cs Cs Cs Cs Cs Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr MrMr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr MrMr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Sa Sa Sa Sa Sa Sa Sa Sa Sa Sa Sa RmRmRmRm Db Db Db Db Db Cs Cs Cs Sa SaSa Ps Ps Ps Ps Ps Mr Mr Mr Mr Mr MrMrMrMr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Db Db Db Db Db Db Db Db DbDb Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Rc Rc Rc Rc Rc Rc Rc Rc Rc Rc Rc Mr Mr Mr Ha Ha Ha Ha Mr Mr Mr Mr Mr Ha Ha HaHaDv Dv Mr Dv Dv Dv Ha Ha Ha Ha Ha Ha Ha Ha Ha Ha Sa Sa Sa Sa Sa Sa Sa Sa Db Db Db Db Db Db Db Db Db Db Db Db Db Cs Cs Cs Cs Cs Cs Cs Cs Cs Ps Ps Ps Ps Sa Sa Sa Db Db Db Db Db Db Db Db Db Db Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Ps Ps Ps Ps PsPs Db DbDb Db Db Db Db DbDb Ps Ps Ps Rc Rc Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls LsLs Ls Ls Ru Ru Ru Ru Ek Ek Ek Bp Bp Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls LsLsLsLs Ls Ru Ru Ru Ru Ek Ek Bp Bp Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls LsLsLs Ru Ru Ru Ru Ek Ek Bp BpLsLs LsLs Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls LsLsLsLsLs Ru Ru Ru Ru Ek Ek Bp Bp LsLs Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls LsLs LsLsLs Ru Ru Ru Ru Ek Ek Bp Bp LsLs Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls LsLsLsLs Ru Ru Ru Ru Ek Ek Bp BpLsLs Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls LsLsLs Ls Ru Ru Ru Ru Ek Ek Bp BpLsLs Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls LsLsLsLs Ru Ru Ru Ru Ek Ek Ek Ls Ls Ls Ru PsPs Ps PsPs Rc Rc Rc Rc Rc Rc Db Db Db Db Db Db Db Db Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Cs Cs Cs Cs Lm Lm Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Ha Ha Mr Mr Ls Ls Ls Ls Mr Mr Ru Ru Ru Ru Ru Ls Ls Ls Ls Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ls Ls Ls Ls Ls Ls Rm Rm Rm Rm Bp Bp Bp Bp Bp Bp Bp Rm Bp Bp Bp Bp Sa Sa Sa Cs CsCs Cs Cs Cs Cs Ps Ps Ps Ps Rc Rc Ps Ps PsDb Db Db Db Db Db DbDb Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Rc Rc Rc Rc Rc Rc Rc Db Db Db Db Db Rc Rc Rc Rc Ps Ps Ps Ps Ps Ps Ps Ps Ps Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db DbDb Db Db Db Db Db Db Db Db Db Db Db Db Db Ps Ps Ps Db Db Db Db Db Db Rc Rc Ps Ps Ps Db Db Db Db Db Db Db Db Db Db Pt Pt Pt Pt Pt Pt Pt Pt Pt Pt Pt Pt Pt Pt Ps Ps Ps Ps Ps Lm Lm Lm Lm Lm Lm Lm Lm Lm Ps Ps LmLm Lm Lm Ps Ps Ps Ps Ps Pt Pt Pt Pt Pt Pt Pt Pt Pt Pt Pt Pt Pt Pt As As As As As As As As As As As As As As As As As As Wf Wf Wf Wf Wf Wf Wf Wf As As As As As As As As As As As As As As As As As As As As As As As As As As As As As Bp Bp Bp Bp Bp Bp Bp Bp Bp As As As As Pt Pt Pt Bp As As Cs Cs Cs Cs Cs Cs Cs Cs Cs Cs Cs Cs Cs CsCs Cs Cs Cs Cs Cs Cs Cs Cs Cs Cs Ps Cs Cs Cs Cs Cs Cs Cs Cs Cs CsCs Cs Cs Cs Cs Cs Cs Cs Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Db Db Db Db DbDb Db Db Db Db Db Db Db Db Sa Sa Sa Sa Sa Rc Rc Rc Rc Rc Rc Lm Lm Lm Lm Lm Db Db Db Db Db Sa Sa Sa Sa Sa RcRcRcRc LmLmLmLmLm Db LmLm Lm Lm Lm Lm Lm Lm Lm Db Db Db Db Db Db Db Sa Sa Sa Sa Sa Rc Rc Rc Rc Lm Lm Lm Lm Lm Rc Lm Rc Rc Rc RcRcRcRcRcRc Lm Lm Lm Lm Lm Lm Db Db Db Db Lm Lm Sa Sa Sa Sa Sa Sa SaDb Db Db Db Db Rc Rc Rc Rc Rc Rc Rc Db Db DbLmLm Lm Lm Lm Lm Lm Lm Lm Lm Lm Sa Sa Sa Sa Sa Sa Sa Sa SaSa Sa LmLm Db Db As As As As As As AsAs As As AsAs As As AsAs As As AsAs Wf Wf As As As As As As As As As As As As As As As Bp Lc Lc Lc Lc Lc Lc As As As As AsAs As As As As Lc Lc LcLc LcAs AsAs Ps Ps Ps Ps Ps Ps Ps Ps Lm Lm Lm Lm Lm Lm Lm Lm Db Db Db Db Db DbDbDb PsPsPs Ps Ps Ps Ps Ps Ps Ps Ps Ps Ps PsPs DbDb Db Db Db Db Db Db Db Ls LsLsLsLsLs Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ru Ru Ru Ru Ek Ek Bp Bp Ls Ls Ls Ls LsLsLsLsLsLs Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ru Ru Ru Ru Ek Ek Bp Bp Ls Ls Ls Ls Ls Ls LsLsLsLs Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ru Ru Ru Ru Ek Ek Bp Bp Ls Ls Ls Ls LsLsLsLsLsLs Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ru Ru Ru Ru Ek Ek Bp Bp Ls Ls Ls Ls Ls Ls LsLsLsLs Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ru Ru Ru Ru Ek Ek Bp Ls Ls Ls Ls LsLsLsLs Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ru Ru Ru Ek Bp Bp Ls Ls Ls Ls Ls Ls Ls Ls Db Db DbDbDb Ps Ps Db Db Ps Db Db Db Db Db Db Db Db Ps Ps Ps Rc Rc Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Rc Rc Rc Rc Rc Rc Rc Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Ru Ru Ru Ru Ru RuRu Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ru Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls LsLs Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls LsLsLsLsLsLsLsLsLs Ls Ls Ls Ls Ls Ls Ls Ek Ek Ek Ek Ek Ek Ek Ek Ls Ls Bp Bp Bp Bp Bp Bp Bp Bp Bp Bp Bp Bp Ek Ek Ek Ek Ek Bp Bp Bp Bp Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls LsLsLsLsLsLsLsLsLsLsLs Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls LsLsLsLsLsLsLsLsLsLs Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ek Ek LsLs Ls LsBpBpBpBp EkEkEk Bp Ek Ek Ek Ls Ls BpBpBpLs Ls Ls Ls Ls Ls Ls LsLsLsLsLsLsLsLsLsLs Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls Ls LsLsLsLsLsLsLsLsLs Ls Ls LsLs Ls Ls LsLsLsLsLsLsLsLsLsLsLs Ls Ls Ek Ek Ek Ek Ek Ek Ek Ek Ek BpBp BpBpBp BpBp Pc Pc Pc Pc Pc Pc Pc Pc Pc Pr Pc Pc Pc Pc PcPc Pc PcPc Pc Pc Lc Lc Pt As As As As As As As As As As Pt Pt Pt Pt Pt Pt Lc Lc Lc Lc BpBp AsAsAsAsAsAs As AsAs As As As Pc Pc Pc Pr Pc Pc Up Up Up Up Up Up Up Up Up Up Up Up Up Up Up Up Up Up Pc Pc Au Pc Pc Pc Pc Ct Pc Pc Pc Up Up Up Up Up Up Up Up Up Up Up Up Bp Co Co Co Co Co Co Co Pt Pt Pt Pt PtPt Pt As As As As As As As As As As As Au Au Au Au Au Au Au Au Up Au Au Au Co Co Pr Au Ct CtCt Au Ct Ct Ct Ct Au Au Ct Ct Ct Ct Ct Ct Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Db Rc Rc Cs Lm Db Db Db Lm Sa Lm Lm Lm Lm Lm Lm Lm LmLm Lm Sa Lm Lm Lm Lm LmLm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Db Db Lm Lm Lm Lm Lm Lm Lm Lm Cs Cs Sa Sa Db Db Db Db Lm Lm Lm Lm Lm Lm LmLmLm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Sa Sa Sa Db Db WfWfWf Db DbDb Db Db Mr Mr AuCs Cs Cs Ps Ps Pt Db Db Db CoCo Co Co Co * WATER USE CATEGORY (WUC) KEY WUCOLS Region Applicable to this Project: REGION 1 H = High; M = Moderate; L = Low; VL = Very Low; NL = Species Not Listed * from: Water Use Classification of Landscape Species, A Guide to the Water Needs of Landscape Plants (WUCOLS) Revised 2014, University of California Cooperative Extension, L.R. Costello, K.S. Jones PLANT LEGEND *WUC CODE BOTANICAL NAME COMMON NAME SIZE CHARACTER QTY. Shade Trees L Pc Pistacia chinensis 'Keith Davey'Keith Davey Chinese Pistache 24" Box STANDARD 28 L Pr Platanus racemosa California Sycamore 24" Box STANDARD 10 L Up Ulmus parvifolia Chinese Elm 24" Box STANDARD 33 Ornamental Trees L Au Arbutus unedo Strawberry Tree 15 Gal.STANDARD 20 L Co Cercis occidentalis Western Redbud 15 Gal.STANDARD 7 L Ct Chitalpa tashkentensis Chitalpa 15 Gal.STANDARD 13 Shrubs M As Asparagus densiflorus 'Myers'Myers Asparagus 1 Gal.@ 36" O.C.137 L Cs Cistus spp.Rockrose 5 Gal.@ 48" O.C.87 L Db Dietes bicolor Fortnight Lily 1 Gal.@ 36" O.C.289 L Dv Dodonaea viscosa Green Hopseed Bush 5 Gal.@ 120" O.C.5 L Ek Erigeron karvinskianus Santa Barbara Daisy 1 Gal.@ 48" O.C.59 L Ha Heteromeles arbutifolia Toyon 5 Gal.@ 72" O.C.19 L Ls Lavandula spp.Lavender 1 Gal.@ 30" O.C.591 L Lm Lomondra longifolia Dwarf Mat Rush 1 Gal.@ 36" O.C.118 L Lc Loropetalum chinense Fringe Flower 5 Gal.@ 72" O.C.17 L Mr Muhlenbergia rigens Deergrass 1 Gal.@ 48" O.C.183 L Ps Phormium spp New Zealand Flax 1 Gal.@ 48" O.C.90 L Pt Pittosporum tobira Japanese Pittosporum 5 Gal.@ 48" O.C.49 L Rc Rhamnus californica 'Eve Case'Eve Case Coffeeberry 5 Gal.@ 48" O.C.81 L Ru Rhaphiolepis umbellata 'Minor'Dwarf Yeddo Hawthorn 1 Gal.@ 36" O.C.141 L Rm Romneya coulteri Matilija Poppy 5 Gal.@ 72" O.C.10 L Sa Salvia leucantha Mexican Sage 5 Gal.@ 48" O.C.61 M Wf Woodwardia fimbriata Giant Chain Fern 5 Gal.@ 72" O.C.13 Groundcover L Bp Baccharis pilularis Coyote Bush 5 Gal.@ 72" O.C.81 L Carex divulsa Berkeley Sedge 1 Gal.@ 24" O.C.124 L Crushed Rock 752 SF PLANTING NOTES 1.The project Geotechnical Report recommends over excavation to remove twelve (12) inches of site soil for new construction (see report excerpt). Given that the site will largely be imported soil, BFS will specify a soils and amendment horticultural test for approval prior to any planting. 2.Mulch: Chipped wood to contain less than 1% foreign matter including soil, weeds, seeds, etc. by dry weight at three (3) inch depth. 30 0 30 60 ROYAL WAY TOWNHOMES GILROY, CA HOCHHAUSER BLATTER ARCHITECTURE AND PLANNING SHEET NO: SHEET NAME: PROJECT NO: DATE: SCALE: DRAWN | CHECKED: REVISIONS: PROJECT: NO.DESCRIPTIONDATE ISSUANCE: PLANNING SUBMITTAL JB/LF AS SHOWN 04/26/2022 21.005 F:\PRODUCTION\Projects\2021\21.005\CAD\21005_L-2.0 Const-Planting.dwg 4/26/2022Landscape Site Plan L-2.0 GEOTECH REPORT: SOIL PREPARATION AND GRADING RECOMMENDATIONS Earth Systems Pacific - June 7, 2013 7.A.c Packet Pg. 62 Attachment: Civil and Landscape Plans (3981 : Royal Way Townhomes) Mr Mr Mr Mr Sa Sa Sa Sa Sa Sa Sa Sa Sa Sa Sa RmRmRmRm Db Db Db Db Db Cs Cs Cs Sa SaSa Mr Mr Mr Ls Ls Ls Ls Bp Pr Pc Pc Ct Sa Lm Lm Lm Lm LmLm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Db Db Lm Lm Lm Lm Lm Lm Lm Lm Cs Cs Sa Sa Lm Lm Lm Lm Lm Lm LmLmLm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Lm Sa Sa Sa Db Db CONCRETE SEATWALL: SEE /L-2.14 Ps Ps Ps Ps Ps Mr Mr Mr Mr Mr MrMrMrMr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Db Db Db Db Db Db Db Db DbDb Mr Mr Mr Mr Mr Mr Mr Mr Mr Mr Rc Rc Rc Rc Rc Rc Rc Rc Rc Rc Rc Mr Mr Mr Ha Ha Ha Ha Mr Mr Mr Mr Mr Ha Ha HaHaDv Dv Mr Dv Dv Dv Ha Ha Ha Ha Ha Ha Ha Ha Ha Ha Ls Ls Ls Ls Ls Ls Ls Ls LsRu Ek Ek Ek Ls Ls Ls Up Co Co Pr Au Mr Mr CoCo Co Co Co CONCRETE SEAT WALL: INTEGRAL COLOR, EXPOSED SMOOTH FORM FINISH. SEE SPECS. EXPOSED EDGES RADIUSED 1/2", TYP. FINISH GRADE AT PAVING CONCRETE FOOTING: SEE SPECS FG1'-6"18" REBAR: #4 VERTICAL 24" O.C. REBAR: #4 HORIZONTAL 9" O.C., CONT. AGGREGATE BASE: COMPACTED TO MIN. 95% RELATIVE COMPACTION. SEE SPECS SUBGRADE: UPPER 6" SCARIFIED & COMPACTED TO MIN. 95% RELATIVE COMPACTION. SEE SPECS1'-6"3'-0"3"3"3"3"MIN MIN MINMIN4 1" = 1'-0" Concrete Seat Wall 36"0,92MSaSaSaSaSaSaSaSaDbDbDbDbDbDbDbDbDbDbDbCsCsCsCsCsCsCsPsPsPsSaSaSaDbDbDbDbDbDbDbDbDbDbLmLmLmLmLmLmLmLmLmLmLmLmLmLmSaSaSaPsPsPsPsRuRuRuLsLsLsLsLsLsLsLsLsEkEkEkLsLsBpUpPcAuPcPcPcAuCsCsCsPsPs10 0 10 20 1 1"=10'-0" Picnic Area Enlargement: 4,151 sf ROYAL WAY TOWNHOMES GILROY, CA HOCHHAUSER BLATTER ARCHITECTURE AND PLANNING SHEET NO: SHEET NAME: PROJECT NO: DATE: SCALE: DRAWN | CHECKED: REVISIONS: PROJECT: NO.DESCRIPTIONDATE ISSUANCE: PLANNING SUBMITTAL JB/LF AS SHOWN 04/26/2022 21.005 F:\PRODUCTION\Projects\2021\21.005\CAD\21005_L-2.0 Const-Planting.dwg 4/26/2022Construction & Planting Enlargement Plan L-2.1 3 1" = 10'-0" Gazebo Area Enlargement: 1,533 sf 2 1"=10'-0" Playground Enlargement: 2,463 sf 10 0 10 20 10 0 10 20 7.A.c Packet Pg. 63 Attachment: Civil and Landscape Plans (3981 : Royal Way Townhomes) ROYAL WAY TOWNHOMES GILROY, CA HOCHHAUSER BLATTER ARCHITECTURE AND PLANNING SHEET NO: SHEET NAME: PROJECT NO: DATE: SCALE: DRAWN | CHECKED: REVISIONS: PROJECT: NO.DESCRIPTIONDATE ISSUANCE: PLANNING SUBMITTAL JB/LF AS SHOWN 04/26/2022 21.005 Plant Images L-2.2 DIETES BICOLORCISTUS SALVIFOLIUS ERIGERON KARVINSKIANUS LAVANDULA SPP. PISTACIA CHINENSIS 'KEITH DAVEY'ARBUTUS UNEDO CHITALPA TASHKENTENSIS PLATANUS RACEMOSA ULMUS PARVIFOLIA CERCIS OCCIDENTALIS ASPARAGUS DENSIFLORUS DODONAEA VISCOSA HETEROMELES ARBUTIFOLIA 7.A.c Packet Pg. 64 Attachment: Civil and Landscape Plans (3981 : Royal Way Townhomes) ROYAL WAY TOWNHOMES GILROY, CA HOCHHAUSER BLATTER ARCHITECTURE AND PLANNING SHEET NO: SHEET NAME: PROJECT NO: DATE: SCALE: DRAWN | CHECKED: REVISIONS: PROJECT: NO.DESCRIPTIONDATE ISSUANCE: PLANNING SUBMITTAL JB/LF AS SHOWN 04/26/2022 21.005 Plant Images L-2.3 RHAPHIOLEPSIS UMBELLATA 'MINOR'RHAMNUS CALIFORNICA PHORMIUM SPP.MUHLENBERGIA RIGENS ROMNEYA COULTERI LOMANDRA LONGIFOLIA LOROPETALUM CHINENSE PITTOSPORUM TOBIRA SALVIA LEUCANTHA WOODWARDIA FIMBRIATA CAREX DIVULSA BACCHARIS PILULARIS 7.A.c Packet Pg. 65 Attachment: Civil and Landscape Plans (3981 : Royal Way Townhomes) DWUP 36 " 0 ,92M ROYAL WAY GILROY HIGH SCHOOLCARNADERO CREEK HYDROZONE 9 & 10 RESIDENTIAL BACKYARDS HYDROZONE 9 & 10 RESIDENTIAL BACKYARDS HYDROZONE 9 & 10 RESIDENTIAL BACKYARDS HYDROZONE 9 & 10 RESIDENTIAL BACKYARDS HYDROZONE 9 & 10 RESIDENTIAL BACKYARDS HYDROZONE 9 & 10 RESIDENTIAL BACKYARDS HYDROZONE 9 & 10 RESIDENTIAL BACKYARDS HYDROZONE 9 & 10 RESIDENTIAL BACKYARDS HYDROZONE 9 & 10 RESIDENTIAL BACKYARDS HYDROZONE 1 & 2 GAZEBO AREA HYDROZONE 1 & 2 GAZEBO AREA HYDROZONE 5 & 6 PLAY AREA HYDROZONE 7 & 8 COMMON AREAS HYDROZONE 7 & 8 COMMON AREAS HYDROZONE 7 & 8 COMMON AREAS HYDROZONE 7 & 8 COMMON AREAS HYDROZONE 7 & 8 COMMON AREAS HYDROZONE 7 & 8 COMMON AREAS HYDROZONE 7 & 8 COMMON AREAS HYDROZONE 7 & 8 COMMON AREAS HYDROZONE 7 & 8 COMMON AREAS HYDROZONE 7 & 8 COMMON AREASHYDROZONE 7 & 8 COMMON AREAS HYDROZONE 7 & 8 COMMON AREAS HYDROZONE 7 & 8 COMMON AREAS HYDROZONE 7 & 8 COMMON AREAS HYDROZONE 7 & 8 COMMON AREAS HYDROZONE 7 & 8 COMMON AREAS HYDROZONE 9 & 10 RESIDENTIAL BACKYARDS IRRIGATION NOTES 1.THE IRRIGATION DESIGN WILL COMPLY WITH THE MODEL WATER EFFICIENT LANDSCAPE ORDINANCE (MWELO) AND LOCAL ORDINANCES 2.THE DESIGN WILL INCLUDE A SEPARATE METERED POINT OF CONNECTION WITH A BACKFLOW DEVICE 3.THE CONTROLLER WILL BE WILL HAVE A MASTER VALVE AND FLOW SENSOR FOR MANAGING FLOW 4.THE CONTROLLER WILL UTILIZE EVAPOTRANSPIRATION DATA FOR MANAGING RUN TIMES 5.THE CONTROLLER WILL UTILIZE EVAPOTRANSPIRATION DATA FOR MANAGING RUN TIMES 6.THE SYSTEM WILL BE DESIGNED TO PREVENT RUNOFF 7.THE SYSTEM WILL BE DESIGNED BY GROUPING PLANTS OF SIMILAR WATER USE TOGETHER INTO HYDROZONES 8.IRRIGATION DISTRIBUTION WILL BE THROUGH HIGH EFFICIENCY/LOW VOLUME SPRAY HEADS, DRIP EMITTERS OR SUBSURFACE DRIP TUBING 9.SELECT AREAS OF NATIVE PLANTS TO BE IRRIGATED WITH TEMPORARY IRRIGATION; IRRIGATION TO BE REMOVED ONCE THOSE PLANTS ARE ESTABLISHED 30 0 30 60 ROYAL WAY TOWNHOMES GILROY, CA HOCHHAUSER BLATTER ARCHITECTURE AND PLANNING SHEET NO: SHEET NAME: PROJECT NO: DATE: SCALE: DRAWN | CHECKED: REVISIONS: PROJECT: NO.DESCRIPTIONDATE ISSUANCE: PLANNING SUBMITTAL JB/LF AS SHOWN 04/26/2022 21.005 F:\PRODUCTION\Projects\2021\21.005\CAD\21005_L-3.0 Irrigation.dwg 4/26/2022Irrigation Plan L-3.0 GEOTECH REPORT: SITE SOILS QUANTUM GEOTECHNICAL INC. - August 13, 2021 7.A.c Packet Pg. 66 Attachment: Civil and Landscape Plans (3981 : Royal Way Townhomes) BUILDING H (2 UNITS) (E) PROPERTY LINE BUILDING A (6 UNITS) BUILDING G (2 UNITS) BUILDING F (3 UNITS) BUILDING L (6 UNITS) BUILDING E (8 UNITS) BUILDING B (4 UNITS) BUILDING D (5 UNITS)(E) PROPERTY LINE (E) PROPERTY LINE (E) PROPERTY LINE (E) PROPERTY LINE (E) RIGHT OF WAY R O Y A L W A Y (PUBLIC)I M P E R I A L D R I V E(PUBLIC)F I L B R O D R I V E(PUBLIC)BUILDING C (4 UNITS) BUILDING K (2 UNITS) BUILDING M (3 UNITS) (E) PROPERTY LINE60.0'RIGHT OF WAY30.0'30.0'10.0'PUE20.0'BUILDINGSETBACKPERTR 6251TO BEREMOVEDROYAL WAY CENTERLINE FILBRO DRIVE CENTERLINE IMPERIAL DRIVE CENTERLINE (E) RIGHT OF WAY TR 6251 BUILDING SETBACK TO BE REMOVED PUE PUE PARCEL 1 3.36 ACRES S89° 14' 46"E 81.16' S88° 00' 41"E 80.03' S 4 6 ° 2 5 ' 5 4 " E 1 1 1 . 6 7 ' S89° 17' 37"E 162.45'S00° 45' 02"W287.75'L = 15.50' R = 20.00' D = 044° 24' 55" L = 15.50' R = 20.00' D = 044° 24' 55" L =106.56'R =50.00' D =122°06'30" L =7 9 .9 1 ' R =5 0 .0 0 ' D =091°3 4 '0 1 " L = 11.86' R = 50.00' D = 013° 35' 21"S34° 30' 33"W34.22'S14° 23' 25"W42.88'S18° 21' 53"E20.80'S18° 21' 53"E121.64'S25° 22 ' 57"E63.23 ' N89° 17' 49"W 117.48' N 5 1 ° 3 0 ' 3 4 " W 72 . 2 0 ' N 4 5 ° 5 3 ' 1 8 "W 5 7 . 2 4 ' N 4 9 ° 3 9 ' 3 8 "W 3 7 . 1 8 ' N 5 1 ° 3 0 ' 3 4 " W 25 . 0 3 ' N70° 0 5 ' 2 6 " W 56.1 3 ' N86° 50' 13"W 57.39' S88° 08' 35"W 60.80' S81° 44' 18"W 82.03' S84° 33' 14"W 46.79' N72° 37' 02"W 18.90' L = 15.12' R = 225.01' D = 003° 51' 01" L = 55.27' R = 225.01' D = 014° 04' 30" N80° 24' 29"W 13.49' N89° 17' 37"W N89° 17' 37"W APPROX TOE LEVEE APPROX LEVEE SETBACK 25'EXIST FLOOD AND DRAINAGE EASEMENT EXIST WATER PIPELINE EASEMENT EXIST TEMPORARY CONSTRUCTION EASEMENT TR 6251 BUILDING SETBACK TO BE REMOVED D R I V E A I S L E (PRIVATE)D R I V E A I S L E(PRIVATE)D R I V E A I S L E(PRIVATE)D R I V E A I S L E(PRIVATE)D R I V E A I S L E(PRIVATE)D R I V E A I S L E(PRIVATE)10.0' PROPOSED WATER ESMT 10.0'PROPOSEDWATERESMT10.0' PROPOSED WATER ESMT 10.0' PROPOS E D WATER ESMT10.0'PROPOSEDWATERESMT30 15 0 SCALE: 1" = 30' 30 60 VESTING TENTATIVE PARCEL MAP NO. 21-04 FOR CONDOMINIUM PURPOSES SHEET 1 OF 1 BENCHMARK: THE BENCHMARK FOR THIS PROJECT BGS PID HS 5172 WITH AN ELEVATION OF 208.83 (NAVD 1988). BASIS OF BEARINGS: THE BASIS OF BEARINGS FOR THIS PROJECT IS N.A.D. 1983 NOR. CAL. SMART NET (JANUARY 2016), CALIFORNIA COORDINATE SYSTEM ZONE 3. ORIGIN OF SURVEY INFORMATION: THE TOPOGRAPHIC INFORMATION SHOWN IN THESE DRAWINGS AND USED TO DESIGN THE INFORMATION SHOWN ON THESE DRAWINGS WAS PERFORMED AND PREPARED BY MID COAST ENGINEERS ON FEBRUARY 8, 2016. SURVEY NOTES UTILITY INFORMATION ELECTRICITY/GAS: PG&E TELEPHONE: VERIZON/AT&T/CHARTER WATER/SEWER:CITY OF GILROY TRASH SERVICE:RECOLOGY SOUTH COUNTY PROJECT INFORMATION ZONING: HIGH DENSITY RESIDENTIAL APNS: 799-044-093, 799-044-094, 799-044-095, 799-044-096, 799-044-097, 799-044-098, 799-044-109, FLOOD ZONE: ZONE X EXISTING USE:VACANT LAND (DEMOLISHED RESIDENTIAL) PROPOSED USE: TOWNHOMES EXISTING PARCELS:7 PROPOSED PARCELS:1 SITE AREA: 3.37 AC (146,707 SQUARE FEET) PROPERTY OWNER: TMP ROYAL WAY, LLC 5671 SANTA TERESA BOULEVARD, SUITE 200 SAN JOSE, CA 95123 408.960.8010 AGENCY:CITY OF GILROY 7351 ROSANNA STREET GILROY, CA 95020 ARCHITECT:HOCHHAUSER BLATTER 122 EAST ARRELLAGA SANTA BARBARA, CA 93101 805.962.2746 CIVIL ENGINEER: CIVIL DESIGN STUDIO, INC. ROBERT WINSLOW, P.E., QSD P.O. BOX 199 CAMBRIA, CA 93428 805.706.0401 GEOTECHNICAL ENGINEER: EARTH SYSTEMS PACIFIC 500 PARK CENTER DRIVE HOLLISTER, CA 95023 831.637.2133 SURVEYOR:MID COAST ENGINEERS 70 PENNY LANE, SUITE A WATSONVILLE, CA 95076 931.724.2580 CIVIL ENGINEERING PLANNING PERMITTING CIVIL DESIGN STUDIO P.O. Box 199 | Cambria | CA 93428 805.706.0401 www.civil-studio.com PROJECT PARTICIPANTS 6TH ST R E E T 10TH S T R E E T MONTEREY ROADHIGHWAY 101LUCH E S S A A V E N U E PROJECT LOCATION VICINITY MAP NOT TO SCALE I, ROBERT WINSLOW, CERTIFY THAT THIS TENTATIVE MAP WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT IT COMPLIES WITH THE CITY OF GILROY SUBDIVISION ORDINANCE AND THE STATE MAP ACT. A SOILS REPORT ON THIS PROPERTY HAS BEEN PREPARED BY, EARTH SYSTEMS PACIFIC, TITLED "GEOTECHNICAL ENGINEERING REPORT, ROYAL WAY DEVELOPMENT, ROYAL WAY, GILROY, CALIFORNIA (EARTH SYSTEMS PACIFIC FILE NO. SH-12015-SB)" AND DATED JUNE 7, 2013. THIS VESTING TENTATIVE MAP IS BASED ON A SURVEY/ALTA PERFORMED BY MID COAST ENGINEERS DATED FEBRUARY 8, 2016, AND REVISED SEPTEMBER 2, 2021. SEE AFOREMENTIONED ALTA SURVEY FOR EXISTING CONDITIONS AND LOT CONFIGURATION. NOTES Z:\Shared\CDS Data\Active Jobs\20-088 Royal Way Apartments\_Project\1_Prelim Docs\20-088 TPM.dwg, June 22, 2022DATE: 6/22/2022 7.A.d Packet Pg. 67 Attachment: Vesting Tentative Map Sheet (3981 : Royal Way Townhomes) 7.A.e Packet Pg. 68 Attachment: Street Name Exhibit (3981 : Royal Way Townhomes) RESOLUTION NO. 2022-__ A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF GILROY RECOMMENDING TO THE CITY COUNCIL APPROVAL OF ZONE CHANGE Z 21-05, AMENDMENT FROM R3 TO R3-PUD TO APPROVE A 45 UNIT TOWNHOME DEVELOPMENT ON 3.37 ACRES AT ROYAL WAY, APN 799-44-93, 94, 95, 96, 97, 98, 101, 109 & 110, GILROY, CA 95020. WHEREAS, on October 4, 2021, Michael Cady, Third Millennium Partners and property owner Paul Sanders, TMP Royal Way, LLC filed an application requesting architectural and site review, tentative map, and planned unit development rezoning to permit a 45 unit townhome project on the subject 3.37 acre vacant in-fill site located on Royal Way and the Uvas Creek Trail; and WHEREAS, on July 9, 2022, the application submittal was accepted as complete; and WHEREAS, the project has been reviewed and determined to qualify for an infill exemption pursuant to the provisions of the California Environmental Quality Act (CEQA); and WHEREAS, pursuant to Gilroy City Code Section 30.26.50 and Section 30.50.50, the Planning Commission and City Council must approve the planned unit development (PUD) rezoning request and a planned development permit prior to development under the PUD overlay; and WHEREAS, the Planning Commission of the City of Gilroy has concurrently reviewed architectural and site plan review application AS 21-17, which serves as the approved PUD development plan, to assure that quality design elements and public amenities are included as required for development within the PUD overlay; and WHEREAS, the Planning Commission of the City of Gilroy has concurrently reviewed the vesting tentative map application TM 21-04, as necessary to subdivide the property into individual townhome lots for sale consistent with the PUD rezoning and development plan approvals; and WHEREAS, on October 6, 2022, the Planning Commission of the City of Gilroy held a duly noticed public hearing on the project, independently considered the environmental determination, considered the Planned Unit Development request (Z 20-06) in accordance with the Gilroy Zoning Ordinance, staff report, and all evidence received including written and oral public testimony; and WHEREAS, the location and custodian of the documents or other materials which constitute the record of proceedings upon which the project approval is based is the Community Development Department, Planning Division; and WHEREAS, the Planning Commission of the City of Gilroy has determined that the project qualifies for an infill exemption under the California Environmental Quality Act, pursuant to section 15332 of the CEQA Guidelines, and no further environmental analysis is required, as follows: 7.A.f Packet Pg. 69 Attachment: Z 21-05 PC Resolution (3981 : Royal Way Townhomes) Resolution No. 2022-__ Page 2 i) The project is consistent with the applicable general plan medium density land use designation, all applicable general plan policies that promote attached medium density development of the site as proposed, and CEQA Guidelines Section 15183 that states the no additional environmental review is for a project consistent with the general plan where there are no particular project-specific significant effects. ii) The project is substantially consistent with the base R3 zoning designation and regulations, with flexibility to the zoning standards that have been considered and approved through the PUD overlay process in order to permit attached townhome development consistent with the General Plan. iii) The proposed development occurs within city limits on a project site of no more than five acres which is substantially surrounded by urban uses. iv) The site has no value as habitat for endangered, rare or threatened species. v) Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality and proposes development anticipated by the General Plan and General Plan EIR. vi) The site can be adequately served by all required utilities and public services which ae available at the street frontage. vii) There are no significant effects peculiar to this site which is a vacant infill site that was previously approved for residential development and has no unique constraints or habitat conditions. WHEREAS, the Planning Commission of the City of Gilroy has determined that the following findings are supported, as necessary pursuant to Chapter 30.26 and Article LII, for establishment of the Planned Unit Development overlay combining district: i) The R3PUD overlay conforms to the applicable Gilroy General Plan in that it promotes attached medium density residential development at 13.35 units per acre, consistent with the Medium Density Residential land use density of 8 to 20 units per acre. ii) The PUD overlay amendment is necessary in order to carry out the applicable general plan goals and policies in that it would provide an attached housing ownership option that complies with applicable multi-family objective design standards, provides a type of development that would integrate well within the existing neighborhood which contains a mixture of multi-family and single family development, and meets the medium density general plan land use density established for the site. iii) The PUD overlay amendment is necessary in order to carry out the general purpose of the Zoning Ordinance in that it would promote development of high quality, medium density, ownership housing options within the City. iv) As required by the overlay combining district, Architectural and Site Review Permit AS 21- 17 has been submitted and considered concurrently as the PUD development plan for this PUD zoning amendment. NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the City of Gilroy hereby recommends to the City Council approval of Z 21-05, amending Assessor Parcel No’s 799-44-93, 94, 95, 96, 97, 98, 101, 109 and 110 from the R3 to the R3-PUD zone district, for the Royal Way Townhomes project, subject to the development as proposed by the concurrent and related 7.A.f Packet Pg. 70 Attachment: Z 21-05 PC Resolution (3981 : Royal Way Townhomes) Resolution No. 2022-__ Page 3 site development plan applications AS 21-17 and TM 21-04, or as otherwise permitted under the R3 base zoning district standards should these related entitlements expire. PASSED AND ADOPTED this 6th day of October by the following roll call vote: AYES: NOES: ABSENT: ATTEST: APPROVED: _________________________________ __________________________________ Sharon Goei, Secretary Manny Bhandal, Chairperson 7.A.f Packet Pg. 71 Attachment: Z 21-05 PC Resolution (3981 : Royal Way Townhomes) 1 RESOLUTION NO. 2022-__ A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF GILROY RECOMMENDING TO THE CITY COUNCIL APPROVAL OF ARCHITECTRUAL AND SITE REVIEW PERMIT AS 21-17 TO APPROVE A 45 UNIT TOWNHOME PLANNED DEVELOPMENT ON 3.37 ACRES AT ROYAL WAY, APN 799-44-93, 94, 95, 96, 97, 98, 101, 109 & 110, GILROY, CA 95020. WHEREAS, on October 4, 2021, Michael Cady, Third Millennium Partners and property owner Paul Sanders, TMP Royal Way, LLC filed an application requesting architectural and site review, tentative map, and planned unit development rezoning to permit a 45 unit townhome project on the subject 3.37 acre vacant in-fill site located on Royal Way and the Uvas Creek Trail; and WHEREAS, on July 9, 2022, the application submittal was accepted as complete; and WHEREAS, the Planning Commission of the City of Gilroy has determined that the project qualifies for an infill exemption under the California Environmental Quality Act, pursuant to section 15332 of the CEQA Guidelines, and no further environmental analysis is required; and WHEREAS, pursuant to Gilroy City Code Section 30.50.40 and Section 30.50.50, the Planning Commission must recommend and City Council must approve a planned development permit prior to development under the PUD overlay, and approve the site and building design for medium density housing; and WHEREAS, the Planning Commission of the City of Gilroy has reviewed the PUD zoning amendment Z 21-05 by separate resolution, to assure that quality design elements and public amenities are included as required for development within the PUD overlay; and WHEREAS, the Planning Commission of the City of Gilroy has concurrently reviewed the vesting tentative map application TM 21-04, as necessary to subdivide the property into individual townhome lots for sale consistent with the PUD rezoning and development plan approvals; and WHEREAS, on October 6, 2022, the Planning Commission of the City of Gilroy held a duly noticed public hearing on the project, independently considered the environmental determination and the zoning and land use entitlements in accordance with the Gilroy Zoning Ordinance, considered the staff report, and all evidence received including written and oral public testimony; and WHEREAS, the location and custodian of the documents or other materials which constitute the record of proceedings upon which the project approval is based is the Community Development Department, Planning Division; and 7.A.g Packet Pg. 72 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) Resolution No. 2022-__ Page 2 NOW, THEREFORE, BE IT FURTHER RESOLVED that the Planning Commission of the City of Gilroy hereby recommends to the City Council ________ , based upon the following findings and subject to the conditions attached hereto as Exhibit A. FINDINGS i.) The findings required under Section 30.50.50 for approval of AS 21-17 PUD development plan are satisfied as follows: a. Conforms to the Gilroy general plan in terms of general location and standards of development in that it proposes attached housing at 13.35 units per net acre which complies with the medium density residential range of 8 to 20 units per net acre, and the housing will integrate with the existing neighborhood which is primarily comprised of two story multi-family and single-family homes. b. Provide the type of development which will fill a specific need of the surrounding area, in that it promotes additional home ownership opportunities within the City as an option to the more predominant single family housing supply. c. Not require urban services beyond those which are currently available at Royal Way to serve the infill development site. d. Provide a harmonious, integrated plan for an attached housing product that will integrate with the neighborhood, implement the desired density, and provide desired amenities, which justifies the few minor exceptions requested for exterior boundary side yard and front yard setbacks to the normal requirements of the R3 zoning district. e. Reflect an economical and efficient pattern of site development by providing a mix of two and 3 bedroom units approximately 1200 to 1300 square feet in size that comply with density, open space, landscaping, parking and height standards and integrate with the neighborhood development pattern. f. Include greater provisions for landscaping and open space than would generally be required in that the project includes private yard areas for each home exceeding the 150 square foot minimum, minimum patio, porch and balcony areas that exceed the 48 square foot area, active and passive recreation areas that significantly exceed the 1200 sf combined total required, and landscaping and maintenance of property on the Gilroy High School would be included to ensure the area would be visible and attractive. g. Utilize creative, aesthetic design principles to create attractive buildings, open space and site design to blend with the character of surrounding areas in that the project includes stepbacks and setbacks from adjacent residences with perimeter walkways to provide for increased privacy and open space between the adjoining units, and attractive buildings that would face the Uvas Creek Trail and Royal Way frontage so that the buildings do not back onto public space. h. Not create traffic congestion, noise, odor, or other adverse effects on surrounding areas, as the project consists of a small infill development in an existing residential neighborhood that would not generate a significant or unusual number of vehicle trips. i. Provide adequate access, parking, landscaping, trash areas and storage, as necessary as these features have been planned for an integrated into the plan in compliance with standards. 7.A.g Packet Pg. 73 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) Resolution No. 2022-__ Page 3 j. Include art as an additional public amenity consistent with the intent of the PUD overlay district as well as the City of Gilroy Multifamily Objective Design Standards. ii.) The findings required under Section 30.50.40 for approval of AS 21-17 site and building design are satisfied as follows: a. The medium density development is in accordance with the general plan land use designation and applicable policies as discussed in finding i) a above. b. The land use is in harmony with the surrounding environment as the size, placement, orientation and design of homes would compatible with the type and scale of existing development in the neighborhood which includes two story single and multifamily development, units face onto public areas and open spaces, the buildings and landscaping details provide detailed architecture and dense landscaping with trees, and the project will promote private home ownership in the area. c. The project has been reviewed to ensure traffic, signs, site development, landscaping, drainage, fire protection and environmental impacts were adequately evaluated by all departments and the project meets or exceeds the standards as discussed in the detailed project staff report. d. Conditions have been included as part of the approval to ensure construction of the project including landscaping, trash areas, lighting, screening design quality will be maintained and remain covered by these findings. PASSED AND ADOPTED this ___ day of ____ by the following roll call vote: AYES: NOES: ABSTAIN: ABSENT: ATTEST: APPROVED: _________________________________ __________________________________ Sharon Goei, Secretary Manny Bhandal, Chairperson 7.A.g Packet Pg. 74 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 1 ATTACHMENT A STANDARD CONDITIONS OF APPROVAL AS 21-17 100. Note: The following abbreviations identify the City department or division responsible for determining compliance with these conditions. The first group listed has responsibility for compliance at plan check, the second confirms compliance with the condition at final inspection, prior to final occupancy or issuance of a certificate of occupancy, or as specified in the condition. If only one group is identified, they have responsibilities from initial review through compliance verification. In the context of these Conditions of Approval, the term “Developer” means permit applicant, property owner, operator, permittee, lessee, and/or tenants using the space(s) for the intended use(s). Developer shall comply with project conditions for the life of the project. RESPONSIBLE DEPARTMENTS/DIVISIONS BL Building Division/Inspectors PK Parks/Landscape Design CA City Attorney PL Planning Division CC Chemical Control Agency PW Public Works/Engineering FP Fire Prevention TR Traffic Division PD Police Department WW Wastewater/Source Control PLANNING CONDITIONS The following GENERAL conditions authorize specific terms of the project ENTITLEMENT(S). 1. APPROVED PROJECT: The approval for AS 21-17 is granted to construct 45 two story townhomes in 11 buildings with associated parking, landscaping, amenities and site improvements located on the 3.37 acres of land at Assessor Parcel No. 799-44-93, 94, 95, 96, 97, 98, 101, 109 & 110,as shown on Project Plans dated 4/26/22 3rd planning submittal for Royal Way Townhomes prepared by Hochhauser Blatter Architecture and Planning, BFS Landscape Architects and Civil Design Studio, and consisting of 49 sheets. Build-out of the project shall conform to the plans, except as otherwise specified in these conditions. Any future adjustment or modification to the plans, including any changes made at time of building permit submittal, shall be considered by the Community Development Director or designee, may require separate discretionary approval, and shall conform to all City, State, and Federal requirements, including subsequent City Code requirements or policies adopted by City Council. 2. PERMIT EXPIRATION: The expiration date of this approval shall be concurrent with the Vesting Tentative Map TM 21-04. If building permits have not been obtained within 12 months after the Final Map is recorded, the approval shall be deemed automatically revoked. Upon application, an extension of time may be 7.A.g Packet Pg. 75 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 2 granted by the Community Development Director or designee. Should Developer intend to request an extension to the permit expiration date, Developer must submit to the Planning Division a written application with applicable fees prior to the expiration date. Only timely requests may be considered pursuant to the City Code. 3. RELATED ENTITLEMENTS: This entitlement represents the approved development plan for Z 21-05, R3-PUD rezoning. Subdivision of the site into individual townhomes may be permitted consistent with approval TM 21-04. 4. COMPLIANCE WITH CONDITIONS: If Developer, owner or tenant fails to comply with any of the conditions of this permit, the Developer, owner or tenant shall be subject to permit revocation or enforcement actions pursuant to the City Code. All costs associated with any such actions shall be the responsibility of Developer, owner or tenant. 5. INDEMNIFICATION: Developer agrees, as a condition of permit approval, at Developer’s own expense, to defend, indemnify, and hold harmless the City of Gilroy (“the City”) and its officers, contractors, consultants, attorneys, employees and agents from any and all claim(s), action(s) or proceeding(s) brought against the City or its officers, contractors, consultants, attorneys, employees, or agents to challenge, attack, set aside, void or annul the approval of this resolution or any condition attached thereto or any proceedings, acts or determinations taken, including actions taken under the California Environmental Quality Act of 1970, as amended, done or made prior to the approval of such resolution that were part of the approval process. 6. WATER LIMITATIONS: Developer shall be advised that the approval is subject to the drought emergencies provisions pursuant to the Gilroy City Code Chapter 27.98. 7. SINGLE-PHASE DEVELOPMENT: Construction of the project shall be done in a single-phase unless a phased construction project schedule is approved by the Community Development Director or designee. The following conditions shall be addressed prior to issuance of any BUILDING PERMIT, GRADING PERMIT or IMPROVEMENT PLAN, whichever is first issued, or as otherwise specified in the condition. 8. CONDITIONS OF APPROVAL: Developer shall include a plan sheet(s) that includes a reproduction of all conditions of approval of this permit, as adopted by the decision-maker. 9. CERTIFICATION OF BUILDING PERMIT PLANS: The project architect shall certify in writing that the architectural design shown in the building permit plans match the plans approved by the Community Development Director or designee/Planning Commission/City Council. Any changes must be clearly noted. The project architect shall also certify that the structural plans are consistent with the architectural plans. In the event of a discrepancy between the structural plans 7.A.g Packet Pg. 76 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 3 and the architectural plans, the architectural plans shall take precedence, and revised structural drawings shall be submitted to the Building Division. 10. COLORS AND MATERIALS: Plans submitted for building permit applications shall include all exterior building materials and colors, including product and finish manufacturer name, color name and number, and surface finish type (e.g. stucco with sand finish, plaster with smooth finish) to be used in construction. 11. SUBSEQUENT ENTITLEMENTS: Developer shall obtain necessary permits prior to initiating any new construction or modifications authorized under this approval, including but not limited to temporary construction trailers, temporary staging areas, model home sales offices, advertising signs of any kind, exterior and interior modifications. Developer shall pay all requisite fees in effect at the time of plan submittal and/or issuance, as applicable. 12. OTHER REVIEW AGENCIES: This project requires review and approval by outside agencies including, but not limited to [REVIEWING AGENCIES]. Proof of approval from these agencies may be required prior to building permit issuance, inspections, or prior to Certificate of Occupancy. 13. HABITAT PERMIT: Concurrent with or prior to an application for a grading permit, Developer shall obtain a Habitat Permit HP 21-13 and pay all applicable mitigation fees. (See Santa Clara Valley Habitat Agency website: https://www.scv- habitatagency.org/). The grading permit will be issued only after approval of the Habitat Plan permit and payment of assessed fees. 14. WINDOWS: The manufacturer type, design, material, and installation details for all windows within the project shall be specified in the construction drawings for review and approval by the Community Development Director or designee. 15. GARAGE DOORS: Developer shall provide automatic garage door openers for all garages. All garage entries closer than 23 feet to the front property line shall be equipped with a sectional roll-up garage door. 16. FENCES AND WALLS: All fencing and walls are to be shown on construction drawings submitted for building permit, consistent with the details shown on sheet A 4.5. 17. BICYCLE RACKS OR STORAGE: Developer shall provide “inverted U,” or equivalent short term bicycle racks as shown on detail 2 sheet A 4.5. Racks on bicycle pads shall be located along public walkways near each building as shown on sheet A1.1. 18. REFUSE STORAGE: Developer shall provide a level pad adjacent to the street for each unit to place receptacles for trash service pickup service, and storage space shall be maintained in the garage for placement of the bins during the rest of the week (as shown on approved plans). 7.A.g Packet Pg. 77 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 4 19. SCREENING OF APPERTUNANCES: Developer shall show on construction drawings details of screening for all exterior equipment, including but not limited to mechanical equipment, post indicator valves, backflow prevention devices, utility meters, mailboxes and address directories, etc. Ground mounted utility appurtenances such as transformers shall not be visible from any public right-of- way and shall be adequately screened through the use or combination of concrete or masonry walls, berms, and landscaping. In addition to the above, backflow preventers shall be painted dark green, except the fire connection which shall be painted yellow. The final placement and design of these items shall be to the satisfaction of the Community Development Director or designee. 20. ROOFTOP EQUIPMENT: Developer shall ensure rooftop mechanical equipment, including but not limited to heating and cooling systems, plumbing vents, ducts, antennas and other appurtenances protruding from the roof are recessed or otherwise screened. Details of the roof equipment and roof screens shall be included in the building permit drawings and approved by the Community Development Director or designee. 21. RAIN GUTTERS AND DOWNSPOUTS: Developer shall install all roof and building rain gutters and downspouts, vents, and flashing to integrate as closely as possible with building design elements, including matching the color of the adjacent surface. 22. ADDRESS DIRECTORIES: Address directories shall be placed in decorative cabinets and clustered for efficient access by residents and service persons, etc. 23. PLAY STRUCTURE: Provisions for a children’s play yard, including appropriate equipment, shall be included on the landscape plans to be approved by the Community Development Director or designee, and installed prior to any occupancy. The provisions of such facilities and their location must be included in sales information to prospective buyers. 24. LIGHTING PLAN: Developer shall submit a lighting plan with the application for building permit. This plan should include photometric contours, manufacturer’s specifications on the fixtures, and mounting heights. Parking lot and exterior light fixtures shall be full cutoff type so that lighting is directed downward only, minimizing glare and light pollution, and shall not cast light on any adjacent property or roadway. Developer shall recess or conceal any under-canopy lighting elements so they are not directly visible from any public area. The lighting plan must be approved by the Community Development Director or designee. 25. LANDSCAPE AND LIGHTING PLAN: A combined landscape and lighting plan shall be included to verify all project onsite lighting shall be of a type and in a location that does not constitute a hazard to vehicular traffic, either on private property or on public property, including streets. Such lighting shall not conflict with 7.A.g Packet Pg. 78 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 5 drainage plans, landscape plans, tree locations, parking spaces, or any other such land use concerns. 26. LANDSCAPING: Prior to building permit issuance, proposed landscaping shall be shown on the site plan and submitted with the construction drawings for review and approval by the Community Development Director or designee, which substantially comply with approved plans except as conditioned herein. 27. LANDSCAPE MULCH: As part of the Landscape Plan submittal, Developer shall clarify a minimum three (3) inch layer of mulch to be applied on all exposed soil surfaces, as required by the State Model Water Efficient Landscape Ordinance (MWELO). 28. INVASIVE PLANT SPECIES: Developer shall not include any invasive plant species, such as those listed by the California Invasive Plant Council. 29. LANDSCAPE DOCUMENTATION PACKAGE: Prior to issuance of building permits or initiation of the proposed use, whichever comes first, Developer shall submit a completed Landscape Documentation Package, including a soil analysis/management report along with appropriate application review fees, to the Community Development Department, including required documentation for compliance verification, and obtain approval of such plans. 30. IRRIGATION SENSORS: Prior to issuance of building permits, developer shall (as part of the irrigation system) indicate on construction drawings sensors that suspend or alter irrigation operation during unfavorable weather conditions (e.g. automatic rain shut-off devices). 31. TREE SPECIES: Olive tree species shall be replaced with a less invasive tree, to avoid seedlings entering the creek channel. 32. TREE LOCATIONS: Trees shall be removed from the Valley Water pipeline easement. This potentially impacts three trees located behind Building D and the recreation lot. 33. PLANNED UNIT DEVELOPMENT AMENITIES: In compliance with the Planned Unit Development Combining District (City Code 30.26), the Developer is required to provide a higher standard of amenities than a standard development. The Developer has proposed to landscape unused property on the adjacent high school site, provide increased active and passive recreation and open space areas in the complex, and a location for public art near the community gazebo. Final details of the amenities must be reviewed and approved during building permit review and completed prior to occupancy of the first unit. 34. PUBLIC ART: Prior to issuance of building permits, submit a process, timetable, and evidence of commitment acceptable to the City to ensure installation of a suitable, significant piece of public-oriented sculpture or similar public art installation prior to occupancy. This shall include involving the Community 7.A.g Packet Pg. 79 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 6 Development Director or designee in reviewing preliminary concepts, artist, and type of work. All public art must be reviewed and approved by the City of Gilroy Arts and Culture Commission. The following conditions shall be met prior to RELEASE OF UTILITIES, FINAL INSPECTION, or ISSUANCE OF A CERTIFICATE OF OCCUPANCY, whichever occurs first, or as otherwise specified in the condition. 35. ON- AND OFF-SITE IMPROVEMENTS: Prior to occupancy, Developer shall complete all required offsite and onsite improvements related to the project, including structures, paving, and landscaping, unless otherwise allowed by the Community Development Director, or stated in these conditions. 36. LANDSCAPE AND IRRIGATION INSTALLATION: Prior to issuance of certificate of occupancy or building permit final sign-off, Developer shall complete installation of all landscaping and irrigation in accordance with the approved plans. 37. LANDSCAPE CERTIFICATE OF COMPLETION: Prior to occupancy or initiation of the proposed use, or completion of each build-out phase of development, Developer shall submit a signed Certificate of Completion, along with all necessary supporting documentation and payment to the Community Development Department, for compliance verification of the landscape installation. Developer is required under the Model Water Efficient Landscape Ordinance (MWELO) to provide a copy of the approved Certificate of Completion to the property owner or his or her designee. 38. PLANNING INSPECTION: Inspection(s) by the Planning Division may be required for the foundation, framing, application of exterior materials, and final completion of each structure to ensure that the construction matches the approved plans. 39. SITE CLEAN-UP: Prior to issuance of a certificate of occupancy, Developer shall remove all construction materials, debris, and vehicles from the subject property. The following conditions shall be complied with AT ALL TIMES DURING THE CONSTRUCTION PHASE OF THE PROJECT, or as otherwise specified in the condition. 40. CONSTRUCTION RELATED NOISE: To minimize potential construction-related impacts to noise, Developer shall include the following language on any grading, site work, and construction plans issued for the subject site “During earth-moving, grading, and construction activities, Developer shall implement the following measures at the construction site: a. Limit construction activity to weekdays between 7:00 a.m. and 7:00 p.m., and on Saturdays between 9:00 a.m. and 7:00 p.m. Construction noise is prohibited on Sundays and City-observed holidays; b. Locate stationary noise-generating equipment as far as possible from 7.A.g Packet Pg. 80 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 7 sensitive receptors when sensitive receptors adjoin or are near a construction project area; c. Construct sound walls or other noise reduction measures prior to developing the project site; d. Equip all internal combustion engine driven equipment with intake and exhaust mufflers that are in good condition and appropriate for the equipment; e. Prohibit all unnecessary idling of internal combustion engines; f. Utilize “quiet” models of air compressors and other stationary noise sources where technology exists; and g. Designate a “disturbance coordinator’ who would be responsible for responding to any complaints about construction noise. The disturbance coordinator will determine the cause of the noise complaint (e.g. bad muffler, etc.) and will require that reasonable measures be implemented to correct the problem.” 41. CONSTRUCTION RELATED AIR QUALITY: To minimize potential construction- related impacts to air quality, Developer shall require all construction contractors to implement the basic construction mitigation measures recommended by the Bay Area Air Quality Management District (BAAQMD) and shall include the following language on any grading, site work, and construction plans issued for the project site “During earth-moving, grading, and construction activities, Developer shall implement the following basic control measures at the construction site: a. All exposed surfaces (e.g. parking areas, staging areas, soil piles, graded areas, and unpaved access roads) shall be watered two times per day; b. All haul trucks transporting soil, sand, or other loose material onsite or offsite shall be covered; c. All visible mud or dirt tracked out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited; d. All vehicle speeds on unpaved roads or pathways shall be limited to 15 miles per hour; e. All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used; f. Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Code of Regulations [CCR]). Clear signage shall be provided for construction workers at all access points; g. All construction equipment shall be maintained and properly tuned in accordance with manufacturer’s specifications. All equipment shall be checked by a certified visible emissions evaluator; and h. Post a publicly visible sign with the telephone number and person to contact at the lead agency regarding dust complaints. This person shall respond and 7.A.g Packet Pg. 81 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 8 take corrective action within 48 hours. The Air District’s phone number shall also be visible to ensure compliance with applicable regulations.” 42. DISCOVERY OF CONTAMINATED SOILS: If contaminated soils are discovered, the Developer will ensure the contractor employs engineering controls and Best Management Practices (BMPs) to minimize human exposure to potential contaminants. Engineering controls and construction BMPs will include, but not be limited to, the following: a. Contractor employees working on-site will be certified in OSHA’s 40-hour Hazardous Waste Operations and Emergency Response (HAZWOPER) training; b. Contractor will stockpile soil during development activities to allow for proper characterization and evaluation of disposal options; c. Contractor will monitor area around construction site for fugitive vapor emissions with appropriate filed screening instrumentation; d. Contractor will water/mist soil as it is being excavated and loaded onto transportation trucks; e. Contractor will place any stockpiled soil in areas shielded from prevailing winds; and f. Contractor will cover the bottom of excavated areas with sheeting when work is not being performed. 43. DISCOVERY OF PALEONTOLOGICAL RESOURCES: In the event that a fossil is discovered during construction of the project, excavations within 50’ of the find shall be temporarily halted or delayed until the discovery is examined by a qualified paleontologist, in accordance with the Society of Vertebrate Paleontology standards. The City shall include a standard inadvertent discovery clause in every construction contract to inform contractors of this requirement. If the find is determined to be significant and if avoidance is not feasible, the paleontologist shall design and carry out a data recovery plan consistent with the Society of Vertebrate Paleontology standards. 44. DISCOVERY OF ARCHAEOLOGICAL RESOURCES: In the event of an accidental discovery of archaeological resources during grading or construction activities, Developer shall include the following language on any grading, site work, and construction plans issued for the project site: “If archaeological or cultural resources are discovered during earth-moving, grading, or construction activities, all work shall be halted within at least 50 meters (165 feet) of the find and the area shall be staked off immediately. The monitoring professional archaeologist, if one is onsite, shall be notified and evaluate the find. If a monitoring professional archaeologist is not onsite, the City shall be notified immediately and a qualified professional archaeologist shall be retained (at Developer’s expense) to evaluate the find and report to the City. If the find is determined to be significant, appropriate mitigation measures shall be formulated by the professional archaeologist and implemented by the responsible party.” 7.A.g Packet Pg. 82 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 9 45. DISCOVERY OF HUMAN REMAINS: In the event of an accidental discovery or recognition of any human remains, Developer shall include the following language in all grading, site work, and construction plans: “If human remains are found during earth-moving, grading, or construction activities, there shall be no further excavation or disturbance of the site or any nearby area reasonably suspected to overlie adjacent human remains until the coroner of Santa Clara County is contacted to determine that no investigation of the cause of death is required. If the coroner determines the remains to be Native American the coroner shall contact the Native American Heritage Commission within 24 hours. The Native American Heritage Commission shall identify the person or persons it believes to be the most likely descendent (MLD) from the deceased Native American. The MLD may then make recommendations to the landowner or the person responsible for the excavation work, for means of treating or disposing of, with appropriate dignity, the human remains and associated grave goods as provided in Public Resources Code Section 5097.98. The landowner or his authorized representative shall rebury the Native American human remains and associated grave goods with appropriate dignity on the property in a location not subject to further disturbance if: a) the Native American Heritage Commission is unable to identify a MLD or the MLD failed to make a recommendation within 24 hours after being notified by the commission; b) the descendent identified fails to make a recommendation; or c) the landowner or his authorized representative rejects the recommendation of the descendent, and the mediation by the Native American Heritage Commission fails to provide measures acceptable to the landowner.” The following conditions shall be complied with AT ALL TIMES that the use permitted by this entitlement occupies the premises. 46. ADDITIONS, ACCESSORY BUILDINGS, AND PATIO COVERS: Building additions and patio covers shall conform to the zoning district or PUD approval, as applicable. 47. GARAGE USE: Garage spaces shall be maintained for resident parking. Storage is permitted in designated areas on the plan, and shall not prevent use of garage for required vehicle parking. 48. LANDSCAPE MAINTENANCE: For the life of the project, Developer shall maintain landscaping and irrigation in accordance with the approved plans, except as otherwise permitted or required by law. Significant changes to the number, placement, and selection of plant species may require a modification to this approval, to be determined by the Community Development Director or designee. PUBLIC WORKS CONDITIONS OF APPROVAL 7.A.g Packet Pg. 83 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 10 The following conditions authorize the specific terms and are a part of the project ENTITLEMENT(S); and which shall be addressed on the construction plans submitted for any BUILDING PERMIT, GRADING PERMIT or SUPERSTRUCTURE, and shall be satisfied prior to issuance of whichever permit is issued first, or if another deadline is specified in a condition, at that time. 49. PAYMENT OF PUBLIC WORKS PLAN CHECK AND INSPECTION FEE: At the time of first improvement plan submittal, the applicant shall submit a $20,000.00 (Twenty thousand dollar) initial deposit for project plan check and construction inspection. This deposit will be credited/accounted toward final plan check and inspection fee for the project. In addition, the applicant shall submit a detailed project cost estimate prepared by the project engineer, to approval of the City Engineer, with the initial project plan submittal. The cost estimate shall be broken out into on-site and off-site improvements. Prior to plan approval, the applicant shall pay 100% of the plan check and inspection fee based on the approved project cost estimate. Public Works will not sign-off on the issuance of the project building permit without full payment of this plan check and inspection fee. (PUBLIC WORKS). 50. PLAN SUBMITTAL: The Site Improvements engineering project plans shall be submitted to Public Works, Land Development Section, in full, per the Public Works Engineering Submittal Checklist available on the City’s website under Land Development or by contacting the Public Works Engineering Project Manager assigned to this project. Improvement plans are required for both on-site and off- site improvements, and the improvement plan set cover sheet shall include an index referencing on-site and off-site improvements. All improvements shall be designed and constructed in accordance with the City of Gilroy Municipal Code and Standard Specifications and Details and are subject to all laws of the City of Gilroy by reference. The improvement plans shall include all civil project plans including, but not limited to, site plans, grading plans, utility plans, joint trench, off-site plans, lighting (photometric) plans, and landscaping plans. The plans shall clearly identify both public and private utilities. The improvement plans shall be submitted per the Public Works Engineering Submittal Checklist provided by the City, and available on the City website. In addition: a. Plans and all required documents (per the Public Works Land Development Submittal Checklist) shall be made by appointment only by contacting the Public Works Project Manager assigned to this project. A complete set of improvement plans shall consist of Civil site design, landscape site design, Electrical, Joint Trench. Any walls or structural features part of the landscape design shall also be included; b. Improvement plans are required for both on-site and off-site improvements. A separate plan set for each shall be prepared, or at the approval of the City Engineer, onsite and offsite sheets can be combined into one plan set; c. The improvement plan submittal, including utility sheets, shall show appropriate line types and labels to identify different type of utilities and pipe 7.A.g Packet Pg. 84 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 11 sizes. Utility boxes, hydrants, backflow preventers, etc. shall be relocated/installed behind the back of sidewalk; d. Improvement plans (as second sheet in plan set) shall contain Approved Conditions of Approval; e. Improvement plans shall include General Notes found in the City of Gilroy General Guidelines; f. Improvement plans shall be completed per the Public Works Engineering submittal checklist, which can be found in the City’s website. At first submittal, a completed checklist shall be included in the submittal package and shall show which items have been included. g. The improvement plan cover sheet shall include a table summarizing all facilities (Streets, Utilities, Parks, Landscaping, etc.), showing the ownership of all facilities, access rights to, and the maintenance responsibilities of all facilities; h. Improvement and grading plans shall show existing topo and features at least 50’ beyond the project boundary. The plan shall clearly show existing topo, label contour elevations, drainage patterns, flow lines, slopes, and all other property encumbrances; i. If the project has excess fill or cut that will be off-hauled to a site or on- hauled from a site within the city limits of Gilroy, an additional Haul Permit is required. A statement indicating the need to obtain a Haul Permit must be added as a general note to the Grading and Drainage Plan; j. All grading and improvement plans shall identify the vertical elevation datum, date of survey, and surveyor; k. A Title Report shall be submitted with first submittal improvement plans. An existing site plan shall be submitted showing all existing site conditions and title report easements. The plan shall include bearing and distance information for all right-of-way and easements; l. The plan shall show any proposed easements to be dedicated for any needed purpose, or any easement expected to be abandoned through separate instrument. This includes PUE, PSE, EVAE, Cross-Property Access Easement, Landscape Easement, Drainage Easement, Pole Line Easement, etc.; m. To ensure the plans are coordinated and there are no conflicts between disciplines, the applicant shall provide a “composite exhibit” showing Civil, Landscape, Electrical, and Joint Trench design information (as a separate sheet titled “Composite Plan”) to confirm that there are no conflicts. This sheet recommended to be provided by the Civil Engineer. n. All Solid Waste Vehicle circulation movements shall be modeled and shown on a separate plan sheet. The circulation plan shall be prepared to the City Engineer’s satisfaction, and modeled using AutoTurn swept analysis software, and shall include all turning and street circulation movements; o. All Emergency Vehicle circulation movements shall be modeled and shown on a separate plan sheet. The circulation plan shall be prepared to the City Engineer’s satisfaction, and modeled using AutoTurn swept analysis software, and shall include all turning and street circulation movements; 7.A.g Packet Pg. 85 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 12 p. All utility boxes exposed to or near to (and necessarily exposed to) traffic or in a driveway, including sanitary sewer and/or water meter boxes, shall have traffic-rated boxes and lids; q. All on-site recycled water system improvements, including appurtenances, shall be located within a PSE. (PUBLIC WORKS) 51. UTILITY PLANS: A utility plan shall be provided and included as part of the site improvements package as specified within these conditions of approval. To ensure coordination between the applicant and the relevant utility company: a. The applicant shall provide joint trench composite plans for the underground electrical, gas, telephone, cable television, and communication conduits and cables including the size, location and details of all trenches, locations of building utility service stubs and meters and placements or arrangements of junction structures as a part of the Improvement Plan submittals for the project. Show preferred and alternative locations for all utility vaults and boxes if project has not obtained PG&E approval. A licensed Civil or Electrical Engineer shall sign the composite drawings and/or utility improvement plans. (All dry utilities shall be placed underground). b. The applicant shall negotiate any necessary right-of-way or easement with PG&E, or any other utilities, subject to the review and approval by the Engineering Division and the utility companies. c. A “Will Serve Letter” shall be provided for each utility company expected to service the subdivision. Early coordination with the utility companies is necessary to obtain this letter. Coordination of City utilities shall be through the Engineering Division. d. A note shall be placed on the joint trench composite plans which states that the plan agrees with City Codes and Standards and that no underground utility conflict exists. (PUBLIC WORKS) 52. UTILITY RESPONSIBILITIES: Storm and sewer utilities in private areas shall be privately owned and privately maintained. The water system in Gilroy is owned and maintained by the City. Conversely, public utilities within utility easements on private property remain the responsibility of the individual utility companies to maintain. The plans shall note the inspection, ownership and maintenance responsibility for each utility shown on the plans within a Table of Responsibilities on the project cover sheet of the improvement plans submitted with the initial plan submittal. The table shall include the list of streets, the responsible party for inspection of the improvements, who is responsible for the ownership of the utility, and who is responsible for the maintenance of the utility. An example of this table, including the types of utilities to be listed, can be provided by the Engineering Division upon request. (PUBLIC WORKS) 53. PREPARATION OF ELECTRICAL PLANS: The project electrical plans shall be prepared by a registered professional engineer experienced in preparing these types of plans. The applicant shall submit, with the improvement plans submitted with the initial plan submittal, a letter from the design Electrical or Civil Engineer that states the electrical plan conform to City Codes and Standards, and to the approved improvement plans. The letter shall be signed and stamped by the professional engineer that prepares the improvement plans. (PUBLIC WORKS) 7.A.g Packet Pg. 86 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 13 54. EXISTING FACILITIES PROTECTION: All existing public utilities shall be protected in place and if necessary, relocated as approved by the City Engineer. No permanent structure is permitted within City easements without the approval of the City of Gilroy. (PUBLIC WORKS) 55. WATER QUALITY: Project design shall comply with the Stormwater Management Guidance Manual for Low Impact Development & Post-Construction Requirements. The applicant shall submit the Source Control Checklist as well as the appropriate Performance Requirements Checklist found in Appendix A of the manual at the time of the initial submittal to Public Works, Land Development Section. The manual can be found at the following site: www.cityofgilroy.org/261/Storm-Water- Management (PUBLIC WORKS) 56. DEVELOPER STORM WATER QUALITY RESPONSIBILITY: The developer is responsible for ensuring that all contractors are aware of all storm water quality measures and implement such measures. Failure to comply with the approved construction BMPs will result in the issuance of correction notices, citations, or a project stop order. (PUBLIC WORKS) 57. BEST MANAGEMENT PRACTICES (BMP): The applicant shall perform all construction activities in accordance with Gilroy Municipal Code Section 27C, Municipal Storm Water Quality Protection and Discharge Controls, and Section E.10, Construction Site Storm Water Run-Off Control Program of the Regional NPDES Permit. Detailed information can be located at: www.flowstobay.org/documents/business/construction/SWPPP.pdf. This sheet shall be printed and included in all building construction plan sets permitted for construction in the City of Gilroy. (PUBLIC WORKS) 58. FIRE DEPARTMENT HYDRANT FLOW TEST: The applicant shall perform a Fire Hydrant flow test to confirm the water system will adequately serve the development and will modify any part of the systems that does not perform to the standards established by the City. Applicant shall coordinate with Fire Department for the Fire Hydrant flow test. The flow test results shall be submitted with the initial plan submittal. (PUBLIC WORKS) 59. WATER CONSERVATION: The project shall fully comply with the measures required by the City’s Water Supply Shortage Regulations Ordinance (Gilroy City Code, Chapter 27, Article VI), and subsequent amendments to meet the requirements imposed by the State of California’s Water Board. This ordinance established permanent voluntary water saving measures and temporary conservation standards. This project shall apply for a recycled water use permit, by sending a request to Saeid Vaziry, Senior Civil Engineer, Saied.Vaziry@cityofgilroy.org, 408-846-0492. Project information to be provided includes, but not limited to: Site plan, proposed connection point in the rec water system, volume of water need, duration (what months), time of days. (PUBLIC WORKS) 60. PROJECT STUDIES: The applicant shall submit, for City approval, any applicable water, sewer, storm drain or traffic studies for the development deemed appropriate by the City 7.A.g Packet Pg. 87 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 14 Engineer. These studies shall provide the supporting hydraulic calculation for pipe sizing per the City Standard Design Guidelines. The study shall be reviewed and approved by Engineering. If the results of the study indicate that this development contributes to the over-capacity of the trunk line, the applicant will be required to mitigate the impact by removing and replacing or upsizing of the existing utilities to accommodate the appropriate level of project flows to the approval of the City Engineer. The improvements shall be addressed on the construction drawings, to the approval of the City Engineer, prior to the issuance of the first building permit. (PUBLIC WORKS) 61. IMPACT FEES: The project is subject to the City’s Street Tree, Storm, Sewer, Water, Traffic, and Public Facilities Development Impact Fees. The City’s latest impact fee schedule is available on the City’s website. Payment of all Impact Fees is required at first building permit issuance. Fees shall be based on the current fee schedule in effect at the time of fee payment, consistent with and in accordance with City policy. Note that impact fees increase at the beginning of each fiscal year, July 1. Specific fee language is provided further in these conditions of approval. (PUBLIC WORKS) 62. STORMWATER MANAGEMENT PLAN: At first improvement plan submittal, the applicant shall submit a Storm Water Management Plan (SWMP) prepared by a registered Civil Engineer. The SWMP shall analyze the existing and ultimate conditions and facilities, and the study shall include all off-site tributary areas. Study and the design shall be in compliance with the City’s Stormwater Management Guidance Manual (latest edition). Existing off-site drainage patterns, i.e., tributary areas, drainage amount, and velocity shall not be altered by the development. The plan shall be to the approval of the City Engineer and shall be approved prior to the issuance of the building permit. (PUBLIC WORKS) 63. STORMWATER CONTROL PLAN: At first improvement plan submittal, the applicant shall submit a design level Stormwater Control Plan Report (in 8 ½ x 11 report format), to include background, summary, and explanation of all aspects of stormwater management. The report shall also include exhibits, tables, calculations, and all technical information supporting facts, including but not limited to, exhibit of the proposed site conditions, which clearly delineates impervious and pervious areas on site. The plan shall provide a separate hatch or shading for landscaping/pervious areas on-site including those areas that are not bio-retention areas. This stormwater control plan report format does not replace or is not in-lieu of any stormwater control plan sheet in the improvement plans. The stormwater control plan shall include a signed Performance Requirement Certifications specified in the Stormwater Guidance Manual. At applicant’s sole expense, the stormwater control plan shall be submitted for review by an independent third party accepted by the City for compliance. Result of the peer review shall be submittal and approved by the City Engineer prior to the issuance of the first building permit. (PUBLIC WORKS) 64. REPAIR OF PUBLIC IMPROVEMENTS: The applicant shall repair or replace all existing improvements not designated for removal, and all new improvements that are damaged during construction or removed because of the applicant’s operations. The applicant shall request a walk-through with the Engineering Construction Inspector before the start of construction to verify existing conditions. 7.A.g Packet Pg. 88 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 15 Said repairs shall be completed prior to the first occupancy of the project. (PUBLIC WORKS) 65. TRIANGULAR AREA OF VISIBILITY : Landscaping and permanent structures located within the 10' triangular area of visibility at the driveway, and 45’ triangular area of visibility at any project corner, shall have a minimum vertical clearance of 9’, and/or be less than 2’ in height. This includes all PG&E above ground structures and other utility facilities. The sight triangle shall be shown on the site civil plans, to the approval of the City Engineer, to demonstrate this condition. (PUBLIC WORKS) 66. DRIVEWAY DESIGN: Driveway grades shall be designed to keep a standard design vehicle from dragging or “bottoming out” on the street or driveway, and to keep water collected in the street from flowing onto the lots. The details of such design shall be provided on the site civil plans to the satisfaction of the City All new driveways servicing multiple units shall be design as to not affect or impact any street or public right of way. This includes, but not limited to the use, operation, queuing, maneuver, or delay of passenger vehicles, emergency vehicles, pedestrian use. Engineer. (PUBLIC WORKS) 67. GRADING & DRAINAGE: All grading activity shall address National Pollutant Discharge Elimination System (NPDES) concerns. There shall be no earthwork disturbance or grading activities between October 15th and April 15th unless otherwise approved by the City Engineer. If approved, the applicant shall submit a Winterization Erosion Control Plan to the City Engineer for review and approval. This plan shall incorporate erosion control devices and other techniques in accordance with Gilroy Municipal Code § 27C to minimize erosion. Specific measures to control sediment runoff, construction pollution and other potential construction contamination sediment runoff, construction pollution and other potential construction contamination shall be addressed through the Erosion Control Plan and Storm Water Pollution Prevention Plan (SWPPP). The SWPPP shall supplement the Erosion Control Plan and project improvement plans. These documents shall also be kept on-site while the project is under construction. A Notice of Intent (NOI) shall be filed with the State Water Resources Control Board, with a copy provided to the Engineering Division before a grading permit will be issued. A project WDID# shall be added to the grading plans prior to plan approval. (PUBLIC WORKS) 68. GEOTECHNICAL ENGINEER: Prior to improvement plan approval, the applicant’s Geotechnical Engineer shall review the final grading, pavement design and drainage plans to ensure that said designs are in accordance with the recommendations or the project geotechnical study, and the peer review comments. The applicant’s Geotechnical Engineer’s approval shall then be conveyed to the City either by letter, or by signing the plans. 7.A.g Packet Pg. 89 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 16 All grading operations and soil compaction activities shall be per the approved project’s design level geotechnical report. All grading activities shall be conducted under the observation of, and tested by, a licensed geotechnical engineer. A report shall be filed with the City of Gilroy for each phase of construction, stating that all grading activities were performed in conformance with the requirements of the project’s geotechnical report. The applicant shall add this condition to the general notes on the grading plan. Certification of grades and compaction are required prior to Building Permit final. This statement must be added as a general note to the Grading and Drainage Plan. (PUBLIC WORKS) 69. TREE REMOVAL PERMIT: The applicant shall obtain a Tree Removal Permit from the Engineering Division for removal of existing trees in the public right-of-way, prior to the issuance of a building permit or demolition building permit, whichever is issued first. (PUBLIC WORKS) 70. ENCROACHMENT PERMITS, BONDS, AND INSURANCE: The applicant must obtain an encroachment permit, posting the required bonds and insurance, and provide a one (1) year warranty for all work to be done in the City's right-of-way or City easement. This encroachment permit shall be obtained prior to the issuance of a foundation building permit and prior to any work being done in the City's right-of-way. All existing public utilities shall be protected in place and if necessary, relocated as approved by the City Engineer. No permanent structures are permitted within the City right-of-way, or within any City easement unless otherwise approved by the City Engineer. The applicant shall have street improvement plans prepared for all work in the public right-of-way by a licensed civil engineer, whose signed engineer’s stamp shall appear on the plans. Prior to issuance of the encroachment permit, the applicant shall submit any applicable pedestrian or traffic control plans for any lane or sidewalk closures. The traffic control plan shall comply with the State of California Manual of Uniform Traffic Control Devices (MUTCD), and standard construction practices. [(For major street improvements) Construction plans for improvements in the right-of-way shall be submitted to the City Engineer at 30%, 60%, and 90% design for review. All design assumptions and criteria shall be submitted with each phase of design submittal. Project specifications shall be included for review with the 90% design review.] Final construction plans and specifications shall be approved by the City Engineer, and released for construction, prior to the issuance of the encroachment permit. The applicant is required to confirm the location of existing utility lines along the project frontage by topographic surveys or by potholing if survey data is not able to provide accurate data on critical conforms or points of connection. Prior to any potholing, applicant shall submit a pothole plan for City review and approval. Applicant shall provide the pothole result to the City Engineer prior to final design. Right-of-way improvements shall include, at a minimum, the following items: (PUBLIC WORKS) a. STREET MARKINGS: The applicant shall install necessary street markings of a material and design approved by the City Engineer and replace any that 7.A.g Packet Pg. 90 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 17 are damaged during construction. These include but are not limited to all pavement markings, painted curbs, and handicap markings. All permanent pavement markings shall be thermoplastic and comply with Caltrans Standards. Color and location of painted curbs shall be shown on the plans and are subject to approval by the City Engineer. Any existing painted curb or pavement markings no longer required shall be removed by grinding if thermoplastic, or sand blasting if in paint. b. SIDEWALK: The applicant shall remove and replace all sidewalk surrounding the project site to City standards. Sidewalk replacement shall be constructed per the City Standard Drawings. c. CURB AND GUTTER: The applicant shall replace any damaged and non- City Standard curb and gutter surrounding the project site. The actual amount of curb and gutter to be replaced shall be determined by the Public Works Construction Inspector in the field prior to construction. New curb and gutter shall be constructed per the City Standard Drawing STR-12. d. DRIVEWAY APPROACHES: The applicant shall install City Standard Residential driveway approaches as shown on the approved plans. The new residential driveway approach shall be constructed per the City Standard Drawing. e. SEWER LATERAL: i. The applicant shall install as a minimum a six (6) inch City Standard sewer lateral connection from the property line to the sewer main located in the street right-of-way. The installation shall be done in accordance with the City Standard Drawing SWR-6 including a 6" property line clean-out. f. SEWER CLEAN-OUT: The applicant shall install a sewer lateral clean-out at the property line in accordance with the City Standard Drawing SWR-6. g. SEWER MAIN: New sewer line shall be PVC, SDR 26 or equal. Applicant is required to submit plans and drawings for approval prior to submitting the first building permit. Construction of the new mainline shall be completed prior to issuance of the certificate of occupancy. h. SANITARY SEWER MANHOLES: The applicant shall install standard sanitary sewer manholes, per approved plans and in accordance with the City Standard Drawing. i. STORM WATER CATCH BASIN(S): The applicant shall install standard storm water catch basins, in accordance with the City Standard Drawings. j. STREET TREES: The applicant shall install street trees along the project frontage in accordance with the City Standards. 7.A.g Packet Pg. 91 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 18 k. STREET LIGHT(S): i. The applicant shall provide and install standard aluminum electrolier street light(s) per City Standard Drawing EL-1 to EL-5. The applicant is responsible for all PG&E service fees and hook-up charges. Any new service point connection required to power the new lights shall be shown on the construction drawings along with the conduit, pull boxes and other items necessary to install the street lights. An Isometric lighting level needs to be provided by the designer/contractor. A separate light study may be required by the City Engineer. The new street light shall have 32’ mounting height per Standard Drawing EL-3, with mounting arm length per Standard Drawing EL-4, the Fixture shall be Leotek GC1 or GC2 series in an approved configuration per detail EL-2 or approved equal. The arm shall be installed at the location as shown on the approved plans. l. FIRE HYDRANTS: The applicant shall install new fire hydrants along the project frontage. Spacing shall meet City and Fire Marshall requirements. 71. UTILITIES: All new services to the development shall be "underground service" designed and installed in accordance with the Pacific Gas and Electric Company, AT&T (phone) Company and local cable company regulations. Transformers and switch gear cabinets shall be placed underground unless otherwise approved by the Planning Director and the City Engineer. Underground utility plans must be submitted to the City prior to installation. (PUBLIC WORKS) 72. STREET LIGHTING STANDARDS: The applicant shall submit photometric plans for parking lots, driveways, circulation areas, aisles, passageways, recesses, and publicly-accessible grounds contiguous to all buildings showing lighting levels to Illuminating Engineering Society (IES) Standards. The lighting system shall be designed as to limit light spill beyond property lines and to shield the light source from view from off site. The photometric plan shall be approved by the City Engineer or their designee, and shall comply with lighting requirements as follows: a. Arterial Streets: 1.0 fc average. 3/1 average to minimum uniformity. 0.34 fc minimum b. Collector/Local Streets: 0.6 fc average. 4/1 average to minimum uniformity. 0.2 fc minimum c. Local Streets: 0.4 fc average. 6/1 average to minimum uniformity. 0.07fc minimum. d. High Volume Intersections: 1.1fc average. 3/1 average to minimum uniformity. 0.4 fc minimum. e. Low Volume Intersections: 0.7 fc average. 4/1 average to minimum uniformity. 0.2 fc minimum. 7.A.g Packet Pg. 92 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 19 The applicant shall submit a photometric plan identifying how these lighting levels are being met given the site geometrics, using the City Standard street lights, and a Type III lighting distribution. The width of the street shall, and lighting levels shall determine the lighting spacing. Street lights and pull boxes shall be installed in the planter strip if one is present, or behind the back of walk where feasible so as to maintain sidewalk clear of obstructions to the approval of the City Engineer. The photometric plan shall be approved prior to the issuance of the building permit. (PUBLIC WORKS) 73. FENCES AND OTHER PERMANENT STRUCTURES WITHIN CITY RIGHT-OF- WAY: The applicant shall locate all project fencing and foundation of a permanent nature within the project’s property and out of the City right-of-way whenever possible. If located within the City right-of-way, the applicant shall have a license agreement recorded against the owner’s property that indemnifies and holds harmless the City. The license agreement shall also include language in which the applicant agrees to allow access to any utility company wishing to have access to the public right-of-way for existing or new utility installation. The license agreement shall also include language that requires the removal of the fence and foundation, at the owner’s expense, should the City desire to use the right-of-way for street, sidewalk or other purposes identified by the City Engineer. The license agreement shall be approved as to form by the City Attorney’s Office and shall be recorded against the owner’s property prior to the issuance of any City encroachment permit. (PUBLIC WORKS) 74. FLOOR DRAINS: All floor drains shall be plumbed to connect to the sanitary sewer system and shall not be connected to stormwater collection system. The plumbing connections shall be shown on the plans to the approval of the City Engineer. (PUBLIC WORKS) 75. STORM DRAIN INLETS AND WATERWAYS: Per the City’s Clean Water Program’s requirements, the applicant shall mark with the words “No Dumping! Flows to Bay,” or equivalent, using methods approved by the City standards on all storm inlets surrounding and within the project parcel. Furthermore, storm drains shall be designed to serve exclusively stormwater. Dual-purpose storm drains that switch to sanitary sewer are not permitted in the City of Gilroy. (PUBLIC WORKS) 76. GARBAGE/RECYCLE STORAGE AND SERVICE: The applicant shall provide an adequate area for the purposes of storing garbage and recycling collection containers for scheduled servicing by the franchise solid waste collection service. If required, the containers may be placed on the street within the loading zone for a maximum of two hours; one hour prior to the scheduled servicing time and must be removed from the street within one hour after the service. The containers shall be placed at the service location allowing enough room for the truck to safely approach the containers. The collection containers shall be brought to the service area on the day of service and returned to the storage enclosure by the property owner. The containers are not to be in public view or in the public right-of-way prior to, or beyond the scheduled service times. A letter shall be provided, to the approval of the City Engineer, from the City’s franchise solid waste collection 7.A.g Packet Pg. 93 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 20 service provider (Recology) confirming serviceability and site accessibility of the solid waste pickup as designed and shown on the project plans. Contact Recology at 408-842-3358. (PUBLIC WORKS) 77. DRAINAGE: Drainage improvements made on-site shall conform to standard engineering practices and shall not allow any site drainage to impact adjacent properties. All drainage capacity calculations shall be performed by a licensed Civil Engineer, whose signed engineer’s stamp shall appear on the calculations sheets and shall be submitted to the City for review and approval with the project civil plans. If the project is proposing to connect to an existing storm drain system within or downstream from the site, the design engineer shall provide calculations with the final design plans to demonstrate that the downstream drainage system has adequate capacity to accommodate the additional site flows being added to the system for the design storm per City Standards. The calculations shall be to the approval of the City Engineer prior to the issuance of the first building permit. (PUBLIC WORKS) 78. STORMWATER MANAGEMENT: At Developer’s sole expense, Developer shall submit results from a third-party review of the project’s stormwater design. The results shall confirm that the project is complying with requirements set in the City of Gilroy Stormwater Management Guidance Manual for Low Impact Development and Post-Construction Requirements. (PUBLIC WORKS) 79. SITE LANDSCAPING COORDINATION: The site landscaping needs to be coordinated between the stormwater treatment area and the overall site landscaping plan area. The landscaping within the stormwater treatment area will not count towards the site landscaping requirement. Stormwater treatment areas should be identified on the site first, and then site landscaping to make sure the correct plant material is identified for each area. Some site landscaping plant material may not be suitable in stormwater treatment areas due to the nature of the facility. Sewer facilities cannot be aligned through stormwater treatment facilities. It is the applicant’s responsibility to coordinate the civil stormwater treatment facilities and the plans from the project landscaper. (PUBLIC WORKS) 80. ADDRESS PLAN: The applicant shall submit to the Public Works Department a proposed street naming street address plan. Applicant shall contract the planning department to obtain a list of potential street names. The applicant shall make suggested street names, which will be forwarded and confirmed or changed by the City’s street naming committee. The plan shall be substantially in conformance with the address plan approved with the Arch & Site application. Said submittal shall be approved by the City Engineer and City Street Naming Committee prior to the submittal of plans for any demolition permit, building permit, or site development permit and shall be satisfied prior to issuance of whichever permit is issued first. (PUBLIC WORKS) 7.A.g Packet Pg. 94 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 21 81. PERMITS REQUIRED BY OTHER AGENCIES: The applicant shall obtain all applicable permits from federal, state, and local agencies as required to construct the proposed improvements. The applicant is hereby informed that permits may be required by one (1) or more of the following: Army Corps of Engineers, UPRR, Fish and Wildlife, Regional Water Quality Control Board, Santa Clara County Roads and Airports, Santa Clara Valley Water District or Habitat Permit. If project is within jurisdiction of any of these agencies, verification of permit or waiver of permit must be given to the Public Works Department prior to issuance of any required City permits. If the City is required to be a party to the permit application and a fee is required, the applicant shall reimburse the City for its cost. A copy of these permits shall be provided to the satisfaction of the City Engineer prior to the issuance of the building permit. (PUBLIC WORKS) 82. STREET TREE DEVELOPMENT IMPACT FEE: The applicant shall pay a fee to provide funding towards additional tree planting in the City. The fee is based on the amount of added hardscape the project is adding. The estimated impact fee, based on the approved plans, is $1,398.40. This fee is only an estimate based on the planning documents provided. The actual impact fee will be calculated based on the final building permit plans submitted, and the fees approved by the City Council in place at the time of the building permit submittal. The fee shall be collected by the Public Works Department and paid prior to issuance of the first building permit. (PUBLIC WORKS) 83. STORM DEVELOPMENT IMPACT FEE: The applicant shall pay a fee proportional to the project's share of storm drainage flowing off-site and shall be used to enhance the City’s storm drainage system based on the recommendations of the adopted Storm Drainage Master Plan. The estimated impact fee, based on the approved plans, is $3,092.60. This fee is only an estimate based on the planning documents provided. The actual impact fee will be calculated based on the final building permit plans submitted, and the fees approved by the City Council in place at the time of the building permit submittal. The fee shall be collected by the Public Works Department and paid prior to issuance of the first building permit. (PUBLIC WORKS) 84. SANITARY SEWER DEVELOPMENT IMPACT FEE: The applicant shall pay a fee proportional to the project’s share of the increase amount of sewage generated by the project, which shall be used to enhance the City’s sewer system based on the adopted Sewer Master Plan. The estimated impact fee, based on the approved plans, is $322,920.00. This fee is only an estimate based on the planning documents provided. The actual impact fee will be calculated based on the final building permit plans submitted, and the fees approved by the City Council in place at the time of the building permit submittal. The fee shall be collected by the Public Works Department and paid prior to issuance of the first building permit. At first improvement plan submittal, applicant’s engineer shall submit a calculation for sanitary sewer and water generation per the City’s Master Plan design criteria. The fee shall be collected by the Public Works Department and paid prior to issuance of the first building permit. (PUBLIC WORKS) 7.A.g Packet Pg. 95 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 22 85. WATER DEVELOPMENT IMPACT FEE: The applicant shall pay a fee proportional to the project's share of impact to the City’s water system, and the water needs of the development. The fee shall be used to fund improvements identified in the City’s Water Master Plan. The estimated impact fee, based on the approved plans, is $82,935.00. This fee is only an estimate based on the planning documents provided. The actual impact fee will be calculated based on the final building permit plans submitted, and the fees approved by the City Council in place at the time of the building permit submittal. At first improvement plan submittal, applicant’s engineer shall submit a calculation for water generation per the City’s Master Plan design criteria. The fee shall be collected by the Public Works Department and paid prior to issuance of the first building permit. (PUBLIC WORKS) 86. TRANSPORTATION IMPROVEMENT FEE: The applicant shall pay a fee proportional to the project's share of transportation improvements needed to serve cumulative development within the City of Gilroy. The funds shall be used to fund improvements identified in the City Traffic Circulation Master Plan. The estimated impact fee, based on the approved plans, is $474,660.00. This fee is only an estimate based on the planning documents provided. The actual impact fee will be calculated based on the final building permit plans submitted, and the fees approved by the City Council in place at the time of the building permit submittal. The fee shall be collected by the Public Works Department and paid prior to issuance of the first building permit. (PUBLIC WORKS) 87. PUBLIC FACILITIES IMPACT FEE: The applicant shall pay a fee proportional to the project’s share of the increase to the use of City Public facilities. The estimated impact fee, based on the approved plans, is $856,260.00. This fee is only an estimate based on the planning documents provided. The actual impact fee will be calculated based on the final building permit plans submitted, and the fees approved by the City Council in place at the time of the building permit submittal. The fee shall be collected by the Public Works Department and paid prior to issuance of the first building permit. (PUBLIC WORKS) 88. PUBLIC STORMWATER MANAGEMENT IMPACT FEE: The applicant shall pay a fee for the initial set up of each stormwater postconstruction BMP and an annual administration and monitoring fee associated with soliciting, accepting, and entering each postconstruction BMP inspection and monitoring report to comply with mandated state reporting. The estimated impact fee, based on the approved plans, is $1,200.00. This fee is only an estimate based on the planning documents provided. The actual impact fee will be calculated based on the final building permit plans submitted, and the fees approved by the City Council in place at the time of the building permit submittal. The fee shall be collected by the Public Works Department and paid prior to issuance of the first building permit. (PUBLIC WORKS) 89. CONSTRUCTION NOTICING: At least two weeks prior to commencement of any on or off-site work, the applicant shall post at the site, and to property owners within (300') three hundred feet of the exterior boundary of the project site a notice that construction work will commence on or around the stated date. The notice 7.A.g Packet Pg. 96 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 23 shall include a list of contact persons with name, title, phone number and area of responsibility. The person responsible for maintaining the list shall be included. The list shall be current at all times and shall consist of persons with authority to initiate corrective action in their area of responsibility. The names of individuals responsible for dust, noise and litter control shall be expressly identified in the notice. Noticing shall be in both English and Spanish. The notice shall be submitted for review to the approval of the City Engineer two weeks prior to the issuance of the building permit. (PUBLIC WORKS) 90. JOINT TRENCH PLANS: The developer shall submit a joint trench plan set at initial improvement plan submittal. The joint trench plans shall show all joint trench boxes outside of the sidewalk path of travel. All proposed meter pedestals and above ground facilities shall be at least 3-ft clear from the back of sidewalk in private streets and 5-ft clear from back of sidewalk in public streets. The joint trench plans shall include a typical detail from the face of curb to the back of the easement showing the joint trench and boxes relative to the sidewalk. 91. DRIVEWAY APPROACHES: The proposed driveway approaches design along the Royal way frontage between buildings K, H, & G shall be designed per City Standard. Driveways shall be designed to not affect or impact street or public right of way operation, queuing, maneuver, delay, passenger vehicles, emergency vehicles, pedestrian. (PUBLIC WORKS) 92. PRIVATE DRIVEWAYS: The proposed driveways between buildings K, H, & G shall be designed per City Standard to maintain full ingress egress at all times (2- way traffic). Driveways shall be designed to not affect or impact street or public right of way operation, queuing, maneuver, delay, passenger vehicles, emergency vehicles, pedestrian. (PUBLIC WORKS) 93. PRIVATE DRIVE ISLES: The proposed driveway approaches for 24-ft drive isles off the Royal Way Cul-De-Sacs shall be per City Standard and align with the proposed private drive isle centerlines. (PUBLIC WORKS) 94. FIRE TRUCK CIRCULATION PLAN: The developer shall submit for review an updated fire truck circulation plan demonstrating through vehicle Auto-Turn movements that a westbound fire engine can enter the project meeting Fire Department criteria. This Conditions of approval shall be confirmed with the Fire Department. (PUBLIC WORKS) 95. VEHICLE PARKING AND LINE OF SITE PLAN: At initial building submittal, the developer shall submit for review a Vehicle Parking and Line of Site Plan as a part of the plan set. This Plan shall include an existing parking conditions plan (along Royal Way) and a post development parking condition plan. The post development parking condition plan shall show line of sight triangles for all proposed driveways and identify the total amount of public parking removed from Royal Way. (PUBLIC WORKS) 7.A.g Packet Pg. 97 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 24 The following conditions shall be complied with AT ALL TIMES DURING THE CONSTRUCTION PHASE OF THE PROJECT, or if another deadline is specified in a condition, at that time. 96. PUBLIC WORKS CONSTRUCTION ACTIVITIES: The City shall be notified at least fifteen (15) working days prior to the start of any construction work, and at that time the contractor shall provide a project construction and phasing schedule, and a 24-hour emergency telephone number list. The schedule shall be in Microsoft Project, or an approved equal, and shall identify the scheduled critical path for the installation of improvements to the approval of the City Engineer. The schedule shall be updated weekly. The approved construction and phasing schedule shall be shared with Gilroy Unified School District (GUSD) to avoid traffic impacts to surrounding school functions. An approved construction information handout(s) shall also be provided to GUSD to share with school parents. (PUBLIC WORKS) a. All work shown on the improvement plans shall be inspected to the approval of the City Engineer as applicable. Uninspected work shall be removed as deemed appropriate by the City Engineer. b. Construction activities related to the issuance of any Public Works permit shall be restricted to the weekday between 7:00 a.m. and 7:00 p.m., Saturday 9:00 a.m. to 7:00 p.m. allowed only for general construction activities that require no inspection and only with approval of the Public Works Director. No work shall be done on Sundays and on City Holidays unless otherwise approved by the City Engineer. Please note that no work shall be allowed to take place within the City right-of-way after 5:00 p.m. Monday through Friday. In addition, no work being done under the issuance of a Public Works encroachment permit may be performed on the weekend unless prior approvals have been granted by Public Works. The City Engineer may apply additional construction period restrictions, as necessary, to accommodate standard commute traffic along arterial roadways and along school commute routes. Signs outlining the project construction times shall be posted at conspicuous locations on site where it is visible to the public. The signs shall be per the City Standard Drawing for posting construction hours. The sign shall be kept free of graffiti at all times. Contact the Public Works Department to obtain sample City Standard sign outlining hours of operation. c. The allowed hours of Public Works construction activities may be waived or modified through an exemption, for limited periods, if the City Engineer finds that the following criteria are met: i. Permitting extended hours of construction will decrease the total time needed to complete the project thus mitigating the total amount of noise associated with the project as a whole; or, 7.A.g Packet Pg. 98 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 25 ii. Permitting extended hours of construction are required to accommodate design or engineering requirements, such as a large concrete pour. Such a need would be determined by the project's design engineer and require approval of the City Engineer. iii. An emergency situation exists where the construction work is necessary to correct an unsafe or dangerous condition resulting in obvious and eminent peril to public health and safety. If such a condition exists, the City may waive any of the remaining requirements outlined below. iv. The exemption will not conflict with any other condition of approval required by the City to mitigate significant impacts. v. The contractor or owner of the property will notify residential and commercial occupants of property adjacent to the construction site of the hours of construction activity which may impact the area. This notification must be provided three days prior to the start of the extended construction activity. vi. The approved hours of construction activity will be posted at the construction site in a place and manner that can be easily viewed by any interested member of the public. vii. The City Engineer may revoke the exemption at any time if the contractor or owner of the property fails to abide by the conditions of exemption or if it is determined that the peace, comfort and tranquility of the occupants of adjacent residential or commercial properties are impaired because of the location and nature of the construction. The waiver application must be submitted to the Public Works Construction Inspector ten (10) working days prior to the requested date of waiver. d. The following provision to control traffic congestion, noise, and dust shall be followed during site excavation, grading and construction: i. All construction vehicles should be properly maintained and equipped with exhaust mufflers that meet State standards. ii. Blowing dust shall be reduced by timing construction activities so that paving and building construction begin as soon as possible after completion of grading, and by landscaping disturbed soils as soon as possible. iii. Water trucks shall be present and in use at the construction site. All portions of the site subject to blowing dust shall be watered as often as deemed necessary by the City, or a minimum of three 7.A.g Packet Pg. 99 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 26 times daily, or apply (non-toxic) soil stabilizers on all unpaved access roads, parking areas, and staging areas at construction sites in order to insure proper control of blowing dust for the duration of the project. iv. Watering on public streets and wash down of dirt and debris into storm drain systems will not be allowed. Streets will be cleaned by street sweepers or by hand as often as deemed necessary by the Construction Inspector, or at least once a day. Watering associated with on-site construction activity shall take place between the hours of 8 a.m. and 5 p.m. and shall include at least one late-afternoon watering to minimize the effects of blowing dust. Recycled water shall be used for construction watering to manage dust control where possible, as determined by the City Engineer. Recycled water shall be billed at the municipal industrial rate based on the current Santa Clara Valley Water District’s municipal industrial rate. Where recycled water is not available potable water shall be used. All potable construction water from fire hydrants shall be metered and billed at the current portable fire hydrant meter rate. v. All public streets soiled or littered due to this construction activity shall be cleaned and swept on a daily basis during the workweek to the satisfaction of the Construction Inspector. vi. Construction grading activity shall be discontinued in wind conditions that in the opinion of the Public Works Construction Inspector cause excessive neighborhood dust problems. vii. Site dirt shall not be tracked into the public right-of-way, and shall be cleaned immediately if done, or the project may risk being shut down. Mud, silt, concrete, and other construction debris shall not be washed into the City’s storm drains. viii. Construction activities shall be scheduled so that paving and foundation placement begin immediately upon completion of grading operation. ix. All aggregate materials transported to and from the site shall be covered in accordance with Section 23114 of the California Vehicle Code during transit to and from the site. x. Prior to issuance of any permit, the applicant shall submit any applicable pedestrian or traffic detour plans, to the satisfaction of the City Engineer, for any lane or sidewalk closures. The traffic control plan shall be prepared by a licensed professional engineer with experience in preparing such plans. The Traffic Control Plan shall be prepared by a licensed engineer in accordance with the 7.A.g Packet Pg. 100 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 27 requirements of the latest edition of the California Manual on Uniform Traffic Control Devices (MUTCD) and standard construction practices. The Traffic Control Plan shall be approved prior to the commencement of any work within the public right-of- way. xi. During construction, the applicant shall make accessible any or all City utilities as directed by the City Engineer. xii. The minimum soils sampling and testing frequency shall conform to Chapter 8 of the Caltrans Construction Manual. The applicant shall require the soils engineer submit to daily testing and sampling reports to the City Engineer. 97. HERITAGE TREE PROTECTION MEASURES: The applicant shall submit a tree protection plan showing how all on and off-site heritage trees will be protected during construction. All approved and installed Heritage Tree protection measures shall be installed prior to any site activities and maintained throughout the period of construction. The Project Arborist shall complete inspections on an as-need basis during the construction period and shall submit a monthly report of his/her findings in a letter sent by fax or email to the City Planner assigned to this project. (PUBLIC WORKS) 98. PROJECT CLOSE-OUT: Prior to City acceptance of all tract subdivision and property improvement agreements, the applicant shall comply with all City construction close-out procedures to the approval of the City Engineer. City construction close-out procedures can be found the City’s website under Public Works. Prior to final inspections, all pertinent conditions of approval and all improvements shall be completed to the satisfaction of the Planning Director and City Engineer. A letter indicating that all project conditions have been met shall be submitted prior to the first occupancy. All public improvements, including the complete installation of all improvements relative to streets, fencing, sanitary sewer, storm drainage, water system, underground utilities, etc., shall be completed and attested to by the City Engineer before approval of occupancy of any unit. Where facilities of other agencies are involved, such installation shall be verified as having been completed and accepted by those agencies. In addition, the applicant shall submit a detailed project cost estimate of all improvements (public and private) constructed on-site and within the public right-of-way. The cost estimate shall be prepared by the project engineer and be to the approval of the City Engineer. The cost estimate shall be broken out into on-site and off-site improvements based on the format provided by the City. Until such time as all improvements required are fully completed and accepted by City, the applicant shall be responsible for the care maintenance of and any damage to such improvements. City shall not, nor shall any officer or employee thereof, be liable or responsible for any accident, loss, or damage, regardless of cause, happening or occurring to the work or Improvements required for this project prior to the completion and acceptance of the work or Improvements. All 7.A.g Packet Pg. 101 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 28 such risks shall be the responsibility of and are hereby assumed by the applicant. (PUBLIC WORKS) 99. MATERIAL HAULING ROUTE AND PERMIT: For material delivery vehicles equal to, or larger than two-axle, six-tire single unit truck (SU) size or larger as defined by FHWA Standards, the applicant shall submit a truck hauling route and receive a haul permit that conforms to City of Gilroy Standards to the approval of the City Engineer. Note that the City requires a Haul Permit be issued for any hauling activities. The project sponsor shall require contractors to prohibit trucks from using “compression release engine brakes” on residential streets. A letter from the applicant confirming the intention to use this hauling route shall be submitted to the Department of Public Works, and approved, prior to the issuance of any City permits. All material hauling activities including but not limited to, adherence to the approved route, hours of operation, staging of materials, dust control and street maintenance shall be the responsibility of the applicant. All storage and office trailers will be kept off the public right-of-way. Tracking of dirt onto City streets and walks will not be allowed. The applicant must provide an approved method of cleaning tires and trimming loads on-site. Any job-related dirt and/or debris that impacts the public right-of-way shall be removed immediately. No wash down of dirt into storm drains will be allowed. All material hauling activities shall be done in accordance with applicable City ordinances and conditions of approval. Mud, silt, concrete, and other construction debris shall not be washed into the City’s storm drains. Violation of such may be cause for suspension of work. (PUBLIC WORKS) 100. CONSTRUCTION STAGING AND WORKER PARKING: Prior to construction, the applicant shall provide a construction staging and parking plan that minimizes the effect of construction materials, delivery, and worker parking and/or material staging in the neighborhood and shall include an estimate of the number of workers, equipment, and materials staging square footage that will be present on the site during the various phases of construction and indicate where sufficient off- street parking will be utilized and identify any locations for off-site material deliveries. Said plan shall be approved by the City Engineer prior to issuance of City permits and shall be complied with at all times during construction. Failure to enforce the parking plan may result in suspension of the City permits. No vehicle having a manufacturer's rated gross vehicle weight exceeding ten thousand (10,000) pounds shall be allowed to park on the portion of a street which abuts property in a residential zone without prior approval from the City Engineer (§15.40.070). (PUBLIC WORKS) 101. SITE WATER DISCHARGE: In accordance with the City’s Municipal Code, Prohibition of Illegal Discharges (Gilroy Municipal Code Section 27C.7), the City Engineer may approve the discharge of uncontaminated pumped ground waters to the sanitary sewer only when such source is deemed unacceptable by State and Federal authorities for discharge to surface waters of the United States, whether pretreated or untreated, and for which no reasonable alternative method of disposal is available. Following the verification of the applicable local, state and/or 7.A.g Packet Pg. 102 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 29 federal approvals, a Discharge Plan will be approved and monitored by the City Engineer. (PUBLIC WORKS) 102. ARCHITECTURAL COPPER: Per Gilroy Municipal Code Section 27C.7 Prohibition of Illegal Discharges, the applicant shall follow the specific best management practices for the installation of the Architectural Copper. For detailed information please distribute the flyer to all construction personnel involved in the fabrication and installation of the Architectural Copper that is located at: http://flowstobay.org/files/newdevelopment/flyersfactsheets/ArchitecturalcopperBMPs.pdf (PUBLIC WORKS) The following conditions shall be complied with AT ALL TIMES that the use permitted by this entitlement occupies the premises 103. POST CONSTRUCTION BEST MANAGEMENT PRACTICES (BMP): In accordance with Gilroy Municipal Code Chapter 27D Post Construction Storm Water Pollution Prevention all projects that meet the criteria described in the Storm Water Guidance Manual for Low Impact Development and Post-Construction Requirements shall prepare a storm water control plan (SWCP) and shall meet the requirements of the design standards and selection of best management practices and shall be selected and designed to the satisfaction of the City Engineer or designee. Requirements shall include: a. Owner/occupant shall inspect private storm drain facilities at least two (2) times per year and sweep parking lots immediately prior to and once during the storm season. b. The applicant shall be charged the cost of abatement for issues associated with, but not limited to, inspection of the private storm drain facilities, emergency maintenance needed to protect public health or watercourses, and facility replacement or repair in the event that the treatment facility is no longer able to meet performance standards or has deteriorated. Any abatement activity performed on the applicant’s property by City staff will be charged to the applicant at the City’s adopted hourly rate. c. Label new and redeveloped storm drain inlets with the phrase “No Dumping: Drains to Bay” plaques to alert the public to the destination of storm water and to prevent direct discharge of pollutants into the storm drain. Template ordering information is available at www.flowstobay.org. d. All process equipment, oils fuels, solvents, coolants, fertilizers, pesticides, and similar chemical products, as well as petroleum-based wastes, tallow, and grease planned for storage outdoors shall be stored in covered containers at all times. e. All public outdoor spaces and trails shall include installation and upkeep of dog waste stations. Garbage and recycling receptacles and bins shall be designed and maintained with permanent covers to prevent exposure of trash to rain. Trash enclosure drains shall be connected to the sanitary sewer system. (PUBLIC WORKS) 7.A.g Packet Pg. 103 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 30 BUILDING CONDITIONS 104. CONDITIONS OF APPROVAL: All conditions of approval shall be included on the first sheet after the cover sheet of the construction drawing submitted for a building permit. 105. PRE-CONSTRUCTION MEETING: A pre-construction meeting shall be held at a time and location agreed upon by the City and applicant for the purpose of reviewing conditions of approval, pre-occupancy requirements / temporary certificate of occupancy and construction-site procedures. This meeting shall be held prior to the issuance of any permit issued by the building department. The applicant shall be represented by his design and construction staff, which includes any sub-contractors. Departments having conditions of approval for the project will represent the City. 106. TEMPORARY FENCING: Temporary fencing along the perimeter of a building site, during construction is required to ensure security, public safety, and/or noise/dust mitigation. “Temporary” shall mean the placement of fencing in a manner that is not permanently attached to the ground or attached to any other structure or material that is itself permanently attached to the ground. Temporary construction fences consisting of chain-link or plywood, no more that 6-feet in height above the ground and shall not require any permits or special authorization. Unless letters of permission from adjacent property owners or a City encroachment permit have been obtained, temporary construction fencing shall be placed only on the property that contains the subject construction project. All temporary construction fencing shall be thoroughly removed from the project site upon completion of construction. 107. JOB SITE SIGNAGE: Prior to construction, A 36-inch by 48-inch weatherproof sign shall be posted on the site and located to be clearly readable from the public right- of-way, the sign shall include the following information: a. Address of the project site. b. Permitted hours of construction and of deliveries/off-haul. c. Name, e-mail address and direct phone number of the General Contractor. d. Name, e-mail address and direct phone number of the person responsible for managing the project. e. Name and direct phone number of the party to call in case of an emergency. City of Gilroy Code Enforcement complaint telephone number (408-846-0264). 108. CONSTRUCTION ACTIVITIES: The following provisions to control traffic congestion, noise, and dust shall be followed during site excavation, grading and construction: construction activities shall be limited between the hours of seven am and seven pm Monday through Friday and nine am to seven pm on Saturday. Construction Activities shall not occur on Sundays or city holidays which include New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas. 7.A.g Packet Pg. 104 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 31 109. FINAL GRADING AND DRAINAGE PLAN: At the time of building permit plan submittal, the project developer shall submit a final grading and drainage plan prepared by a licensed civil engineer depicting all final grades (with accurate elevations above sea level indicated) and on-site drainage control measures to prevent storm water runoff onto adjoining properties. 110. PAD ELEVATION CERTIFICATION: The applicant and/or developer shall submit a pad elevation certification letter prepared by a licensed land surveyor or registered civil engineer to the Building Official certifying that the pad elevation(s) and building location (setbacks) are pursuant to the approved plans, prior to receiving a foundation inspection for the structure. 111. SITE SURVEY: The applicant shall provide a site survey of entire parcel stamped and signed by a Land Surveyor licensed by the State of California. The survey shall include, but not be limited to, the following: location and dimensions of property line, location of streets and easements, existing buildings, topographic contour lines, trees/landscape, miscellaneous structures, etc. The purpose of the site survey is to accurately verify compliance with items such as setback dimensions, heights of buildings from established contours, compliance with heritage tree ordinance, etc. 112. PERMIT CARD: The stamped, approved, job copy of the plans and permit card shall be located onsite at all times. 113. TITLE 24:The building(s) covered by this approval shall be designed and constructed to the Title 24 Building Standards, including Building, Electrical, Mechanical, Plumbing, Energy, Fire, Green Building and both State and Federal accessibility requirements in effect and as amended by the City of Gilroy at the time of building permit submittal. 114. GREEN BUILDING STANDARDS: The building shall be designed to include the green building measures specified as mandatory in the application checklists contained in the California Green Building Standards Code. The applicant shall incorporate the checklist along with a notation on the checklist to specify where the information can be located on the plans, details, or specifications, etc. All measures will be verified by the Building Inspector at final inspection. 115. GEOTECHNICAL REPORT: The applicant shall provide a stamped, signed, and dated soil investigation report containing design recommendations to the Building Official. The classification shall be based on observation and any necessary tests of materials disclosed by boring or excavations made in appropriate locations. Additional studies may be necessary to evaluate soil strength, the effect of moisture variation on soil-bearing capacity, compressibility, liquefaction, seismically induced soil liquefaction, soil instability, and expansiveness. Additionally, the applicant shall submit a stamped, signed, and dated letter from the Geotechnical Engineer or Civil Engineer who prepared the soil investigation stating the following: a. The plans and specifications substantially conform to the recommendations in the soil investigation. 7.A.g Packet Pg. 105 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 32 b. The Geotechnical Engineer or Civil Engineer who prepared the soil investigation has been retained to provide soil site observation and provide periodic and final reports to the City of Gilroy. Prior to final inspection for any building or structure, the Geotechnical Engineer or Civil Engineer who prepared the soil investigation shall issue a final report stating the completed pad, foundation, finish grading and associated site work substantially conform to the approved plans, specifications and investigations. 116. The project developer is responsible for implementing the following BMPs. a) The project developer shall include erosion control/stormwater quality measures on the project grading plan which shall specifically address measures to prevent soil, dirt, and debris from entering the public storm drain system. Such measures may include, but are not limited to, hydroseeding, hay bales, sandbags, and siltation fences and shall be subject to the review and approval of the City Engineer/Building Official. If no grading plan is required, necessary erosion control/stormwater quality measures shall be shown on the site plan submitted for a building permit and shall be subject to the review and approval of the Building Division. The project developer is responsible for ensuring that the contractor is aware of and implements such measures. b) All cut and fill slopes shall be revegetated and stabilized after completion of grading, but in no case later than October 15. Hydroseeding shall be accomplished before September 15 and irrigated with a temporary irrigation system to ensure that the vegetated areas are established before October 15. No grading shall occur between October 15 and April 15 unless approved erosion control/stormwater quality measures are in place, subject to the approval of City Engineer/Building Official. Such measures shall be maintained until such time as permanent landscaping is in place. c) Gather all sorted construction debris on a regular basis and place in the appropriate container for recycling; to be emptied at least on a weekly basis. When appropriate, use tarps on the ground to collect fallen debris or splatters that could contribute to stormwater runoff pollution. d) Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement and storm drains adjoining the site. Limit construction access routes onto the site and place gravel on them. Do not drive vehicles and equipment off paved or graveled areas during wet weather. Broom sweep the street pavement adjoining the project site on a daily basis. Scrape caked on mud and dirt from these areas before sweeping. e) Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet nearest the downstream side of the project site in order to retain any debris or dirt flowing in the storm drain system. Maintain and/or replace filter materials to ensure effectiveness and to prevent street flooding. f) Create a contained and covered area on the site for the storage of cement, paints, oils, fertilizers, pesticides, or other materials used on the 7.A.g Packet Pg. 106 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 33 site that have the potential of being discharged into the storm drain system by being windblown or by being spilled. g) Never clean machinery, equipment, tools, brushes, or rinse containers into a street, gutter, or storm drain. h) Ensure that concrete/gunite supply trucks or concrete/plaster operations do not discharge wash water into a street, gutter, or storm drain. i) Concrete wash area: I. locate wash out area away from storm drains and open ditches II. construct a temporary pit large enough to store the liquid and solid waste III. clean the pit by allowing concrete to set IV. break up the concrete; and then V. recycle or dispose of properly j) The project shall comply with the following: I. Cleaning all on-site storm drains at least twice a year with one cleaning immediately prior to the rainy season. The City may require additional cleanings. Sweeping regularly but not less than once a month, driveways, sidewalks and paved areas to minimize the accumulation of litter and debris. Corners and hard to reach areas shall be swept manually. Debris from pressure washing shall be trapped and collected to prevent entry into the storm drain system. Wastewater containing any soap, cleaning agent or degreaser shall not be discharged into the storm drain. 117. PORTABLE TOILETS: Portable toilets used during construction shall be emptied on a regular basis as necessary to prevent odor. A containment pan is required under all portable toilets. 118. CONSTRUCTION STORAGE: All construction materials, debris and equipment shall be stored on site. If that is not physically possible, an encroachment permit shall be obtained from the Department of Public Works prior to placing any construction materials, debris, debris boxes or unlicensed equipment in the right-of- way. The placing of portable restroom facilities in the City right-of-way will not be permitted. 119. CONSTRUCTION SITE MAINTENANCE: All portions of the job site shall be maintained in an organized and professional condition. All trash, debris, construction scraps and broken/deteriorated machinery shall be removed from the site at the end of each week. If off loaded construction materials are not used within 2 weeks, they shall be screened from view. All sidewalks, driveways and public/private roadways fronting the subject site shall be broom cleaned at the end of each business day. 120. PLAN MODIFICATIONS: Acceptance of the plans does not release the developer from correction of mistakes, errors, or omissions contained therein. If, during the course of construction, the public interest requires a modification or a departure from these accepted plans, the City shall have the authority to require such 7.A.g Packet Pg. 107 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 34 modifications or departure and specify the manner in which the same is to be made. FIRE PREVENTION CONDITIONS 121. Fire Department Access – Using Autoturn vehicle pathway tracking software, demonstrate that large vehicles (e.g. fire ladder truck, garbage trucks, school buses) can navigate into, throughout, and out of this development. Show offsite and onsite, ingress, egress, and onsite navigation. Please note that the proposed plans indicate 24 foot wide roads will serve the development. Please review the Engineering Department’s design standards for roadways. Fire Apparatus shall not be required to cross to the opposite side of a street as part of a turn on that street or onto another street. Dead end streets in excess of 150 feet shall be provided with a cul-de-sac of 78’diameter unless they qualify for use of an alternative turn around standard. See the Fire Department approved dead end turn around standards. 122. For roads less than 28 feet in width, no vehicle street parking is allowed. Because of this, the HOA shall develop enforceable conditions such that the garage and driveways shall be available to accommodate all vehicle parking. 123. Gates & Fencing – Gates and fencing were not shown on the plans submitted. There has been some discussion about security for this project. If the project designer decides to install gates and fences, then Fire Prevention and Engineering Department requirements will need to be met. 124. The plan reviewer could only locate one fire hydrant shown on the plans for the proposed 53,946 square feet of new structures. For future plans submitted to the City of Gilroy, show public and private fire hydrants distributed throughout the proposed development in a logical fashion. Fire Hydrants shall be able to flow 1500 gpm with a 20 psi residual pressure. Street Hydrants shall be spaced every 300 ft, and within 150 ft of any building. Offsite improvement plan shall provide Fire Hydrants per the City Standard. Hydrants shall be installed prior to commencement of construction with combustible materials. 125. All buildings shall be provided with water meters and water laterals sized for the type and size of building being proposed. All buildings shall have a fire sprinkler system using the current and appropriate NFPA standard based on the building type and size. All fire sprinkler systems shall be designed using the hydraulic calculation method. Request a fire hydrant flow test from Deputy Fire Marshal Jonathan Crick by contacting him at Jonathan.crick@cityofgilroy.org and/or 408- 846-0436. 126. Traffic calming devises shall be prohibited unless approved by the Fire Chief and Fire Marshal. 7.A.g Packet Pg. 108 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 35 127. Open Spaces, including storm water detention/retention basins, landscaped and naturally vegetated areas shall have vegetation management to remove dead plants and debris, and to remove, disc or mow weeds during weed abatement season from April to November of each year. In HOA managed areas, the HOA shall be responsible. For privately owned property it shall be performed by the property owner. VALLEY WATER CONDITIONS OF APPROVAL The following conditions shall be met prior to the approval of the FINAL MAP or PARCEL MAP, or if another deadline is specified in a condition, at that time. 128. Verify the bearings provided in Sheet 2 of Mid Coast Engineers’ survey map; more specifically, the bearing provided for the southerly property line. This appears to be inconsistent with the bearing provided in Valley Water’s easement deed for the future South County Recycled Water Line. Review the shared property line between the proposed development and Valley Water’s right of way. The Applicant’s response indicating that ALTA was “provided by a licensed surveyor” does not adequately justify the noted inconsistency for the shared property line. 129. Show and label Valley Water’s two easements on the Alta survey and all other plan sheets where there are proposed improvements. 130. Fencing shall be maintained along the property line to prevent people from climbing up onto the existing levee. Show the fence in the cross sections provided on Sheet C1.1; details for the fence should also be provided. 131. Provide details for proposed retaining wall shown on Sheet C1.0. A cross section and detail should be provided to show that the entire retaining wall, including the footing, is within the limits of the subject property. 132. Show existing and proposed grades along the property line to ensure that there are no impacts to the levee, or the drainage pattern next to the levee. 133. Valley Water owns a Temporary Construction Easement (TCE) within portions of APN 799-44-109 and 799-44-110. Please be advised that no construction, grading, or improvements shall take place until such time that the temporary construction easement is extinguished. According to the TCE deeds: “The easement is necessary for the purpose of constructing the South County Recycled Water Pipeline Project and related activities incident to construction. This temporary construction easement shall not be revoked and shall continue in full force and effect until such time the construction of the South County Recycled Water Pipeline Project has been completed at which time the temporary construction shall terminate.” 7.A.g Packet Pg. 109 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 36 134. Sheet C1.0 shows a concrete walkway which crosses the length of Valley Water’s water pipeline easement. As per the easement deed, the “easement area shall be kept clear of any type of building, fences, structure, pavement, or trees unless prior written approval is obtained from [Santa Clara Valley Water] District.” Staff would like to reiterate that a Valley Water encroachment permit will need to be issued for the proposed improvements in this area. Issuance of an encroachment permit are subject to the applicant demonstrating the improvements will not adversely impact Valley Water facilities or access for construction, operation, and/or maintenance of its facilities. 135. On Sheet L-1.0, Valley Water recommends the complete removal of the olive trees (Olea europaea) as their seedlings are invasive on creeks. According to the Guidelines and Standards for Land Use Near Streams (G&S), Design Guide 3, Section 1.C.2, Olea europaea is listed as an invasive species that should be avoided. Furthermore, Design Guide 4, Section 1.C, states that invasive, non- native species should not be planted near streams. 136. Sheet L-2.0 of the landscaping plans show Western Sycamore (Platanus racemosa) as one of the proposed tree plantings. Valley Water would like to note that recent studies in Coyote Valley have shown that many Western Sycamores could be a non-local ecotype or undesirable hybrid species. According to the G&S, Design Guide 2, Sections 1.B and 1.C, plantings that have been “propagated from seeds, cuttings or divisions collected from the same local creek or watershed” should be used. 137. Sheet L-2.0 of the landscaping plans shows proposed plantings within the limits of the TCE and pipeline easement noted in Comment #5 and #6, respectively. Valley Water currently has an ongoing capital project to expand the recycled water line through the subject parcel. Consequently, the TCE should be kept clear until construction in this area has been completed. 138. Sheet L-2.0 of the landscaping plans currently show a proposed tree planting within Valley Water’s pipeline easement. To avoid potential damage and maximize access to the pipeline, trees should not be planted within the easement area. Plantings within the easement area must be limited to low lying ground cover plants which do not consist of shrubs or trees. A Valley Water approval and permit is required for any proposed improvements within the easement. 139. The lighting plans prepared by AGi32 show trees within Valley Water’s fee title; please clarify if these are existing trees. There should be no proposed trees on Valley Water right of way. 7.A.g Packet Pg. 110 Attachment: AS 21-17 PC Resolution (3981 : Royal Way Townhomes) 1 RESOLUTION NO. 2022-__ A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF GILROY RECOMMENDING TO THE CITY COUNCIL APPROVAL OF VESTING TENTATIVE MAP TM 21-04 TO APPROVE A 45 UNIT TOWNHOME PLANNED DEVELOPMENT ON 3.37 ACRES AT ROYAL WAY, APN 799-44-93, 94, 95, 96, 97, 98, 101, 109 & 110, GILROY, CA 95020. WHEREAS, on October 4, 2021, Michael Cady, Third Millennium Partners and property owner Paul Sanders, TMP Royal Way, LLC filed an application requesting architectural and site review, tentative map, and planned unit development rezoning to permit a 45 unit townhome project on the subject 3.37 acre vacant in-fill site located on Royal Way and the Uvas Creek Trail; and WHEREAS, on July 9, 2022, the application submittal was accepted as complete; and WHEREAS, the Planning Commission of the City of Gilroy has determined that the project qualifies for an infill exemption under the California Environmental Quality Act, pursuant to section 15332 of the CEQA Guidelines, and no further environmental analysis is required; and WHEREAS, pursuant to Gilroy City Code Chapter 21 Subdivisions, the Planning Commission must recommend and City Council must approve a vesting tentative map application; and WHEREAS, the Planning Commission of the City of Gilroy has reviewed PUD zoning amendment Z 21-05 and the related architectural and site review permit AS 21-17 by separate resolutions, which are required to allow for the townhome development to proceed as proposed; and WHEREAS, on October 6, 2022, the Planning Commission of the City of Gilroy held a duly noticed public hearing on the project, independently considered the environmental determination and the zoning and land use entitlements in accordance with the Gilroy Zoning Ordinance, considered the staff report, and all evidence received including written and oral public testimony; and WHEREAS, the location and custodian of the documents or other materials which constitute the record of proceedings upon which the project approval is based is the Community Development Department, Planning Division; and NOW, THEREFORE, BE IT FURTHER RESOLVED that the Planning Commission of the City of Gilroy hereby recommends to the City Council approval of TM 21-04, based upon findings required pursuant to the state Subdivision Map Act Section 66474, and subject to the conditions attached hereto as Exhibit A. FINDINGS TM 21-04 7.A.h Packet Pg. 111 Attachment: TM 21-04 PC Resolution (3981 : Royal Way Townhomes) Resolution No. 2022-__ Page 2 i) The proposed map is consistent with the general plan medium density land use designation and general plan policies that require attached housing in the medium density residential land use designation and promote home ownership options. ii) The site is physically suitable for the type of development as it consists of flatland area that is not in a flood prone location, does not have any unique physical or environmental constraints and is designated for medium density land use at and the project is within the 8 to 20 unit per acre density. iii) The design of the subdivision or the proposed improvements are unlikely to cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat as the site has no creeks, streams, wetlands or any other physical or environmental constraints and qualifies for an infill exemption pursuant to section 15332 of the California environmental quality act. iv) The design of the subdivision or type of improvements is not likely to cause serious public health problems given that the utilities for the development are immediately adjacent along the Royal Way frontage and will be extended into the site under valid grading and encroachment permits. v) The design of the subdivision or the type of improvements as proposed and conditioned will not conflict with easements, acquired by the public at large, for access through or use of, property within the proposed subdivision. PASSED AND ADOPTED this 6th day of October by the following roll call vote: AYES: NOES: ABSTAIN: ABSENT: ATTEST: APPROVED: _________________________________ __________________________________ Sharon Goei, Secretary Manny Bhandal, Chairperson 7.A.h Packet Pg. 112 Attachment: TM 21-04 PC Resolution (3981 : Royal Way Townhomes) 1 ATTACHMENT A STANDARD CONDITIONS OF APPROVAL TM 21-04 Note: The following abbreviations identify the City department or division responsible for determining compliance with these conditions. The first group listed has responsibility for compliance at plan check, the second confirms compliance with the condition at final inspection, prior to final occupancy or issuance of a certificate of occupancy, or as specified in the condition. If only one group is identified, they have responsibilities from initial review through compliance verification. In the context of these Conditions of Approval, the term “Developer” means permit applicant, property owner, operator, permittee, lessee, and/or tenants using the space(s) for the intended use(s). Developer shall comply with project conditions for the life of the project. RESPONSIBLE DEPARTMENTS/DIVISIONS BL Building Division/Inspectors PK Parks/Landscape Design CA City Attorney PL Planning Division CC Chemical Control Agency PW Public Works/Engineering FP Fire Prevention TR Traffic Division PD Police Department WW Wastewater/Source Control PLANNING CONDITIONS The following conditions shall be met prior to the approval of the FINAL MAP or PARCEL MAP, or other deadline as specified in the condition. 1. RELATED ENTITLEMENTS: Approval and development of TM 21-04 for a 45 unit townhome development shall be subject to conformance with the related PUD rezoning Z 21-05 and PUD development plan AS 21-17. 2. TENTATIVE MAP: An approved tentative map or vesting tentative map shall expire twenty-four (24) months from the approval date and may be extended pursuant to the provisions of the Map Act, if the final map is not approved prior to expiration. 3. HOMEOWNERS’ ASSOCIATION: Developer shall establish a Homeowners’ Association (HOA) for the development. The HOA shall be responsible for the maintenance and enforcement of parking, private streets, landscaping, recreation and other interior areas held in common by the HOA. Such responsibilities shall be provided within the Covenants, Conditions, and Restrictions (CC&Rs) for the development. The City shall review all CC&Rs prior to recordation. 4. COVENANTS, CONDITIONS, AND RESTRICTIONS: Any covenants, conditions, and restrictions (CC&Rs) applicable to the project property shall be consistent with 7.A.h Packet Pg. 113 Attachment: TM 21-04 PC Resolution (3981 : Royal Way Townhomes) 2 the terms of this permit and the City Code. If there is a conflict between the CC&Rs and the City Code or this permit, the City Code or this permit shall prevail. PUBLIC WORKS CONDITIONS OF APPROVAL The following conditions shall be met prior to the approval of the FINAL MAP or PARCEL MAP, or if another deadline is specified in a condition, at that time. 5. PARCEL MAP: It shall be the applicant's responsibility to have a parcel map, prepared by a person authorized to practice land surveying in California, delineating all parcels created or deleted and all changes in lot lines in conformance with the Gilroy Municipal Code. The parcel map shall be approved by the Department of Public Works and recorded with the County Recorder’s Office prior to the issuance of any City permits. A parcel map guarantee shall be submitted to the City, by the applicant’s title company, prior to release of the parcel map to the title company for recordation. Prior to the City’s release of the parcel map to the title company, the applicant may, at the discretion of the City Engineer, be required to submit to the City an electronic copy of the map in the AutoCAD Version being used by the City at the time of recordation. It is the applicant's responsibility to check with their title company and the County Recorder’s Office to determine the time necessary to have the map recorded after City approval. (PUBLIC WORKS) 6. PROPERTY IMPROVEMENT AGREEMENT (PIA): The applicant shall enter into a public improvement agreement with the City per Gov. Code Section 66462(a) and shall arrange to provide Payment and Performance bonds each for 100% of the cost of public infrastructure improvements to be constructed in the public right-of- way. These improvements shall include, but not be limited to, roadway construction, sidewalk, curb and gutter, water lines, storm lines, sewer lines, street lights, and signal equipment. City Standard insurance shall be provided per the terms of the agreement. The agreement will be forwarded to the City Council for approval with project (parcel or final) map. The PIA shall be approved by the City Council prior to the issuance of the project building permit. (PUBLIC WORKS) 7. MONUMENTS: The applicant shall arrange for the engineer to have all monuments set per the recorded final map. A certificate letter by the Surveyor or Engineer will be provided to the City Engineer. (PUBLIC WORKS) 8. COVANANTS, CONDITIONS & RESTRICTIONS (CC&R): The applicant shall prepare project Covenants, Conditions and Restrictions (CC&R) for the project. The CC&Rs shall be submitted with the project map for review and approval of the City Engineer, the City Attorney, and the Planning Manager. The CC&Rs shall include relevant project Conditions of Approval and shall include language that restricts the Homeowner’s Association from making changes to the CC&Rs without 7.A.h Packet Pg. 114 Attachment: TM 21-04 PC Resolution (3981 : Royal Way Townhomes) 3 first obtaining approval from the City. The CC&Rs shall be reviewed and approved prior to the City Council approval of the project map. (PUBLIC WORKS) 9. RECORD DRAWINGS: The applicant shall submit one full set of original record drawings and construction specifications for all off-site improvements to the Department of Public Works. All underground facilities shall be shown on the record drawings as constructed in the field. The applicant shall also provide the City with an electronic copy of the record drawings in the AutoCAD Version being used by the City at the time of completion of the work. The applicant shall also submit an AutoCAD drawing file of all consultants composite basemap linework showing all public improvements and utility layouts. This condition shall be met prior to the release of utilities, final inspection, or issuance of a certificate of occupancy, whichever occurs first. (PUBLIC WORKS) 10. PAVEMENT RESTORATION: Due to the proposed development making pavement cuts into the existing roadway, additional construction traffic, existing pavement condition, and additional future traffic all reducing the City Pavement Condition Index, the developer shall grind and pave Royal Way, from curb to curb, along the project frontage (full roadway width) with a minimum 3” hot mix AC with pavement section dig-out repairs where needed. The extent of the pavement section dig-out repairs to be determined by the developer’s geotechnical engineer and to be confirmed by the City Engineer. Identify this item on the first building submittal. (PUBLIC WORKS) 11. STREET RESURFACING PRIOR TO ACCEPTANCE: Streets in the public right of way shall be striped in paint as a final condition prior to the beginning of the one- year warranty period. Prior to final acceptance, the applicant shall apply a Type II slurry/microsufacing to all streets, and apply final street markings, per the approved plans, in thermoplastic to Caltrans Standards. All Type II slurry/microsurfacing and final striping shall be to the approval of the City Engineer. (PUBLIC WORKS) 12. STORMWATER MANAGEMENT FACILITIES MAINTENANCE AGREEMENT: The applicant shall execute a Stormwater Management Facilities Maintenance Agreement with the City Engineer as specified in Chapter 7.39.210-230 of the Stormwater Management and Discharge Control ordinance. The agreement shall outline the operation and maintenance (O&M) plan for the permanent storm water treatment facilities. The City-Standard Stormwater BMP Operation and Maintenance Agreement will be provided by Public Works Engineering. The agreement shall include the following: a. This Agreement shall also provide that in the event that maintenance or repair is neglected, or the stormwater management facility becomes a danger to public health or safety, the city shall have the authority to perform maintenance and/or repair work and to recover the costs from the owner. b. All on-site stormwater management facilities shall be operated and maintained in good condition and promptly repaired/replaced by the property owner(s) or other legal entity approved by the City. 7.A.h Packet Pg. 115 Attachment: TM 21-04 PC Resolution (3981 : Royal Way Townhomes) 4 c. Any repairs or restoration/replacement and maintenance shall be in accordance with City-approved plans. d. The property owner(s) shall develop a maintenance schedule for the life of any stormwater management facility and shall describe the maintenance to be completed, the time period for completion, and who shall perform the maintenance. This maintenance schedule shall be included with the approved Stormwater Runoff Management Plan. This agreement shall be executed prior to the first occupancy of the building. (PUBLIC WORKS) 13. STORMWATER MANAGEMENT FACILITIES INSPECTION: The Stormwater Management Facilities Maintenance Agreement work shall require inspections be performed which shall adhere to the following: a. To comply with the State Stormwater requirements and the NPDES permit, the applicant shall secure a QSD or QSP to maintain all erosion control and BMP measures during construction. The applicant’s QSD or QSP shall provide the City weekly inspection reports to the approval of the City Engineer. b. Stormwater facility inspections shall be done at least twice per year, once in Fall by October 1st, in preparation for the wet season, and once in Winter by March 15th. Written records shall be kept of all inspections and shall include, at minimum, the following information: 1. Site address; 2. Date and time of inspection; 3. Name of the person conducting the inspection; 4. List of stormwater facilities inspected; 5. Condition of each stormwater facility inspected; 6. Description of any needed maintenance or repairs; and 7. As applicable, the need for site re-inspection. c. Upon completion of each inspection, an inspection report shall be submitted to Public Works Engineering no later than October 1st for the Fall report, and no later than March 15th of the following year for the Winter report. d. Before commencing any grading or construction activities, the applicant shall obtain a National Pollutant Discharge Elimination System (NPDES) permit and provide evidence of filing of a Notice of Intent (NOI) with the State Water Resources Control Board. e. The applicant is responsible for ensuring that all contractors are aware of all storm water quality measures and implement such measures. Failure to comply with the approved construction BMPs will result in the issuance of correction notices, citations or a project stop order. f. Sequence of construction for all stormwater facilities (bioswales, detention/ retention basins, drain rock, etc.) shall be done toward final phases of project to prevent silting of facilities and reduce the intended use of the facilities. g. Prior to final inspection, all stormwater facilities will be tested by a certified QSP or QSD to meet the minimum design infiltration rate. All tests shall be made at on 20 ft x 20ft grid pattern over the surface of the completed stormwater facility unless otherwise approved by the City Engineer. 7.A.h Packet Pg. 116 Attachment: TM 21-04 PC Resolution (3981 : Royal Way Townhomes) 5 All soil and infiltration properties for all stormwater facilities shall be evaluated by the geotechnical engineer. Percolation tests (using Double Ring Infiltrometer Testing with appropriate safety factors) at horizontal and vertical (at the depth of the stormwater facility) shall be conducted for each stormwater facility. A 50% safety factor shall be applied to the calculated percolation test and shall be used as the basis for design (the design percolation rate). The geotechnical report shall include a section designated for stormwater design, including percolation results and design parameters. (PUBLIC WORKS) 7.A.h Packet Pg. 117 Attachment: TM 21-04 PC Resolution (3981 : Royal Way Townhomes) Community Development Department 7351 Rosanna Street, Gilroy, California 95020-61197 Telephone: (408) 846-0451 Fax (408) 846-0429 http://www.cityofgilroy.org DATE: October 6, 2022 TO: Planning Commission FROM: Jon Biggs, Special Assistant to City Administration SUBJECT: Proposed Tentative Map to divide 778 First Street into two parcels, Application No. TM 22-04 RECOMMENDATION: Staff has analyzed the proposed project, and recommends that the Planning Commission adopt a resolution, included with this agenda report, recommending that the City Council approve the proposed tentative map to divide 778 First Street into two parcels. PROJECT DESCRIPTION: The applicant, Craig Filice representing Castlewood Corner LLC, is seeking approval of a Tentative Map Application, TM 22-04, that will subdivide an approximately 75,482 square foot lot at 778 First Street into two lots having approximately 55,191 and 20,291 square feet, respectively. There are existing buildings and a building under construction on the site, along with other site improvements. The parcel map is proposed to create a separate lot for the new building already under construction. No new construction is proposed. There are currently two Assessor Parcels that make up the subject site, Assessor Parcel Numbers 808-12-035 & 808-12-036. The proposed property line creating the two separate lots, consistent with the current Assessor Parcels, generally runs down the middle of the site access drive aisle that extends from the driveway apron fronting on First Street to the rear of the site. A condition of approval requires that the owner formalize reciprocal easements between these parcels, to assure that access to each of the sites and parking spaces is maintained and available into the future. BACKGROUND: Subject Property and Surrounding Land Uses: The subject site is a 75,482 square foot corner lot located adjacent to the intersection of First Street and Wren Avenue at the south-east corner of this intersection. The site is developed with a mixture of uses 7.B Packet Pg. 118 2 within two separate buildings, one of which is under construction. Uses include retail, office, and a coffeeshop with drive-up window that will be within the building currently under construction. This building will also have one additional lease space; however, a tenant for that space has not been identified. In addition to the buildings, the site is improved with parking spaces, drive aisles, and landscaping and has all the services needed to facilitate a mixed-use operation such as water, wastewater lines, and power. Driveways at the site provide access to First Street and Wren Avenue. LOCATION EXISTING LAND USE GENERAL PLAN ZONING Project Site Mixed Use Commercial Mixed Use Corridor - High C-3, Shopping Center Commercial North Mixed Use Commercial Mixed Use Corridor - High C-3, Shopping Center Commercial South Residential High Density Residential C-3, Shopping Center Commercial East Residential High Density Residential R-3, Medium Density Residential West Mixed Use Commercial Mixed Use Corridor - High C-3, Shopping Center Commercial Background Information: As noted earlier in this report, the site is developed with two buildings, with on one building under construction in the center of the development. The parcel split is proposed for the new retail building, which will house a coffee shop and an additional retail lease space. An Architectural and Site Review permit (AS) was approved for the building under construction in 2019. Construction started in 2021. Environmental Determination: The proposed subdivision is exempt from further environmental review and qualifies for the State CEQA Guidelines Class 15 Exemption, Minor Land Divisions, because the proposed subdivision results in less than four parcels, is in conformance the City’s General Plan and Zoning, seeks no exceptions or variances, and all services and access to the resulting parcels is available. DISCUSSION AND ANALYSIS: General Plan Consistency: The City's General Plan designates the subject site as Mixed Use Corridor (MU), which supports the mix of uses on the site. This designation encourages a mix of retail, office, and high -density residential uses. Although there are no residential units on the current and proposed sites, it adjoins a residential development along the southern property line (existing drive aisle accessed from First Street provides alternate emergency access to these residential units) and there are more residential units within walking distance of the project site. The proposed division of the site does not impact the ability of the mix of uses on the site to continue. As such, the proposal conforms to the following goals and policies of the General Plan: General Plan Policy/Goal Consistency Analysis LU 1.4 Mix of Uses. Encourage a diverse mix of land uses to achieve a balance between jobs and housing, to ensure the community’s long-term viability, and to increase job Complies. The proposed subdivision helps preserve mix of uses on the project site and allows the property owner flexibility in the future to quickly address changing market circumstances. 7.B Packet Pg. 119 3 opportunities in the city to assist in equalizing the jobs/housing balance. LU 4.1 Clustering Commercial Uses. Encourage new commercial uses to group into clustered areas or centers containing professional offices, retail sales and services. Not Applicable. The subdivision would not change the existing approved development plan for this site. LU 7.1 Mixed-Use Districts. Encourage mixed-use development to locate within the Downtown and in the First Street Mixed-Use District. Substantially Complies. The proposed subdivision does not conflict with this policy and provides flexibility to the property owner to address market changes and preferences of the future. Goal EP 3 Maintain a supportive business climate that increases the City’s ability to support expansion of existing businesses and attraction of new businesses. The proposal supports the business climate by providing flexibility to the site, which can make it more responsive to market conditions of the future. Goal EP 5 Maintain and expand Gilroy’s retail sector to meet local and regional demands and generate tax revenues for City operations. The proposal allows for expansion and flexibility of retail establishments to meet local and regional demand; thus, supporting the generation of tax revenues for City operations. Zoning Code Conformance: The lot split is located in the C-3, Shopping Center Commercial, zone district. There are no minimum lot sizes in this zone district so the resulting lots of 55,191 square feet and 20,291 square feet respectively will be in compliance. The applicant is not requesting exceptions to any of the site development standards of the C-3 Zone District. Tentative Map Analysis: Subdivisions are subject to review consistent with Section 21.41(a) of the City Code. The City does not currently have a process for parcel maps, therefore the project requires review by the Planning Commission and City Council, consistent with this section. The tentative map as distributed to all departments and utilities agencies for review to ensure the project would create parcels suitable for development. The primary criteria applied to review of the lot split are discussed as follows: a) Flood Zone: The site is located in Flood Zone X, which is not a Special Flood Hazard Area. b) Site Layout: The site is developed with two buildings, one of which is under construction, and various other improvements such as drive aisles, parking spaces, landscaping, and utility improvements. No adjustments to the site layout are being proposed with the requested tentative map. Access to the site is by way of driveways that are on First Street and Wren Avenues. c) Design and Size of Lots: The proposed parcels will have 55,191 square feet and 20,291 square feet respectively and are of sufficient size and geometry to accommodate their buildings and other improvements. d) Density: There are no residential units existing or proposed on the project site; thus, no residential densities, or dwelling units per acre, are indicated. e) Circulation: Each resulting parcel will have frontage on First Street and the 7.B Packet Pg. 120 4 corner parcel will have frontage on Wren Avenue as well. Given the existing network of drive aisles on the site, all the parcels will can be accessed from First Street or Wren Avenue. f) Open Space: There are no open space requirements for parcels in this zone district and the majority of the existing and proposed parcels is dedicated to buildings, drive aisles, and parking. However, the site is landscaped especially at the edges of the parcel along their street frontages. g) Improvements: The existing and proposed parcels are developed and full services are and remain available. h) Property Dedications and Easements: In order to maintain ap propriate access among the existing and resulting parcels, a condition of approval requiring dedication of reciprocal driveway ingress and egress between the parcels is being recommended and included in Planning Commission’s Resolution attached with this agenda report. i) Transportation Alternatives: The resulting parcels of this proposed tentative map will each have frontage on First Street. There are a variety of transportation alternatives along the First Street frontage of the parcels due to recent and pas t improvements along the First Street corridor. The First Street corridor now contains dedicated bike lanes adjacent to the property and there is a sidewalk along this frontage as well with street trees planted within this pedestrian path that provide shade and a more pleasant walking experience. In addition to these existing bicycle and pedestrian amenities, there is a bus stop for local Transit Route 85 at the First Street and Wren intersection, which provides those visiting the site with another transportation opportunity. In all, the site is well served by alternate transportation sources. Pursuant to Gilroy City Code Section 21.41 approval of a tentative map must be made consistent with Subdivision Map Act section 66474. Based on the discussion herein, staff supports a recommendation of approval by the Planning Commission subject to the findings staff is suggesting and the conditions of approval that are included in the attached Resolution of this agenda report. Technical Advisory Committee (TAC): Project plans were routed to Engineering, Building, Police, and Fire representatives for internal review and comment. The TAC has considered the project and the recommendations of the TAC members have been incorporated into the project plans and/or are included as recommended conditions in attached resolution. PUBLIC NOTICING: Property owner information (i.e. list, labels, and map) within 500 feet of the subject site were generated by Stewart Title Company using current ownership data. On September 26, 2022 notices of this Planning Commission meeting were mailed to the property owners along within other interested parties. In addition, the property has been posted with on-site signage notifying passersby of pending development and that the Planning Commission public hearing packets are available through the City's webpage. APPEAL PROCEDURE: 7.B Packet Pg. 121 5 The Planning Commission’s action is not final, but rather a recommendation to the City Council. As such, the matter will be considered by the City Council at a public meeting, the date, location, and time of which will be posted and made available to the public. Attachments: 1. Location Map 778 First Street 2. Tentative Map First ST 3. PC Resolution TM 22-04 First 778 7.B Packet Pg. 122 Note: Map is for reference purposes only. City of Gilroy 3,920 City of Gilroy, GIS Services 653.3 1:NAD_1983_StatePlane_California_III_FIPS_0403_Feet 326.67 Feet653.30 LOCATION MAP - TM 22-04 7.B.a Packet Pg. 123 Attachment: Location Map 778 First Street (3991 : 778 First Tentative Map) COMPACTCIVIL ENGINEERSLAND SURVEYORSCONSTRUCTION MANAGERSHANNA-B UNTTIEST. 19107651 EIGLEBERRY STREET GILROY 95020 CALIFORNIAOFFICE (408) 842-2173 FAX (408) 842-3662EMAIL: ENGINEERING @ HANNABRUNETTI.COM1Preliminary Parcel MapCastlewood Corner LLC - 770 First Street - apn 808-12-036NOT FOR CONSTRUCTIONPRELIMINARY PLANSTentative Parcel Mapfor840 & 778 First Streetapn 808-12-036, 035in theCity of GilroyPARCEL 1 ON 830 M 6PROPOSEDCOMMERCIALBUILDINGEXISTING COMMERCIALBUILDING TO REMAIN7.B.bPacket Pg. 124Attachment: Tentative Map First ST (3991 : 778 First Tentative Map) COMPACT DRIVETHRUSTOPDRIVETHRUCIVIL ENGINEERSLAND SURVEYORSCONSTRUCTION MANAGERSHANNA-B UNTTIEST. 19107651 EIGLEBERRY STREET GILROY 95020 CALIFORNIAOFFICE (408) 842-2173 FAX (408) 842-3662EMAIL: ENGINEERING @ HANNABRUNETTI.COM2Existing ConditionsCastlewood Corner LLC - 770 First Street - apn 808-12-036NOT FOR CONSTRUCTIONPRELIMINARY PLANS7.B.bPacket Pg. 125Attachment: Tentative Map First ST (3991 : 778 First Tentative Map) 1 RESOLUTION NO. 2022-__ A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF GILROY RECOMMENDING APPROVAL TO THE GILROY CITY COUNCIL OF A TENTATIVE MAP FOR PROPERTY LOCATED AT 778 FIRST STREET INTO TWO PARCELS, APN’S: 808-12-035 & 808-12-036 (FILE NUMBER TM 22-04) WHEREAS, On July 25, 2022 an application was filed by Craig Filice representing Castlewood Corner LLC proposing the subdivision of a parcel at 778 First Street within the C-3, Shopping Center Commercial zone district; and WHEREAS, the application submittal was deemed complete on September 19, 2022; and WHEREAS, proposed subdivision is exempt from further environmental review and qualifies for the State CEQA Guidelines Class 15 Exemption, Minor Land Divisions, because the proposed subdivision results in less than four parcels, is in conformance the City’s General Plan and Zoning, seeks no exceptions or variances, and all services and access to the resulting parcels is available; and WHEREAS, the Planning Commission held a duly noticed public meeting on October 6, 2022 at which time the Planning Commission received and considered the staff report as well as all evidence received including written and oral public testimony related to the project; and WHEREAS, the location and custodian of the documents or other materials which constitute the record of proceedings upon which the project approval is based is the Community Development Department, Planning Division. NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the City of Gilroy hereby finds as follows: FINDINGS 1. The proposed Tentative Map to subdivide an approximately 1.73 acre site into two (2) new commercial lots is consistent with the intent of the goals and policies of the City's General Plan and the uses anticipated within the General Plan Mixed Use Land designation and City’s Zoning Ordinance and the City's Subdivision and Land Development Code, and the State Subdivision Map Act in that the proposed subdivision does not alter the existing mix of uses or make prohibitive a mix of commercial uses on the resulting parcels. 2. The site is physically suitable for the type of development given that it is a level site that is not in flood prone location does not have unique physical constraints and the size and geometry of the property complies with all applicable codes and ordinances and there are no exceptions to the site development standards of the C-3 Zone District. 3. There will be no significant environmental impacts as a result of this project, which 7.B.c Packet Pg. 126 Attachment: PC Resolution TM 22-04 First 778 (3991 : 778 First Tentative Map) Resolution No. 2022-__ Page 2 qualifies for the State CEQA Guidelines Class 15 Exemption, Minor Land Divisions, because the proposed subdivision results in less than four parcels, is in conformance the City’s General Plan and Zoning, seeks no exceptions or variances, and all services and access to the resulting parcels is available. 4. The design of the subdivision is not likely to cause serious public health problems given that public utilities and infrastructure improvements to serve the proposed parcels are in place as evidenced by the existing development on the site and the construction that is taking place. 5. The design of the subdivision and existing improvements will not and do not conflict with easements, acquired by the public at large, for access through or use of the property within the proposed subdivision. NOW, THEREFORE, BE IT FURTHER RESOLVED that the Planning Commission of the City of Gilroy hereby recommends to the Gilroy City Council approval of Tentative Map Application No. TM 22-04, subject to the conditions attached hereto as Exhibit A. PASSED AND ADOPTED this XX day of October by the following roll call vote: AYES: NOES: ABSTAIN: ABSENT: ATTEST: APPROVED: _____________________________ _____________________________________ Sharon Goei, Secretary Manny Bhandal, Chairperson 7.B.c Packet Pg. 127 Attachment: PC Resolution TM 22-04 First 778 (3991 : 778 First Tentative Map) Resolution No. 2022-__ Page 3 EXHIBIT A 778 FIRST STREET, TM 22-04 TENTATIVE MAP CONDITIONS OF APPROVAL __________ The following GENERAL conditions authorize specific terms of the project ENTITLEMENT(S). 1. APPROVED PROJECT: The approval for Tentative Parcel Map TM 22-04 is granted to subdivide a 75,482 square foot site into two (2) commercial parcels, located at 778 First Street (APN’s: 808-12-035 & 808-12-036) within the City of Gilroy C-3, Shopping Center Commercial, zoning district as shown on the Tentative Parcel Map prepared by Hanna and Brunetti, Civil Engineers and Land Surveyors for Castlewood Corner LLC, consisting of two (2) sheets, dated June 2022 and received by the Planning Division on July 25, 2022. Any future adjustment or modification to the plans, including any changes made at time of building permit submittal, shall be considered by the Community Development Director or designee, may require separate discretionary approval, and shall conform to all City, State, and Federal requirements, including subsequent City Code requirements or policies adopted by City Council. 2. COMPLIANCE WITH CONDITIONS: If Developer, owner or tenant fails to comply with any of the conditions of this permit, the Developer, owner or tenant shall be subject to permit revocation or enforcement actions pursuant to the City Code. All costs associated with any such actions shall be the responsibility of Developer, owner or tenant. 3. INDEMNIFICATION: Developer agrees, as a condition of permit approval, at Developer’s own expense, to defend, indemnify, and hold harmless the City of Gilroy (“the City”) and its officers, contractors, consultants, attorneys, employees and agents from any and all claim(s), action(s) or proceeding(s) brought against the City or its officers, contractors, consultants, attorneys, employees, or agents to challenge, attack, set aside, void or annul the approval of this resolution or any condition attached thereto or any proceedings, acts or determinations taken, including actions taken under the California Environmental Quality Act of 1970, as amended, done or made prior to the approval of such resolution that were part of the approval process. The following conditions shall be met prior to the approval of the FINAL MAP or PARCEL MAP, or other deadline as specified in the condition. 7.B.c Packet Pg. 128 Attachment: PC Resolution TM 22-04 First 778 (3991 : 778 First Tentative Map) Resolution No. 2022-__ Page 4 4. TENTATIVE MAP: An approved tentative parcel map, which shall expire twenty-four (24) months from the approval date, may be extended pursuant to the provisions of the Map Act. 5. COVENANTS, CONDITIONS, AND RESTRICTIONS: Any covenants, conditions, and restrictions (CC&Rs) applicable to the project property shall be consistent with the terms of this permit and the City Code. If there is a conflict between the CC&Rs and the City Code or this permit, the City Code or this permit shall prevail. ENGINEERING PROJECT SPECIFIC CONDITIONS OF APPROVAL 1. DRIVEWAY ACCESS EASEMENT - The applicant or owner shall dedicate reciprocal driveway ingress and egress easements. Said easements shall be approved by both affected property owners. The easements shall be approved by the City Engineer, recorded with the County Recorder’s Office, and a recorded copy of the document returned to the City prior to any City permits. The easement may also be designated on any associated parcel or subdivision map. 2. PARCEL MAP - It shall be the applicant's responsibility to have a parcel map, prepared by a person authorized to practice land surveying in California, delineating all parcels created or deleted and all changes in lot lines in conformance with the Gilroy Municipal Code. The parcel map shall be approved by the Department of Public Works and recorded with the County Recorder’s Office prior to the issuance of any City permits. A parcel map guarantee shall be submitted to the City, by the applicant’s title company, prior to release of the parcel map to the title company for recordation. Prior to the City’s release of the parcel map to the title company, the applicant may, at the discretion of the City Engineer, be required to submit to the City an electronic copy of the map in the AutoCAD Version being used by the City at the time of recordation. It is the applicant's responsibility to check with their title company and the County Recorder’s Office to determine the time necessary to have the map recorded after City approval. 7.B.c Packet Pg. 129 Attachment: PC Resolution TM 22-04 First 778 (3991 : 778 First Tentative Map) Community Development Department 7351 Rosanna Street, Gilroy, California 95020-61197 Telephone: (408) 846-0451 Fax (408) 846-0429 http://www.cityofgilroy.org DATE: October 6, 2022 TO: Planning Commission FROM: Cindy McCormick, Customer Service Manager SUBJECT: Annual Presentation to Council RECOMMENDATION: Accept report and provide feedback on any final edits to the presentation. BACKGROUND Each year, the City’s Boards, Committees, and Commissions give a presentation to the City Council, briefly describing the Commission and its members and providing an overview of the previous year’s actions and activities. The presentation is led by the Chair, with assistance from City staff (script and preparation of slides). Staff is also in attendance to help answer any questions the Council may have. DISCUSSION On September 1st, staff presented a draft power point for review and feedback by the Planning Commission. The Commission requested that staff include the following four projects in the presentation: Covale Taproom, Cold Storage, Chestnut & 10 Street commercial project, and the Gurries residential project. The draft power point with requested modifications will be presented to the Commission on October 6 th for additional feedback and final revisions. NEXT STEPS This year’s presentation to the Council is scheduled for Monday, November 21st at 6:00 PM in the Council Chambers. Chair Bhandal will lead the presentation. The in-person presentation is given in the early part of the Council agenda. 8.A Packet Pg. 130 Planning Current Project Log 1 City of Gilroy Planning Division - PROPOSED Dated:9/30/2022 App Type Legend: MA Mills Act Request Staff Directory Link A Annexation MM Minor Modification Cindy McCormick CM AS Architectural and Site Review SP Sign Permit Kraig Tambornini KT CUP Conditional Use Permit TM Tentative Map Melissa Durkin MAD DA Development Agreement TUP Temporary Use Permit Jon Biggs JB DTSUP Downtown Special Use Permit TR Tree Removal Permit Unassigned TBD DUP Downtown Use Permit USA Urban Service Area GPA General Plan Amendment V Variance HP Habitat Permit VMD Minor Deviation M Miscellaneous & Pre-Application Z Zoning Amendment DATE FILED PROJECT #LOCATION PROJECT NAME & DESCRIPTION APPLICANT PARCEL NUMBER(S)# Residential Units (if any)PLANNER Status xx/xx/xxxx DO NOT USE - INSERT NEW LINE BELOW 9/28-Pending AS 22-24 450 9th St Allium Plaza Sign Program Amendment 9/22-Pending TM 22-05 (22090031)6955 Camino Arroyo Gilroy Crossing lot split 9/13-Pending AS 22-31 Extension Cell Site Renewal Pending Payment 7/14-Pending HP 22-10 850 Holloway Habitat Permit for Product Exchange Center AS 21-26 KT Pending Payment 2/4-Pending HP 22-02 (22020014)6705 Silacci W ay Habitat Permit for AS 16-25 Ver Consultants 841-70-025 n/a KT Pending Payment 9/20/2022 AS 22-22 601 Renz PGE Substation Improvements TBD 9/15/2022 ZC 22-07 575 Las Animas Wireless facility KT 9/14/2022 TUP 22-06 6920 Monterey St Temp Event Use Jose Montes 841 66 033 KT 9/14/2022 AS 22-23 1986 Lavender New Hillside SFR MG/KT 9/14/2022 ZC 22-06 8655 Monterey St Wireless facility Verizon 790 27 006 KT 9/13/2022 HP 22-13 6300 Cameron Habitat permit for new Industrial Building per AS 21-20 (SCVHA GIL2022146)DJP/KT 9/9/2022 AS 22-21, GPA 22-03, ZC 22-05 710 Renz Lane Hotel with GPA and Rezone from Industrial to Commercial K Singh Nijjar 810 10 046, 047 CM 9/8/2022 M 22-10 6630, 6680, 6730 Monterey New Affordable Housing in GD Downtown District per SB 330 ROEM 841 14 007, 008, 009 94 mfr KT 9/1/2022 AS 22-20 2040 Portmarnock New Hillside SFR Maria Jianto 810-57-026 1sfr MG/CM Under Review by Mgroup 8/26/2022 AS 22-19, CUP 22-04 1000 Gilman New Ministorage use in M2-PUD SC Ventures LLC 841 18 086 KT 8/23/2022 AS 22-18 1920 Mantelli Drive New Hillside SFR Jhon Mecate 783-45-016 1sfr KT 8/9/2022 AS 22-17 2320 Wildrose Court New Hillside SFR Aminreza Ahmadi 783-46-039 1 SFR + 1 ADU CM incomplete 9/9 8/1/2022 ZC 22-05 2765 Hecker Pass ATT Zoning Clearance AT&T 783 04 004 KT 7/28/2022 AS 22-07 7251 Eagle Ridge Drive New Hillside SFR Woo Cheong 810-56-031 1 SFR CM incomplete 8/31 7/28/2022 AS 22-08 7265 Eagle Ridge Drive New Hillside SFR Woo Cheong 810-56-032 1 SFR CM incomplete 8/31 7/25/2022 TM 22-04 778 First 2 lot commercial developed site C Filice 808 12 036 no JB 5/25/2022 AS 22-16, V 22-01 201, 221 Yamane Drive 163,400 SF speculative industrial shell building Dennis Pauley 835-02-004, -057 no JB 5/24/2022 AS 22-15, Z 22-04 108 Chickadee Lane Mixed use project with 12 apartment units and 2,992 SF of retail space Linda Hinkle 790-66-057 12 MF units KT 5/18/2022 TM 22-03 7040 Church Street 3 lot subdivision Amanda Musy- Verdel 799-11-063 not yet JB 5/12/2022 TUP 22-05 Portrush Lane TUP for Model Home Complex Toll Bros 810-74-008 no JB 4/22/2022 HP 22-05 SVHA GIL 2022-090 Eagle Ridge Canyon Estates Habitat Plan Application Toll brothers 810-74-001 no JB Under Review by DJP 4/19/2022 M 22-06 Citywide Vending Policy City N/A no JB 3/23/2022 M 22-05 700 Gilman DRG pre-App for Self Storage and RV Parking Facility Andrew Kenny 841-18-086 no JB 3/17/2022 AS 22-09 (22030023) Portrush Court, Southerland Court, Walton Heath Court Canyon Estates - 19 new detached SFRs in Eagle Ridge Daniel Raia 810-74-001 thru -014; 810-75-001 thru -007, & - 011 19 sfr JB 3/15/2022 TM 22-02, Z 22-02 (22030029,30)Miller at Santa Teresa 54 lot subdivision and zone change of 37.54 acres from A1 to RH (SFR); consisting of 39 market rate tract homes, 14 custom homes and a clulbhouse.Ren Jizhong 810 23 005 53 sfr market rate JB Description:This log contains all major planning projects currently under consideration.Contact the planning division at PlanningDivision@CityofGilroy.org or call (408) 846-0440 if you have any questions regarding this information. C:\Users\zinnia.navarro\appdata\roaming\iqm2\minutetraq\gilroyca@gilroyca.iqm2.com\work\communications\51665166 9.A Packet Pg. 131 Communication: Planning Current Project Log (INFORMATIONAL ITEMS) Planning Current Project Log 2 3/9/2022 AS 22-06 (22030017)8820 Muraoka New steel shop building with ancillary offices Santino Orozco 835-31-028 no KT 1/31/2022 AS 22-03 (22010026)951 Renz Lane Two new industrial buildings totaling 205,600 SF Jun Lee 841-18-080, -081 no JB 11/30/2021 AS 21-23 (21110042)210 Las Animas New 7,949 SF industrial, building: approximately 4,975 SF for endeavour storage offices, wholesale and container storage yard (not mini storage) and approximately 3,000 SF for future tenant Lon Davis 835-02-013 no JB 9/1/2021 HP 21-13 Royal Way See TM 21-04 TMP Royal way, LLC 799-44-093, 094, 095, 096, 097, 098, 101, 109, and 110 4 single-family homes KT Under Review by DJP 9/1/2021 TM 21-04 (21090001); Z 21-05 (21090002); AS 21-17 (21090003); HP 21-13 (21080029)Royal Way Tentative Map, Zone Change, PUD Architectural & Site Review, and Habitat Plan Permit for a 45-unit townhouse project TMP Royal way, LLC 799-44-093, 094, 095, 096, 097, 098, 101, 109, and 110 4 single-family homes KT 8/30/2021 HP 21-12 (21080029) Club Drive, north of Santa Teresa Drive Habitat Plan Permit for the McCutchin Creek, Palomino I and II, and future Glen Loma Ranch area Glen Loma Group/Filice Family Estate 808-43-002, 808-43-003 n/a JB 7/30/2021 USA 21-01 (21070038)South Gilroy, see APNs USA Amendment (south Gilroy)Kerley, et. al. 808-25-001, -002, -003, - 004, -005 and 808-21-001, - 002, -003, -004 not yet CM on hold by applicant 7/29/2021 AS 21-13, TM 21-02 6970 Camino Arroyo Five lot development in Gilroy Crossings PUD Phase 2 for restaurant, gas station, two hotels and future industrial/medical use.B Desai 841 70 149 no KT 7/8/2021 MM 21-07 (21060028)2140 Hollyhock LN Riparian setback encroachment CEQA 783-70-015 no CM incomplete 7/8/2021 CUP 21-02 (21050024)/ AS 21-10 (21050022)8605 Murray Ave. Request to establish a dog boarding facility and caretaker unit in the Murray-Las Animas overlay district. Donald Melancon 835-01-003 Caretaker Unit KT 1/1/2021 GP 22-01 Citywide Housing Element 2023-2031 City City-Wide no CM draft 9/12/22 1/1/2021 M 20-05 Citywide SB 330 Compliance Checklist City City wide no CM 1/1/2021 M 21-06 Citywide Parklet policy City City wide no CM on hold 11/16/2020 AS20-23; M 20-12 (20070016)8000 Camino Arroyo Data Center Bernie Woytek 841-069-028, 841-069-039, 841-080-005 no CM scoping meeting Sep/Oct 9/29/2020 AS 20-18 (20100002) GLR Specific Plan; Northeast of Santa Teresa & West of Miller Architectural & Site review for the 40-unit multi-family Malvasia neighborhood Glen Loma Group 808-18-003, 808-18-024, 808-18-025, 808-18-026 40 MF JB 9/29/2020 AS 20-19 (20100003)Santa Teresa & West of Miller Knoll neighborhood.Developer; 408-847-808-18-025, 808-18-026 no JB 9/29/2020 TM 20-05 (20090053) / AS 20-18 (20100002) / AS 20-19 (20100003) GLR Specific Plan; Northeast of Santa Teresa & West of Miller Tentative Map for Glen Loma Ranch specific plan Canyon Creek, Rocky Knoll, and Malvasia neighorhoods. Totals 40 single-family units and 74 townhouse units. Includes Architectural & Site review for the 40-unit multi-family Malvasia neighborhood and and 34-unit multi-family Rocky Knoll neighborhood. Wren Investors, Developer; 408-847- 3911 808-18-003, 808-18-024, 808-18-025, 808-18-026 40 MF, see TM 20-05 JB 03/01/20 M 19-23 Citywide Mills Act Program - Ordinance, site visits, annual reports City City wide no CM on hold 09/24/19 M 19-10 Glen Loma Ranch Specific Plan Traffic study for Tenth Street Bridge Construction/Modification to consider elimination of bridge requirement Glen Loma Group no JB 08/02/18 M 18-18 (#18080001)Citywide Special Events Permit/Temporary Use Permit Policy City no MAD 06/27/18 M 21-10 Citywide Historical Resource Inventory (additions, removals)City City wide no CM on hold 05/04/18 AS 18-09 (18050017) Z 18-04 (18050018)Automall Pkwy. Zoning Amendment - Sign Ordinance -Electronic Billboard Arrow Sign Co.City wide no CM hearings in Nov/Jan 2023 09/04/16 Z 17-02 (#17030053)North of Santa Teresa Blvd Glen Loma Ranch Specific Plan update Wren Investors, Developer; 408-847- 3912 JB 9/2/2016 M 16-10 10th Street Bridge CEQA Documentation for 10th Street Bridge City N/A no JB 08/25/16 AS 16-33 (#16080044)W. Luchessa and Miller Ave.New Glen Loma Ranch Fire Station City of Gilroy no JB 12/02/15 GPA 15-02 (#15120002), Z 15-12 (#15120004)Downtown High Speed Rail Station Area Plan - Reactivation of contract w HSRA to prepare an updated plan is pending preparation by Dec 2022 City no KT C:\Users\zinnia.navarro\appdata\roaming\iqm2\minutetraq\gilroyca@gilroyca.iqm2.com\work\communications\51665166 9.A Packet Pg. 132 Communication: Planning Current Project Log (INFORMATIONAL ITEMS) Planning Current Project Log 3 9/28/2015 Z 15-03 ( includes Z 20-02 (20060030), Z 15-16 (#15120033)Citywide Comprehensive Zoning Ordinance Update & Admin Draft Zoning Map (Concurrent w GP 2040 GPA 13-02 Project), including bicycle parking standards, RDO & Admin hearing process amendments City City-Wide no KT 11/26/12 A 12-01 (#12110049) Z 12-09 (#12110052)Vickery & Kern Avenues Annexation of 5.46 acres and prezone to Neighborhood District Mark Hewell, Developer Phone: 408-483- 2400 not yet CM/MD 7/17/12 USA 14-02 (#14070058), USA 12-01 (#12070023)Vickery & Kern Avenues Urban Service Area amendment to incorporate of 55.66+/- acres into Gilroy’s Urban Service Area (USA) Wren Investors, Developer; 408-847- 3900 not yet CM/MD C:\Users\zinnia.navarro\appdata\roaming\iqm2\minutetraq\gilroyca@gilroyca.iqm2.com\work\communications\51665166 9.A Packet Pg. 133 Communication: Planning Current Project Log (INFORMATIONAL ITEMS)