No preview available
Resolution No. 2023-19 | Storm Drainage Master Plan | Adopted 04/03/2023 RESOLUTION NO. 2023-19 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GILROY ADOPTING THE STORM DRAINAGE SYSTEM MASTER PLAN FOR THE CITY OF GILROY WHEREAS, the 2022 Storm Drainage System Master (Plan) serves as a guide to assess the current operations and functionality of the City’s existing s torm drain system; and WHEREAS, the City last developed a Storm Drainage System Master Plan in 2004, which identified capacity deficiencies in the existing storm drain system and recommended improvements to alleviate existing deficiencies and serve future developments in the Gilroy Planning Area; and WHEREAS, Akel Engineering Group, Inc. was retained by the City Council in August 2019 to prepare the Plan; and WHEREAS, the objective of the Plan is to review and make recommendations on how the current sewer system can be upgraded within the City to best suit the sewer needs of the City in the future; and WHEREAS, the projects identified in the Plan will be added to the City’s Capital Improvement Program; and NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Gilroy hereby adopts the Storm Drain System Master Plan attached hereto and made a part hereof. PASSED AND ADOPTED by the City Council of the City of Gilroy at a regular meeting duly held on the 3rd day of April 2023 by the following roll call vote: AYES: COUNCIL MEMBERS: ARMENDARIZ, BRACCO, CLINE, MARQUES, TOVAR, BLANKLEY NOES: COUNCIL MEMBERS: NONE ABSTAIN: COUNCIL MEMBERS: NONE ABSENT: COUNCIL MEMBERS: HILTON APPROVED: Marie Blankley, Mayor ATTEST: _______________________ Thai Nam Pham, City Clerk Marie Blankley (Apr 4, 2023 14:49 PDT) Marie Blankley 2023 Storm DrainageSystem Master Plan City of Gilroy DRAF T CITY OF GILROY 2023 STORM DRAINAGE SYSTEM MASTER PLAN Final March 2023 74 3 3 N. F I RS T S T RE E T , S UI T E 1 0 3 • F RE S NO , CA LI F O RN I A 9 37 2 0 • ( 5 59) 43 6 -06 0 0 • F A X ( 55 9) 4 3 6 -0622 www.akeleng.com Smart Planning Our Water Resources March 29, 2023 City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 Attention: Gary Heap, P.E. City Engineer Subject: 2023 Storm Drainage System Master Plan – Final Report Dear Gary: We are pleased to submit the draft report for the City of Gilroy Storm Drainage System Master Plan. This master plan is a standalone document, though it was prepared as part of the integrated infrastructure master plans for the water, sewer, and storm drainage master plans. The master plan documents the following: •Existing system facilities, acceptable hydrologic and hydraulic performance criteria, and projected stormwater runoff consistent with the Urban Planning Area •Development of the City’s GIS-based hydrologic and hydraulic stormwater models. •Capacity evaluation of the existing system with improvements to mitigate existing deficiencies and to accommodate future growth. •Capital improvement program (CIP) with an opinion of probable construction costs and suggestions for cost allocations to meet AB 1600. We extend our thanks to you, Daryl Jordan, Director of Public Works and other City staff whose courtesy and cooperation were valuable components in completing this study. Sincerely, AKEL ENGINEERING GROUP, INC. Tony Akel, P.E., D. WRE President Enclosure: Report Acknowledgements City Council Marie Blankley, Mayor Dion Bracco , Mayor Pro Tempore Rebeca Armendariz Tom Cline Zach Hilton Carol Marques Fred Tovar Management Personnel Jimmy Forbis, City Administrator Daryl Jordan, P.E., Director of Public Works Gary Heap, P.E., City Engineer Jorge Duran, P.E., Senior City Engineer Sharon Goei, Community Development Director Matt Jones, Deputy Director of Public Works Other City Engineering, Planning, and Operations Staff City of Gilroy Storm Drainage System Master Plan TABLE OF CONTENTS PAGE NO. March 2023 i City of Gilroy Storm Drainage System Master Plan 0.0 EXECUTIVE SUMMARY ................................................................................................. ES-1 ES.1 STUDY OBJECTIVES ..................................................................................... ES-1 ES.2 INTEGRATED APPROACH TO MASTER PLANNING .................................... ES-1 ES.3 STUDY AREA DESCRIPTION......................................................................... ES-2 ES.4 SYSTEM PERFORMANCE AND DESIGN CRITERIA ..................................... ES-2 ES.5 HYDROLOGIC AND HYDRAULIC MODEL DEVELOPMENT.......................... ES-6 ES.6 CAPACITY EVALUATION ............................................................................... ES-6 ES.7 CAPITAL IMPROVEMENT PROGRAM ........................................................... ES-9 1.0 CHAPTER 1 - INTRODUCTION ...................................................................................... 1-1 1.1 BACKGROUND ............................................................................................... 1-1 1.2 SCOPE OF WORK .......................................................................................... 1-1 1.3 INTEGRATED APPROACH TO MASTER PLANNING .................................... 1-3 1.4 PREVIOUS MASTER PLANS .......................................................................... 1-3 1.5 RELEVANT REPORTS ................................................................................... 1-3 1.6 REPORT ORGANIZATION .............................................................................. 1-4 1.7 ACKNOWLEDGEMENTS ................................................................................ 1-4 1.8 UNIT CONVERSIONS AND ABBREVIATIONS ............................................... 1-5 1.9 GEOGRAPHIC INFORMATION SYSTEMS ..................................................... 1-5 2.0 CHAPTER 2 – PLANNING AREA CHARACTERISTICS ................................................ 2-1 2.1 STUDY AREA DESCRIPTION......................................................................... 2-1 2.2 WATERSHEDS AND DRAINAGE AREAS ...................................................... 2-1 2.2.1 Watersheds ....................................................................................... 2-3 2.2.2 Drainage Areas .................................................................................. 2-3 2.3 FLOODPLAINS ............................................................................................... 2-3 2.4 EXISTING SERVICE AREAS AND LAND USE ............................................... 2-6 2.5 HISTORICAL AND PROJECTED POPULATION............................................. 2-6 3.0 CHAPTER 3 – SYSTEM PERFORMANCE AND DESIGN CRITERIA ............................. 3-1 3.1 HYDROLOGIC CRITERIA ............................................................................... 3-1 3.1.1 Precipitation Characteristics .............................................................. 3-1 3.1.2 Design Storms ................................................................................... 3-1 3.1.3 Design Storm Events ......................................................................... 3-4 3.1.4 Soil Imperviousness........................................................................... 3-4 3.2 HYDRAULIC CRITERIA .................................................................................. 3-8 3.2.1 Gravity Conveyance Facilities ............................................................ 3-8 4.0 CHAPTER 4 – EXISTING FACILITIES AND MODEL DEVELOPMENT .......................... 4-1 4.1 HYDROLOGIC SYSTEM OVERVIEW ............................................................. 4-1 4.1.1 Watersheds ....................................................................................... 4-1 4.1.2 Drainage Areas .................................................................................. 4-1 4.1.3 Drainage Sub-catchment ................................................................... 4-3 4.2 HYDRAULIC SYSTEM OVERVIEW ................................................................ 4-4 4.2.1 Conveyance System .......................................................................... 4-4 4.2.2 Outfalls .............................................................................................. 4-4 4.3 MODEL DEVELOPMENT ................................................................................ 4-8 4.3.1 Modeling Software ............................................................................. 4-8 City of Gilroy Storm Drainage System Master Plan TABLE OF CONTENTS PAGE NO. March 2023 ii City of Gilroy Storm Drainage System Master Plan 4.3.2 Land Use and Routing Methodology .................................................. 4-8 4.3.3 Hydrological Soil Classification .......................................................... 4-9 4.3.4 Typical Channel Cross-Section .......................................................... 4-9 4.3.5 Physical Hydraulic Model Elements ................................................... 4-9 5.0 CHAPTER 5 – EVALUATION AND PROPOSED IMPROVEMENTS .............................. 5-1 5.1 OVERVIEW ..................................................................................................... 5-1 5.2 KNOWN AREAS OF CONCERN ..................................................................... 5-1 5.3 PIPELINE CONVEYANCE CAPACITY EVALUATION ..................................... 5-1 5.4 CAPACITY EVALUATION ANALYSIS ............................................................. 5-1 5.4.1 Alternative 1 - 8th Street 36-inch Pipeline Improvements .................... 5-4 5.4.2 Alternative 2 – Diverting Stormwater Runoff to Princevalle Channel .. 5-4 5.4.3 Ronan Channel Drainage Area .......................................................... 5-9 5.4.4 Miller Slough Drainage Area .............................................................. 5-9 5.4.5 North Uvas Drainage Area ................................................................. 5-10 5.4.6 South Uvas Drainage Area ................................................................ 5-10 5.4.7 Princevalle Drainage Area ................................................................. 5-11 5.4.8 Lower Miller Slough Drainage Area ................................................... 5-12 5.5 OUTFALLS ...................................................................................................... 5-12 6.0 CHAPTER 6 - CAPITAL IMPROVEMENT PROGRAM ................................................... 6-1 6.1 COST ESTIMATE ACCURACY ....................................................................... 6-1 6.2 COST ESTIMATE METHODOLOGY ............................................................... 6-2 6.2.1 Unit Costs .......................................................................................... 6-2 6.2.2 Construction Cost Index .................................................................... 6-2 6.2.3 Construction Contingency Allowance ................................................. 6-2 6.2.4 Project Related Costs ........................................................................ 6-2 6.3 CAPITAL IMPROVEMENT PROGRAM ........................................................... 6-4 6.3.1 Capital Improvement Costs ................................................................ 6-4 6.3.2 Pipelines ............................................................................................ 6-4 6.3.3 Recommended Cost Allocation Analysis ............................................ 6-9 City of Gilroy Storm Drainage System Master Plan TABLE OF CONTENTS PAGE NO. March 2023 iii City of Gilroy Storm Drainage System Master Plan FIGURES Figure ES.1 Regional Location Map ...................................................................... ES-3 Figure ES.2 Planning Area .................................................................................... ES-4 Figure ES.3 Existing Storm Drainage System ....................................................... ES-7 Figure ES.4 Capital Improvement Program ........................................................... ES-8 Figure 1.1 Regional Location Map .................................................................................... 1-2 Figure 2.1 Planning Area .................................................................................................. 2-2 Figure 2.2 Waterways and Watersheds ............................................................................ 2-4 Figure 2.3 FEMA 100 Year Flood Zones .......................................................................... 2-5 Figure 2.4 Existing Land Use ........................................................................................... 2-7 Figure 2.5 2040 General Plan Land Use .......................................................................... 2-8 Figure 3.1 10-Year/24-Hour Unit Hyetograph ................................................................... 3-5 Figure 4.1 Storm Drainage Areas ..................................................................................... 4-2 Figure 4.2 Existing Modeled Storm Drainage Systems ..................................................... 4-5 Figure 4.3 Hydrological Soil Classification ........................................................................ 4-10 Figure 4.4 Typical Channel Cross-Section ....................................................................... 4-11 Figure 5.1 Existing System Analysis 10-Year Design Storm ............................................. 5-2 Figure 5.2 Proposed Improvements Alternative 1 ............................................................. 5-5 Figure 5.3 Proposed Improvements Alternative 2 ............................................................. 5-6 Figure 6.1 Capital Improvement Program ......................................................................... 6-5 TABLES Table ES.1 Hydrologic and Hydraulic Design Criteria ........................................................ ES-5 Table ES.2 Unit Costs ....................................................................................................... ES-10 Table ES.3 Capital Improvement Program ......................................................................... ES-11 Table 1.1 Unit Conversions ............................................................................................. 1-6 Table 1.2 Abbreviations and Acronyms ........................................................................... 1-7 Table 2.1 Existing and Future Land Use ......................................................................... 2-9 Table 2.2 Historical and Projected Population ................................................................. 2-10 Table 3.1 Precipitation Depth-Duration-Frequency Data ................................................. 3-2 Table 3.2 Precipitation Depth-Duration-Frequency Comparison ...................................... 3-3 Table 3.3 Relevant Design Storms .................................................................................. 3-6 Table 3.4 Soil Imperviousness and SCS Curve Numbers ............................................... 3-7 Table 3.5 Hydrologic and Hydraulic Design Criteria ........................................................ 3-9 Table 4.1 Existing GIS Storm Pipe Inventory .................................................................. 4-6 Table 4.2 Existing Modeled Storm Pipe Inventory ........................................................... 4-7 Table 5.1 Storm Drainage System Problem Areas .......................................................... 5-3 Table 5.2 Proposed Improvements ................................................................................. 5-7 Table 6.1 Unit Costs ....................................................................................................... 6-3 Table 6.2 Capital Improvement Program ......................................................................... 6-6 City of Gilroy Storm Drainage System Master Plan TABLE OF CONTENTS March 2023 iv City of Gilroy Storm Drainage System Master Plan APPENDICES Appendix A Hydrology Review Appendix B Storm Drainage Area Hydrologic Routing March 2023 ES-1 City of Gilroy Storm Drainage System Master Plan 2023 City of Gilroy 0.0 EXECUTIVE SUMMARY This executive summary presents a brief background of the City of Gilroy’s (City) storm drainage system, the planning area characteristics, the hydrology and hydraulic criteria, and the hydrology and hydraulic model developments. These hydrology and hydraulic models were used to evaluate the capacity adequacy of the existing stormwater drainage system, for recommending improvements to mitigate existing deficiencies and for servicing future growth. The prioritized capital improvement program accounts for growth through the Gilroy Planning Area. ES.1 STUDY OBJECTIVES Recognizing the importance of planning, developing, and financing system facilities to provide reliable stormwater system service to existing customers and for servicing anticipated growth within the sphere of influence, the City initiated the 2022 Storm Drainage System Master Plan. The City of Gilroy authorized Akel Engineering Group Inc. to complete the following tasks: •Summarize the City’s existing stormwater system facilities. •Document growth planning assumptions and known future developments. •Update the stormwater system performance criteria and design storm event. •Develop new hydrologic and hydraulic models. •Evaluate the storm drainage facilities to address hydraulic capacity requirements from existing and projected developments. •Recommend a capital improvement program (CIP) with an opinion of probable construction costs. •Perform a cost allocation analysis for cost sharing purposes. •Develop a 2023 Storm Drainage System Master Plan Report. ES.2 INTEGRATED APPROACH TO MASTER PLANNING The City implemented an integrated master planning approach and contracted the services of Akel Engineering Group Inc. to prepare the following documents: •2023 Water System Master Plan •2023 Sewer System Master Plan •2023 Storm Drainage System Master Plan March 2023 ES-2 City of Gilroy Storm Drainage System Master Plan While each of these reports is published as a standalone document, it has been coordinated for consistency with the City’s General Plan. Additionally, each document has been cross referenced to reflect relevant analysis results with the other documents. ES.3 STUDY AREA DESCRIPTION The City of Gilroy is located in Santa Clara County near the west coast of California, south of City of San Francisco. The City of Gilroy lies within the seismically active region of San Francisco Bay. The City of Gilroy lies in the southern portion of the Santa Clara County and is the most southern City located within the county. The City is located approximately 32 miles southeast of the City of San Jose, 8 miles southeast of Morgan Hill, 25 miles east of City of Santa Cruz, and 16 miles northwest of City of Hollister. The City limits currently encompass 16.5 square miles, with an approximate population of 56,599 residents, according to Department of Finance as of January 2021. Figure ES.1 displays the City’s location. The City’s service area is generally bound to the north by Fitzgerald Avenue, to the northeast by San Ysidro Avenue, to the southeast by Camino Arroyo, to the west by Burchell Road and Rancho Vista Drive, and to the south by Carnadero Avenue. U.S. Route 101 divides the City in a southeast to northwest direction and the California State Route 152 (Hecker Pass Hwy) runs east- west direction in the northern half of the City. The topography is generally flat in the middle of the service area, with increasing slopes in the east and west side of the City due to the Santa Cruz Mountains to the west and the Diablo Range to the east. Figure ES.2 displays the planning area showing City limits, the Urban Growth Boundary (UGB) of the City and Planning Area / Sphere of Influence (SOI). The City operates and maintains a storm drainage system that covers the area within the City Limits. Currently, stormwater runoff discharges to the Uvas Creek, Ronan Channel, Miller Slough Channel, Princevalle Channel and Lower Miller Slough Channel. ES.4 SYSTEM PERFORMANCE AND DESIGN CRITERIA This report documents the City’s performance and design criteria that were used for evaluating hydrologic and hydraulic systems within the City’s drainage watershed (Table ES.1). Hydrologic criteria are developed to characterize the flood routing of rainfall runoff in a defined drainage system. Akel Engineering Group Inc. obtained the services of Kasraie Consulting to review the hydrologic modeling approach, applied rainfall depths and distributions, sub-catchment delineations, model runoff, and outflow hydrographs of this project. The hydraulic criteria for the storm drainage system were used to evaluate the capacity requirements of conveyance facilities . Two design storms were used for the evaluation of the City’s existing storm drainage system, and for the future drainage conveyance facilities. The 10-year 24-hour design storm was used for evaluating the pipeline conveyance facilities as well as to size future pipeline while the 100-year 24-hour design storm was used to determine if street flooding exceeds one foot in depth. !( !( !( Morgan Hill Watsonville Gilroy U n i o n P a c ifi c R a ilr o a d £¤101 £¤101 £¤101 £¤101 UV152 UV152 UV25 UV152 UV129 UV129 UV129 UV1 UV152 Calero Reservoir Anderson Reservoir Coyote Reservoir Uvas Reservoir Figure ES.1 Regional Location Map Storm Drainage System Master Plan City of Gilroy 5Updated: September 21, 2020 GIS 0120.5 Miles Legend !(Cities Railroads Highway City Limits Urban Growth Boundary Study Area Elevation (ft) 51 - 100 101 - 250 251 - 500 501 - 1,000 1,001 - 2,000 2,001 - 3,0009 - 50 3,001 - 3,792 Waterbodies Flie Path: P:\xGIS\GIS_Projects\Gilroy\Storm\200626-MP\GL_Fig1-1RLMap_092120.mxd City of Gilroy £¤101 £¤101 £¤101 UV152 UV152 UV25 UV152Union Paci f i c Rai l r oadCoyote Reservoir Canyon Pescadero Creek W ildcatH a t f i e l d CanyonCreekPajaro R ivPajaro R ivPajaro R ivPajaro RiverCarnadero CreekUvas Creek Miller SloughGar l i c Cr eekJones Cr eekSan Ysidro CreekLlagas CreekUvas Creek Ll agas Cre ekCoyote CreekLive Oak CreekLl agas Cr eekLlagas CreekL la g a s C r e e k C r e e k Figure ES.2 Planning Area Storm Drainage System Master Plan City of Gilroy 5Updated: April 15, 2022 GIS 0120.5 Miles Legend City Limits City Limits Area Specific Plan Areas Urban Service Area Urban Growth Boundary Sphere of Influence Boundary General Plan Area Roads Highways Railroads Rivers & Creeks Waterbodies File Path: P:\xGIS\GIS_Projects\Gilroy\Storm\200626-MP\GL_Fig2-1PlanningArea_041522.mxd Table ES.1 Hydrologic and Hydraulic Design Criteria Hydrology and Hydraulics Design Criteria Conveyance Facilities Pipelines 10-Year 24-Hour design storm to determine if storm water have a minimum of one foot of freeboard between the top of curb and the Hydraulic Grade Line. Streets 100-Year 24-Hour design storm to determine if flooding exceeds one foot in depth and can flood buildings or create safety hazards. Receiving Waters (Streams, Creeks, Channels) FEMA 100-year water surface elevations used for downstream control for facilities where 100-year flood maps are available. 9/16/2020 Storm Drainage System Master Plan City of Gilroy March 2023 ES-6 City of Gilroy Storm Drainage System Master Plan ES.5 HYDROLOGIC AND HYDRAULIC MODEL DEVELOPMENT Factors critical to the hydrologic model development include watersheds, drainage areas within each watershed, overland flow routing within drainage sub-catchments, and conveyance that makes full use of pipes as well as streets for routing 100-year design storm events. The hydraulic model was developed to evaluate the capacity adequacy of the City’s storm drainage system. The model was used to identify capacity deficiencies and to recommend improvements to mitigate those deficiencies. The hydrologic and hydraulic modeling software used for evaluating the capacity adequacy of the City’s storm drainage system, InfoSWMM by Innovyze Inc. The software uses the fully dynamic St. Venant’s Equation, which has a more accurate engine for simulating backwater and surcharge conditions. The software also incorporates the use of the Manning Equation in other calculations including upstream pipe flow conditions. The physical hydraulic model was thus developed, as shown on Figure ES.3. The model was populated to include rim elevations at manholes, invert elevations of pipelines, pipe sizes, pipe slopes, pipe lengths, and outfall elevations. Tributary catchments contributing runoff to the City’s drainage system were delineated based on 1 feet contours. The hydrologic model developed in InfoSWMM was used to generate runoff from these tributary catchments. Inflow hydrographs from the hydrologic model were then imported to the hydraulic model to simulate runoff entering the piped system. ES.6 CAPACITY EVALUATION The City’s hydrology and hydraulic models were used to evaluate the capacity adequacy of the existing system and for sizing future improvements. Using the criteria described in the System Performance and Design Criteria chapter, the hydrology and hydraulic models were used to recommend capacity improvements. The recommended pipe improvements to mitigate existing system deficiencies and to serve future growth are shown on Figure ES.4. !C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!CV £¤101UV152SUNRISE DRSANTA TERESA BLKERN AVWREN AVTHIRD STSECOND STP RI N C E V A L L E S TSIXTH STTENTH STUVAS PARK DRM U R R A Y A V RENZ LNLEWIS STMO N T E R E Y S T GOLDEN GATE AVBUENA VISTA AVM AR C E L L A A V LEAVESLEY RDS A N Y S ID R O A V A R R O Y O C IR M O N T E R E Y S T SOUTHSIDE DRS A NT A T E RES A B L S A N T A T E R E S A B L CASTRO VALLEY RDEAGLE RIDG E DRCLUB DRDAY RDMANTELLI DRUV152UV152£¤101L la g a s C r e e k Uvas CreekLlagas CreekUvas Creek303042182442483024481860335442722118184242361818183024364824242430242718243048302418181818241824302121183 6 2 448 363 0 424 2 42182142243624242418242418241818181818182 4 1827 242 4 2 4 2 4 184 8 607 218182 4 2 7 183 3 2 4 3636183636363 0 364224 6 05442 362418 1 8 27 3 6 2 1 72 241 8 24848448303024181824181 8 241 8 6 0 331821301821242730/42182724302418242427272418365418 1836361836181 8 18271 8 42181821181824244 242 1 8 1 8 184 2 1 8 1 8 181818423636Miller SloughR o n a n Ch a n n e l214 23648 3021PrincevalleM ille rChannelL o we r S lo u g h 242424363642246 0 6 0,,,,,,,,,,,, ,,,,,,,,,,,,,,,, , ,,,, , ,,, ,,,,,,,,,,,,,,,DAY RDPUEBLO STFigure ES.3Existing Modeled StormDrainage SystemStorm Drainage System Master Plan City of GilroyLegendExisting Modeled System!COutfallsPipes by Diameter18" or Less21" - 36"42" or GreaterChannelsNon-Modeled SystemPipesChannelsRoadsRailroadsCity LimitsUrban Growth BoundaryRivers & CreeksWaterbodies5Updated: April 14, 2022GIS00.510.25MileFile Path: P:\xGIS\GIS_Projects\Gilroy\Storm\200626-MP\GL_Fig4-1_ExistingSys_041422.mxd !C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!CV £¤101UV152SUNRISE DRSANTA TERESA BLKERN AVWREN AVTHIRD STSECOND STP RI N C E V A L L E S TSIXTH STTENTH STUVAS PARK DRM U R R A Y A V RENZ LNLEWIS STMO N T E R E Y S T GOLDEN GATE AVBUENA VISTA AVM AR C E L L A A V LEAVESLEY RDS A N Y S ID R O A V A R R O Y O C IR M O N T E R E Y S T SOUTHSIDE DRS A NT A T E RES A B L S A N T A T E R E S A B L CASTRO VALLEY RDEAGLE RIDG E DRCLUB DRDAY RDMANTELLI DRUV152UV152£¤101L la g a s C r e e k Uvas CreekLlagas CreekUvas Creek30304224424830244818603354427221181842423618181830243648242430242718304830241818181824182430213 6 2 448 363 0 424 2 42182142243618242418241818181818181827 242 4 2 4 184 8 607 218182 4 3 6 304 2 36363636363 0 364224 6 05442 362427 3 6 2 1 7 2 241 8 24848448303024181824181 8 241 8 6 0 331821301821242742/18272424182424272418365418 18361836181 8 18271 8 42181821181824241 8 1 8 1 8 181818423636Miller SloughR o n a n Ch a n n e l2136483021PrincevalleM ille rChannelL o we r S lo u g h 242424363642246 0 6 0,,,,,,,,,,,, ,,,,,,,,,,,,,,,, , ,,,, , ,,, ,,,,,,,,,,,,,,,DAY RDPUEBLO ST2 4 24P R-1 0 PR-119 0 9 0 N U -6 N U -5 NU-79024LM-54 8 P R -12 48 P R -13 LM-1L M -2 L M -4 LM-33 6 L M -6 2 7 M S -6 3024MS-2MS-43 0 MS-54 8 3 6 4 8 4 8 48 42RC-9R C -3 R C -5RC-7 R C -8 48RC-43 6 4 8 ,R C -7 R C -8 R C -6 30MS-13024RC-230RC-1303036NU-1NU-3SU-1NU-2303024NU-430424848PR-1PR-2PR-4PR-5PR-7PR-6PR-348483 0 5 4 PR -9 P R -8 NU -6 NU-890Figure ES.4Capital ImprovementProgramStorm Drainage System Master Plan City of GilroyLegendProposed Improvements!COutfallPipesExisting Modeled System!COutfallsPipes by Diameter18" or Less21" - 36"42" or GreaterChannelsNon-Modeled SystemPipesChannelsRoadsRailroadsCity LimitsUrban Growth BoundaryRivers & CreeksWaterbodies5Updated: April 15, 2022GIS00.510.25MileFile Path: P:\xGIS\GIS_Projects\Gilroy\Storm\200626-MP\GL_Fig6-1_CIP_Scen2_041522.mxd March 2023 ES-9 City of Gilroy Storm Drainage System Master Plan ES.7 CAPITAL IMPROVEMENT PROGRAM The Capital Improvement Program costs for the projects identified in this master plan for mitigating existing system deficiencies and for serving anticipated future growth throughout the City are summarized on Table ES.3, and are graphically represented on Figure ES.4. Each improvement was assigned a uniquely coded identifier corresponding to its respective hydrologic drainage area. The baseline costs for pipelines are shown in Table ES.2. The estimated construction costs include the baseline costs plus 30 percent contingency allowance to account for unforeseen events and unknown field conditions. Capital improvement costs include the estimated construction costs plus 30 percent project-related costs (engineering design, project administration, construction management and inspection, and legal costs). The costs in this Storm Drainage System Master Plan were benchmarked using a 20-City national average ENR CCI of 12,647, reflecting a date of November 2021. In total, the CIP project cost totals approximately $34.8 million dollars. Table ES.2 Unit Costs Storm Drainage System Master Plan City of Gilroy Pipelines (in)($/Lineal Foot) 24 245 27 283 30 302 36 358 42 414 48 489 54 545 60 564 66 622 72 678 84 866 90 928 Pipeline Casings $22 per inch diameter per liner foot Note : 3/29/2023 1. Unit costs are based on an ENR CCI Index Value of 13,176 (March 2023). Table ES.3 Capital Improvement Program Storm Drainage System Master Plan City of Gilroy Existing Diameter New/Parallel/ Replace Diameter Length Unit Cost Infr. Cost Existing Users Future Users Existing Users Future users (in)(in)(ft)($/lf)($)($)($)($)(%)(%)($)($) Ronan Channel Drainage Area RC-1 Sunrise Dr From Dream Catcher Way to Golden Sky Way 18 Replacement 30 400 302 120,601 121,000 158,000 206,000 100%0%206,000 0 RC-2 Mantelli Dr From Muir Drive to Delta Dr 18 Replacement 24 1,250 245 306,506 307,000 400,000 520,000 100%0%520,000 0 RC-3 Zamzow Ct From approx. 1,250' n/o Cohansey Ave to Cohansey Ave -New 48 1,200 489 586,990 587,000 764,000 994,000 8%92%74,621 919,379 RC-4 Cohansey Ave From approx. 350' e/o Monterey Rd to Murray Ave -New 48 1,450 489 709,280 710,000 923,000 1,200,000 0%100%0 1,200,000 RC-5 Murray Ave From Cohansey Ave to Tomkins Ct -New 48 2,800 489 1,369,643 1,370,000 1,781,000 2,316,000 9%91%219,340 2,096,660 RC-6 Murray Ave From Tomkins Ct to Ronan Channel 24 Replacement 48 600 489 293,495 294,000 383,000 498,000 13%87%67,178 430,822 RC-7 No Name Uno/Las Animas Ave From approx. 1,500' s/o Buena Vista Ave to San Ysidro Ave -New 36 3,400 358 1,216,516 1,217,000 1,583,000 2,058,000 91%9%1,875,920 182,080 RC-8 San Ysidro Ave From Las Animas Ave to approx. 500' n/o Leavesley Rd -New 48 3,425 489 1,675,367 1,676,000 2,179,000 2,833,000 79%21%2,227,585 605,415 RC-9 Leavesley Rd From approx. 220' e/o Forest St to approx. 360' e/o Forest St 18 Replacement 42 150 414 62,114 63,000 82,000 107,000 87%13%92,659 14,341 Subtotal - Ronan Channel Drainage Area 6,345,000 8,253,000 10,732,000 5,283,303 5,448,697 Miller Slough Drainage Area MS-1 Wren Ave From approx. 290' n/o First St to Lawrence Dr 24 Replacement 30 2,325 302 700,991 701,000 912,000 1,186,000 100%0%1,186,000 0 MS-2 First St From approx. 180' e/o Princevalle St to Sargent St 18 Replacement 24 525 245 128,732 129,000 168,000 219,000 100%0%219,000 0 MS-3 Sargent St From First St to Broadway 18 Replacement 24 425 245 104,212 105,000 137,000 179,000 100%0%179,000 0 MS-4 Broadway From Sargent St to Church St 18/21 Replacement 30 1,075 302 324,114 325,000 423,000 550,000 100%0%550,000 0 MS-5 Church St From Broadway to approx. 100' s/o Howson St 21 Replacement 30 400 302 120,601 121,000 158,000 206,000 100%0%206,000 0 MS-6 Monterey Rd From Second St to First St 18/24 Replacement 27 675 283 190,847 191,000 249,000 324,000 100%0%324,000 0 Subtotal - Miller Slough Drainage Area 1,572,000 2,047,000 2,664,000 2,664,000 0 North Uvas Drainage Area NU-1 Hecker Pass Hwy From approx. 3,080' w/o Santa Teresa Blvd to approx. 360' w/o Santa Teresa Blvd -New 30 2,825 302 851,742 852,000 1,108,000 1,441,000 0%100%0 1,441,000 NU-2 Hecker Pass Hwy From approx. 360' w/o Santa Teresa Blvd to Santa Teresa Blvd 24 Replacement 30 350 302 105,526 106,000 138,000 180,000 0%100%0 180,000 NU-3 Santa Teresa Blvd From approx. 70' s/o Hecker Pass Hwy to Uvas Creek 24 Replacement 30 2,575 302 776,367 777,000 1,011,000 1,315,000 0%100%0 1,315,000 NU-4 Westwood Dr From approx. 150' s/o Third St to Kentwood Ct 18 Replacement 24 425 245 104,212 105,000 137,000 179,000 100%0%179,000 0 Cost Sharing Baseline Constr. Costs Estimated Constr. Costs Capital Improv. Costs Improv. No.Alignment Limits Pipeline Improvements Infrastructure Costs Suggested Cost Allocation Table ES.3 Capital Improvement Program Storm Drainage System Master Plan City of Gilroy Existing Diameter New/Parallel/ Replace Diameter Length Unit Cost Infr. Cost Existing Users Future Users Existing Users Future users (in)(in)(ft)($/lf)($)($)($)($)(%)(%)($)($) Cost Sharing Baseline Constr. Costs Estimated Constr. Costs Capital Improv. Costs Improv. No.Alignment Limits Pipeline Improvements Infrastructure Costs Suggested Cost Allocation NU-5 Monterey Rd From Princevalle Channel to Victoria Dr -New 90 775 928 718,859 719,000 935,000 1,216,000 100%0%1,216,000 0 NU-6 Monterey Rd From Victoria Dr to approx. 950' n/o Farman Ln 42 Replacement 90 2,175 928 2,017,443 2,018,000 2,624,000 3,412,000 100%0%3,412,000 0 NU-7 ROW From Monterey Rd to approx. 970' n/o Uvas Creek -New 90 975 928 904,371 905,000 1,177,000 1,531,000 100%0%1,531,000 0 NU-8 ROW From approx. 970' n/o Uvas Creek to Uvas Creek -New 90 1,000 928 927,560 928,000 1,207,000 1,570,000 100%0%1,570,000 0 Subtotal - North Uvas Drainage Area 6,410,000 8,337,000 10,844,000 7,908,000 2,936,000 South Uvas Drainage Area SU-1 St Andrews Cir From Carnoustie Ct to approx. 380' nw/o Carnoustie Ct 18 Replacement 36 375 358 134,175 135,000 176,000 229,000 100%0%229,000 0 Subtotal - South Uvas Drainage Area 135,000 176,000 229,000 229,000 0 Princevalle Drainage Area PR-1 Third St From Santa Paula Dr to Wren Ave 27 Replacement 30 825 302 248,739 249,000 324,000 422,000 100%0%422,000 0 PR-2 Third St From Wren Ave to approx. 170' e/o Santa Theresa Dr 27 Replacement 42 675 414 279,515 280,000 364,000 474,000 100%0%474,000 0 PR-3 Third St From approx. 170' e/o Santa Theresa Dr to Santa Theresa Dr 27 Replacement 48 200 489 97,832 98,000 128,000 167,000 100%0%167,000 0 PR-4 Santa Theresa Dr From Third St to approx. 300' s/o Fourth St 27/30 Replacement 48 950 489 464,700 465,000 605,000 787,000 100%0%787,000 0 PR-5 ROW From Santa Theresa Dr to Miller Ave 30 Replacement 48 675 489 330,182 331,000 431,000 561,000 100%0%561,000 0 PR-6 Miller Ave From approx. 300' s/o Fourth St to Fifth St 30 Replacement 48 400 489 195,663 196,000 255,000 332,000 100%0%332,000 0 PR-7 Fifth St From Miller Ave to Princevalle St 30 Replacement 48 1,250 489 611,448 612,000 796,000 1,035,000 100%0%1,035,000 0 PR-8 Princevalle St From Third St to Fifth St 18 Replacement 30 1,250 302 376,877 377,000 491,000 639,000 100%0%639,000 0 PR-9 Princevalle St From Fifth St to Seventh St 42 Replacement 54 1,225 545 668,183 669,000 870,000 1,131,000 100%0%1,131,000 0 PR-10 Alexander St From Tenth St to Banes Ln 18 Replacement 24 825 245 202,294 203,000 264,000 344,000 84%16%288,575 55,425 PR-11 Banes Ln From Alexander St to Automall Pkwy 18 Replacement 24 625 245 153,253 154,000 201,000 262,000 89%11%234,103 27,897 PR-12 Monterey Rd From approx. 380' n/o 8th St to Angra Way -New 48 2,475 489 1,210,667 1,211,000 1,575,000 2,048,000 100%0%2,048,000 0 PR-13 Monterey Rd From Angra Way to Princevalle Channel 42 Replacement 48 775 489 379,098 380,000 494,000 643,000 100%0%643,000 0 Subtotal - Princevalle Drainage Area 5,225,000 6,798,000 8,845,000 8,761,678 83,322 Table ES.3 Capital Improvement Program Storm Drainage System Master Plan City of Gilroy Existing Diameter New/Parallel/ Replace Diameter Length Unit Cost Infr. Cost Existing Users Future Users Existing Users Future users (in)(in)(ft)($/lf)($)($)($)($)(%)(%)($)($) Cost Sharing Baseline Constr. Costs Estimated Constr. Costs Capital Improv. Costs Improv. No.Alignment Limits Pipeline Improvements Infrastructure Costs Suggested Cost Allocation Lower Miller Slough Drainage Area LM-1 Fourth St From Eigleberry St to Monterey Rd 18 Replacement 30 400 302 120,601 121,000 158,000 206,000 100%0%206,000 0 LM-2 Monterey Rd From Fourth St to Sixth St 27 Replacement 36 1,250 358 447,248 448,000 583,000 758,000 100%0%758,000 0 LM-3 Monterey Rd From Sixth St to Hornlein Ct 27 Replacement 42 425 414 175,991 176,000 229,000 298,000 100%0%298,000 0 LM-4 Monterey Rd From Hornlein Ct to approx. 240' n/o Eighth St 33 Replacement 42 775 414 320,924 321,000 418,000 544,000 100%0%544,000 0 LM-5 ROW From Rosanna St to Monterey Rd 18 Replacement 24 1,125 245 275,855 276,000 359,000 467,000 100%0%467,000 0 LM-6 Alexander St From Sixth St to Eighth St 24 Replacement 36 1,300 358 465,138 466,000 606,000 788,000 100%0%788,000 0 Subtotal - Lower Miller Slough Drainage Area 1,808,000 2,353,000 3,061,000 3,061,000 0 Total Costs Subtotal - Ronan Channel Drainage Area 6,345,000 8,253,000 10,732,000 5,283,303 5,448,697 Subtotal - Miller Slough Drainage Area 1,572,000 2,047,000 2,664,000 2,664,000 0 Subtotal - North Uvas Drainage Area 6,410,000 8,337,000 10,844,000 7,908,000 2,936,000 Subtotal - South Uvas Drainage Area 135,000 176,000 229,000 229,000 0 Subtotal - Princevalle Drainage Area 5,225,000 6,798,000 8,845,000 8,761,678 83,322 Subtotal - Lower Miller Slough Drainage Area 1,808,000 2,353,000 3,061,000 3,061,000 0 Total Improvement Costs 21,495,000 27,964,000 36,375,000 27,906,981 8,468,019 Notes: 3/29/2023 1. Cost estimates are based on the Engineering News Record (ENR) construction cost index (CCI) of 13,176 for March 2023 2. Baseline construction costs plus 30% to account for unforeseen events and unknown conditions. 3. Estimated construction cost plus 30% to cover other costs including: engineering design, project administration (developer and City staff), construction management and inspection, and legal costs. March 2023 1-1 City of Gilroy Storm Drainage System Master Plan 2023 City of Gilroy 1.0 CHAPTER 1 - INTRODUCTION This chapter provides a brief background of the City of Gilroy’s (City) Storm Drainage system, the need for this master plan, and the objectives of the study. Abbreviations, and definitions are also provided in this chapter. 1.1 BACKGROUND The City of Gilroy is located approximately 32 miles southeast of the City of San Jose, 8 miles southeast of Morgan Hill, 25 miles east of the City of Santa Cruz, and 16 miles northwest of City of Hollister (Figure 1.1). The City provides storm drainage services to approximately 17,000 residential, commercial, industrial, and institutional establishments. The City currently owns and operates more than 132 miles of storm drainage pipelines, with up to 84-inch pipe sizes. In 2004, the City of Gilroy developed a Storm Drainage System Master Plan that identified capacity deficiencies in the storm drainage system and recommended improvements to alleviate deficiencies and serve future developments in the Gilroy Planning Area. Recognizing the importance of planning, developing, and financing system facilities to provide enhanced stormwater drainage system service to existing customers and for servicing anticipated growth within the Gilroy Planning Area, the City initiated updating elements of the 2004 Storm Drainage System Master Plan, to reflect current land use conditions and General Plan updates. 1.2 SCOPE OF WORK City Council approved Akel Engineering Group Inc. to prepare this 2022 Storm Drainage System Master Plan (SDSMP) and a concurrent Water System Master Plan and Sewer System Master Plan. The 2022 SDSMP evaluates the City’s storm drainage system and recommends capacity improvements necessary to service the needs of existing users and for servicing the future growth of the City. This 2022 SDSMP is intended to serve as a tool for planning and phasing the construction of future storm drainage infrastructure for the projected buildout of the City’s service area. The planning area and horizon for this master plan is based on the City’s 2040 General Plan. Should planning conditions change, and depending on their magnitude, adjustments to the master plan recommendations might be necessary. The master plan included the following tasks: •Summarize the City’s existing stormwater system facilities. •Document growth planning assumptions and known future developments. •Update the stormwater system performance criteria and design storm event. •Develop new hydrologic and hydraulic models. !( !( !( Morgan Hill Watsonville Gilroy U n i o n P a c ifi c R a ilr o a d £¤101 £¤101 £¤101 £¤101 UV152 UV152 UV25 UV152 UV129 UV129 UV129 UV1 UV152 Calero Reservoir Anderson Reservoir Coyote Reservoir Uvas Reservoir Figure 1.1 Regional Location Map Storm Drainage System Master Plan City of Gilroy 5Updated: September 21, 2020 GIS 0120.5 Miles Legend !(Cities Railroads Highway City Limits Urban Growth Boundary Study Area Elevation (ft) 51 - 100 101 - 250 251 - 500 501 - 1,000 1,001 - 2,000 2,001 - 3,0009 - 50 3,001 - 3,792 Waterbodies Flie Path: P:\xGIS\GIS_Projects\Gilroy\Storm\200626-MP\GL_Fig1-1RLMap_092120.mxd March 2023 1-3 City of Gilroy Storm Drainage System Master Plan • Evaluate the storm drainage facilities to address hydraulic capacity requirements from existing and projected developments. • Recommend a capital improvement program (CIP) with an opinion of probable construction costs. • Perform a cost allocation analysis for cost sharing purposes. • Develop a 2023 Storm Drainage System Master Plan Report. 1.3 INTEGRATED APPROACH TO MASTER PLANNING This City implemented an integrated master planning approach and contracted the services of Akel Engineering Group Inc. to prepare the following documents: • 2023 Water System Master Plan • 2023 Sewer System Master Plan • 2023 Storm Drainage System Master Plan While each of these reports is published as a standalone document, it has been coordinated for consistency with the City’s 2040 General Plan. Additionally, each document has been cross referenced to reflect relevant analysis results with the other documents. 1.4 PREVIOUS MASTER PLANS The City’s most recent storm drainage master plan was completed in 2004. This master plan included evaluation of servicing growth to the planning area, evaluating the existing system, and identifying storm drainage improvements required to serve future growth. Additionally, the 2004 master plan included the development of the hydrologic and hydraulic models, which were used for evaluating the storm drainage system. Improvements were recommended for servicing existing and future growth areas, and a corresponding Capital Improvement Program was developed to quantify the costs associated with each improvement. 1.5 RELEVANT REPORTS The City has completed several special studies intended to evaluate localized growth. These reports were referenced and used during the capacity analysis. The following lists relevant reports that were used in the completion of this master plan, as well as a brief description of each document: • City of Gilroy 2040 General Plan, November 2020 (2040 GP). The City’s 2040 General Plan provides future land use planning, and growth assumptions for the Planning Area. Additionally, this report establishes the planning horizon for improvements in this master plan. March 2023 1-4 City of Gilroy Storm Drainage System Master Plan •City of Gilroy Storm Drainage System Master Plan, May 2004 (2004 SDSMP). This report documents the planning and performance criteria, evaluates the storm drainage system, recommends improvements, and provides an estimate of costs. 1.6 REPORT ORGANIZATION The Storm Drainage System Master Plan report contains the following chapters: Chapter 1 – Introduction. This chapter provides a brief background of the City’s Storm Drainage system, the need for this master plan, and the objectives of the study. Unit conversions, abbreviations, and definitions are also provided in this chapter. Chapter 2 – Planning Area Characteristics. This chapter presents a discussion of the planning area characteristics affecting the hydrologic and hydraulic analysis of this master plan. These characteristics include soil, topography, floodplains, and land use. Chapter 3 – System Performance and Design Criteria. This chapter presents the City’s planning and design criteria that were used for evaluating hydrologic and hydraulic systems within the City’s drainage watershed. Chapter 4 –Existing Facilities Model Development. This chapter defines the hydrologic delineation of storm drainage areas, routing to their respective receiving facilities, and includes the hydrologic model development. Additionally, this chapter includes an overview of the storm drainage system, and the hydraulic model development. Chapter 5 – Evaluation and Proposed Improvements. This chapter presents a summary of the storm drainage system evaluation and identifies improvements needed to mitigate existing deficiencies, as well as improvements needed to expand the system and service future growth. Chapter 6 – Capital Improvement Program. This chapter provides a summary of the recommended storm drainage system improvements intended to mitigate existing capacity deficiencies and for accommodating anticipated future growth. This chapter also presents the cost criteria and methodologies for developing the Capital Improvement Program (CIP). Finally, a cost allocation analysis, usually used for cost sharing purposes, is also included. 1.7 ACKNOWLEDGEMENTS Obtaining the necessary information to successfully complete the analysis presented in this report, and developing the long-term strategy for mitigating the existing system deficiencies and for accommodating future growth, was accomplished with the strong commitment and very active input from dedicated team members including: •Daryl Jordan, P.E.; Director of Public Works •Gary Heap, P.E.; City Engineer •Jorge Duran, P.E.; Senior City Engineer March 2023 1-5 City of Gilroy Storm Drainage System Master Plan •Matt Jones, Deputy Public Works Director 1.8 UNIT CONVERSIONS AND ABBREVIATIONS Engineering units were used in reporting flow rates and volumes pertaining to the design and operation of various components of the storm drainage system. Where it was necessary to report values in smaller or large quantities, different sets of units were used to describe the same parameter. Values reported in one set of units can be converted to another set of units by applying a multiplication factor. A list of multiplication factors for units used in this report are shown on Table 1.1. Various abbreviations and acronyms were also used in this report to represent relevant storm drainage system terminologies and engineering units. A list of abbreviations and acronyms is included in Table 1.2. 1.9 GEOGRAPHIC INFORMATION SYSTEMS This master planning effort made extensive use of Geographic Information Systems (GIS) technology, for completing the following tasks: •Developing the physical characteristics of the hydraulic model. •Delineating stormwater tributary areas, and outlining watershed areas. •Extracting ground elevations along the storm drainage system from available contour maps and digital elevation models. •Generating maps and exhibits used in this master plan. Table 1.1 Unit Conversions Storm Drainage System Master Plan City of Gilroy Volume Unit Calculations To Convert From:To:Multiply by: acre feet gallons 325,857 acre feet cubic feet 43,560 acre feet million gallons 0.3259 cubic feet gallons 7.481 cubic feet acre feet 2.296 x 10-5 cubic feet million gallons 7.481 x 10-6 gallons cubic feet 0.1337 gallons acre feet 3.069 x 10-6 gallons million gallons 1 x 10-6 million gallons gallons 1,000,000 million gallons cubic feet 133,672 million gallons acre feet 3.069 Flow Rate Calculations To Convert From:To:Multiply By: ac-ft/yr mgd 8.93 x 10-4 ac-ft/yr cfs 1.381 x 10-3 ac-ft/yr gpm 0.621 ac-ft/yr gpd 892.7 cfs mgd 0.646 cfs gpm 448.8 cfs ac-ft/yr 724 cfs gpd 646300 gpd mgd 1 x 10-6 gpd cfs 1.547 x 10-6 gpd gpm 6.944 x 10-4 gpd ac-ft/yr 1.12 x 10-3 gpm mgd 1.44 x 10-3 gpm cfs 2.228 x 10-3 gpm ac-ft/yr 1.61 gpm gpd 1,440 mgd cfs 1.547 mgd gpm 694.4 mgd ac-ft/yr 1,120 mgd gpd 1,000,000 9/16/2020 Table 1.2 Abbreviations and Acronyms Storm Drainage System Master Plan City of Gilroy Abbreviation Expansion Abbreviation Expansion 2016 SDSMP 2016 Storm Drainage System Master Plan ft Feet 10Yr-24Hr 10-Year 24-Hour fps Feet per Second 100Yr-24Hr 100-Year 24-Hour GIS Geographic Information Systems AC Acre HDPE High Density Polyethylene Pipe ACP Asbestos Cement Pipe in Inch Akel Akel Engineering Group, Inc.in/hr Inch per Hour Caltrans California Department of Transportation LF Linear Feet City City of Gilroy mi Miles CCI Construction Cost Index NRCS National Resource Conservation Service cfs Cubic Feet per Second NOAA National Oceanic and Atmospheric Administration CI Cast Iron Pipe PVC Polyvinyl Chloride Pipe CIP Capital Improvement Program RCP Reinforced Concrete Pipe County County of Santa Clara ROW Right of Way CMP Corrugated Metal Pipe SCS Soil Conservation Service DIP Ductile Iron Pipe SOI Sphere of Influence DDF Depth Duration Frequency SSURGO Soil Survey Geographic database ENR Engineering News Record SWMM Stormwater Management Model EPA Environmental Protection Agency UGB Urban Growth Boundary DOF Department of Finance UWMP Urban Water Management Plan FEMA Federal Emergency Management Agency VCP Verified Clay Pipe 9/16/2020 March 2023 2-1 City of Gilroy Storm Drainage System Master Plan 2023 City of Gilroy 2.0 CHAPTER 2 – PLANNING AREA CHARACTERISTICS This chapter presents a discussion of the planning area characteristics affecting the hydrologic and hydraulic analysis of this master plan. These characteristics include soil, topography, floodplains, and land use. 2.1 STUDY AREA DESCRIPTION The City of Gilroy is located in Santa Clara County near the west coast of California, south of City of San Francisco. The City of Gilroy lies within the seismically active region of San Francisco Bay. The City of Gilroy lies in the southern portion of the Santa Clara County and is the most southern City located within the county. The City is located approximately 32 miles southeast of the City of San Jose, 8 miles southeast of Morgan Hill, 25 miles east of City of Santa Cruz, and 16 miles northwest of City of Hollister. The City limits currently encompass 16.5 square miles, with an approximate population of 57,000 residents, according to Department of Finance as of January 2021. Figure 1.1 displays the City’s location. The City’s service area is generally bound to the north by Fitzgerald Avenue, to the northeast by San Ysidro Avenue, to the southeast by Camino Arroyo, to the west by Burchell Road and Rancho Vista Drive, and to the south by Carnadero Avenue. U.S. Route 101 divides the City in a southeast to northwest direction and the California State Route 152 (Hecker Pass Hwy) runs east- west direction in the northern half of the City. The topography is generally flat in the middle of the service area, with increasing slopes in the east and west side of the City due to the Santa Cruz Mountains to the west and the Diablo Range to the east. Figure 2.1 displays the planning area showing City limits, the Urban Growth Boundary (UGB) of the City and Planning Area / Sphere of Influence (SOI). The City operates and maintains a storm drainage system that covers the area within the City Limits. Currently, stormwater runoff discharges to the Uvas Creek, Ronan Channel, Miller Slough Channel, Princevalle Channel and Lower Miller Slough Channel, as describe in the following section. 2.2 WATERSHEDS AND DRAINAGE AREAS The City of Gilroy maintains a rich diversity of land use types, which contribute to a varying degree of stormwater runoff containment needs. Several creeks, a vast array of agricultural lands, small pockets of development, and the City itself comprises the wide array of runoff generation and conveyance within the planning area. City of Gilroy £¤101 £¤101 £¤101 UV152 UV152 UV25 UV152Union Paci f i c Rai l r oadCoyote Reservoir Canyon Pescadero Creek W ildcatH a t f i e l d CanyonCreekPajaro R ivPajaro R ivPajaro R ivPajaro RiverCarnadero CreekUvas Creek Miller SloughGar l i c Cr eekJones Cr eekSan Ysidro CreekLlagas CreekUvas Creek Ll agas Cre ekCoyote CreekLive Oak CreekLl agas Cr eekLlagas CreekL la g a s C r e e k C r e e k Figure 2.1 Planning Area Storm Drainage System Master Plan City of Gilroy 5Updated: April 15, 2022 GIS 0120.5 Miles Legend City Limits City Limits Area Specific Plan Areas Urban Service Area Urban Growth Boundary Sphere of Influence Boundary General Plan Area Roads Highways Railroads Rivers & Creeks Waterbodies File Path: P:\xGIS\GIS_Projects\Gilroy\Storm\200626-MP\GL_Fig2-1PlanningArea_041522.mxd March 2023 2-3 City of Gilroy Storm Drainage System Master Plan 2.2.1 Watersheds The City has multiple major watersheds within the Urban Growth Boundary that collect and convey stormwater runoff, and are as follows: Uvas Creek, Llagas Creek, and Pajaro River (Figure 2.2). The following are brief descriptions of the three watersheds: • Uvas Creek Watershed – The portion of the Uvas Creek Watershed within the City limits is generally defined as the area bounded by Rancho Vista Drive to the west and Santa Teresa Boulevard to the east, with the northern and southern boundaries approximately represented by Uvas Creek and Santa Cruz Mountain respectively. • Llagas Creek Watershed – The portion of the Lower Coyote Creek Watershed within the City limits is generally bounded by Olea Court to the west and Llagas Creek to the east, with the northern and southern boundaries approximately represented by Fitzgerald Avenue and Luchessa Avenue respectively. • Pajaro River Watershed – The Pajaro River Watershed within the City limits is generally defined as the area bounded by Uvas Creek to the west and Llagas Creek to the east, with the northern and southern boundaries approximately represented by Luchessa Avenue and Southside Drive respectively. 2.2.2 Drainage Areas Watersheds are typically comprised of smaller drainage areas defined by topographical features. Additionally, these drainage areas may comprise multiple soil types as defined by Natural Resources Conservation Service (NRCS). The City’s storm drainage system consists of a series of conveyance networks. These networks have different means of disposing of stormwater runoff, which include outfall points to Uvas Creek or Llagas Creek, or being conveyed to the canals and sloughs throughout the City. 2.3 FLOODPLAINS Floodplains are important for delineating the extent of water-level rise during major floods. Typically, floodplains are estimated for the historic 100-Year and 500-Year flood. Most of the floodplains for the City are located southeast boundary of the City limits, as shown on Figure 2.3. The Federal Emergency Management Agency (FEMA) produces Flood Insurance Rate Maps that show areas subject to flooding during major storm events. The flood risk information shown on these maps is based on historical data, including meteorological, hydrological, and hydraulic data for the specified area. The map creation is a result of the 1968 National Flood Insurance Program, aimed at reducing or preventing property owner losses due to flooding by allowing premiums to be paid for those in need of protection. !C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!CV £¤101UV152SUNRISE DRSANTA TERESA BLKERN AVWREN AVTHIRD STSECOND STP R IN C E V A L L E S TSIXTH STTENTH STUVAS PARK DRM U R R A Y A V RENZ LNLEWIS STM O N T E R E Y S T GOLDEN GATE AVBUENA VISTA AVM A R C E L L A A V LEAVESLEY RDS A N Y S ID R O A V A R R O Y O C IR M O N T E R E Y S T SOUTHSIDE DRS A N T A T E R E S A B L S A N T A T E R E S A B L CASTRO VALLEY RDEAGLE RIDG E DRCLUB DRDAY RDMANTELLI DRUV152UV152£¤101L la g a s C r e e k Uvas CreekLlagas CreekUvas Creek303042182442483024481860335442722118184242361818183024364824242430242718243048302418181818241824302121183 6 2 448 363 0 424 2 42182142243624242418242418241818181818182 4 1 8 27242 4 2 4 2 4 184 8 607 218182 4 2 7 183 3 2 4 3636183636363 0 364224 6 05442 36241 8 1 8 27 3 6 2 1 7 2 241 8 24848448303024181824181 8 241 8 6 0 331821301821242730/4218272430241824242727241836541 8 1836361836181 8 18271 8 42181821181824244 242 1 8 1 8 184 2 1 8 1 8 181818423636Miller SloughR o n a n Ch a n n e l214 23648 3021PrincevalleM ille rChannelL o w e r S lo u g h 242424363642246 0 6 0,,,,,,,,,,,, ,,,,,,,,,,,,,,,, , ,,,, , ,,, ,,,,,,,,,,,,,,,DAY RDPUEBLO STUvas CreekWatershedLlagas CreekWatershedPajaro RiverWatershedFigure 2.2Waterwaysand WatershedsStorm Drainage System Master PlanCity of GilroyLegendExisting Modeled System!COutfallsPipes by Diameter18" or Less21" - 36"42" or GreaterChannelsNon-Modeled SystemPipesChannelsWatershed BoundariesLlagas CreekPajaro RiverUvas CreekRoadsRailroadsCity LimitsUrban Growth BoundaryRivers & CreeksWaterbodies5Updated: April 14, 2022GIS00.510.25MileFile Path: P:\xGIS\GIS_Projects\Gilroy\Storm\200626-MP\GL_Fig2-2_Watersheds_041522.mxd !C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!CV £¤101UV152SUNRISE DRSANTA TERESA BLKERN AVWREN AVTHIRD STSECOND STP R IN C E V A L L E S TSIXTH STTENTH STUVAS PARK DRM U R R A Y A V RENZ LNLEWIS STM O N T E R E Y S T GOLDEN GATE AVBUENA VISTA AVM A R C E L L A A V LEAVESLEY RDS A N Y S ID R O A V A R R O Y O C IR M O N T E R E Y S T SOUTHSIDE DRS A N T A T E R E S A B L S A N T A T E R E S A B L CASTRO VALLEY RDEAGLE RIDG E DRCLUB DRDAY RDMANTELLI DRUV152UV152£¤101L la g a s C r e e k Uvas CreekLlagas CreekUvas Creek303042182442483024481860335442722118184242361818183024364824242430242718243048302418181818241824302121183 6 2 448 363 0 424 2 42182142243624242418242418241818181818182 4 1 8 27242 4 2 4 2 4 184 8 607 218182 4 2 7 183 3 2 4 3636183636363 0 364224 6 05442 36241 8 1 8 27 3 6 2 1 7 2 241 8 24848448303024181824181 8 241 8 6 0 331821301821242730/4218272430241824242727241836541 8 1836361836181 8 18271 8 42181821181824244 242 1 8 1 8 184 2 1 8 1 8 181818423636Miller SloughR o n a n Ch a n n e l214 23648 3021PrincevalleM ille rChannelL o w e r S lo u g h 242424363642246 0 6 0,,,,,,,,,,,, ,,,,,,,,,,,,,,,, , ,,,, , ,,, ,,,,,,,,,,,,,,,DAY RDPUEBLO STFigure 2.3FEMA 100 YearFlood ZonesStorm Drainage System Master PlanCity of GilroyLegendFEMA 100 Year Flood Zones0.2% Annual Chance Flood Hazard1% Annual Chance Flood HazardRegulatory FloodwayArea of Minimal Flood HazardArea with Reduced Risk Due to LeveeArea of undetermined Flood HazardExisting Modeled System!COutfallsPipes by Diameter18" or Less21" - 36"42" or GreaterChannelsNon-Modeled SystemPipesChannelsRoadsRailroadsCity LimitsUrban Growth BoundaryRivers & CreeksWaterbodies5Updated: April 14, 2022GIS00.510.25MileFile Path: P:\xGIS\GIS_Projects\Gilroy\Storm\200626-MP\GL_Fig2-3_FEMA_Flood_041522.mxd March 2023 2-6 City of Gilroy Storm Drainage System Master Plan 2.4 EXISTING SERVICE AREAS AND LAND USE The City’s storm drainage system services residential and non-residential lands within the City limits, as summarized on Table 2.1, and shown graphically on Figure 2.4. Areas within the City limit include 4,197 acres of developed lands and 4,905 acres of undeveloped lands. At ultimate development of the General Plan, the City’s storm drainage system is anticipated to service approximately 3,045 acres of residential land use, 4,750 acres of non-residential land use, and 2,477 acres of open space land use, for a total of 10,272 acres inside the City’s Urban Growth Boundary (Table 2.1). The land use designations utilized in this master plan are consistent with the Land Use Element of the City’s 2040 General Plan received from the City’s planning division, and shown on Figure 2.5. 2.5 HISTORICAL AND PROJECTED POPULATION According to California Department of Finance (DOF) population estimates, the 2021 City population is approximately 57,000 people. From 2015 to present, the City’s service area has observed an average annual growth rate of approximately 0.7%. This 2022 SDSMP is consistent with the City’s 2020 Urban Water Management Plans (UWMP’s) annual growth rate factor of 1.5%. The current and projected service area population is summarized in Table 2.2. £¤101£¤101UV152UV152UV25L la g a s C r e e k Miller SloughUvas CreekBuena Vista AveFitzgerald AveM o n te r e y R d Day RdSunrise DrMantelli DrS a n ta T e r e s a Bl Wren AveLeavesley RdC a m in o A rro y o Tenth StSouthside DrUvasPark D r Castro Valley RdF ra zie r L a k e R d Bloomfield AveSheldon AveDavidson AveLas Animas AveCohansey AveGilman RdHecker Pass RdFirst StRucker AvPajaro RiverShore RdLegendExisting Land UseLow Density ResidentiaMedium Density ResidentialHigh Density ResidentialNeighborhood DistrictPublic/Quasi-Public FacilityEducational FacilityProfessional OfficeGeneral Services CommercialVisitor-Serving CommercialIndustrialOpen SpacePark and Recreation FacilityVacantCity LimitsRoadsRailroadsRivers & CreeksWaterbodiesFigure 2.4Existing Land UseStorm Drainage System Master PlanCity of Gilroy5Updated: April 15, 2022GIS0120.5MilesFile Path: P:\xGIS\GIS_Projects\Gilroy\Storm\200626-MP\GL_Fig2-4_ExistLandUse_041522.mxd £¤101£¤101UV152UV152UV25L la g a s C r e e k Miller SloughUvas CreekBuena Vista AveFitzgerald AveM o n te r e y R d Day RdSunrise DrMantelli DrS a n ta T e r e s a Bl Wren AveLeavesley RdC a m in o A rro y o Tenth StSouthside DrUvasPark D r Castro Valley RdF ra zie r L a k e R d Bloomfield AveSheldon AveDavidson AveLas Animas AveCohansey AveGilman RdHecker Pass RdFirst StRucker AvPajaro RiverShore RdLegendPlanning Area/Sphere of InfluenceUrban Growth BoundaryCity LimitsGeneral Plan Land UseHillside ResidentialLow Density ResidentialMedium Density ResidentialHigh Density ResidentialGeneral Services CommercialCity Gateway DistrictVisitor Serving CommercialGeneral IndustrialEmployment CenterIndustrial ParkPublic and Quasi-Public FacilityNeighborhood DistrictMixed UseRural CountyOpen SpacePark and Recreation FacilitySpecific Plan AreasDowntownGlen Loma RanchHecker PassRoadsRailroadsRivers & CreeksWaterbodiesFigure 2.52040 General PlanLand UseStorm Drainage System Master PlanCity of Gilroy5Updated: April 15, 2022GIS0120.5MilesFile Path: P:\xGIS\GIS_Projects\Gilroy\Storm\200626-MP\GL_Fig2-5_GeneralPlanLU_041522.mxd Table 2.1 Existing and Future Land Use Storm Drainage System Master Plan City of Gilroy Existing Existing Lands - Redeveloping New Lands - Redevelopment New Development (acre)(acre)(acre)(acre)(acre)(acre)(acre)(acre) Residential Rural Residential -0 0 0 0 0 0 0 0 Hillside Residential Hillside Residential 444 -1 442 112 344 8 464 907 Low Density Residential Low Density Residential 1,704 -121 1,583 122 45 44 211 1,794 Medium Density Residential Medium Density Residential 100 -42 58 177 4 2 183 240 High Density Residential High Density Residential 249 -182 67 18 15 3 36 104 Subtotal - Residential 2,496 -346 2,151 429 408 58 895 3,045 Non-Residential Visitor Serving Commercial Visitor Serving Commercial 99 -67 32 176 0 0 176 208 General Services Commercial General Services Commercial 524 -91 432 106 55 44 205 637 Professional Office 1 0 1 0 0 0 0 1 General Industrial General Industrial 320 -71 249 213 255 389 856 1,105 Campus Industrial 56 -12 44 0 0 0 0 44 Educational Facility Educational Facility 12 -5 7 1 0 0 1 8 Public/Quasi-Public Facility Public/Quasi-Public Facility 596 -44 552 152 102 28 281 833 Neighborhood District Neighborhood District 94 -94 0 38 22 336 395 395 City Gateway District -0 0 0 20 7 0 27 27 Downtown Specific Plan Area -0 0 0 57 32 0 89 89 Mixed Use Corridor High -0 0 0 25 7 0 33 33 Hecker Pass Special Use District -0 0 0 328 88 0 416 416 Glen Loma Ranch -0 0 0 103 237 0 341 341 Industrial Park -0 0 0 43 40 0 83 83 Employment Center -0 0 0 279 30 222 530 530 Subtotal - Non-Residential 1,701 -384 1,317 1,541 876 1,017 3,434 4,750 Other Agriculture -0 0 0 0 0 0 0 0 Park and Recreation Facility Park and Recreation Facility 1,232 -238 995 0 66 88 154 1,149 Vacant Vacant 2,391 -2,391 0 0 0 0 0 0 Open Space Open Space 1,282 -1,030 253 0 1,041 4 1,045 1,298 Rural County -0 0 0 28 0 3 30 30 Subtotal - Other 4,905 -3,658 1,247 28 1,107 95 1,230 2,477 Total Total Developed Area 9,102 -4,388 4,714 1,997 2,391 1,170 5,558 10,272 3/10/2022 Notes: 1. Source: City of Gilroy General Plan Alternatives Report, Public Review Draft July 2019. 2. Specific Plan land use types (Downtown, Hecker Pass, Glen Loma) are comprised of multiple land use types. As such, existing land use acreages reflect existing Specific Plan development under current existing land use designations. Total DevelopmentGeneral Plan Land Use Classification Existing Land Use Classification Future Development Urban Growth Boundary Within City Limits Existing Development Subtotal Existing Development - Unchanged Within City Limits Subtotal Future Development Table 2.2 Historical and Projected Population Storm Drainage System Master Plan City of Gilroy Annual Growth (%) Historical 2000 41,464 - 2001 42,436 2.3% 2002 43,144 1.7% 2003 43,866 1.7% 2004 45,026 2.6% 2005 45,782 1.7% 2006 46,446 1.5% 2007 47,047 1.3% 2008 48,353 2.8% 2009 48,627 0.6% 2010 48,821 0.4% 2011 49,622 1.6% 2012 50,716 2.2% 2013 52,475 3.5% 2014 53,325 1.6% 2015 54,233 1.7% 2016 54,849 1.1% 2017 55,811 1.8% 2018 56,030 0.4% 2019 56,635 1.1% 2020 56,704 0.1% Projected 2021 57,555 1.5% 2022 58,418 1.5% 2023 59,294 1.5% 2024 60,184 1.5% 2025 61,086 1.5% 2026 62,003 1.5% 2027 62,933 1.5% 2028 63,877 1.5% 2029 64,835 1.5% 2030 65,807 1.5% 2031 66,794 1.5% 2032 67,796 1.5% 2033 68,813 1.5% 2034 69,845 1.5% 2035 70,893 1.5% 2036 71,957 1.5% 2037 73,036 1.5% 2038 74,131 1.5% 2039 75,243 1.5% 2040 76,372 1.5% 8/31/2021 Notes: 1. Historical populations extracted from California Department of Finance, Population Estimates E-4. 2. Projected population assuming medium annual growth rate of 1.5% per the City of Gilroy 2020 Urban Water Management Plan. Year Population1,2 March 2023 3-1 City of Gilroy Storm Drainage System Master Plan 2022 City of Gilroy 3.0 CHAPTER 3 – SYSTEM PERFORMANCE AND DESIGN CRITERIA This chapter presents the City’s planning and design criteria that were used for evaluating hydrologic and hydraulic systems within the City’s drainage watershed. 3.1 HYDROLOGIC CRITERIA Hydrologic criteria are developed to characterize the flood routing of rainfall runoff in a defined drainage system. Akel Engineering Group obtained the services of Kasraie Consulting to review the hydrology modeling approach, applied rainfall depths and distributions, sub-catchment delineations, model runoff, and outflow hydrographs of this project. The hydrology sub-catchments review is shown graphically in Appendix A. This section discusses the precipitation characteristics, the design storms used in this master plan, and soil imperviousness. 3.1.1 Precipitation Characteristics A dominating factor in the generation of rainfall in California is the oscillation of the semi- permanent high pressure area of the north Pacific Ocean. This high pressure center moves north in the summer and south in the winter, adjusting the flow of moisture into California. In the winter, when the high pressure center moves further south, moisture can move south and bring widespread rainfall. In certain instances when circulation patterns allow for subtropical moisture to enter California from a southwesterly direction, rainfall amounts can be quite heavy, and can result in widespread flooding. The City receives an average 20.5 inches of total precipitation per year. The City’s wet weather season typically starts in November and ends in April. 3.1.2 Design Storms Design storms are typically defined by three important features: depth, duration and frequency. • Depth. The depth of the storm identifies the amount of precipitation occurring during a specific time interval. This master plan uses the precipitation depth-duration-frequency equations included in the Santa Clara County Drainage Manual, and converted to reflect City of Gilroy specific precipitation documented on Table 3.1. The depth-duration-frequency values reflect rainfall events specific to the City and lists precipitations, in inches and inches per hour, for return intervals up to 100 years. For comparison purposes, Table 3.2 lists the difference in precipitation between the 2004 Master Plan, County Drainage Manual and NOAA Atlas 14 Volume 6 Version 2. While 2004 Master Plan and Santa Clara Drainage Manual values are relatively close, NOAA precipitation values have Table 3.1 Precipitation Depth-Duration-Frequency Storm Drainage System Master Plan City of Gilroy 2-Year 5-Year 10-Year 25-Year 100-Year (in)(in/hr)(in)(in/hr)(in)(in/hr)(in)(in/hr)(in)(in/hr) 5-min 0.15 1.78 0.21 2.50 0.24 2.93 0.29 3.43 0.34 4.12 10-min 0.21 1.24 0.29 1.71 0.33 1.99 0.39 2.33 0.47 2.79 15-min 0.24 0.97 0.33 1.33 0.39 1.57 0.46 1.85 0.56 2.26 30-min 0.33 0.67 0.45 0.91 0.53 1.06 0.62 1.25 0.76 1.51 1-hr 0.48 0.48 0.63 0.63 0.73 0.73 0.85 0.85 1.02 1.02 2-hr 0.73 0.36 0.95 0.47 1.09 0.54 1.25 0.62 1.48 0.74 3-hr 0.94 0.31 1.22 0.41 1.39 0.46 1.60 0.53 1.88 0.63 6-hr 1.36 0.23 1.80 0.30 2.08 0.35 2.40 0.40 2.85 0.48 12-hr 1.83 0.15 2.51 0.21 2.94 0.24 3.44 0.29 4.15 0.35 24-hr 2.29 0.10 3.27 0.14 3.91 0.16 4.69 0.20 5.81 0.24 Note: 10/20/2021 1. Source: Santa Clara County Drainage Manual. Duration Table 3.2 Precipitation Depth-Duration-Frequency Comparison Storm Drainage System Master Plan City of Gilroy 2004 Master Plan Santa Clara County Drainage Manual NOAA Atlas 141 10-Year 100-Year 10-Year 100-Year 10-Year 100-Year (in)(in/hr)(in)(in/hr)(in)(in/hr)(in)(in/hr)(in)(in/hr)(in)(in/hr) 5-min 0.18 2.16 0.27 3.24 0.24 2.93 0.34 4.12 0.26 3.10 0.41 4.97 10-min 0.26 1.56 0.39 2.34 0.33 1.99 0.47 2.79 0.37 2.22 0.59 3.56 15-min 0.32 1.28 0.49 1.96 0.39 1.57 0.56 2.26 0.45 1.79 0.72 2.87 30-min 0.47 0.94 0.71 1.42 0.53 1.06 0.76 1.51 0.62 1.24 0.99 1.98 1-hr 0.69 0.69 1.04 1.04 0.73 0.73 1.02 1.02 0.87 0.87 1.40 1.40 2-hr 1.01 0.51 1.52 0.76 1.09 0.54 1.48 0.74 1.33 0.67 2.14 1.07 3-hr 1.26 0.42 1.89 0.63 1.39 0.46 1.88 0.63 1.68 0.56 2.71 0.90 6-hr 1.84 0.31 2.77 0.46 2.08 0.35 2.85 0.48 2.39 0.40 3.86 0.64 12-hr 2.69 0.22 4.05 0.34 2.94 0.24 4.15 0.35 3.40 0.28 5.46 0.46 24-hr 3.93 0.16 5.92 0.25 3.91 0.16 5.81 0.24 4.69 0.20 7.51 0.31 Note: 10/20/2021 1. Source: NOAA Atlas 14 Volume 6 Version 2 for Gilroy. Duration March 2023 3-4 City of Gilroy Storm Drainage System Master Plan been consistently increasing over the years. City staff selected to maintain consistency with Santa Clara Drainage Manual. • Duration. The duration of the storm can be little as 5-minutes and as high as 24-hours as documented on Table 3.1. This storm drainage master plan uses 24-hours as the duration, and the distribution is based on NOAA Atlas 14 Balanced Centered Hyetograph. The balance centered hyetograph provides a design storm with the peak intensity occurring during the middle of the day (Figure 3.1). • Frequency. The frequency of the storm is the recurrence interval at which the storm may occur at a given area. 3.1.3 Design Storm Events The design storms used in this evaluation, and which are specific to the City, are listed on Table 3.3. The values used in evaluating the storm drainage system are as follows: • 10-year 24-hour. This design storm is used to evaluate pipeline conveyance facilities as well as to size future ones. This storm was quantified at 3.91 inches. • 100-year 24-hour. This design storm is used in evaluating City street performance for conveying stormwater flows, while allowing up to one foot of street flooding; this storm was quantified at 5.81 inches. 3.1.4 Soil Imperviousness In determining the quantity of rainfall runoff generated from a given land use type, three factors dictate the volume of water that enters the storm drainage system: effective imperviousness, ineffective imperviousness, and effective pervious area. • Effective Impervious. An effective impervious area is the percentage of impervious area that generates stormwater runoff entering the storm drainage system. The effective impervious percentages are based on land uses identified in the 2040 General Plan, and are included in Table 3.4. • Ineffective Impervious. An ineffective impervious area is land that has no flow path, or the flow path results in delayed timing of the runoff, to the storm drainage system. These areas are typically noted as residential backyards, pools, or dense shrub landscaping. The values for these areas are shown on Table 3.4. • Effective Pervious. Effective pervious areas contribute to runoff based on the National Resource Conservation Service (NRCS) Soil Classification Group, and the subsequent SCS Curve Number. The Curve Number is listed by soil group in Table 3.4. 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0 2 4 6 8 10 12 14 16 18 20 22Unit Intensity (Unitless)Time (hours) Rainfall Unit Intensity (Design Storm: 3.91 inches) January 15, 2021 Figure 3.1 10-Year/24-Hour Unit Hyetograph Storm Drainage System Master Plan City of Gilroy LEGEND Table 3.3 Relevant Design Storms Storm Drainage System Master Plan City of Gilroy Design Criteria Design Storm 10-year 24-hour Used to evaluate if Hydraulic Grade Line have a minimum of one foot of freeboard between top of curb. Quantified at 3.91 inches. 100-year 24-hour Used in evaluating street conveyance capacity and determining if street flooding exceeds one foot in depth. Quantified at 5.81 inches. 10/20/2021 Table 3.4 Soil Imperviousness and SCS Curve Numbers Storm Drainage System Master Plan City of Gilroy AMC-II Pervious Soil B AMC-II Pervious Soil C AMC-II Pervious Soil D (%)(%)(CN)(CN)(CN) Rural Residential 5 0 63 73 82 Hillside 15 5 65 75 83 Low Density 35 15 67 77 83 Medium Density 50 5 69 79 84 High Density 60 0 71 81 86 Neighborhood District 2 0 78 85 89 Commercial 95 0 80 87 90 Industrial 70 0 76 84 88 Hecker Pass Special Use 1 0 61 73 80 Other Uses Water Surface, Ponds, Streams, Canals 100 0 99 99 99 Natural Grassland 1 0 65 77 82 Floodplains 1 0 55 70 76 Parks, Athletic Fields, Cemetaries 0 74 83 87 0 Government, Schools 80 0 79 83 89 Note: 9/16/2020 1. Source: City of Gilroy 2004 Storm Drainage System Master Plan. Land Use Category Effective Percent Impervious Ineffective Percent Impervious Effective Pervious March 2023 3-8 City of Gilroy Storm Drainage System Master Plan 3.2 HYDRAULIC CRITERIA The hydraulic criteria for the storm drainage system were used to evaluate the capacity requirements of conveyance facilities. 3.2.1 Gravity Conveyance Facilities Gravity pipeline capacities depend on several factors including: material and roughness of the pipe, the limiting velocity and slope, and the maximum allowable depth of flow. The hydraulic modeling software used for evaluating the capacity adequacy of the City storm drainage system is InfoSWMM by Innovyze Inc. This software uses the fully dynamic St. Venant’s Equation, and has a more accurate engine for simulating backwater and surcharge, in addition to manifolded force mains. The software also incorporates the use of the Manning Equation in other calculations including upstream pipe flow conditions. Storm Hydraulic Design The 10-year 24-hour design storm was used to evaluate the City’s existing stormwater system as well as to size pipelines to serve areas of future growth. (Table 3.5). For the the 100-year 24-hour design storm, City streets were allowed to flood in some cases to provide reasonable conveyance and storage capacity, thus reducing additional costly improvements. Manning’s Equation for Pipe Capacity The Continuity Equation and the Manning’s Equation for steady-state flow are used for calculating pipe capacities in open channel flow. Open channel flow can consist of either open conduits or, in the case of gravity pipelines, partially full closed conduits. Gravity full flow occurs when the conduit is flowing full but has not reached a pressure condition. • Continuity Equation: Q = V A Where: Q = peak flow, in cubic feet per second (cfs) V = velocity, in feet per second (fps) A = cross-sectional area of pipe, in square feet (sq. ft.) • Manning Equation: V = (1.486 R2/3 S1/2)/n Where: V = velocity, in feet per second (fps) n = Manning’s roughness coefficient R = hydraulic radius, area divided by wetted perimeter (ft) S = slope of pipe, in feet per foot (ft/ft) Table 3.5 Hydrologic and Hydraulic Design Criteria Hydrology and Hydraulics Design Criteria Conveyance Facilities Pipelines 10-Year 24-Hour design storm to determine if storm water have a minimum of one foot of freeboard between the top of curb and the Hydraulic Grade Line. Streets 100-Year 24-Hour design storm to determine if flooding exceeds one foot in depth and can flood buildings or create safety hazards. Receiving Waters (Streams, Creeks, Channels) FEMA 100-year water surface elevations used for downstream control for facilities where 100-year flood maps are available. 9/16/2020 Storm Drainage System Master Plan City of Gilroy March 2023 3-10 City of Gilroy Storm Drainage System Master Plan St. Venant’s Equation for Pipe Capacity A dynamic type of modeling facilitates the analysis of unsteady and non-uniform flows (dynamic flows) within a gravity conveyance system. Some hydraulic modeling programs have the ability to analyze these types of flows using the St. Venant Equation, which take into account unsteady and non-uniform conditions that occur over changes in time and cross-section within system pipes. The St. Venant Equations are a set of two equations, a Continuity Equation and a Dynamic Equation, used to analyze dynamic flows within a system. The first equation, the Continuity Equation, relates the continuity of flow mass within the system pipes in terms of: (A) the change in the cross-sectional area of flow at a point over time, and (B) The change of flow over the distance of piping in the system. The continuity equation is shown as follows: • Continuity Equation: 𝜕𝐴 𝜕𝑡+𝜕𝑄 𝜕𝑥=0 (A) (B) __ Where: t = time x = distance along the longitudinal direction of the channel Q = discharge flow A = flow cross-sectional area perpendicular to the x directional axis The second equation, the Dynamic Equation, relates changes in flow to fluid momentum in the system using: (A) Changes in acceleration at a point over time, (B) Changes in convective flow acceleration, (C) Changes in momentum due to fluid pressure at a given point, (D) Changes in momentum from the friction slope of the pipe, and (E) Fluid momentum provided by gravitational forces. The Dynamic Equation is provided as follows: • Dynamic Equation: 𝜕𝑄 𝜕𝑡+𝜕 𝜕𝑡(𝛽𝑄2 𝐴)+𝑔𝐴𝜕𝑥 𝜕𝑥+𝑔𝐴𝑆𝑓−𝑔𝐴𝑆𝑜=0 • (A) (B) (C) (D) (E) __ Where: t = time x = distance along the longitudinal direction of the channel Q = discharge flow A = flow cross-sectional area perpendicular to the x directional axis y = flow depth measured from the channel bottom and normal to the x directional axis Sf = friction slope So = channel slope β = momentum g = gravitational acceleration Use of this method of analysis provides a more accurate and precise analysis of flow conditions within the system compared to steady state flow analysis methods. It must be noted that two March 2023 3-11 City of Gilroy Storm Drainage System Master Plan assumptions are made for use of St. Venant Equations in the modeling software. First, flow is one dimensional. This means it is only necessary to consider velocities in the downstream direction and not in the transverse or vertical directions. Second, the flow is gradually varied. This means the vertical pressure distribution increases linearly with depth within the pipe. Manning’s Roughness Coefficient (n) The Manning Roughness Coefficient ‘n’ is a friction coefficient that is used in the Manning formula for flow calculation in open channel flow. In conveyance systems, the coefficient can vary between 0.011 and 0.017 depending on pipe material, size of pipe, depth of flow, root intrusion, smoothness of joints, and other factors. For the purpose of this evaluation, an “n” value of 0.013 was used for both existing and proposed gravity pipes unless directed otherwise by City staff based on pipe structural condition. This “n” value is an acceptable practice in planning studies. March 2023 4-1 City of Gilroy Storm Drainage System Master Plan 2023 City of Gilroy 4.0 CHAPTER 4 – EXISTING FACILITIES AND MODEL DEVELOPMENT This chapter defines the hydrologic delineation of storm drainage areas, routing to their respective receiving facilities, and includes the hydrologic model development. Additionally, this chapter includes an overview of the storm drainage system, and the model development. 4.1 HYDROLOGIC SYSTEM OVERVIEW Factors critical to the hydrologic model development include watersheds, drainage areas within each watershed, overland flow routing within drainage sub-catchments, and conveyance that makes full use of pipes as well as streets for routing 100-year design storm events. This section discusses the existing watersheds, and the delineation of drainage areas and sub-catchments. 4.1.1 Watersheds Watersheds within the City Planned Area Boundary and outlying areas were defined based on the receiving tributary creek or river system, with topographical or physical barriers dictating the limits of the watershed. The City has multiple natural watersheds that collect and convey stormwater runoff within Urban Growth Boundary: Uvas Creek Watershed, Llagas Creek Watershed, and Pajaro River Watershed (Figure 2.2). 4.1.2 Drainage Areas Drainage areas are typically defined by existing or natural conveyance systems within each watershed. The City’s drainage area boundaries are generally dictated by the open channel conveyance facilities throughout the City (Figure 4.1). Drainage areas in the City discharge stormwater runoff into creeks, channels or sloughs that flow through the City. Each drainage area was assigned a unique identifier intended for cross-referencing purposes. The identifier reflects the name of the receiving water body or storm drainage infrastructure that receives the stormwater runoff. The project divided the City into seven drainage areas, which are briefly summarized as follows: • Llagas Drainage Area: The Llagas drainage area is generally defined as the area east of Highway 101 and west of Llagas Creek, with the northern and southern boundaries approximately represented by Miller Slough Channel and Southside Drive respectively. • Miller Slough Drainage Area. The Miller Slough drainage area is generally defined as the area east of Santa Teresa Boulevard and west of Highway 101, with the northern and southern boundaries approximately represented by La Primavera Way and First Street respectively. This drainage area generally flows in a northerly direction towards the Miller Slough Channel. £¤101UV152SUNRISE DRSANTA TERESA BLKERN AVWREN AVTHIRD STSECOND STP RI N C E V A L L E S TSIXTH STTENTH STUVAS PARK DRM U R R AY A V RENZ LNLEWIS STM O N T E R E Y S T GOLDEN GATE AVBUENA VISTA AVV M AR C E L L A A V LEAVESLEY RDS A N Y S ID R O A V A R R O Y O C IR M O N T E R E Y S T SOUTHSIDE DRS A NT A T E RES A B L S A N T A T E R E S A B L CASTRO VALLEY RDEAG LE RIDG E DRCLUB DRDAY RDMANTELLI DRUV152UV152£¤101L la g a s C r e e k Uvas CreekLlagas CreekMiller SloughR o n a n Ch a n n e lSouthUvasNorthUvasNorthUvasPrincevalleLlagasLowerMiller SloughMillerSloughRonanChannelLowerMiller SloughRonanChannelUvas CreekLegendHydrologic Drainage AreasLlagasMiller SloughLower Miller SloughNorth UvasPrincevalleRonan ChannelSouth UvasChannelsRoadsRailroadsCity LimitsUrban Growth BoundaryRivers & CreeksWaterbodiesPrincevalleM ille rChannelL o w e r S lo u g h Figure 4.1Storm DrainageAreasStorm Drainage System Master Plan City of Gilroy5Updated: April 15, 2022GIS00.510.25MileFile Path: P:\xGIS\GIS_Projects\Gilroy\Storm\200626-MP\GL_Fig4-2_DrainageBasins_41522.mxd March 2023 4-3 City of Gilroy Storm Drainage System Master Plan • Lower Miller Slough Drainage Area. The Lower Miller Slough drainage area is generally defined as the area east of Carmel Street and west of Highway 101, with the northern and southern boundaries approximately represented by Second Street and Tenth Street respectively. This drainage area is generally flows in easterly direction towards the Lower Miller Slough Channel. • North Uvas Drainage Area. The North Uvas drainage area is generally defined as the area east of Burchell Road and Santa Barbara Drive, with northern and southern boundaries approximately represented by Olea Court and Uvas Creek respectively. This drainage area is generally flows in southerly direction towards the Uvas Creek. • Princevalle Drainage Area. The Princevalle drainage area is generally defined as the area east of Santa Barbara Drive and west of Cameron Boulevard, with the northern and southern boundaries approximately represented by First Street and Luchessa Avenue respectively. This drainage area generally flows in a southeasterly direction, though it currently is drained, via storm drainage system, in a southerly direction, towards the Princevalle Channel. • Ronan Channel Drainage Area. The Ronan Channel drainage area is generally defined as the area east of Jean Ellen Court and west of Highway 101, with northern and southern boundaries approximately represented by Fitzgerald Avenue and First Street respectively. • South Uvas Drainage Area. The South Uvas drainage area is generally defined as the area east of the Rancho Vista Drive and west of Highway 101, with the southeastern boundaries approximately represented by Uvas Creek. This drainage area generally flows in a northeasterly direction towards the Uvas Creek. 4.1.3 Drainage Sub-catchment Each drainage area shown on Figure 4.1 was further divided into smaller sub-catchments for the purpose of routing tributary hydrologic stormwater flows to appropriate stormwater manhole. The connectivity within each sub-catchment is very critical for accurate analysis and was thus graphically documented on exhibits included in Appendix B. Each sub-catchment included hydrologic modeling information to mimic Overland Flow Routing and Combined Pipe Street Conveyance. • Overland Flow Routing. This element consists of routing rainfall runoff from sub- catchments to stormwater manhole. Overland flow routing is dependent on many factors such as land use, subsurface soil infiltration characteristics and physical barriers blocking the flow paths within the drainage sub-catchment. The nonlinear reservoir method is typically used to calculate overland flow and was built into the hydrologic component of the model. March 2023 4-4 City of Gilroy Storm Drainage System Master Plan • Combined Pipe Street Conveyance. During typical storm events, and up to 10-year 24- hour design storms, streets are used to convey rainfall runoff from house gutters to nearest catchments where it enters the conveyance system. To mitigate very costly conveyance facility improvements during more intense storm events and up to the 100-year 24-hour design storm, this analysis assumed that existing streets may also provide additional capacity for routing rainfall runoff at a flood depth not to exceed one foot. 4.2 HYDRAULIC SYSTEM OVERVIEW The City’s storm drainage system consists of approximately 132 miles of up to 84-inch diameter gravity pipelines that convey stormwater runoff as shown on Figure 4.2. A system-wide pipeline inventory, listing the total length by pipe diameter and material, is shown on Table 4.1. This table is based on information extracted from the City’s GIS database and was updated to reflect the review of construction drawings provided by City staff. The 15-inch and 18-inch diameter pipeline accounts for 50 percent of the total storm drainage pipeline lengths. The following section discusses the components of the storm drainage system. 4.2.1 Conveyance System The modeled storm drainage system includes approximately 55 miles of stormwater conveyance to local water bodies, or channels (Table 4.2). Pipe sizes range from 18-inches to 84-inches in diameter, and are shown on Figure 4.2. The modeled storm conveyance system is predominantly composed of 18-, 24-, and 36-inch diameter pipelines. The City-owned open channel conveyance systems includes the following: Ronan Channel, Miller Slough and Princevalle Channel. These channels play an important role in relieving stormwater runoff during intense rainfall events. 4.2.2 Outfalls The modeled system consists of more than 60 outfall points that discharge runoff to natural creeks, sloughs, and channels. These outfalls were located along the Uvas Creek, Princevalle Channel, Miller Slough Channel, Lower Miller Slough Channel, Ronan Channel, and Llagas Creek as shown in Figure 4.2. !C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!CV £¤101UV152SUNRISE DRSANTA TERESA BLKERN AVWREN AVTHIRD STSECOND STP RI N C E V A L L E S TSIXTH STTENTH STUVAS PARK DRM U R R A Y A V RENZ LNLEWIS STMO N T E R E Y S T GOLDEN GATE AVBUENA VISTA AVM AR C E L L A A V LEAVESLEY RDS A N Y S ID R O A V A R R O Y O C IR M O N T E R E Y S T SOUTHSIDE DRS A NT A T E RES A B L S A N T A T E R E S A B L CASTRO VALLEY RDEAGLE RIDG E DRCLUB DRDAY RDMANTELLI DRUV152UV152£¤101L la g a s C r e e k Uvas CreekLlagas CreekUvas Creek303042182442483024481860335442722118184242361818183024364824242430242718243048302418181818241824302121183 6 2 448 363 0 424 2 42182142243624242418242418241818181818182 4 1827 242 4 2 4 2 4 184 8 607 218182 4 2 7 183 3 2 4 3636183636363 0 364224 6 05442 362418 1 8 27 3 6 2 1 72 241 8 24848448303024181824181 8 241 8 6 0 331821301821242730/42182724302418242427272418365418 1836361836181 8 18271 8 42181821181824244 242 1 8 1 8 184 2 1 8 1 8 181818423636Miller SloughR o n a n Ch a n n e l214 23648 3021PrincevalleM ille rChannelL o we r S lo u g h 242424363642246 0 6 0,,,,,,,,,,,, ,,,,,,,,,,,,,,,, , ,,,, , ,,, ,,,,,,,,,,,,,,,DAY RDPUEBLO STFigure 4.2Existing Modeled StormDrainage SystemStorm Drainage System Master Plan City of GilroyLegendExisting Modeled System!COutfallsPipes by Diameter18" or Less21" - 36"42" or GreaterChannelsNon-Modeled SystemPipesChannelsRoadsRailroadsCity LimitsUrban Growth BoundaryRivers & CreeksWaterbodies5Updated: April 14, 2022GIS00.510.25MileFile Path: P:\xGIS\GIS_Projects\Gilroy\Storm\200626-MP\GL_Fig4-1_ExistingSys_041422.mxd Table 4.1 Existing GIS Storm Pipe Inventory Storm Drainage System Master Plan City of Gilroy Length In Material RCP CMP CIP Concrete HDPE PVC VCP ACP DIP Unknown (in)(ft)(ft)(ft)(ft)(ft)(ft)(ft)(ft)(ft)(ft)(ft) Unknown Diameter 32,806 88 0 83 0 12 0 0 0 33,525 66,514 4 19 0 0 0 71 3,165 0 0 0 0 3,255 6 2,733 0 0 0 16 5,802 603 115 0 944 10,214 8 5,816 0 177 0 0 500 0 351 0 817 7,661 10 2,200 27 226 0 0 362 0 354 0 0 3,169 12 22,978 491 283 1,031 2,205 3,996 39 197 0 377 31,597 15 110,396 576 157 608 1,614 1,397 1,097 41 0 1,024 116,910 18 204,862 609 19 1,666 4,399 8,219 0 0 394 551 220,720 21 12,428 257 0 362 0 0 0 0 0 0 13,047 24 74,554 810 0 0 2,705 446 0 0 0 648 79,163 27 14,574 147 0 904 0 0 0 0 0 0 15,625 30 27,537 112 0 192 0 22 0 0 0 422 28,285 33 3,829 0 0 0 0 413 0 0 0 0 4,242 36 31,597 180 1,144 0 333 0 0 0 0 0 33,254 42 18,409 0 0 0 0 0 335 0 0 0 18,743 48 22,485 808 0 0 0 0 0 0 0 0 23,293 54 3,028 0 0 0 0 0 0 0 0 0 3,028 60 7,495 162 0 0 0 0 0 0 0 0 7,656 72 4,208 0 174 0 0 2,281 0 0 0 0 6,664 84 1,137 0 0 0 0 0 0 0 0 0 1,137 Total (ft)603,090 4,268 2,179 4,846 11,343 26,617 2,073 1,058 394 38,309 694,176 Total (miles)114.2 0.8 0.4 0.9 2.1 5.0 0.4 0.2 0.1 7.3 131.5 Note: 9/28/2020 1. Source: GIS information provided by City Staff on September 04, 2020. Pipe Size Total Length Table 4.2 Existing Modeled Storm Pipe Inventory Storm Drainage System Master Plan City of Gilroy Pipe Size Length Percent of Total System (in)(ft)(miles)(%) 18 101,964 19.3 35.14% 21 12,908 2.4 4.45% 24 58,024 11.0 19.99% 27 12,974 2.5 4.47% 30 23,095 4.4 7.96% 33 3,609 0.7 1.24% 36 28,224 5.3 9.73% 42 18,721 3.5 6.45% 48 16,129 3.1 5.56% 54 2,624 0.5 0.90% 60 6,830 1.3 2.35% 72 3,976 0.8 1.37% 84 1,117 0.2 0.38% Total 290,194 55.0 100% 10/5/2021 March 2023 4-8 City of Gilroy Storm Drainage System Master Plan 4.3 MODEL DEVELOPMENT A GIS-based model of the City’s storm drainage system was developed to identify capacity deficiencies and to recommend improvements to mitigate those deficiencies. This section discusses the modeling software, land use and routing methodology. 4.3.1 Modeling Software The hydrologic component of the drainage model generates runoff through synthetic design storm events and sub-catchment parameters that mimic actual surface response to rainfall. The hydraulic component of the drainage model routes stormwater runoff from source (loading manholes) to the discharge points (outfalls) by using physical characteristics of the storm drainage system (pipelines). The hydraulic model then performs calculations and solves series of equations to simulate flows in pipes, including backwater calculations for surcharged conditions. There are several network analysis software products released by different manufacturers that can equally perform the hydrologic and hydraulic analysis satisfactorily. The selection of a particular software depends on user preferences, the storm drainage system’s unique requirements, and the costs for purchasing and maintaining the software. The modeling software used for evaluating the capacity adequacy of the Gilroy storm drainage system, InfoSWMM by Innovyze Inc. This software uses the fully dynamic St. Venant’s Equation, and has a more accurate engine for simulating backwater and surcharge. The software also incorporates the use of the Manning Equation in other calculations including upstream pipe flow conditions. The St Venant’s and Manning’s Equations were discussed in the System Performance and Design Criteria chapter. 4.3.2 Land Use and Routing Methodology The sub-catchment parameters in the model were populated to account for land use types, flood routing, and routing methodology. • Land Use. Land use was used to define impervious area and the SCS Curve Number for pervious runoff. Residential areas included soil classifications to define non-effective runoff mostly confined in backyards. • Flood Routing. Flood routing consists of determining the flow path and connectivity to the storm drainage collection system. • Routing Methodology. Nonlinear reservoir method is used for transforming precipitation into runoff for overland flow routing, street flow, and pipe conveyance. This is typically defined by the time of concentration, which represents the time it takes for overland flow to reach from the furthest point in a sub-catchment to the outfall. It is calculated as the sum of the inlet time required to reach a manhole and the travel time in the conveyance system from the manhole to the outfall. March 2023 4-9 City of Gilroy Storm Drainage System Master Plan 4.3.3 Hydrological Soil Classification Soils are classified into four hydrologic soil units. These groups are A, B, C, and D, where A soil are characterized by having high infiltration rates and low potential runoff and D soil are characterized by having very slow infiltration rates and high runoff potential. The City hydrological soil classification extracted from Soil Survey Geographic database (SSURGO) is shown graphically on Figure 4.3. 4.3.4 Typical Channel Cross-Section The majority of the City’s storm drainage system are pipelines that drain into the major channels discussed in the previous section. Typical channel cross-sections are shown graphically on Figure 4.4 and were used to represent some of the channels in the models. 4.3.5 Physical Hydraulic Model Elements The City’s GIS database was used as a primary source to define physical hydraulic model elements. Data gaps related to inverts and ground elevations were resolved through review of as- built drawings. The physical hydraulic model was populated to include rim elevations at manholes, invert elevations of pipelines, pipe sizes, pipe slopes, pipe lengths, and outfall elevations. £¤101UV152SUNRISE DRSANTA TERESA BLKERN AVWREN AVTHIRD STSECOND STP R I N C E V A L L E S TSIXTH STTENTH STUVAS PARK DRM U R R A Y A V RENZ LNLEWIS STM O N T E R E Y S T GOLDEN GATE AVBUENA VISTA AVV M A R C E L L A A V LEAVESLEY RDS A N Y S ID R O A V A R R O Y O C IR M O N T E R E Y S T SOUTHSIDE DRS A N T A T E R E S A B L S A N T A T E R E S A B L CASTRO VALLEY RDEAG LE RIDG E DRCLUB DRDAY RDMANTELLI DRUV152UV152£¤101L la g a s C r e e k Uvas CreekUvas CreekLlagas CreekMiller SloughR o n a n Ch a n n e lFigure 4.3Hydraulical SoilClassificationStorm Drainage System Master PlanCity of Gilroy5Updated: February 9, 2022GIS00.510.25MileLegendSubbasin Soil TypeType BType CType DChannelsRoadsRailroadsCity LimitsUrban Growth BoundaryRivers & CreeksWaterbodiesFile Path & Name: P:\xGIS\GIS_Projects\Gilroy\Storm\200626-MP\GL_Fig4-3_SoilClassification_020922.mxdPrincevalleM ille rChannelL o w e r S lo u g h Miller Slough X 2 16 28 42 Lower Miller Slough X 2 28.4 42.4 68.8 February 26, 2021 0 1 2 3 4 5 6 7 8 9 0 10 20 30 40 50Depth, ftMiller Slough Figure 4.4 Channel Cross-Section Storm Drainage System Master Plan City of Gilroy 3 LEGEND T = 40' y = 8' b = 12' 1 1.75 0 2 4 6 8 10 12 14 0 20 40 60 80 100 120Depth, ftRonan 0 1 2 3 4 5 6 7 8 9 10 0 5 10 15 20 25 30 35Depth, ftPrincevalle 0 2 4 6 8 10 12 14 0 10 20 30 40 50 60 70 80Depth, ftLower Miller Slough T = 67' y = 12'1 2.2 T =102' y = 13'1 2 T = 30' y = 9'1 1.5 b = 14' b = 50' b = 3' T: Top Width b: Bottom Width y:Depth Note: Channel cross-section estimated using SCVWD contours. March 2023 5-1 City of Gilroy Storm Drainage System Master Plan 2023 City of Gilroy 5.0 CHAPTER 5 – EVALUATION AND PROPOSED IMPROVEMENTS This chapter presents a summary of the storm drainage system evaluation and identifies improvements needed to mitigate existing deficiencies as well as improvements needed to expand the system to service future growth. 5.1 OVERVIEW The City’s stormwater model was used to evaluate the current storm drainage system, identify capacity deficiencies and to recommend improvements required to serve future growth based on the relevant design storms. The criteria used for evaluating the capacity adequacy of the storm drainage system and used for sizing recommended improvements were discussed and summarized in the System Performance and Design Criteria chapter. 5.2 KNOWN AREAS OF CONCERN The capacity evaluation phase also considered a detailed review of known areas of concern. City staff have maintained an inventory of known areas of concern that may experience surface water ponding during large storm events. The known areas of concern provided by City staff are documented on Table 5.1. The capacity improvement recommended in this chapter are intended to alleviate some of these problem areas. 5.3 PIPELINE CONVEYANCE CAPACITY EVALUATION The 10-year 24-hour design storm was used for evaluating the capacity adequacy of pipeline conveyance facilities. The existing capacity analysis indicates that the conveyance facilities are generally adequate to accommodate the design storm, with certain areas experiencing surcharging and flooding as shown on Figure 5.1. As part of the Master Plan, an analysis of the recently updated NOAA Atlas 14 precipitation was completed and corresponding recommendations were presented to City staff for review. City staff reviewed and requested a similar analysis using the precipitation data from the Santa Clara County Drainage Manual. City staff chose to maintain the precipitation data from the Santa Clara County Drainage Manual for the purposes of developing the capital improvement program (CIP) discussed in a later chapter. 5.4 CAPACITY EVALUATION ANALYSIS This Master Plan evaluated the storm drainage system infrastructure and recommend improvements to mitigate existing system deficiencies and future development at the buildout. Two alternatives were considered and evaluated, discussed as follows: !C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(V £¤101UV152SUNRISE DRSANTA TERESA BLKERN AVWREN AVTHIRD STSECOND STP R IN C E V A L L E S TSIXTH STTENTH STUVAS PARK DRM U R R A Y A V RENZ LNLEWIS STM O N T E R E Y S T GOLDEN GATE AVBUENA VISTA AVM A R C E L L A A V LEAVESLEY RDS A N Y S ID R O A V A R R O Y O C IR M O N T E R E Y S T SOUTHSIDE DRS A N T A T E R E S A B L S A N T A T E R E S A B L CASTRO VALLEY RDEAGLE RIDG E DRCLUB DRDAY RDMANTELLI DRUV152UV152£¤101L la g a s C r e e k Uvas CreekLlagas CreekUvas Creek303042182442483024481860335442722118184242361818183024364824242430242718243048302418181818241824302121183 6 2 448 363 0 424 2 42182142243624242418242418241818181818182 4 1 8 27242 4 2 4 2 4 184 8 607 218182 4 2 7 183 3 2 4 3636183636363 0 364224 6 05442 36241 8 1 8 27 3 6 2 1 7 2 241 8 24848448303024181824181 8 241 8 6 0 331821301821242730/4218272430241824242727241836541 8 1836361836181 8 18271 8 42181821181824244 242 1 8 1 8 184 2 1 8 1 8 181818423636Miller SloughR o n a n Ch a n n e l214 23648 3021PrincevalleM ille rChannelL o w e r S lo u g h 242424363642246 0 6 0,,,,,,,,,,,, ,,,,,,,,,,,,,,,, , ,,,, , ,,, ,,,,,,,,,,,,,,,DAY RDPUEBLO STFigure 5.1Existing System Analysis10-Year Design StormStorm Drainage System Master PlanCity of GilroyLegend!(Flooding Manholes!(Surcharging ManholesExisting Modeled System!COutfallsPipes by Diameter18" or Less21" - 36"42" or GreaterChannelsRoadsRailroadsCity LimitsUrban Growth BoundaryRivers & CreeksWaterbodies5Updated: April 15, 2022GIS00.510.25MileFile Path: P:\xGIS\GIS_Projects\Gilroy\Storm\200626-MP\GL_Fig5-1_10YrStorm_041522.mxd Table 5.1 Storm Drainage System Problem Areas Storm Drainage System Master Plan City of Gilroy No.Type of Concern Location 1 Leaves on Catch Basin Monterey Road & First Street 2 Flooding First Street & Church Street 3 Flooding Third Street & Church Street 4 Leaves on Catch Basin Sixth Street & Church Street 5 Flooding Seventh Street & Church Street 6 Flooding Luchessa Avenue between Monterey Road & Chestnut Street 7 Flooding Chestnut Street between Eighth Street & Ninth Street 8 Leaves on Catch Basin Church Street & Howson Street 9 Flooding Welburn Avenue & Hanna Street 10 Leaves on Catch Basin Welburn Avenue & Westwood Drive 11 Flooding Wren Avenue & Ronan Avenue 12 Leaves on Catch Basin Driftwood Terrace & Westwood Drive 13 Flooding Hanna Street & Broadway 14 Flooding Hanna Street & Third Street 15 Flooding Rosanna Street & Third Street 16 Flooding Dowdy Street & Fifth Street 17 Leaves on Catch Basin Fourth Street & Filice Drive 18 Leaves on Catch Basin Fourth Street & Monte Vista Way 19 Leaves on Catch Basin Fourth Street & Miller Avenue 20 Leaves on Catch Basin Sixth Street & Princevalle Street 21 Flooding Forest Street & Martin Street Note: 12/8/2021 1. Storm drainage problem locations provided by City staff on March 24, 2021. March 2023 5-4 City of Gilroy Storm Drainage System Master Plan 5.4.1 Alternative 1 - 8th Street 36-inch Pipeline Improvements This alternative consists of a total 10.1 miles of pipeline improvements, including paralleling the existing 36-inch diameter storm drainage pipeline along 8th Street under Highway 101. However, this alternative requires coordination with the California Department of Transportation (Caltrans) for the 36-inch diameter parallel pipeline. In summary, this alternative will require the following improvements, which are shown graphically on Figure 5.2. • 10.1 miles of new pipeline ranging in size from 24 to 90 inches in diameter. As part of this master plan, preliminary costs were prepared as a means of comparing infrastructure improvements alternatives. The total approximate cost estimate for this alternative is at $40.7 million. 5.4.2 Alternative 2 – Diverting Stormwater Runoff to Princevalle Channel Following the review of the first alternative improvements, city staff requested Akel to evaluate the feasibility of diverting stormwater runoff south to Princevalle Channel, as a second alternative. This alternative consists of a total 9.3 miles of pipeline improvements, none of the which improvements are crossing Highway 101 and therefore do not require coordination with Caltrans. In summary, this alternative will require the following improvements, which are shown graphically on Figure 5.3. • 9.3 miles of new pipeline ranging in size from 24 to 90 inches in diameter. The total estimated cost for this alternative is estimated at $36.4 million. This alternative was selected by City staff due to the lower capital improvement costs and construction feasibility. In comparison, alternative 1 costs were estimated at $40.7 million and that alternative require the construction of 36-inch pipeline under Highway 101. Since Alternative 2 is the recommended alternative, a more detailed listing of improvements is summarized on Table 5.2, and which are shown graphically and cross reference on Figure 5.3. Each pipeline has been assigned a uniquely coded identifier corresponding to the drainage area in which it resided; this unique identifier is intended to aid in defining the location of the improvement for mapping purposes. The Alternative 2 improvements are also briefly described in this section, by drainage area: Alternative 1 Proposed Improvement Costs: $40.7 million dollars. Also requires construction of 36-inch pipeline under Highway 101. Alternative 2 (Recommended) Recommended Improvement Costs: $36.4 million dollars !C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!CV £¤101UV152SUNRISE DRSANTA TERESA BLKERN AVWREN AVTHIRD STSECOND STP R I N C E V A L L E S TSIXTH STTENTH STUVAS PARK DRM U R R A Y A V RENZ LNLEWIS STM O N T E R E Y S T GOLDEN GATE AVBUENA VISTA AVM A R C E L L A A V LEAVESLEY RDS A N Y S ID R O A V A R R O Y O C IR M O N T E R E Y S T SOUTHSIDE DRS A N T A T E R E S A B L S A N T A T E R E S A B L CASTRO VALLEY RDEAGLE RIDG E DRCLUB DRDAY RDMANTELLI DRUV152UV152£¤101L la g a s C r e e k Uvas CreekLlagas CreekUvas Creek30304224424830244818603354427221181842423618181830243648242430242718304830241818181824182430213 6 2 448 363 0 424 2 42182142243618242418241818181818181 8 27242 4 2 4 184 8 607 218182 4 3 6 304 2 3 0 4224 6 05442 362427 3 6 2 1 7 2 241 8 24848448303024181824181 8 241 8 6 0 331821301821242742/1827242418242427241836541 8 18361836181 8 18271 8 42181821181824241 8 1 8 1 8 181818423636Miller SloughR o n a n Ch a n n e l2136483021PrincevalleM ille rChannelL o w e r S lo u g h 242424363642246 0 6 0,,,,,,,,,,,, ,,,,,,,,,,,,,,,, , ,,,, , ,,, ,,,,,,,,,,,,,,,DAY RDPUEBLO ST2 4 249 0 9 0 90244 2 3 6 2 7 30243 0 4 8 3 6 4 8 4 8 4 8 42483 6 4 8 ,303024303030363030243042484848483 0 5 4 9048545460603636/Figure 5.2Proposed ImprovementsAlternative 1Storm Drainage System Master PlanCity of GilroyLegendProposed Improvements!COutfallPipesPipeline CasingExisting Modeled System!COutfallsPipes by Diameter18" or Less21" - 36"42" or GreaterChannelsNon-Modeled SystemPipesChannelsRoadsRailroadsCity LimitsUrban Growth BoundaryRivers & CreeksWaterbodies5Updated: April 15, 2022GIS00.510.25MileFile Path: P:\xGIS\GIS_Projects\Gilroy\Storm\200626-MP\GL_Fig5-2_PropImpAlt1_041522.mxd !C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!CV £¤101UV152SUNRISE DRSANTA TERESA BLKERN AVWREN AVTHIRD STSECOND STP R I N C E V A L L E S TSIXTH STTENTH STUVAS PARK DRM U R R A Y A V RENZ LNLEWIS STM O N T E R E Y S T GOLDEN GATE AVBUENA VISTA AVM A R C E L L A A V LEAVESLEY RDS A N Y S ID R O A V A R R O Y O C IR M O N T E R E Y S T SOUTHSIDE DRS A N T A T E R E S A B L S A N T A T E R E S A B L CASTRO VALLEY RDEAGLE RIDG E DRCLUB DRDAY RDMANTELLI DRUV152UV152£¤101L la g a s C r e e k Uvas CreekLlagas CreekUvas Creek30304224424830244818603354427221181842423618181830243648242430242718304830241818181824182430213 6 2 448 363 0 424 2 42182142243618242418241818181818181 8 27242 4 2 4 184 8 607 218182 4 3 6 304 2 36363636363 0 364224 6 05442 362427 3 6 2 1 7 2 241 8 24848448303024181824181 8 241 8 6 0 331821301821242742/1827242418242427241836541 8 18361836181 8 18271 8 42181821181824241 8 1 8 1 8 181818423636Miller SloughR o n a n Ch a n n e l2136483021PrincevalleM ille rChannelL o w e r S lo u g h 242424363642246 0 6 0,,,,,,,,,,,, ,,,,,,,,,,,,,,,, , ,,,, , ,,, ,,,,,,,,,,,,,,,DAY RDPUEBLO ST2 4 249 0 9 0 90244 8 4 8 3 6 2 7 30243 0 4 8 3 6 4 8 4 8 4 8 42483 6 4 8 ,303024303030363030243042484848483 0 5 4 90Figure 5.3Proposed ImprovementsAlternative 2Storm Drainage System Master PlanCity of GilroyLegendProposed Improvements!COutfallPipesExisting Modeled System!COutfallsPipes by Diameter18" or Less21" - 36"42" or GreaterChannelsNon-Modeled SystemPipesChannelsRoadsRailroadsCity LimitsUrban Growth BoundaryRivers & CreeksWaterbodies5Updated: April 15, 2022GIS00.510.25MileFile Path: P:\xGIS\GIS_Projects\Gilroy\Storm\200626-MP\GL_Fig5-3_PropImpAlt2_041522.mxd Table 5.2 Proposed Improvements Storm Drainage System Master Plan City of Gilroy Diameter Length (in)(in)(ft) Ronan Channel Drainage Area RC-1 Sunrise Dr From Dream Catcher Way to Golden Sky Way 18 Replacement 30 400 RC-2 Mantelli Dr From Muir Drive to Delta Dr 18 Replacement 24 1,250 RC-3 Zamzow Ct From approx. 1,250' n/o Cohansey Ave to Cohansey Ave -New 48 1,200 RC-4 Cohansey Ave From approx. 350' e/o Monterey Rd to Murray Ave -New 48 1,450 RC-5 Murray Ave From Cohansey Ave to Tomkins Ct -New 48 2,800 RC-6 Murray Ave From Tomkins Ct to Ronan Channel 24 Replacement 48 600 RC-7 No Name Uno/Las Animas Ave From approx. 1,500' s/o Buena Vista Ave to San Ysidro Ave -New 36 3,400 RC-8 San Ysidro Ave From Las Animas Ave to approx. 500' n/o Leavesley Rd -New 48 3,425 RC-9 Leavesley Rd From approx. 220' e/o Forest St to approx. 360' e/o Forest St 18 Replacement 42 150 Miller Slough Drainage Area MS-1 Wren Ave From approx. 290' n/o First St to Lawrence Dr 24 Replacement 30 2,325 MS-2 First St From approx. 180' e/o Princevalle St to Sargent St 18 Replacement 24 525 MS-3 Sargent St From First St to Broadway 18 Replacement 24 425 MS-4 Broadway From Sargent St to Church St 18/21 Replacement 30 1,075 MS-5 Church St From Broadway to approx. 100' s/o Howson St 21 Replacement 30 400 MS-6 Monterey Rd From Second St to First St 18/24 Replacement 27 675 North Uvas Drainage Area NU-1 Hecker Pass Hwy From approx. 3,080' w/o Santa Teresa Blvd to approx. 360' w/o Santa Teresa Blvd -New 30 2,825 NU-2 Hecker Pass Hwy From approx. 360' w/o Santa Teresa Blvd to Santa Teresa Blvd 24 Replacement 30 350 NU-3 Santa Teresa Blvd From approx. 70' s/o Hecker Pass Hwy to Uvas Creek 24 Replacement 30 2,575 NU-4 Westwood Dr From approx. 150' s/o Third St to Kentwood Ct 18 Replacement 24 425 NU-5 Monterey Rd From Princevalle Channel to Victoria Dr -New 90 775 NU-6 Monterey Rd From Victoria Dr to approx. 950' n/o Farman Ln 42 Replacement 90 2,175 NU-7 ROW From Monterey Rd to approx. 970' n/o Uvas Creek -New 90 975 NU-8 ROW From approx. 970' n/o Uvas Creek to Uvas Creek -New 90 1,000 South Uvas Drainage Area SU-1 St Andrews Cir From Carnoustie Ct to approx. 380' nw/o Carnoustie Ct 18 Replacement 36 375 Improv. No.Alignment Limits Existing Diameter Pipeline Improvements New/Parallel/ Replace Table 5.2 Proposed Improvements Storm Drainage System Master Plan City of Gilroy Diameter Length (in)(in)(ft) Improv. No.Alignment Limits Existing Diameter Pipeline Improvements New/Parallel/ Replace Princevalle Drainage Area PR-1 Third St From Santa Paula Dr to Wren Ave 27 Replacement 30 825 PR-2 Third St From Wren Ave to approx. 170' e/o Santa Theresa Dr 27 Replacement 42 675 PR-3 Third St From approx. 170' e/o Santa Theresa Dr to Santa Theresa Dr 27 Replacement 48 200 PR-4 Santa Theresa Dr From Third St to approx. 300' s/o Fourth St 27/30 Replacement 48 950 PR-5 ROW From Santa Theresa Dr to Miller Ave 30 Replacement 48 675 PR-6 Miller Ave From approx. 300' s/o Fourth St to Fifth St 30 Replacement 48 400 PR-7 Fifth St From Miller Ave to Princevalle St 30 Replacement 48 1,250 PR-8 Princevalle St From Third St to Fifth St 18 Replacement 30 1,250 PR-9 Princevalle St From Fifth St to Seventh St 42 Replacement 54 1,225 PR-10 Alexander St From Tenth St to Banes Ln 18 Replacement 24 825 PR-11 Banes Ln From Alexander St to Automall Pkwy 18 Replacement 24 625 PR-12 Monterey Rd From approx. 380' n/o 8th St to Angra Way -New 48 2,475 PR-13 Monterey Rd From Angra Way to Princevalle Channel 42 Replacement 48 775 Lower Miller Slough Drainage Area LM-1 Fourth St From Eigleberry St to Monterey Rd 18 Replacement 30 400 LM-2 Monterey Rd From Fourth St to Sixth St 27 Replacement 36 1,250 LM-3 Monterey Rd From Sixth St to Hornlein Ct 27 Replacement 42 425 LM-4 Monterey Rd From Hornlein Ct to approx. 240' n/o Eighth St 33 Replacement 42 775 LM-5 ROW From Rosanna St to Monterey Rd 18 Replacement 24 1,125 LM-6 Alexander St From Sixth St to Eighth St 24 Replacement 36 1,300 4/11/2022 March 2023 5-9 City of Gilroy Storm Drainage System Master Plan 5.4.3 Ronan Channel Drainage Area This section documents improvements within the Ronan Channel drainage service area. • RC-1: Replace the existing 18-inch diameter pipeline on Sunrise Drive with a new 30-inch diameter pipeline from Dream Catcher Way to Golden Sky Way. • RC-2: Replace the existing 18-inch diameter pipeline on Mantelli Drive with a new 24-inch diameter pipeline from Muir Drive to Delta Drive. • RC-3: Construct a new 48-inch diameter pipeline on Zamzow Court from approximately 1,250 feet north of Cohansey Avenue to Cohansey Avenue. • RC-4: Construct a new 48-inch diameter pipeline on Cohansey Avenue from approximately 350 feet east of Monterey Road to Murray Avenue. • RC-5: Construct a new 48-inch diameter pipeline on Murray Avenue from approximately Murray Avenue to Tomkins Court. • RC-6: Replace the existing 24-inch diameter pipeline on Murray Avenue with a new 48- inch diameter pipeline from Tomkins Court to Ronan Channel. • RC-7: Construct a new 36-inch diameter pipeline along No Name Uno and Las Animas Avenue from approximately 1,500 feet south of Buena Vista Avenue to San Ysidro Avenue. • RC-8: Construct a new 48-inch diameter pipeline on San Ysidro Avenue from Las Ysidro Avenue to approximately 500 feet north of Leavesley Road. • RC-9: Replace the existing 18-inch diameter pipeline on Leavesley Road with a new 42- inch diameter pipeline from approximately 220 feet east of Forest Street to approximately 360 feet east of Forest Street. 5.4.4 Miller Slough Drainage Area This section documents improvements within the Miller Slough drainage service area. • MS-1: Replace the existing 24-inch diameter pipeline on Wren Avenue with a new 30-inch diameter pipeline from approximately 290 feet north of First Street to Lawrence Drive. • MS-2: Replace the existing 18-inch diameter pipeline on First Street with a new 24-inch diameter pipeline from approximately 180 feet east of Princevalle Street to Sargent Sreet. • MS-3: Replace the existing 18-inch diameter pipeline on Sargent Street with a new 24-inch diameter pipeline from First Street to Broadway. March 2023 5-10 City of Gilroy Storm Drainage System Master Plan • MS-4: Replace the existing 18 and 21-inch diameter pipeline on Broadway with a new 30- inch diameter pipeline from Sargent Street to Church Street. • MS-5: Replace the existing 21-inch diameter pipeline on Church Street with a new 30-inch diameter pipeline from Broadway to approximately 100 feet south of Howson Street. • MS-6: Replace the existing 18 and 24-inch diameter pipeline on Monterey Road with a new 27-inch diameter pipeline from Second Street to First Street. 5.4.5 North Uvas Drainage Area This section documents improvements within the North Uvas drainage service area. • NU-1: Construct a new 30-inch diameter pipeline on Hecker Pass Highway from approximately 3,080 feet west of Santa Teresa Boulevard to approximately 360 feet west of Santa Teresa Boulevard. • NU-2: Replace the existing 24-inch diameter pipeline on Hecker Pass Highway with a new 30-inch diameter pipeline from approximately 360 feet west of Santa Teresa Boulevard to Santa Teresa Boulevard. • NU-3: Replace the existing 24-inch diameter pipeline on Santa Teresa Boulevard with a new 30-inch diameter pipeline from approximately 70 feet south of Hecker Pass Highway to Uvas Creek. • NU-4: Replace the existing 18-inch diameter pipeline on Westwood Drive with a new 24- inch diameter pipeline from approximately 150 feet south of Third Street to Kentwood Court. • NU-5. Construct a new 90-inch diameter pipeline on Monterey Road from Princevalle Channel to Victoria Drive. • NU-6: Replace the existing 42-inch diameter pipeline on Monterey Road with a new 90- inch diameter pipeline from Victoria Drive to approximately 950 feet north of Farman Lane. • NU-7. Construct a new 90-inch diameter pipeline in right-of-way from Monterey Road to approximately 970 feet north of Uvas Creek. • NU-8. Construct a new 90-inch diameter pipeline in right-of-way from approximately 970 feet north of Uvas Creek to Uvas Creek. 5.4.6 South Uvas Drainage Area This section documents improvements within the South Uvas drainage service area. March 2023 5-11 City of Gilroy Storm Drainage System Master Plan • SU-1: Replace the existing 18-inch diameter pipeline on St Andrews Circle with a new 36- inch diameter pipeline from Carnoustie Court to approximately 380 feet northwest of Carnoustie Court. 5.4.7 Princevalle Drainage Area This section documents improvements within the Princevalle drainage service area. • PR-1: Replace the existing 27-inch diameter pipeline on Third Street with a new 30-inch diameter pipeline from Santa Paula Drive to Wren Avenue. • PR-2: Replace the existing 27-inch diameter pipeline on Third Street with a new 42-inch diameter pipeline from Wren Avenue to approximately 170 feet east of Santa Theresa Drive. • PR-3: Replace the existing 27-inch diameter pipeline on Third Street with a new 48-inch diameter pipeline from approximately 170 feet east of Santa Theresa Drive to Santa Theresa Drive. • PR-4: Replace the existing 27 and 30-inch diameter pipeline on Santa Theresa Drive with a new 48-inch diameter pipeline from Third Street to approximately 300 feet south of Fourth Street. • PR-5: Replace the existing 30-inch diameter pipeline in right-of-way with a new 48-inch diameter pipeline from Santa Theresa Drive to Miller Avenue. • PR-6: Replace the existing 30-inch diameter pipeline on Miller Avenue with a new 48-inch diameter pipeline from approximately 300 feet south of Fourth Street to Fifth Street. • PR-7: Replace the existing 30-inch diameter pipeline on Fifth Street with a new 48-inch diameter pipeline from Miller Avenue to Princevalle Street. • PR-8: Replace the existing 18-inch diameter pipeline on Princevalle Street with a new 30- inch diameter pipeline from Third Street to Fifth Street. • PR-9: Replace the existing 42-inch diameter pipeline on Princevalle Street with a new 54- inch diameter pipeline from Fifth Street to Seventh Street. • PR-10: Replace the existing 18-inch diameter pipeline on Alexander Street with a new 24- inch diameter pipeline from Tenth Street to Banes Lane. • PR-11: Replace the existing 18-inch diameter pipeline on Banes Lane with a new 24-inch diameter pipeline from Alexander Steet to Automall Parkway. • PR-12: Construct a new 48-inch diameter pipeline on Monterey Road from approximately 380 feet north of Eighth Street to Angra Way. March 2023 5-12 City of Gilroy Storm Drainage System Master Plan • PR-13: Replace the existing 42-inch diameter pipeline on Monterey Road with a new 48- inch diameter pipeline from Angra Way to Princevalle Channel. 5.4.8 Lower Miller Slough Drainage Area This section documents improvements within the Lower Miller Slough drainage service area. • LM-1: Replace the existing 18-inch diameter pipeline on Fourth Street with a new 30-inch diameter pipeline from Eigleberry Street to Monterey Road. • LM-2: Replace the existing 27-inch diameter pipeline on Monterey Road with a new 36- inch diameter pipeline from Fourth Street to Sixth Street. • LM-3: Replace the existing 27-inch diameter pipeline on Monterey Road with a new 42- inch diameter pipeline from Sixth Street to Hornlein Court. • LM-4: Replace the existing 33-inch diameter pipeline on Monterey Road with a new 42- inch diameter pipeline from Hornlein Court to approximately 240 feet north of Eighth Street. • LM-5: Replace the existing 18-inch diameter pipeline in right-of-way with a new 24-inch diameter pipeline from Rosanna Street to Monterey Road. • LM-6: Replace the existing 24-inch diameter pipeline on Alexander Street with a new 36- inch diameter pipeline from Sixth Street to Eighth Street. 5.5 OUTFALLS The City’s storm drainage system discharges stormwater runoff into several outfalls that discharge into: Ronan Channel, Miller Slough Channel, Princevalle Channel, Uvas Creek, and Llagas Creek. As part of this master plan, outfalls were assumed in adequate condition, and capable of conveying stormwater flows from upstream facilities. March 2023 6-1 City of Gilroy Storm Drainage System Master Plan 2023 City of Gilroy 6.0 CHAPTER 6 - CAPITAL IMPROVEMENT PROGRAM This chapter provides a summary of the recommended storm drainage system improvements to mitigate existing capacity deficiencies and for accommodating anticipated future growth. This chapter also presents the cost criteria and methodologies for developing the Capital Improvement Program (CIP). Finally, a cost allocation analysis, usually used for cost sharing purposes, is also included. 6.1 COST ESTIMATE ACCURACY Cost estimates presented in the Capital Improvement Program were prepared for general master planning purposes and, where relevant, for further project evaluation. Final costs of a project will depend on several factors including the final project scope, costs of labor and material, and market conditions during construction. The Association for the Advancement of Cost Engineering (AACE International), formerly known as the American Association of Cost Engineers, has defined three classifications of assessing project costs. These classifications are presented in order of increasing accuracy: Order of Magnitude, Budget, and Definitive. • Order of Magnitude Estimate. This classification is also known as an “original estimate”, “study estimate”, or “preliminary estimate”, and is generally intended for master plans and studies. This estimate is not supported with detailed engineering data about the specific project, and its accuracy is dependent on historical data and cost indices. It is generally expected that this estimate would be accurate within -30 percent to +50 percent. • Budget Estimate. This classification is also known as an “official estimate” and generally intended for pre-design studies. This estimate is prepared to include flow sheets and equipment layouts and details. It is generally expected that this estimate would be accurate within -15 percent to +30 percent. • Definitive Estimate. This classification is also known as a “final estimate” and prepared during the time of contract bidding. The data includes complete plot plans and elevations, equipment data sheets, and complete specifications. It is generally expected that this estimate would be accurate within -5 percent to + 15 percent. Costs developed in this study should be considered “Order of Magnitude” and have an expected accuracy range of -30 percent and +50 percent. March 2023 6-2 City of Gilroy Storm Drainage System Master Plan 6.2 COST ESTIMATE METHODOLOGY Cost estimates presented in this chapter are opinions of probable construction and other relevant costs developed from several sources including cost curves, Akel experience on other master planning projects, and input from City staff on the development of public and private cost sharing. Where appropriate, costs were escalated to reflect the more current Engineering News Records (ENR) Construction Cost Index (CCI). This section documents the unit costs used in developing the opinion of probable construction costs, the Construction Cost Index, the land acquisition costs, and markups to account for construction contingency and other project related costs. 6.2.1 Unit Costs The unit cost estimates used in developing the Capital Improvement Program are summarized on Table 6.1. The unit costs are intended for developing the Order of Magnitude estimate, and do not account for site specific conditions, labor or material costs during the time of construction, final project scope, implementation schedule, detailed utility and topography surveys, investigation of alternative routes for pipelines, and other various factors. These factors are assumed included in the contingencies applied to the final capital improvement cost. 6.2.2 Construction Cost Index Costs estimated in this study are adjusted utilizing the Engineering News Record (ENR) Construction Cost Index (CCI), which is widely used in the engineering and construction industries. The costs in this Storm Drainage System Master Plan were benchmarked using a 20-City national average ENR CCI of 12,176, reflecting a date of March 2023. 6.2.3 Construction Contingency Allowance Knowledge about site-specific conditions for each proposed project is limited at the master planning stage; therefore, construction contingencies were used. The estimated construction costs in this master plan include a 30 percent contingency allowance to account for unforeseen events and unknown field conditions. 6.2.4 Project Related Costs The capital improvement costs also account for project-related costs, comprising of engineering design, project administration (developer and City staff), construction management and inspection, and legal costs. The project related costs in this master plan were estimated by applying an additional 30 percent to the estimated construction costs. Table 6.1 Unit Costs Storm Drainage System Master Plan City of Gilroy Pipelines (in)($/Lineal Foot) 24 245 27 283 30 302 36 358 42 414 48 489 54 545 60 564 66 622 72 678 84 866 90 928 Pipeline Casings $22 per inch diameter per liner foot Note : 3/29/2023 1. Unit costs are based on an ENR CCI Index Value of 13,176 (March 2023). March 2023 6-4 City of Gilroy Storm Drainage System Master Plan 6.3 CAPITAL IMPROVEMENT PROGRAM This section documents the capital improvement program, contingencies included in the costs, and the allocation of costs to meet the requirements of AB1600. 6.3.1 Capital Improvement Costs The Capital Improvement Program costs for the projects identified in this master plan for mitigating existing deficiencies and for servicing future growth throughout the City are summarized on Table 6.2. Each improvement was assigned a unique code identifier associated with the improvement pipelines drainage area, and is summarized graphically on Figure 6.1. The estimated construction costs include the baseline costs plus 30 percent contingency allowance to account for unforeseen events and unknown field conditions, as described in a previous section. Capital Improvement Costs include the estimated construction costs plus 30 percent project-related costs (engineering design, project administration, construction management and inspection, and legal costs). 6.3.2 Pipelines The recommended pipeline improvements are grouped by drainage area and listed on Table 6.2. Each improvement includes a general description of the street alignment and limits, as well as existing pipe diameter and length. Improvements are shown on Figure 6.1. The following pipeline improvements categories were identified: • New Pipeline. A new pipeline is proposed where none exists. • Replacement Pipeline. This improvement is intended as a replacement to an existing pipeline, and along the same alignment. The existing pipeline should be abandoned when the replacement pipeline has been constructed. The opinion of probable construction costs, for the projects included in this master plan, are based on the pipe unit costs summarized on Table 6.1. It is assumed that any replacement pipes will be in the same alignment and at the same slope as the existing pipe. However, this study recommends a field survey of the alignment during the pre- design stage of each project. !C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!C!CV £¤101UV152SUNRISE DRSANTA TERESA BLKERN AVWREN AVTHIRD STSECOND STP R I N C E V A L L E S TSIXTH STTENTH STUVAS PARK DRM U R R A Y A V RENZ LNLEWIS STM O N T E R E Y S T GOLDEN GATE AVBUENA VISTA AVM A R C E L L A A V LEAVESLEY RDS A N Y S ID R O A V A R R O Y O C IR M O N T E R E Y S T SOUTHSIDE DRS A N T A T E R E S A B L S A N T A T E R E S A B L CASTRO VALLEY RDEAGLE RIDG E DRCLUB DRDAY RDMANTELLI DRUV152UV152£¤101L la g a s C r e e k Uvas CreekLlagas CreekUvas Creek30304224424830244818603354427221181842423618181830243648242430242718304830241818181824182430213 6 2 448 363 0 424 2 42182142243618242418241818181818181 8 27242 4 2 4 184 8 607 218182 4 3 6 304 2 36363636363 0 364224 6 05442 362427 3 6 2 1 7 2 241 8 24848448303024181824181 8 241 8 6 0 331821301821242742/1827242418242427241836541 8 18361836181 8 18271 8 42181821181824241 8 1 8 1 8 181818423636Miller SloughR o n a n Ch a n n e l2136483021PrincevalleM ille rChannelL o w e r S lo u g h 242424363642246 0 6 0,,,,,,,,,,,, ,,,,,,,,,,,,,,,, , ,,,, , ,,, ,,,,,,,,,,,,,,,DAY RDPUEBLO ST2 4 24P R -1 0 PR-119 0 9 0 N U -6 N U -5 NU-79024LM-54 8 P R -1 2 4 8 P R -1 3 LM-1L M -2 L M -4 LM-33 6 L M -6 2 7 M S -6 3024MS-2MS-43 0 MS-54 8 3 6 4 8 4 8 4 8 42RC-9R C -3 R C -5RC-7 R C -8 48RC-43 6 4 8 ,R C -7 R C -8 R C -6 30MS-13024RC-230RC-1303036NU-1NU-3SU-1NU-2303024NU-430424848PR-1PR-2PR-4PR-5PR-7PR-6PR-348483 0 5 4 PR -9 P R -8 NU -6 NU-890Figure 6.1Capital ImprovementProgramStorm Drainage System Master PlanCity of GilroyLegendProposed Improvements!COutfallPipesExisting Modeled System!COutfallsPipes by Diameter18" or Less21" - 36"42" or GreaterChannelsNon-Modeled SystemPipesChannelsRoadsRailroadsCity LimitsUrban Growth BoundaryRivers & CreeksWaterbodies5Updated: April 15, 2022GIS00.510.25MileFile Path: P:\xGIS\GIS_Projects\Gilroy\Storm\200626-MP\GL_Fig6-1_CIP_Scen2_041522.mxd Table 6.2 Capital Improvement Program Storm Drainage System Master Plan City of Gilroy Existing Diameter New/Parallel/ Replace Diameter Length Unit Cost Infr. Cost Existing Users Future Users Existing Users Future users (in)(in)(ft)($/lf)($)($)($)($)(%)(%)($)($) Ronan Channel Drainage Area RC-1 Sunrise Dr From Dream Catcher Way to Golden Sky Way 18 Replacement 30 400 302 120,601 121,000 158,000 206,000 100%0%206,000 0 RC-2 Mantelli Dr From Muir Drive to Delta Dr 18 Replacement 24 1,250 245 306,506 307,000 400,000 520,000 100%0%520,000 0 RC-3 Zamzow Ct From approx. 1,250' n/o Cohansey Ave to Cohansey Ave -New 48 1,200 489 586,990 587,000 764,000 994,000 8%92%74,621 919,379 RC-4 Cohansey Ave From approx. 350' e/o Monterey Rd to Murray Ave -New 48 1,450 489 709,280 710,000 923,000 1,200,000 0%100%0 1,200,000 RC-5 Murray Ave From Cohansey Ave to Tomkins Ct -New 48 2,800 489 1,369,643 1,370,000 1,781,000 2,316,000 9%91%219,340 2,096,660 RC-6 Murray Ave From Tomkins Ct to Ronan Channel 24 Replacement 48 600 489 293,495 294,000 383,000 498,000 13%87%67,178 430,822 RC-7 No Name Uno/Las Animas Ave From approx. 1,500' s/o Buena Vista Ave to San Ysidro Ave -New 36 3,400 358 1,216,516 1,217,000 1,583,000 2,058,000 91%9%1,875,920 182,080 RC-8 San Ysidro Ave From Las Animas Ave to approx. 500' n/o Leavesley Rd -New 48 3,425 489 1,675,367 1,676,000 2,179,000 2,833,000 79%21%2,227,585 605,415 RC-9 Leavesley Rd From approx. 220' e/o Forest St to approx. 360' e/o Forest St 18 Replacement 42 150 414 62,114 63,000 82,000 107,000 87%13%92,659 14,341 Subtotal - Ronan Channel Drainage Area 6,345,000 8,253,000 10,732,000 5,283,303 5,448,697 Miller Slough Drainage Area MS-1 Wren Ave From approx. 290' n/o First St to Lawrence Dr 24 Replacement 30 2,325 302 700,991 701,000 912,000 1,186,000 100%0%1,186,000 0 MS-2 First St From approx. 180' e/o Princevalle St to Sargent St 18 Replacement 24 525 245 128,732 129,000 168,000 219,000 100%0%219,000 0 MS-3 Sargent St From First St to Broadway 18 Replacement 24 425 245 104,212 105,000 137,000 179,000 100%0%179,000 0 MS-4 Broadway From Sargent St to Church St 18/21 Replacement 30 1,075 302 324,114 325,000 423,000 550,000 100%0%550,000 0 MS-5 Church St From Broadway to approx. 100' s/o Howson St 21 Replacement 30 400 302 120,601 121,000 158,000 206,000 100%0%206,000 0 MS-6 Monterey Rd From Second St to First St 18/24 Replacement 27 675 283 190,847 191,000 249,000 324,000 100%0%324,000 0 Subtotal - Miller Slough Drainage Area 1,572,000 2,047,000 2,664,000 2,664,000 0 North Uvas Drainage Area NU-1 Hecker Pass Hwy From approx. 3,080' w/o Santa Teresa Blvd to approx. 360' w/o Santa Teresa Blvd -New 30 2,825 302 851,742 852,000 1,108,000 1,441,000 0%100%0 1,441,000 NU-2 Hecker Pass Hwy From approx. 360' w/o Santa Teresa Blvd to Santa Teresa Blvd 24 Replacement 30 350 302 105,526 106,000 138,000 180,000 0%100%0 180,000 NU-3 Santa Teresa Blvd From approx. 70' s/o Hecker Pass Hwy to Uvas Creek 24 Replacement 30 2,575 302 776,367 777,000 1,011,000 1,315,000 0%100%0 1,315,000 NU-4 Westwood Dr From approx. 150' s/o Third St to Kentwood Ct 18 Replacement 24 425 245 104,212 105,000 137,000 179,000 100%0%179,000 0 Cost Sharing Baseline Constr. Costs Estimated Constr. Costs Capital Improv. Costs Improv. No.Alignment Limits Pipeline Improvements Infrastructure Costs Suggested Cost Allocation Table 6.2 Capital Improvement Program Storm Drainage System Master Plan City of Gilroy Existing Diameter New/Parallel/ Replace Diameter Length Unit Cost Infr. Cost Existing Users Future Users Existing Users Future users (in)(in)(ft)($/lf)($)($)($)($)(%)(%)($)($) Cost Sharing Baseline Constr. Costs Estimated Constr. Costs Capital Improv. Costs Improv. No.Alignment Limits Pipeline Improvements Infrastructure Costs Suggested Cost Allocation NU-5 Monterey Rd From Princevalle Channel to Victoria Dr -New 90 775 928 718,859 719,000 935,000 1,216,000 100%0%1,216,000 0 NU-6 Monterey Rd From Victoria Dr to approx. 950' n/o Farman Ln 42 Replacement 90 2,175 928 2,017,443 2,018,000 2,624,000 3,412,000 100%0%3,412,000 0 NU-7 ROW From Monterey Rd to approx. 970' n/o Uvas Creek -New 90 975 928 904,371 905,000 1,177,000 1,531,000 100%0%1,531,000 0 NU-8 ROW From approx. 970' n/o Uvas Creek to Uvas Creek -New 90 1,000 928 927,560 928,000 1,207,000 1,570,000 100%0%1,570,000 0 Subtotal - North Uvas Drainage Area 6,410,000 8,337,000 10,844,000 7,908,000 2,936,000 South Uvas Drainage Area SU-1 St Andrews Cir From Carnoustie Ct to approx. 380' nw/o Carnoustie Ct 18 Replacement 36 375 358 134,175 135,000 176,000 229,000 100%0%229,000 0 Subtotal - South Uvas Drainage Area 135,000 176,000 229,000 229,000 0 Princevalle Drainage Area PR-1 Third St From Santa Paula Dr to Wren Ave 27 Replacement 30 825 302 248,739 249,000 324,000 422,000 100%0%422,000 0 PR-2 Third St From Wren Ave to approx. 170' e/o Santa Theresa Dr 27 Replacement 42 675 414 279,515 280,000 364,000 474,000 100%0%474,000 0 PR-3 Third St From approx. 170' e/o Santa Theresa Dr to Santa Theresa Dr 27 Replacement 48 200 489 97,832 98,000 128,000 167,000 100%0%167,000 0 PR-4 Santa Theresa Dr From Third St to approx. 300' s/o Fourth St 27/30 Replacement 48 950 489 464,700 465,000 605,000 787,000 100%0%787,000 0 PR-5 ROW From Santa Theresa Dr to Miller Ave 30 Replacement 48 675 489 330,182 331,000 431,000 561,000 100%0%561,000 0 PR-6 Miller Ave From approx. 300' s/o Fourth St to Fifth St 30 Replacement 48 400 489 195,663 196,000 255,000 332,000 100%0%332,000 0 PR-7 Fifth St From Miller Ave to Princevalle St 30 Replacement 48 1,250 489 611,448 612,000 796,000 1,035,000 100%0%1,035,000 0 PR-8 Princevalle St From Third St to Fifth St 18 Replacement 30 1,250 302 376,877 377,000 491,000 639,000 100%0%639,000 0 PR-9 Princevalle St From Fifth St to Seventh St 42 Replacement 54 1,225 545 668,183 669,000 870,000 1,131,000 100%0%1,131,000 0 PR-10 Alexander St From Tenth St to Banes Ln 18 Replacement 24 825 245 202,294 203,000 264,000 344,000 84%16%288,575 55,425 PR-11 Banes Ln From Alexander St to Automall Pkwy 18 Replacement 24 625 245 153,253 154,000 201,000 262,000 89%11%234,103 27,897 PR-12 Monterey Rd From approx. 380' n/o 8th St to Angra Way -New 48 2,475 489 1,210,667 1,211,000 1,575,000 2,048,000 100%0%2,048,000 0 PR-13 Monterey Rd From Angra Way to Princevalle Channel 42 Replacement 48 775 489 379,098 380,000 494,000 643,000 100%0%643,000 0 Subtotal - Princevalle Drainage Area 5,225,000 6,798,000 8,845,000 8,761,678 83,322 Table 6.2 Capital Improvement Program Storm Drainage System Master Plan City of Gilroy Existing Diameter New/Parallel/ Replace Diameter Length Unit Cost Infr. Cost Existing Users Future Users Existing Users Future users (in)(in)(ft)($/lf)($)($)($)($)(%)(%)($)($) Cost Sharing Baseline Constr. Costs Estimated Constr. Costs Capital Improv. Costs Improv. No.Alignment Limits Pipeline Improvements Infrastructure Costs Suggested Cost Allocation Lower Miller Slough Drainage Area LM-1 Fourth St From Eigleberry St to Monterey Rd 18 Replacement 30 400 302 120,601 121,000 158,000 206,000 100%0%206,000 0 LM-2 Monterey Rd From Fourth St to Sixth St 27 Replacement 36 1,250 358 447,248 448,000 583,000 758,000 100%0%758,000 0 LM-3 Monterey Rd From Sixth St to Hornlein Ct 27 Replacement 42 425 414 175,991 176,000 229,000 298,000 100%0%298,000 0 LM-4 Monterey Rd From Hornlein Ct to approx. 240' n/o Eighth St 33 Replacement 42 775 414 320,924 321,000 418,000 544,000 100%0%544,000 0 LM-5 ROW From Rosanna St to Monterey Rd 18 Replacement 24 1,125 245 275,855 276,000 359,000 467,000 100%0%467,000 0 LM-6 Alexander St From Sixth St to Eighth St 24 Replacement 36 1,300 358 465,138 466,000 606,000 788,000 100%0%788,000 0 Subtotal - Lower Miller Slough Drainage Area 1,808,000 2,353,000 3,061,000 3,061,000 0 Total Costs Subtotal - Ronan Channel Drainage Area 6,345,000 8,253,000 10,732,000 5,283,303 5,448,697 Subtotal - Miller Slough Drainage Area 1,572,000 2,047,000 2,664,000 2,664,000 0 Subtotal - North Uvas Drainage Area 6,410,000 8,337,000 10,844,000 7,908,000 2,936,000 Subtotal - South Uvas Drainage Area 135,000 176,000 229,000 229,000 0 Subtotal - Princevalle Drainage Area 5,225,000 6,798,000 8,845,000 8,761,678 83,322 Subtotal - Lower Miller Slough Drainage Area 1,808,000 2,353,000 3,061,000 3,061,000 0 Total Improvement Costs 21,495,000 27,964,000 36,375,000 27,906,981 8,468,019 Notes: 3/29/2023 1. Cost estimates are based on the Engineering News Record (ENR) construction cost index (CCI) of 13,176 for March 2023 2. Baseline construction costs plus 30% to account for unforeseen events and unknown conditions. 3. Estimated construction cost plus 30% to cover other costs including: engineering design, project administration (developer and City staff), construction management and inspection, and legal costs. March 2023 6-9 City of Gilroy Storm Drainage System Master Plan 6.3.3 Recommended Cost Allocation Analysis Cost allocation analysis is needed to identify improvement funding sources, and to establish a nexus between development impact fees and improvements needed to service growth. In compliance with the provisions of Assembly Bill AB 1600, the analysis differentiates between the project needs of servicing existing users and for those required to service anticipated future developments. Table 6.2 lists each improvement and separates the cost by responsibility between existing and future users. The cost responsibility is based on model parameters for existing and future land use, and may change depending on the nature of development. March 2023 City of Gilroy Storm Drainage System Master Plan 2023 City of Gilroy APPENDIX A Hydrology Review SU002 RC001 SU024 SU072 SU090 RC058 RC056 RC082 SU055 SU012 SU066 RC005A RC062 RC003 RC060 SU068 SU088 SU098 SU071 LL051 NU002A LL050 RC123 RC008 SU060 SU057 NU010 SU044 NU012 RC005D LM042 MS094 RC054 NU040A LL046 SU078 RC098 MS082 RC011 SU010 RC114 LM035 PR020 PR078 MS130 NU018 PR084 RC074 SU032 RC083 RC066 RC016 LM021 NU013 RC086 LM054 LM052 MS116 PR068 NU014 NU011 LM020 LM032 RC006 RC050A RC110 RC099 SU059 PR076 PR051 NU045 PR040 NU015 RC002 NU020 PR002NU021 PR010 NU023 RC088 RC064A LM024 MS110 NU005 PR064 MS122 SU080 PR022 RC041 RC100A RC064 LL044 PR004 SU035 NU052 SU079 SU080A SU067 PR012 NU028 MS106 RC092 MS102 PR014 PR098 NU034 RC038 LL042 RC052 RC044 LL047 RC029 RC084 SU008 RC122 NU042 MS107 MS120 SU100 RC055 RC005B RC048 RC022 RC004 RC030 PR026 PR080 PR085 RC014 MS090 SU048 NU016 NU006 LM046 SU083A PR053 RC007 RC067 RC085 RC009 PR032 LL048 MS096 PR071 MS086 SU042 MS115 NU017 NU040 PR034 RC043 PR070 MS108 RC024 PR008 RC005C RC028 RC072 PR042 RC051 MS100 NU009 LM038 RC044A MS124 MS098 RC068A MS091 PR036 RC108 RC051A SU042A RC118 NU019 PR086 RC027 RC039 PR075 RC042 MS098A RC090 RC106 PR066 LM022 LM050 NU024 SU069 NU048 RC100 LM033 NU043NU036 NU053 RC102 RC012 MS109 PR028 PR024 SU034 LM030 PR052 RC031 RC121 PR050 SU011 PR074 MS132 RC112A PR006 SU021 LM044 PR061 SU074 RC013 PR030 RC051B RC021 SU083 RC015 LM028 MS100A NU004B SU096 NU030 SU050 PR063 LM040 PR047 SU058 NU004 SU070 SU020 MS128 PR091 RC014A PR005 SU036 RC026 RC014B SU056 RC019 NU022 PR046 RC068 PR031 MS107A SU042B MS100C NU026 LM037 NU004C RC093 RC112 SU084B PR090 SU046 NU050 RC036 RC052A RC046 RC021A MS104 PR040A RC019A MS092 RC023 NU004A MS126 SU076 PR016 SU091 SU084 RC020 PR054 RC032 SU026 MS090A MS126A RC040 SU092 MS092B MS100B RC070 RC025 PR044 SU038 MS092A SU033 SU018 SU030 MS128A RC018 SU035A SU036A PR062 RC116RC120 RC050B PR055 RC017 SU084A RC050 SU028 SU030A NU032 SU040SU014 NU038 PR054A 10-Year Yield (CFS/ACRE) Hydrology Subcatchments Legend 10 YEAR YIELD CFS/ACRE ≤0.26 ≤0.43 ≤0.59 ≤0.69 ≤0.86 0 2,0004,000 Feet1 inch equals 4,000 feet March 2023 City of Gilroy Storm Drainage System Master Plan 2023 City of Gilroy APPENDIX B Storm Drainage Area Hydrologic Routing PR008 PR072 PR076 PR074 PR014 March 3,2022 Princevalle Drainage Area Storm Drainage System Master Plan City of Gilroy LEGEND Princevalle Channel PR002 Flow Combination Hydrologic Sub- catchment Area PR020 PR040 PR044 PR038 PR036PR042 PR032PR034PR030 PR028 PR024PR026 PR022 PR018 PR016 PR010 PR012 PR006 PR002 PR004 PR046 PR050 PR052 PR070 PR080 PR084 PR086 PR048 PR056 PR058 PR066 PR068 PR062 PR054 PR060 PR064 PR078 PR082 PR102 PR094 PR100 PR090 PR096 PR098 PR088 PR092 March 4,2022 North Uvas Drainage Area Storm Drainage System Master Plan City of Gilroy LEGEND North Uvas Creek NU002 Flow Combination Hydrologic Sub- catchment Area NU002 NU004 NU006 NU048 NU050 NU042 NU044 NU056 NU058 NU060 NU062 NU064 NU066 NU068 NU072 NU074 NU076 NU052 NU054 NU046 NU028 NU008 NU010NU012 NU014 NU016 NU018 NU020 NU022 NU070 NU034 NU040 NU030 NU032 NU036 NU038 NU024 NU026 March 4,2022 Lower Miller Slough Drainage Area Storm Drainage System Master Plan City of Gilroy LEGEND Lower Miller Slough LM002 Flow Combination Hydrologic Sub- catchment Area LM006 LM002 LM008 LM026 LM024 LM004 LM010LM012 LM014 LM016 LM018 LM020 LM022 LM032 LM036 LM034 LM038 LM030 LM028 March 4,2022 Llagas Drainage Area Storm Drainage System Master Plan City of Gilroy LEGEND Llagas Creek LL002 Flow Combination Hydrologic Sub- catchment Area LL004 LL008 LL002LL006 LL016 LL010LL014LL012 March 8,2022 Miller Slough Drainage Area Storm Drainage System Master Plan City of Gilroy LEGEND Miller Slough MS002 Flow Combination Hydrologic Sub- catchment Area MS008 MS050 MS052 MS044 MS048 MS058 MS060 MS056 MS054 MS040 MS038 MS012 MS004 MS006 MS030 MS028 MS032 MS034 MS002 MS016MS018 MS010 MS014 MS022 MS020 MS024 MS026 MS036 MS046 MS042 MS062 MS066 MS064 MS068 March 4,2022 Ronan Channel Drainage Area -1 Storm Drainage System Master Plan City of Gilroy LEGEND Ronan Channel RC002 Flow Combination Hydrologic Sub- catchment Area RC002RC014 RC004RC008RC010 RC012 RC006 RC014RC016 RC126 RC128 RC124 RC018 -RC114 (See Ronan Channel Drainage Area -2) RC116 RC136 RC118 RC120 RC122 RC130 RC132 RC134 RC138 RC140 RC142 RC144 RC162 RC146 RC148 RC152 RC154 RC150 RC156 RC168 RC164 RC166 RC170 RC158 RC160 RC172 RC174 RC176 RC178 RC186 RC180 RC182 RC184 RC188 RC190 RC196 RC192 RC194 March 4,2022 Ronan Channel Drainage Area -2 Storm Drainage System Master Plan City of Gilroy LEGEND Ronan Channel RC002 Flow Combination Hydrologic Sub- catchment Area RC114 RC098 RC096 RC094 RC088 RC092 RC090 RC076 RC078 RC080 RC074 RC082 RC084 RC086 RC100 RC102 RC106 RC108 RC044 RC068 RC070 RC064 RC072 RC020 RC022 RC038 RC040 RC042 RC054 RC058 RC056 RC050 RC048 RC052 RC046 RC112 RC104 RC110 RC018RC024RC026RC028 RC062RC060 RC032RC030RC034 RC036 March 9,2022 South Uvas Drainage Area Storm Drainage System Master Plan City of Gilroy LEGEND South Uvas Creek SU002 Flow Combination Hydrologic Sub- catchment Area SU002 SU006 SU030SU004 SU008 SU014 SU018 SU010 SU016 SU026 SU022 SU020 SU024 SU012 SU066 SU068 SU062 SU064 SU060 SU052 SU058 SU054 SU056 SU040 SU044 SU042 SU034 SU032 SU038 SU036 SU048 SU050 SU046 SU078 SU102 SU122 SU076 SU094 SU096 SU098 SU112 SU088 SU084 SU090 SU108 SU028 SU092SU086 SU110 SU120 SU100 SU070 SU072 SU074 SU080 SU082 SU104 SU106 SU118 SU116 SU114 CERTIFICATE OF THE CLERK I, THAI NAM PHAM, City Clerk of the City of Gilroy, do hereby certify that the attached Resolution No. 2023-19 is an original resolution, or true and correct copy of a city Resolution, duly adopted by the Council of the City of Gilroy at a Regular Meeting of said held on Council held Monday, April 3, 2023, at which meeting a quorum was present. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the Official Seal of the City of Gilroy this Monday, April 3, 2023. ____________________________________ Thai Nam Pham, CMC, CPMC City Clerk of the City of Gilroy (Seal)