24342733 - Property Improvement Agreement No. 2015-06 - Meritage Homes of California, Inc. - Recorded 11/27/2019RECORDING REQUEST BY:
City of Gilroy
WHEN RECORDED, MAIL TO:
Shawna Freels
City of Gilroy
7351 Rosanna Street
Gilroy, CA 95020
24342733
Regina Alcomendras
Santa Clara County - Clerk -Recorder
11/27/2019 09:27 AM
Titles: 1 Pages: 13
Fees: 141.00
Taxes: 0
l: 1141.00
11110�11*V2A11w7wMiX10A if,�,411II I
(SPACE ABOVE THIS LINE FOR RECORDER'S USE)
Amendment
Property Improvement Agreement No. 2015-06
Harvest Park Phase II — Tract No. 10276
APN: 790-06-044
Meritage Homes of California, Inc.,
a California corporation
-1-
4838-5913-6157A
CCHU104706091
AMENDMENT
PROPERTY IMPROVEMENT AGREEMENT
RESIDENTIAL
AGREEMENT FOR EXTENSIONS OF WATER DISTRIBUTION SYSTEMS:
IMPROVEMENT OF STREETS: INSTALLATION OF SEWERS, STORM DRAINS AND
OTHER PUBLIC WORKS FACILITIES
Property Improvement Agreement No. 2015-06
This Amendment to P�ro�pe�rt��I�m,_provement Agreement ("Amendment") is made and
entered into this g411day of M� 2019, by and between the City of Gilroy, a municipal
corporation, herein called the "City," and Meritage Homes of California, Inc., a California
corporation, herein called the "Developer."
WHEREAS, a final map of subdivision, record of survey or building permit (Site
Clearance) application was approved and accepted by the City, covering certain real estate and
property improvements known as and called: Harvest Park Phase II, Tract No. 10276, APN: 790-
06-044, a legal description of which is attached hereto and incorporated herein as Exhibit "A"
(the "Property"), and as described in the project improvement plans entitled "Improvement Plans
for Harvest Park II Tract No. 10276;" "Offsite Improvement Plans for Harvest Park II Tract No.
10276; and "Project Plans for Cohansey Avenue Bridge Over Llagas Creek in the City of Gilroy,
California;" and
WHEREAS, the City and the Developer entered into a Property Improvement Agreement
on December 19, 2016 ("Property Improvement Agreement" or "PIA 2015-06") regarding the
performance of certain infrastructure obligations that were required by the conditions of approval
of the "Tentative Map for Harvest Park II" ("TM 13-06"); and
WHEREAS, the City issued building permits to Developer because Developer satisfied
all of its obligations set forth in PIA 2015-06 that were required in order for the City to issue the
building permits; and
WHEREAS, Developer has satisfied all of its obligations set forth in PIA 2015-06 that
are required in order for the Developer to complete its development at the Property; and
WHEREAS, Section 6, Condition 32.a. of PIA 2015-06 provides estimated
reimbursement amounts, payable to Developer, for completed traffic improvements along
Cohansey Avenue and Monterey Road, subject to change pending final review of the costs for
the improvements originally identified in the Traffic Impact Fee ("TIF") report of 2009; and
WHEREAS, on August 19, 2019, the City Council reviewed and adopted a new TIF
Policy; and
WHEREAS, the parties desire to amend Section 6, Condition 32.a. to reflect the
maximum reimbursement amounts and reimbursement schedule specified for each improvement
project, in accordance with the City Council's newly adopted TIF Policy; and
-2-
48385913£157A
CCHUk04706091
WHEREAS, on October 7, 2019, the City Council held a public meeting on the proposed
Amendment to PIA 2015-06, and approved the changes outlined below; and
NOW THEREFORE, in consideration of the foregoing promises and in order to carry on
the intent and purpose of said Codes, Ordinances, Resolutions and Regulations, it is agreed by
and between the parties as follows:
Section 1. Recitals. The foregoing recitals are true and correct and hereby incorporated
herein.
Section 2. Defined Terms. All capitalized terms not defined herein shall have the
meanings ascribed to them in the Property Improvement Agreement.
Section 3. Condition 32.a. Section 6, Condition 32.a. shall be removed in its entirety and
replaced with the following:
32.a. REIMBURSEMENT AMOUNT: Developer shall be reimbursed for the following
traffic improvements. The reimbursement maximum amounts shall be as specified
below for each project. Reimbursements shall be in accordance with the City
Council adopted policy on Traffic Impact Fee (TIF) Reimbursements. The
reimbursement amounts for the projects are as follows:
• Cohansey Bridge - $4,233,661.12
• Cohansey Segment - $521,862.00
• Cohansey/Monterey Intersection - $2,551,175.00
• Water Main Installation (portions installed within limits of each project) -
$474,947.00*
• Total Calculated Reimbursement - $7,781,645.12
*Reimbursed out of Water Impact Fee Fund
These amounts represent the maximum allowed reimbursement for each project.
Per the reimbursement policy, the developer will need to submit back-up
documentation to support the developer costs including project construction
invoices, itemized payment receipts, and cancelled checks from payments, to
justify the actual reimbursement amount.
REIMBURSEMENT SCHEDULE: The reimbursement schedule for each of the
Harvest Park Phase II improvement projects is as follows:
• Cohansey Bridge - Reimbursed over three years* in equal amounts from the
TIF with the first installment paid once the reimbursement request
documentation has been submitted by Developer, and approved by City
-3-
4838-5913.6157v4
CCHU104706091
• Cohansey Segment - Reimbursed in one payment from the TIF once the
reimbursement request documentation has been submitted by Developer, and
approved by City
• Cohansey/Monterey Intersection - Reimbursed over three years* in equal
amounts from the TIF with the first installment paid once the reimbursement
request documentation has been submitted by Developer, and approved by
City
• Water Main Installation - Reimbursed in one payment from the Water Impact
Fee Fund once the reimbursement request documentation has been submitted
by Developer, and approved by City
*If after the second of the three payments on the Cohansey Bridge and the
Cohansey/Monterey Intersection, City staff determines that there are inadequate
funds in the in the TIF program to make the final payment in year three, and
maintain solvency of the TIF program, the final year of the reimbursement shall
be split equally into two final payments to be paid to Developer consecutively in
years three and four following approval of the reimbursement documentation.
Section 4. Effect of this Amendment. Except as expressly modified by this
Amendment, the Property Improvement Agreement and TM 13-06 shall continue in full force
and effect according to its terms, and Developer and City hereby ratify and affirm all their
respective rights and obligations under the Property Improvement Agreement.
Section 5. Binding Agreement. This Amendment shall be binding upon and inure to
the benefit of the heirs, administrators, executors, successors in interest, and assigns of each of
the parties hereto. Any reference in this Amendment to a specifically named party shall be
deemed to apply to any successor, administrator, executor, or assign of such party who has
acquired an interest in compliance with the terms of this Amendment or under law.
Section 6. Recordation: The City shall record a copy of this Amendment within ten (10)
days following execution by all parties.
Section 7. Counterparts. This Amendment may be executed in multiple counterparts,
each of which shall be deemed an original, but all of which, when taken together, shall constitute
the same document.
Section 8. Invalidity. Any provision of this Amendment that is determined by a court of
competent jurisdiction to be invalid or unenforceable shall be deemed severed from this
Amendment, and the remaining provisions shall remain in full force and effect as if the invalid or
unenforceable provision had not been a part hereof.
Section 9.- Headings. The headings used in this Amendment are for convenience only
and shall be disregarded in interpreting the substantive provisions of this Amendment.
-4-
4838-5913.6157v4
CCHUW4706091
IN WITNESS WHEREOF, this Amendment has been entered into by and between Developer and
City as of the date and year first above written.
HERITAGE HOMES OF CALIFORNIA, INC., CITY OF GILROY
a California corporation
By:
Nan
Title
Date
-5-
By.
C-�br�el C:,o r z
C�+� Bpnni�nis a�}�r
Date:
APPROVED AS TO FORM:
By:fflku
Andy Faber, City Attorney
ATTEST:
M
Shawna Preels. Qiity Clerk
4838-5913-6157v4
CCHUT4706091
General Plan Bulidout: Cohansey Avenue B Montervy Road
2012
PROJECT DESCRIPTIONMOTES:
tmmnny'. NI Wey Bmp
Ingram am -2019 updateperpim
Proposed'. Sgrellce
IIInteraeLOon
A rOwtl PlA based an 2012 ..It coati.
ITEM
UNIT
UNIT COST
QUANTITY
COST
1. Surfacing: base LABOR
SF
22
62,590 SF10.
B2].1e
Sudadrg: pavenent
SF
2.7
62,590 SF9911
5ldewelk: new
SF
6.
3,910 SFM.idSltlewalk:
replace
SF
11.
0SF0.00toCurb
and Gutler. new
LF
22.3220
LF450.1f
Curb andGutler.replace
LF
3L
OLF0.001g
Curb Ramps
En,
1.050.
5EA50.In
Red using
SF
2.7
14,070 SF989.11
LandmiI Median
5F
IS.
0SF0.1)
Hid-ped Median
SF
11.
1.500 SF.250.1k
Guad Fall
LF
27.
0 LF0.0011
Blke Pam: base
SF
22
0SF0.00ton
Bike Past: pavement
SF
2.5
0SFamto
SOlphg a Pavement Markers
LF
3A
ISOM LF,672001e
Elec0o0ers
EA
3,650.
0 EA0.001p
Trafc Sgnal(bau pride). 31egs-6lanes
EA
135(g0.
0FAMOOAdditional
cost per lane
EA
19,100.
0EA0.19
Trafik Signal(bese pn.);d legs-8 Mn.
EA
164,000.
1EA,000.AddNorid.1perlane
FA
19100.
9 EA.900.1
Item 1 Taunt
-
,566.602
Eadhwerk
CF
0.7
35,500 CF625.3
Sgniig(3%Item 1)
LS
3.0%
,997.4
Ones(10%Item 1)
LS
10,0%
,656.4
Drainage(12% Items l-2)
LS
12.0%
.162.ee
ended: new
SF
155.
0 SF0.00M
endge: v6den
SF
195.
0SF0.7e
Rmfinlrg Well: a=4 test
SF
46.
0SF0.Tb
Reeinlrg Wall:.4 test
SF
62.2
0 SF0.
a Rummel of EvkstIM Pavement
SF
40.00
0 SF
0.00
a Removal of Edstirg Bdtl6es
SF
217
0 SF
0.00
as Unit, Under9mind8g(Om l
LF
107.00
aU,
0.00
PGE, Charter and Vadrm conbr UIYhy Undegread'
I V'OC
BD (Putting wire, rdegrgrn4ng piles)
LF
0 LF
0.00
ac TreMc Signal Interconnect
LF
21.00
0 LF
am
I8a WA Bus Stop
EA
35.000.00
2EA
70,000.00
IM Miss. Work Indent M phasing, RR.*tC.
LS
1W.000.00
1LS
150.000.00
IOc CM B Inspection Intl. FR, in ems501 Item 14
LS
563.0011.00
1LS
663.000.00
tad SITE SPECIFIC COSTS-
ON
1W SITE SPECIFIC COSTS'
0.00
101 SITE SPECIFIC COSTS'
OM
1-10 Subrpfal
CONSTRUCTION MARK-UPS
1,891
tt Modidebon(7.5%Items 1-10)
LS
1422C411
12 ConsOuctlon 5teg9g S TrafficConuW(13%Item1)
LS
112,am
n -12 SUWGIaI
ENGINEERING COSTS
254 BSS 73
13 Preimkary a FkrM Design (15%Item l-10)
LS
284,404.22
14 CM. Inspection. 4 Testing (]25%Item i-101
LS
237.03.52
15 Pro)ecl Admbdstietion(2S%Items I.10)^
LS
47,400.70
Its Calvans Pracesslnp(5%Item 140)
LS
CM,-Rcwyonly
0.00
181, Union Pa Reareed Processing (2%Ilmm 140)
LS
3 0!:
37.920.56
In. and, AddlOonal Design Cost (2.5%Item 1-10)
LS
OAO
Administratlw and Legal Fees for Land RghtO Way
,ad puncMse(15% Items 17-18)
LS
0.00
1s, td SUNOIAI
LAND RIGHT-OI
60872R00
f?a Residential
SF
23.
OSF
0
m
1h Comemiel
SF
10.B
0 SF
0JOO
17c Industrial
SF
6.60
O SF
0
17d Agdoutlunal
SF
2,49,
0 SF
0.
IS Buildings: SO -SIM
SF
05F
0
17- to SYWOIN
TOTAL PROJECT COST
OAU
1-Io LABORS MATERIALS
1,888,028./3
n - U CONSTRUCTION MARK-UPS
254,855.75
13-18 ENGINEERING COSTS
506,729.00
it. to LAND RIGHT-OF-WAY
0.00
1-1a SUBTOTAL
2,757,612.88
CO"NOENCY-25%Neer!MewrMMaluMMdd .May
GnN)
474,007.03
TOTAL PROJECT COST
S 3,231,620
OUTSIDE FUNDING
S
NOTEB,.
Enbn Pemeaq<Maba,la Prgvct AdalHormILuamayee Mee4
I. .ailed.
P1,1 Al-+d.Gea ce...mrde
eSercY ov wwt e,m�':p4ns'1<I�.vn YlaPee
reD 54uae nwuq weemyaeMrmawa ere wvM�LCYpe,NPaae
ev nee ary
DATE
Vendor
Itimurs.-I or
del.ftuvmn
Amount
05I17719
UPRR
PMdby CBy
5 16AN
BALANCE REMAINING
5 3,214,784
M.. REIMBURSABLE
S 2,561,175
yma9laWet"W WM.. nWIMTnecG1u4er Mawr Pun 1Ye1TF I1PEeM'Ewn111 n'. 110B. FUN044033LManA..., IMMVIa feel AM
SEGMENT2c
ImP meMa tonYt 01 tlne:(bayond 20'Iromcurb): CM1urtn Slnet to Monterey(2010 update)
APprwed PP bated Bn 2012 boll costs.
ITEM
UNIT
UNRCOST
OUAWrrY
COST
fa Simindma.bwe
SF
22
1BCa0 F
d0500.0
1n 5leled : nwnl
F
23
18,000 SF
M1600.
1e Sldevnn: new
SF
8
OSF
0.
Is SIMMA :r
11
0SF
O.oc
le Cue, end Gwx. naw
U,
1.85OtF
41825.
It Crab erd GuOer.
LF
31.
OLF
0
t Cu0
EA
1 OSO
0 EA
0
Is RewM
SF
2.7
aSF
0
11 Leldewped MMldn
1) Hwdsc' Mwl6n
11 GueM RNI
SF
SF
W
10.
I
21.
4,TOOSF
3250 SF
0 LF
91,010.04
37.375.
0.
11 aim PFN: Bw0
SF
2
0 SF
0
iW SIW Pe01: erred
SP
T
0SF
0.
in SWPFB S Fevemwl Mwnen
to WW
lF
EA
3
3850.
1200LF
0
4,080
0
t TreXk 1rY new 'J .-BMwa
FA
1>5000.
0EA
O.
A Wnsb Obs1 W
EA
1B 10D.
0EA
o
1 TmR05 net new :4Iwo -8 MrMe
EA
104000.
0E
0.
AddAbnslmY rbne
EA
10.100.
0EA
O.Ost
1 IW 1 TOMI
2m,m
2 P rlhdwk
CF
a]
_
f 5 0]O CF
7125 )
9 3%'0emt
IS
3.0
TAW
LS
0.
a.
5 0 e 12%lems l-2
LS
-- t2
40132.
as BMpe. new
to a e: wden
SF
SF
155.
1 W.
0 SF
0 $1
0.
Or
7a Rmeln Wall 4=4reet
SF
4fi.
0SF
0.001
7b Rominl Weds 4lbst
SF
82
0OF
0.
0 flomovN al ExWl Pewmml
SF
40.M
05F
0.
A Renrovelbl EdWrMBNIIgw
wey,�Iwler�wud�urNer�u.�nrlr Vuq VruWwueY
mOftIMg W.. Moli muoirt, 'Me
SF
LF
23.
101.
132.
05F
0LF
0LF
0.
O.
0.
Oc TrnTc 51 nal lntermmxl
IF
21.
0LF
0.
Ito PWbwb LeMscb Ind. eta m"mosra
SF
d.
OSF
0.
lab SITE SPECIFIC COSTS-
toe SITE SPECIFIC COSTS-
IO! SITE SKCIFIC
_
0.
0.
0.
I(e SITE SPECIFIC COSTS-
14r SRESPEGFICCOSTS-
I.10 SUMIXY
0.
0.It
382AN5
CONSTRUCTION MARK-UPS
tl MONUMnOb%1~.10)
12 CarMWdb 51 1 ATmft nnol 13%Xem1
LS
LS
].6
2fi.BB5.1
94 14.1
It-12 subwooel
ENGINEERING COSTS
_ _10
_
- --
dT,800.84
13 Fn0 BFbd Dw n(15%Xmm 1.10
LS
15.
573702
14 CM. Irwpedbn, 3 Tw5q(12.5% INms 1-10)
15 PmpdMMnidnnpnl2S% Nem01-10)�
'" Cell.,, Pmcors 5%It.. 1-10
LS
LS
IS
- 12S
2.6
Gb..Il
_
4].800.6
9SBt.T1
0.
IBb UHMn Pacfin Reilmed
Pence" 2%I.-1g0
L$
flYbaW FnvoaAnenteM
Bdpeaauy
00
18c BrWge Addlllonal OwiBn Coat (2.5%Items 110)
PdminNnSvo aM LW Few br Lrd ftht q-Wny
IW nbdw 15%H.=17-18
IS
LS
00
0.
13.16 sbrdal
LAND RIGHT-OF-WAY
114,74a
174 ReedeMld
1]b Coboerolol
m IMbstdel
17d AOdmJXUW
18 BwY - I50
SF
SF
SF
SF
23.
18.
8.
2.4_
O SF
OSF
OSF
05F
05F
0.
0.
0.
0.
0.
A -ID 6uNdtl
PROJECTTOTAL
0.00
1-lo LABOR& WTERV S
1I-12 CONSTRUCTION MARK-UPS
62,899.64
13-15 ENGINEERING COSTS
114,740.5
17 13 LAND RIGHT-OF-WAY
1.13 SUBTOTAL
_
0.00
5801085
CONTINGENCY-2fi%ryewaY]Wnbelyd RN14q.1XeYarrbl
TOTAL PROJECT COST
OUi510E FUNOING
I
Pr*d oeacripnbn
85r817.1
S 655,726
6
NOTES:
pMYmv WerYcb Nvp'(jvel MdbMsomm'. bdvr
�w
,. Prtjed ibnFenrsn KUMs ervtumnY tleaneq. oLL]Ee
v w Ypoo-mb <v-riYAiiSM1i^Ic:+nl
idp al-Ylermme]maPgttraypgq Wa]
u ]]ury
.wrFrmbwvaole lbm.
DATE
Vendor
.mtrmtbn
Amount
1
BALANCE REMAINING
S 655,726
MAX. REIMBURSABLE
1 6 521r862
llo, nbbAtpubsc Woks\Trenenll.1trefl.l..-b4lm lM.F'M 1AolllF Vp]atrtEvmnl2-7�2016 PWCIB400 F UNUSJ02Ctwracy Care mMocl 1011a,.Ib 103E AM
General Plan Bulldoul: Cohansey Avenue 8 Llagas Creek
2012
BRIDGE 21CONSTRUCTION
PROJECT OESCRIPTIONINOTES' esistingdimenSons 7 W'Mdeaenel
Approved PIA basil on 2012 unli costs. new dimensions-2019 175X60' 5,28o
new brt e
ITEM I
LABOR & MATERIALS
UNIT I
UNITCOST I QUANTITY I COST
le Sodacl : base
SF
225 U BF 0.00
lb Sudacl avement
SF
2.70 0SF 0.00
14 Sidewalk: new
SF
am 0SF 0.00
id Sid walk:DelaW
SF
11.60 0SF 0.00
to Curb and Gutter: new
LF
MW 0UP 0.00
11 Cum and GoOer. lace
LF
31A0 O LF 0.00
1 Curb Rams
EA
t 050.00 0 EA 0.05
1h Resurfacin
SF
2.70 0SF 0.00
11 Lardsca add Motion
SF
law 0SF 0.00
t Hamsca dMail
SF
11m 0SF 0.00
1k Guard Rail
LF
27.00 0UP 0.00
1I Bike Path: base
SF
225 0 SF 0.00
1m Bike Fait: averrent
SF
2.55 0 SF 0.00
v, Still B Pavement Markers
LF
3.40 0UP 0.00
to Elec"Ilem
EA
3.650,00 0 EA 0.00
1 Trento Signal haze :3 e-81a1es
EA
135.00000 0EA 0.00
Additional cost er lane
EA
1910,00 O EA 0.00
1 Traffic S' 0al base ce:41 s-8 Wes
EA
IM000.00 0EA 0.00
Additlonal cost per lane
FA
19IND 0 EA 0.00
1 Item 1 Total
0.00
_
2 EaMwork
CF
0.7E
0 CF
0.00
3 Signing (3% Item 1)
LS
__.
000
4 W1Nes 10%Item 1 -- _
LS
0.00
6 Drema a 12%Items l-2
LS
ODD
08 Boma: new
SF
155.00
11,2N SF
1743,672.50
eb Bri e:wwen
SF
195.00
0SF
OuD
7e ReaIN Wall: <=4 feel
SF
48.00
0SF
0.00
Tb Reteplog Walk: 4feel
SF
6220
0SF
0.00
8 Removal of EsIsfin, Pavement
SF
40.00
0SF
0.00
9 RemwalotEmurgarioges
SF
23.7
05F
0.00
ere UaIiW UndeNNuOtling(eancinng)
LF
107.00
0UP
OAO
PGE, Charter and Vertron cast for Witty Undergrounding
90 Pann wire,and roundin es
LF
132.00
0 LF
OM
9c TNEk Signal Interconnect
LF
21.00
O LF
OM
10. New Bridge CIOH Noisome
LS
345.000.00
1LS
345,000.00
mh Chatn Link Fence
LS
3500A0
1 LS
3,500.00
!C: Scorning Welts tall mc.
LS
1114202.50
1 LS
111420250
Tut CM. Ins ecton. B Tesang.In adtllton 0line 14
LS
71870.00
71,870.00
1_c6- HCP Fee
LS
N.M2.75
29302.75
1SITE SPECIFIC COSTS'
0.00
t i10 Subto(al
CONSTRUCTION
3.307,U775
m 7.nsi-10
LS
24&088.08
aWTan2 Wpntc Cw1m1139'e I[em1
LS
13%
_
429,98121
tt-12 Subrofal
ENGINEERING COSTS
678,047.29
13 PNllmine BFInel Oesi n 10%Items l - to;
LS
33p ]84.78
14 CM. Ins n, B TecUn 12.5%Items 1-101
LS
413,443.47
15 Proect Adinmislre8an 2.5%Items l - ID ^
LS
68fl611
lee Caltrans PNcessin 5%Items 1-10
LS
celaanSR
0.00
1az Union Pe[48e Relined Processin 2%Items 1-10
LS
R.Ime4 Envos,1-Na
e,iesesom
0.00
1en Brick. M,t9ona1 DesnCost 25%INms 1-t0
LS
82888.ed
AdmoiStadnd ve aLegal Fees tar Land Right -Of -Way
led purcineS. 15%Items 17-18
LS
0.00
13-16 Subblel
LAND RIGHT-OF.WAY
8085]5.83
7tledaal
.
3fl5
OS
.0
l
SF
00.-mm
000C
SF
6.601 0 S
0A17
17tl dCUIWreII
SF
1 2.49
0 SF
0.00
1s sulwhoa., $0-S150
I SF
1
0SF
1 0.00
17-18 suDrolal
TOTAL
0.00
1-to MATERIALS
----3-.ff7 547 75
1t-12 CONSTRUCTION MARK-UPS
675047,29
13-1a ENGINEERING COSTS
909.575.63
17-1a LAND RIGHT-OF-WAY
0.00
1.19 SUBTOTAL
4,895,170.67
CONTINGENCY-2 (Uwr&Nebr4ls tim4 mallt4laWey oNy)
826,886.94
TOTAL PROJECT COST
OUTSIDE FUNDING
I
S 5,722,OS8
S
NOTES:
Emr lsl,eepecPcm!MS pepc!. P444�oml4wxmevae emeau
r.ww.
Rcp[lMminiabe!bnlrcMev enraonnenitl v'1°ertrca, avbbe,
+'. Pormi!lirp 8 ryn!uFwey apant
ToD &4ten Nee!°Be Vrsalo Le Jale[mirN Mepcp[!.aypap[I iasaee
re[eaury
Nan.ee,m WrSl[la Ile m[
DATE
Vendor
Rslmburwmanlm
D"UnConstrudbn
Amount
BALANCE REMAINING
S 5,722,058
MAX. REIMBURSABLE
5 4,233,66t
\b, W°FIKWudk Wml J..WOI.D.cii..........Ran F.MF UNatAFxW12-7-2016 PWCINW FUNDS J021-Co ,n Y5Lbdea Clmk Cor 10I14201a IeWAN
NVI03W ONLLSIX3 3AOW38
LN3H3Vd 3OVld3B/3AOW3a/In3MVS
Atl183AO ONtl ONIHO
NVI03W 03dtlOS08tlH
MM30LS 3L3H3NOO
LN3W3Atld/3SVB
R �.ILTlI N ]Iq5
�q S dsna
x` o Z_____________ :dCLLS_:oN, SOB -
S3Nn G t� Obf't-"""""--:"418I ov
M 31 Sfl — :Wa38 OV
n Off------:N3U Baru Ntl103W
3l OZf'f------NIVM10O ONtl BBOO
d5 Ol6'f -- Vla3M DNaSI 313a0N00
35Obf'Z------IWWMVd3 Vld3a
d5 OL6'bZ ---- �19 3AoHd 3'in d v
8 3AOW3a '100Mtl5
3S OGO'bl -- -^N3W3A 0 ONtl ONWO
M3N
35 OZ9'Lf "--�1N3W3Atld/35tlB M3N
\S3LLLLNvnD ZF NOLL03Sd3iNl
d0
1N3W3SBOBW138
do imn
ZS N01103SU31N1
p�pq n osa•�--------------=eano
35 OSD'f— NYlmry 03dtl050atlH NY103W 03dYJSO8tlH
!S 061.4—:Ntl103W 03dtlOSOW1 Ntl103ry 03dV3SONYI
3S OZZ'SL----- :1N3W3AYd/3Stla 1N3W3AYd/3SVa O
LLILNV a
— — — — — — — — — _
1N3w3sanomiN 3nAIJAV,l3SNV14OJ
30 lmn
z
— .......... _ ��jp
_ M1I
06 /
0
N3W3sanervua i OZ 1N3VY93S
O3011NI1 / /
— — — — — — — — — — \ 1N3rv3sanervl3a
1 = 30 imn
".:.4?.... —
o.......................... ... ---'-� — to
A
1 1N3W3sanawl3a m
do Ilmll gnN3/lb'A3SNVHOO
i
A
�m
CALIFORNIA ACKNOWLEDGMENT
CIVIL CODE § 1189
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document
to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
State of California 1
County of Vs: o J}
On fk� _7SID 2C�N�k- before me, Coe ,L
Date Here Insert Namitle of the CA er
personally appeared
Name(s)
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed
to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their
authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity
upon behalf of which the person(s) acted, executed the instrument.
CHELSEE CAMGBELL
Notary pubUc California
Sa"amento County
Commission a 2305092
My Comm. Exor, Sep N, 2023
Place Notary Seal and/or Stamp Above
I certify under PENALTY OF PERJURY under the
laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature
Signatu tary Public
Completing this information can deter alteration of the document or
fraudulent reattachment of this form to an unintended document.
Description of Attached Document
Title or Type of Document:
Document Date:
Signer(s) Other Than Named Above:
Capacity(ies) Claimed by Signer(s)
Signer's Name:
❑ Corporate Officer — Title(s):
❑ Partner — ❑ Limited ❑ General
❑ Individual ❑ Attorney in Fad
❑ Trustee ❑ Guardian or Conservator
❑ Other:
Signer is Representing:
�a£rct;n�a
02018 National Notary Association
Number of Pages:
Signer's Name:
❑ Corporate Officer — Title(s):
❑ Partner— ❑ Limited ❑ General
❑ Individual ❑ Attorney in Fact
❑ Trustee ❑ Guardian or Conservator
❑ Other:
Signer is Representing:
CALIFORNIA ACKNOWLEDGMENT CIVIL CODE § 1189
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document
to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
State of California 1
County of —%Qj(x Nafo, 1}
On .1SC5\&Pm19N a3, ZCO before me, Si)ZAjqr),e Atu?kC
Date Here InsertZitl,
personally appeared Gabriel �- isl>Y711)fZ
Name(s) of Signers)
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed
to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their
authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity
upon behalf of which the person(s) acted, executed the instrument.
SIIZANNE GIIII17A
Notary public -California
Santa Clara County I.,
Commission 4 2281205
My Comm. Expires Apr 12, 2023
Place Notary Seal and/or Stamp Above
I certify under PENALTY OF PERJURY under the
laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand ar)p official
Signature
OPTIONAL
of Notary Public
Completing this information can deter alteration of the document or
fraudulent reattachment of this form to an unintended document.
Description of Attached Document
Title or Type of Document: d
Document Date:
Signer(s) Other Than Named Above:
Capacity(ies) Claimed by Signer(s)
Signer's Name:
❑ Corporate Officer — Title(s):
❑ Partner — ❑ Limited ❑ General
❑ Individual ❑ Attorney in Fact
❑ Trustee ❑ Guardian or Conservator
❑ Other:
Signer is Representing:
Oc 2018 National Notary Association
Signer's Name:
❑ Corporate Officer — Title(s):
❑ Partner— ❑ Limited ❑ General
❑ Individual ❑ Attorney in Fact
❑ Trustee ❑ Guardian or Conservator
❑ Other:
Signer is Representing:
to i..
C U
.n
CSi >
•,". O
z
U'
o
a �
� N U
a�
Cd ed
x �
U o
� � o
00
4. 0 o s
U c0. an
>; E o
o ,C s
cz kn
4.4co
U N
U
U o
3 �
4-4
c
O
Q 0000
-o °o
C
O .....
U N
U C4
Lw t4..O N
Q c� N