01/11/2012 Library Commission Regular Meeting Adopted 02/08/2012CITY OF GILROY
MINUTES OF THE REGULAR
LIBRARY COMMISSION MEETING
7 00 P M
Wednesday January 11 2012
CALL TO ORDER
The regular meeting of the Library Commission was called to order by Chair Smith Kathleen
at 7 00 p m in the Senior Center Meeting Room 7371 Hanna Street Gilroy California
SECRETARY S REPORT
Four commissioners were present Newly appointed Commissioner Taylor was excused
APPROVAL OF MINUTES
Motion by Commissioner Smith Carol and seconded by Commissioner Armenta to
approve the minutes of December 14 2011
Hearing no objections it was so ordered
APPROVAL OF AGENDA
Motion by Commissioner Armenta and seconded by Commissioner Smith Carol to
approve the Agenda of January 11 2012
Hearing no objections it was so ordered
INTRODUCTIONS
None
PRESENTATIONS
None
PUBLIC PARTICIPATION
None
NEW BUSINESS
A Election of 2012 Chair and Vice-Chair
Commissioner Smith Kathleen will serve as Chair of the Library Commission
Commissioner Smith Carol will serve as Vice-Chair
B Discussion of New Library Plan Update
Below is a summary of the Gilroy Library PowerPoint Project Update Report that was
compiled by Public Information Officer Joe Kline
Construction of New Library Building
Schedule -The overall schedule is tracking for completion in spring 2012 The Grand
Opening is scheduled for April after the library staffhas a chance to move The building
will be substantially complete in late February
Roofing -The roof is complete with some tile punch list items pending The north
trellis built-up roof was installed in December and is waiting for final gravel surfacing
PV -The flat roof PV panels have been installed The south trellis array will be
complete in January in time to begin commissioning the system
Skin -The building will receive two coats of elastomeric paint in mid-January weather
permitting The building openings have been sealed in Plaster patching will coincide
with painting the stucco
Windows -All windows are installed and are being tested in conjunction with the
building management system to achieve coordinated controls
Mechanical Systems -Functional testing on the heating and ventilation system will
occur in January No major issues have been found and the variable ref igerant volume
system is operating as expected Commissioning will be ongoing through the next few
months
Interior -The restroom terrazzo is complete and the open area terrazzo will be complete
in late January Acoustic ceiling systems are completed and the soft ceiling grid work
has been installed
Architectural Details -The veneer woodwork began in December and will continue into
February Fabric-wrapped panels and wood ceiling installation is underway
Furnishings -The shelving fit-up has begun and will not be completed until early
February The furniture has been purchased and is being stored off-site The installation
is scheduled for mid-February
Interface and Rosanna Street -All of the flat work has been placed The permeable
paver mock-up has been accepted allowing the walkways to b completed this month
Fast Facts -The project is 85 complete tracking by hard construction cost To attain two
Regional Materials Credits 20 of all construction materials must be extracted processed and
manufactllred within 500 miles of the site The project is currently tracking at 64 The
recycled content of building material based on cost is 17 to date The goal is to achieve 20
The percentage is expected to increase once the final submittals are in 94 of the construction
waste has been diverted from the landfill to date The goal is to achieve at least 75 This
rating may eatn the project an exemplary perfonnance point The team continues to regularly
update the LEED scorecard and anticipates achieving a Gold rating The team is striving to
exceed that rating but the process will not be finalized until 2013 An updated LEED tracking
spreadsheet is available The design credits have been uploaded and the team continues to
track the construction credits
Page20f5
DECEMBER 2011 BOND EXPENDITURES
Earth Systems
Applied Materials
Harley Ellis Devereaux
Consolidated CM Construction Management
Smith Emery
Devcon Construction
Nova Partners
South Valley Pro
Hulberg and AssoCiates
PG E
TOTAL
2 583
58
25 886
15 734
3 122
2 488 542
48 147
375
2 100
1 386
2 587 933
SUMMARY OF PROJECT ACTIVITY
SERIES A
Remaining Series A at 12 31 11 0
SERIES B
Series B Funds at 11 3011
November 2011 Expenditures
Remaining Funds at 12 31 11
17 737 857
2 587 933
15 149 924
ConstruCtion began July 2010 mid is scheduled to continue through spring 2012
c Discussion ofDonor Recognition for the New Library
Discussion will occur at alater date
LIBRARY REPORTS
Deputy County Librarian Nancy Howe
The 2012 Library Friends and Commissioners Forum will be held in February 2012 at the
Library Administration Offices The date of the Forum has been tentatively scheduled for
Saturday February 4th from 8 30am -noon The Keynote Speaker will be Senator Simitian
On December 13 2011 Governor Brown announced that the budget trigger enacted as part of
the 2011-12 State budget would be pulled Included in the cuts was the remaining 16 million
the State provided to public libraries through three programs Public Library Foundation per
capita funding for all service area residents Transaction Based Reimbursement support for
libraries loaning their materials to residents of other jurisdictions and California Library
Literacy Services programs to teach adults to read Santa Clara County Library had already
factored the cuts into its 2011-12 budget so there will be no further operational impacts from
the cut
Silicon Valley Reads SVR will celebrate its 10th Anniversary by kicking off the year with two
authors on Wednesday January 25 2010 at 7 30pm at the Campbell Heritage Theater Two
books about what it is like to be both Muslim and American have been selected for Silicon
Valley Reads 2012 the regional program that asks everyone in Santa Clara County to read the
Page 3 of 5
same books at the same time and then discuss them Santa Clara County Library is one of three
co-sponsors along with the San Jose Public Library Foundation and the Santa Clara County
Office of Education
The next meeting of the Joint Powers Authority Board is on January 26 2012 at 1 30pm at the
Library Administration Offices in Los Gatos JP A agenda items to be discussed will include
free wireless access for visitors without library cards Library computer daily access fees for
visitors without cards criteria for free library cards for non-District residents who are Library
volunteers and a review of the Library Funding Formula JP A agendas and minutes will be
posted on the Library website the Friday before each meeting www scclorg
City Librarian Lani Yoshimura
Staff -ChildrenJs Supervising Librarian Linda Glawatz and Library Page Denise Leverton
remain on medical leave Diana Lara enthusiastically continues to be acting Children s
Supervising Librarian Substitutes are currently being used to cover desk hours for vacant
positions The vacant Librarian rill Adult position will be filled soon There have been many
inquiries about library jobs in light of the new facility Currently there are no plans for hiring
new staff
Safety Security -As reported in previous months graffiti and vandalism have been an on-going
problem The incidents are being documented and Community Relations Officer Rachel MtillOZ
continues to be notified Lani has also been in touch with Pat Sullivan the School Resource
Officer about a couple of children who are at the library when they should be in school Both
have behavioral issues which may be affecting the library
New Library -Library patrons are anxious for the new building to open Staff would like to
keep the book drop open even though the library will be closed for 6 weeks during February and
March for the move Checkout times for items checked out prior to the closure will be extended
during that time Details will follow once the new library transition team has met The grand
opening ofthe new library will be in late Apri12012
Woman of the Year -Lani has been named Woman of the Year by the Chamber of Commerce
There will be dinner at the San Juan Bautista Country Club on February 11 2012 This is a
wonderful opportunity to publicize the new library
Circulation -The November 2011 circulation at Gilroy Library increased 7 3 over November
2010 The Gate count in November 2011 was 19 982 a 6 15 increase over November 2010
Programs -The Library held 22 Adult Teen and Children s pr6grams with a total attendance
of 160 people in December
January Calendar of Events -Children s Story time is held on Tuesday evenings Families are
welcome and children may come in their pajamas and Wednesday mornings Ages 2-5
Three Family Movies will be shown including Mr PopperJs Penguins Jan 20 Kung Fu
Panda 2 Jan 21 and Dolphin Tale Jan 21 Participate in the Healthy Steps Workshop Jan 4
or learn how to reduce stress and improve health at the Meditation Workshop Jan 19 See
artofliving org for moreinformation Join the Garlicky Group of Poets for Open Poetry
Page 4 of 5
Readings Jan 14 The Book Club will discuss Cuttingfor Stone by Abraham Verghese Jan
31 See www sccl org for more information
Free Library eBooks and Downloadable Audio Books -View a quick video tutorial get
step-by-step instnlCtions or find out what devices are compatible on the library website at
ww sccl org electronic library ereaders
COMMISSION COMMENTS
Vice-Chair Smith suggested submitting all payment checks together in order to reserve a table
at the Febmary 11 Ih banquet honoring Woman of the Year Lani Yoshimura
ST AFF COMMENTS
Chair Smith suggested that a committee be formed to coordinate with the other agencies
involved in the Grand Opening of the new Gilroy Library Commissioner Armenta stated that
Jay Baksa would like the Library 4 Gilroy Committee to be included in the Grand Opening
FUTURE AGENDA ITEMS
Future Agenda items include Library Commission involvement in the Library Grand Opening
and Future City Directional Signs to the new Library
ADJOURNMENT
Chair Smith Kathleen adjourned the meeting at 7 52 p m
FUTURE MEETINGS
The next regular meeting of the Gilroy Library Commission will be held on Wednesday
Febmary 8 2012 at 7 00 p m in the Senior Center Meeting Room 7371 Hanna Street
Gilroy CA
7L--l---C --7l UL
Ly e Conrotto Recording Secretary
Page 5 of5